Customer Connection Guide Updates Effective May 2017

Similar documents
SECTION 5 TRANSFORMERS

Customer Requirements Commercial Secondary Service

3.1 Overview of ATCO Electric s URD System Design

Page Electric Utility Service Specifications

STREETSCAPE FEASIBILITY TERMS OF REFERENCE

SaskPower Electric Service Requirements Revision 0 November 24, Electric Service Requirements

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

3. DESIGN SPECIFICATIONS

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

List of Figures. List of Forms

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles

Electric Service Guide. Residential Subdivision

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

.1 Applicability: These criteria shall be applied as follows:

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017.

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

EXCAVATION AND BACKFILL

SECTION ELECTRICAL IDENTIFICATION

ACCESS TO HIGH VOLTAGE APPARATUS

Quality Control Checklist - Design Drawings

NEW OR UPGRADED ELECTRICAL SERVICE

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS. 1 Definitions. 2 Scope of Work. 3 Extent of Work

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI

BGE STRATEGIC CUSTOMER ENGINEERING

City of Massillon Site Plan Checklist

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

TOWN of LAKESHORE SITE PLAN CHECKLIST

METER - INSTALLATION Pad Mount Transformer

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION

TABLE OF CONTENTS 7.0 CABLE INSTALLATION IN UNDERGROUND STRUCTURES

Electrical IP Red Seal Practice Exam

1.1 GENERAL RECORD DRAWING REQUIREMENTS

B. Manufacturers: Square-D, G.E. or Westinghosue.

INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION

Article 225: Outside Branch Circuits And Feeders

dpd client assistance memo CAM Plot Plan Requirements Basic Plot Plan What is a Plot Plan?

MERALCO Standards: Electrical Design. Engr. Eduard Mercado Electrical Design Team

CITY OF MUSKEGO DRAFTING STANDARDS

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1

ROWAN UNIVERSITY 201 MULLICA HILL ROAD GLASSBORO, NEW JERSEY 08028

Application for Site Plan Review

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Section. DEVELOPMENT STANDARDS City of Ellensburg ILLUMINATION STANDARDS

MINIMUM C/L RADII OF CURVATURE OF LOCAL ROADS IN SUBDIVISIONS

City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS

Single-Family Dwelling Submittal Requirements

NEC 2014 Code Changes

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

APPENDIX 4. Checklists. Township of King Design Criteria and Standard Detail Drawings

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION

CHAPTER 29 PROJECT COMPLETION DOCUMENTS

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

CHAPTER 11. Plan Standards

Plan Submittal and Review Checklist

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

Wisconsin Contractors Institute Continuing Education

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

SECTION TRANSFORMERS

STANDARD BID ITEM NUMBERS

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

What Plans Do I Need for a Building Permit?

Current Standard Plates including Transmittal Letters are available on the web at:

FINAL - ER 70 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS

B17. Sewer Site Plans BULLETIN

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info

Record Drawing Standards for Projects Version 2.1

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST

STANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Council Policy Engineering Drawing Submission Requirements

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

5.7 Plan Documentation and Supporting Information.

SECTION UNDERGROUND POWER DUCT AND SUB-STRUCTURES. A. Section : Trenching, Backfilling, and Compacting

TOWN OF OAKVILLE FIRE ROUTE APPLICATION PACKAGE

Transcription:

This document provides a list of the updates to the EPCOR Distribution and Transmission Inc. (EDTI) Customer Connection Guide. If you have any questions, please contact EDTI Customer Engineering Services at ces@epcor.com. Note: Additions are indicated in bold, deletions are indicated with a strikethrough. 1. Update to Service Type: EDTI will no longer offer 277/480 V, 3-Ph, 4-W permanent service 2. Addition to Sections 2.1, 3.1, 5.1, and 7.1 General Introduction: For the safety of public, City of Edmonton bylaws require residents or property owners to always keep power assets clear of trees, shrubs, rocks, debris and other items. 3. Addition to Sections 2.1, 4.1, 5.1 and 6.1 General Introduction: The customer must comply with the clearances set out in the Canadian Electrical code for required vertical clearances when crossing other utilities. 4. Addition to Sections 2.5, 3.5, 4.5, 5.6, 6.5 and 7.6 Engineer approved electrical site plan authenticated by a duly registered professional member of APEGA or ASET 5. Addition to Sections 2.6, 3.6, 4.6, 5.8, 6.7, and 7.8 Horizontal Clearance to other Utilities 2.0 m to all valves, hydrants, catch basins, manholes, vaults, sanitary and storm sewer lines, septic tanks, fields, and Minnesota Mounds. (previously 3.0 m). 6. Addition to Sections: 2.8, 3.8, 4.8, 5.10, and 6.9 Electrical Room All electrical rooms must have four walls and a ceiling. 7. Addition to Sections: 2.11, 3.11, and 4.11 General Service Requirements Customers are not allowed to take single phase 120V service off the three phase 240V service. Page 1 of 11

