PO Box 1089 Apex NC

Similar documents
CONSTRUCTION CERTIFICATION PACKAGE

VISUAL INSPECTION CHECKLIST FOR GENERAL NPDES PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES (PAG-02)

MILL HILL ARTS VILLAGE

Section 1. Introduction

PREPARATION GUIDELINES FOR UDFCD MAINTENANCE SITE PLAN

Attachment A Construction Inspection Log (Required for initial certification of stormwater treatment facilities)

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

Town of Apex, North Carolina

Stormwater & Water Quality Training Programs for Colorado

A. Dewatering observation wells are part of dewatering allowance.

APPENDIX 4. Checklists. Township of King Design Criteria and Standard Detail Drawings

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

City of Massillon Site Plan Checklist

Consultant s As Constructed Survey Certification Check List

Appendix C Photo Plates

NWP of 9 Enclosure

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016

Porter County Plan Commission

Dewatering. Deep Wells Vacuum Wellpoints Eductor Wells Artesian Conditions System Design Water Treatment.

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum.

VICINITY MAP LOCATION MAP GRAPHIC SCALES

PLANNING AND DEVELOPMENT

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Notre Dame High Addition/Renovation Addendum 3 Page 1

Application for Site Plan Review

Part 1 - Common Comments on Erosion and Sediment Control Plans (Walter Hamilton, SDID)

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.

STANDARD DETAILS Crow Canyon Road San Ramon, CA Telephone: (925) Fax: (925)

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

TAMU-CC Hike & Bike Trail Revitalization Sub-Committee. TAMU-CC Environmental Advisory Council FY 2009

King And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA (804) (804) (fax)

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

1 MUNICIPAL INFRASTRUCTURE

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

Council Policy Engineering Drawing Submission Requirements

NWP of 10 Enclosure

APPENDIX B: DETAIL DRAWINGS OF SELECTED IMPROVEMENT TECHNIQUES

CHAPTER 11. Plan Standards

1.1 GENERAL RECORD DRAWING REQUIREMENTS

GCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721

MAJOR GRADING PLAN CHECKLIST

NEWMONT MINING CORPORATION ENVIRONMENTAL DEPARTMENT

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

WASHTENAW COUNTY ROAD COMMISSION

CITY OF MORTON RESERVOIR NO. 1 REPLACEMENT - REBID

A. This Section includes plumbing fixtures and related components.

LOCATION FRE SECONDARY LOGGING ROADS. Submitted

Essential Skills: Reading and Interpreting Maps and Plans

Somerset Homeowners Association Board Meeting Minutes Tuesday, July 12, 2011

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

Marine Corps Support Facility-Blount Island: Integrated Natural Resources Program Successes. E2S2 Conference May 12, 2011

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER

1. Denver Water is not the provider. [C1 Cover] Baseline Response: Revised to show Thornton Water Department as the provider.

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:

TUSCAN VILLAGE - MASTERPLAN Salem, New Hampshire PRELLWITZ CHILINSKI ASSOCIATES 221 Hampshire Street Cambridge MA 02139

Humboldt Bay Piling Removal

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

GENERAL DEVELOPMENT APPLICATIONS. General Submission Requirements

ROBOTICS DESIGN CHALLENGE. Colorado TSA State Conference BUILDING COLLAPSE

Ecological Restoration Drafting & Design Guidelines

Environmental Working Group. Monthly Report

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

How to provide as constructed information and interpretation of sewer plans

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices.

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

Anti-Trust Statement

Guide to Developing a Stream Photograph Documentation Program

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

11/06/2014 Pay Items - 1

DECK PERMIT APPLICATION PACKET

Grading, Erosion and Sediment Control (GESC) Checklist

Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014

Conceptual, Preliminary and Final Site Plan Review in Holladay City

CHECKLIST 8-O. Highlands County Engineering Department Improvement Plan Checklist

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

UPPER MISSISSIPPI RIVER RESTORATION LAKE ODESSA HABITAT REHABILITATION AND ENHANCEMENT PROJECT OPERATION AND MAINTENANCE MANUAL APPENDIX F

Stormwater Solutions. Jacopa Penstocks. Key Features & Benefits: How We Create Value:

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

Young Leader Award Nominationn. Karen Kase Lenzini, and Renwick, Inc. Environmental Scientist

Engineering Plan Submittal Requirements. Revised: October 2, Page 1 of 13

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

EE15N The Art & Science of Engineering Design Winter Quarter 2017 PROFESSOR ANDREA GOLDSMITH PROFESSOR MY T. LE FEBUARY 8, 2017