8. Addition to Section 2.12 Trenching and Backhoe The customer's contractor must not trench within 1.0 m of any EDTI wood pole, anchor, transformer, switching cubicle ground grid (2.0 m from the edge of the concrete base and from 300 mm of the guard rail), power pedestal, or energized cable without prior consultation with EDTI approval the supervision of an EPCOR representative. The facilities must be located first using hydro excavating or hand digging before determining where the mechanical excavation limits end. 9. Update to Sections 2.12, 4.12, 5.14, and 6.13 Trenching and Backhoe Ensure that the trench top of duct is a minimum of 1,000 mm to a maximum of 1,300 mm below finished grade. (previously a minimum of 1,100 mm to a maximum of 1,500 mm). 10. Addition to Sections: 2.13, 4.14, and 5.15 Service Ducts Duct must be installed where primary cable is deemed inaccessible by EDTI. All ducts must be equipped with bell collars to avoid damaging the cable. The installation of primary service cable under buildings is not permitted. Without first receiving special permission for an exception from EDTI. A spare conduit must be installed from the Service Entry Point (SEP) to the padmount transformer. On the building, mark where the cable and conduit ends enter and exit under the building. 11. Addition to Sections 2.14, 4.15 and 5.16 Duct Bends Precast concrete pads must be removed before inserting additional ducts into existing pads. 12. Addition to Section 2.18 Padmount Transformers and Switching Cubicles If the location of the precast base is within 4 m of a building foundation or if soil conditions do not support precast bases, engineered screw piles or concrete piles must be installed. Engineered drawings stamped by a civil/geotechnical engineer must be supplied to EDTI Customer Engineering Services before EDTI will grant approval. Page 2 of 11

13. Addition to Sections 2.18 and 5.21 Padmount Transformers and Switching Cubicles EDTI reserves the right to request compaction tests from the customer. Became Customer shall submit compaction test reports for all pad installations on site. If adequate compaction cannot be achieved piles are required. 14. Update to Section 2.18 Padmount Transformers and Switching Cubicles Within 3.0 m of padmounted equipment, landscaping must slope away from the base at a grade between 3% and 10% to allow for proper drainage and safe operational switching. (previously at 2% grade). 15. Addition to Section 2.18 Padmount Transformers and Switching Cubicles The minimum distance from a temporary panel or temporary shack to the ground grid of a transformer is 3.0 m. 16. Addition to Section 2.21 Conductors For commercial services connected to a 3-phase padmount transformer, EDTI recommends colour-coded secondary conductors. (RECOMMENDATION ONLY). 17. Update to Sections 2.22 Cable Installation The customer will supply and install secondary conductors from the customer's switchgear to the transformer location, leaving 5.0 m of conductors above the top of the precast transformer base. After inspection, the conductors must be coiled in a clockwise direction and left in a clean and organized manner around the inside perimeter of the base to allow for easy removal and shaping. (previously 3.0 m) The phasing of secondary conductors coiled in a transformer must be identified with marking tape at intervals not exceeding 1.0 m or colour-coded cable installed. Page 3 of 11

Update to Sections 2.22 (cont.) Cable Installation In general, a maximum of eight runs of secondary conductors, including permanent and temporary services, are permitted for 1,500 KVA and 2,500 KVA 3-phase padmount transformers. In some circumstances, additional runs may be permitted. Contact us to discuss your specific installation. In general, a maximum of six runs of secondary conductors, including permanent and temporary services, are permitted for 3-phase padmount transformers up to 1,000 kva. In some circumstances, additional runs may be permitted. Contact us to discuss your specific installation. 18. Addition to Sections 2.23 Multi-Family Development and Mobile Home Parks All cables used must strictly conform to EDTI's specifications. The size and type of primary cable accepted by EDTI is either 15 kv or 25 kv 1/C #1/0 AL XLPE CN J stranded conductor. Solid conductor is not permitted. 19. Update to Sections 2.23 Multi-Family Development and Mobile Home Parks We recommend that all primary cables be installed in duct on private property. Became All primary cables must be installed in duct on private property. 20. Update to Sections 3.12, 5.19, 6.18, and 7.15 Equipment Access Equipment must be placed beside a 4.6 m wide access roadway, centred in an unimpeded 6.5 m area. The area must be capable of supporting an 18,000 kg truck, plus a transformer weighing up to 6,900 kg (transformers must be unloaded from the side of the vehicle). Road allowance must account for outriggers on the truck also to extend to a width of 7.0 m. (previously 6.07 m). 21. Update to Section 5.1 General Introduction A primary metered service is a service above 750 volts phase to phase. Became A primary metered service is available in a 15 kv or 25 kv area only. Page 4 of 11

22. Updates to Section 5.3 Standard Supply Voltage 15 kv primary metered services are not permitted within EPCOR's 25 kv area, and 25 kv primary services are not permitted within EPCOR's 15 kv area. If you're in a 5 kv area, please contact us for information on conversion to 15 kv. Refer to Drawing 29 for the primary voltage in your area, and contact us for confirmation. 23. Update to Section 5.21 Switching Cubicles When the customer is required to install a cubicle base, we will provide a detailed drawing showing how the base must be constructed. We will also tell you the type of cubicle base to install to ensure the correct base is selected. As an example, for a 200 Amp cubicle with three-fused compartments, a 600 Amp cubicle base is required. Please see Drawings 4 and 5. Became When the customer is required to install a cubicle base, EDTI will advise on the type of cubicle base required, and provide a detailed drawing showing how the base must be constructed. Please see Drawings 4, 5, 6 and 7. 24. Update to Section 5.21 Switching Cubicles Within 3.0 m of padmounted equipment, landscaping must slope away from the base at a 3%-10% grade to allow for proper drainage and safe operational switching. (previously at a 2% grade). 25. Addition to Section 6.22 Termination The customer's main disconnect switches must have sufficient #4/0 lugs to accommodate the number of #4/0 Cu phase conductors required for rating the service (Allen-key-type terminations at the breaker are not acceptable). 26. Additions to Sections 8.1, 8.2, 8.5, 8.6, and 8.7 Metering For any electrical room located below grade, a 1 inch conduit must be installed from the electrical room to the nearest above-grade outside wall, in a location not subject to mechanical damage. Page 5 of 11

Additions to Sections 8.1, 8.2, 8.5, 8.6, and 8.7 (cont.) Metering One end of the conduit must be stubbed out and installed within 1 m of the revenue meter in the basement electrical room. The other end of the conduit must enter a 150 mm 150 mm 100 mm (6 in. 6 in. 4 in.) outlet box mounted on the nearest exterior wall of the building. The complete run of conduit must be installed without fittings or junction boxes. If the conduit run cannot be carried out without fittings or junction boxes, the electrical contractor must install LMR-400 or equivalent cable within the conduit. A 120 V receptacle must be installed within 1 m of the conduit stub-out in the basement utility room. See Drawing 22 27. Addition to Section: 8.2 Metering Rigid bus and suitable insulators must be used on all services over 600 Amp. The bus must be continuous from the main switch to the current transformers and from the transformers to sub-switching or splitter bars. When service conductors can be used (e.g., for services 600 Amp or less and sub-service applications), a short piece of rigid bus and suitable insulators are to be connected to either side of the current transformers, as per Drawing 21. This would require a custom metering transformer enclosure. A drawing of the enclosure must be submitted to EDTI Customer Engineering Services before EDTI will grant construction approval. 28. Addition to Section 8.2 Metering When contractors are installing a combination main breaker and meter socket, Typical Photo 1 is the only type of box that is acceptable for underground fed services. The underground cable must extend through the gutter on the right side in the top section of the enclosure. Microelectric has two models that are acceptable: Model #C01-100G for 100 Amp and Model #C02-200G for 200 Amp. Other manufacturers may have similar equipment. 29. Deletion from Sections 8.2 and 8.6 Commercial and Network Metering A 14mm (0.5-inch) conduit wired with a single-pair telephone line must be provided between the 13-jaw meter socket and main telephone panel, with provisions for telephone connection. Page 6 of 11