SECTION 9: ROOF STRUCTURE, ROOFING MATERIALS AND FLASHING, GUTTER, DOWNSPOUTS, AND SKYLIGHTS. Background

REFLECTION POINTE SUBMITTAL FORMS March 2018 Edition

Washington County Road Engineering Plan Submittal/Review Checklist

SEE SHEET NO. 4 FOR 261DESIREE DR.POND MOW BETWEEN BIKEPATH AND FIELD LINE (0.63 ACRES) TRAIL 800' 130' MOW DRAINWAY SIDESLOPES AND ADJACENT AREA (8.5

Transcription:

PROJECT DETAILS Dragonfly Maintenance Report Property Client Name Client Email Address Client Email Address 2 Client Email Address 3 Client Email Address 4 Number of Ponds & Pond Type Service Type Standard Mowing Schedule Mowing Service Mowing occurs inside of the fence. Special Instructions Pond 4 #5150 Pond Locations SOUTHERN VILLAGE Patsy Smith, Tony Smith patsysmith7077@gmail.com tony@berkeleychapelhill.com 4 Wet Ponds 2 Mowings Per Year https://imageshack.com... MAINTENANCE LOG Pond Name WP 1 Access Address 400 Market St, Chaple Hill, NC Service Date 01/10/2019 Trash Pickup SC= Service Completed Treat Invasives Inlet service Outlet Service SC= Service Completed Unclog Drain Clean Riser/Trash rack Add Dye? Fountain/Aerator Condition Mow/Weed eat Overview of the pond Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 1

Dam Riser Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 2

Inlet Outlet Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 3

Additional Notes Noted image 1 shows secondary outlet. Noted image 2 shows secondary riser. Noted image 3 shows erosion at outlet area. Noted image 4 through 6 show exposed soil along shoreline and slope of pond. Noted image 7 shows secondary outlet before clearing leaves and debris. Trash removed and outlets cleared of leaves and debris. Two aeration diffusers present and functioning. Noted Image 1 Noted Image 2 Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 4

Noted Image 3 Image 4 Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 5

Image 5 Image 6 Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 6

Image 7 Pond Name WP 2 Access Address 400 Market St, Chaple Hill, NC Service Date 01/10/2019 Trash Pickup SC= Service Completed Treat Invasives Inlet service Outlet Service Unclog Drain SC= Service Completed Clean Riser/Trash rack SC= Service Completed Add Dye? Fountain/Aerator Condition Mow/Weed eat Overview of the pond Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 7

Dam Riser Inlet Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 8

Outlet Additional Notes Noted image 1 shows air compressor box with exposed soil. Key required for access. Noted image 2 shows erosion along shoreline slope. Noted image 3 shows bare soil next to riser shoreline. Noted image 4 shows overhead view of outlet pipe. Noted image 5 shows bike removed from pond. Trash removed and drawdown orifice cleared of debris. Bicycle removed from pond. Noted Image 1 Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 9

Noted Image 2 Noted Image 3 Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 10

Image 4 Image 5 Pond Name WP 3 Access Address 400 Market St, Chaple Hill, NC Service Date 01/10/2019 Trash Pickup SC= Service Completed Treat Invasives Inlet service SC= Service Completed Outlet Service Unclog Drain Clean Riser/Trash rack Add Dye? Fountain/Aerator Condition Mow/Weed eat Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 11

Overview of the pond Dam Riser Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 12

Inlet Outlet Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 13

Additional Notes Noted image 1 through 4 show secondary inlets. Noted image 5 shows sedimentation and silt build up from inlet. Noted image 6 through 8 show exposed soil due to disturbed areas. Trash removed and inlet cleared of leaves and debris. Fallen trees along dam. Noted Image 1 Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 14

Noted Image 2 Noted Image 3 Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 15

Image 4 Image 5 Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 16

Image 6 Image 7 Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 17

Image 8 Pond Name WP 4 Access Address 400 Market St, Chaple Hill, NC Service Date 01/10/2019 Trash Pickup SC= Service Completed Treat Invasives Inlet service Outlet Service SC= Service Completed Unclog Drain Clean Riser/Trash rack Add Dye? Fountain/Aerator Condition Mow/Weed eat Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 18

Overview of the pond Dam Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 19

Riser Inlet Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 20

Outlet Additional Notes Noted image 1 and 2 show secondary inlets. Noted image 3 shows outlet before clearing debris. Noted image 4 shows compressor for aeration system. Noted image 5 shows erosion at pond shoreline. Trash removed and outlet cleared of debris. Aeration diffuser functioning properly. Noted Image 1 Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 21

Noted Image 2 Noted Image 3 Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 22

Image 4 Image 5 HANDOFF SCREEN Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 23

Press next to upload submission Submitted by Crew Leader at 01/11/2019 18:20 UTC Page: 24