30. Deletion from Table: 7 Aerial services Acceptable wire and spans 600 # 556.5 MCM 10 m 31. DRAWING 1 Installation of precast concrete 4-way pull box 32. DRAWING 2 Typical underground residential service installation on property 33. DRAWING 3 Typical transformer alcove layout 34. DRAWING 4 Installation of precast concrete base for 4-way 3-phase 15 kv switching cubicle (all variants) 35. DRAWING 5 Installation of precast concrete base for 4-way 3-phase 25 kv switching cubicle (all variants) 36. DRAWING 6 Installation of precast concrete base for 4-way 15 kv single-phase 200 Amp dead front switching cubicle 37. DRAWING 7 Installation of precast concrete base for 4-way 25 kv single-phase 200 Amp dead front switching cubicle 38. DRAWING 8 Installation of precast concrete base for single phase transformers 39. DRAWING 9 Installation of precast concrete base for three phase transformers 40. DRAWING 10 Ground grid requirements for 15 kv & 25 kv switching cubicles and three phase transformers next to each other 41. DRAWING 11 Guard rail construction details Page 7 of 11

42. DRAWING 12 Sample of submission for multi-family developments (For example purpose only) 43. DRAWING 13 Customer owned pole installation on private property Dead end pole 44. DRAWING 14 Customer owned pole installation on private property Straight line 45. DRAWING 15 Heavy duty attachment devices 46. DRAWING 16 Typical residential aerial service installation (maximum service span distance 30 m) 47. DRAWING 17 Typical residential aerial service attachment details (maximum service span distance 30 m) 48. DRAWING 18 Typical underground residential service installation four party trench (Power, Gas, Phone, and CATV) 49. DRAWING 19 Multi-meter installation 50. DRAWING 20 Meter and test block enclosure current transformer rated meter socket 51. DRAWING 21 Three phase instrument transformers for installation over 200 Amp enclosure layout diagram 52. DRAWING 22 Instrument transformer metering layout 53. DRAWING 23 Instrument transformer wiring diagram 54. DRAWING 24 Residential temporary with permanent meter socket support Page 8 of 11

55. DRAWING 25 Right-of way requirement for single phase switching cubicle, single phase transformer or 3 phase transformer 56. DRAWING 26 Right-of way requirement for single phase switching cubicle, single phase transformer or 3 phase transformer with 2.0 m gas right-of-way 57. DRAWING 27 Right-of way requirement for 3 phase switching cubicle 58. DRAWING 28 Right-of way requirement for 3 phase switching cubicle with 2.0 m gas right-of-way 59. DRAWING 29 EPCOR 5kV, 15kV, 25kV and downtown engineering distribution areas 60. TABLE 1 Customer's / EDTI s Responsibilities 61. TABLE 1A Padmount transformer service 62. TABLE 1B Aerial service 63. TABLE 1C Underground secondary service 64. TABLE 1D Primary metered service (underground), 65. TABLE 1E Primary metered service (aerial) 66. TABLE 1F Network service 67. TABLE 1G Unmetered service 68. TABLE 2 Maximum horsepower of motors permitted Page 9 of 11

69. TABLE 3 Main switch or breaker minimum interrupting capacity 70. TABLE 4 Part 1: Primary cable, duct, and pull box standards, Part 2: Primary cable, duct, and pull box standards examples 71. TABLE 4, Part 1 Primary duct size in 25 kv area has been changed from 5 to 4 inch (min). 72. TABLE 5 Padmount equipment Maximum setback distances 73. TABLE 5B Padmount equipment (switching cubicle) Maximum setback distances 74. TABLE 6 Residential and multi-family underground services Acceptable conductors 75. TABLE 7 Aerial services Acceptable wire and spans 76. TABLE 8 Aerial services attachment methods 77. TABLE 9 Main switch or breaker minimum interrupting capacity Downtown secondary network services 78. TABLE 10 Network services Acceptable conductor and conduit size 79. TABLE 11 Meter socket and instrument enclosures 80. Addition to Section 2.12 Trenching and backhoe Customer cannot install ducts in to an energized manhole or handhole. 81. Addition to Section 2.14 Duct Bends Contact EDTI for pre-approval for shorter radius bends if proper depths at service entry cannot be achieved. Page 10 of 11

Page 11 of 11 Customer Connection Guide Updates