INITIAL SKETCH RENDERING

Similar documents
1. Name the horizontal member that rests on the foundation wall to support other wood members.

Contents OVERVIEW INTRODUCTION TO CHIEF ARCHITECT GETTING READY TO DRAW QUICK START VACATION CABIN: FLOOR PLAN. How this Book is Put Together

MODULE 4 Planning your house continued

ArchiCAD Tutorial: How to Trace 2D Drawings to Quickly Create a 3D Model

Pacific Avenue Design Rationale 1155 Pacific Avenue, Kelowna, BC

VILLAS LARGE SQ.FT. ( SQ.MTR.) ROLLER SHUTTER ABOVE COURTYARD VERANDAH 9 X 8-3 GARAGE 22-6 X 8-3 OUTDOOR INFINITY POOL 23 X 8-3 RAMP

2300 N 75th Street Boulder, Colorado

WINTER 15 EXAMINATIONS Subject Code: Model Answer- Building Drawing Page No- 01 /15

ART 3600, Interior Architecture Studio III Fall Grover Center W330 Tuesday & Thursday 1:30 4:20PM

Architectural Design

Architectural Design and Drawing

Loudoun Residence NEW CUSTOM HOME: PROJECT INFORMATION: SCOPE OF WORK: A Hopwood. Cover Sheet SITE ADDRESS: OWNER:

Architectural Design Process

The URBAN CHIC Tiny Home. Designer: Hannah Nail

Updated Sheet Index for DRC Submittal A0.1

TRADITIONS ,420 SQ. FT. 4-5 BEDROOMS BATHROOMS 2-4 CAR ATTACHED GARAGE 11/17

ASSIGNMENT 04: Library Massing + Program

COURSE TITLE: Architectural Drafting LENGTH: Full Year Grades DEPARTMENT: Technology Education Barbara O Donnell, Supervisor SCHOOL:

Meridian THE. a Well-Planned Ranch Home. Open Cafe to Great Room Optional Interior Fireplace

The Mayberry. Bayfront Single - Family Homes OPTIONAL ELEVATION B. *Rendering is Artist s Conception.

Developer Design Review Submittal Requirements - SECTION 5

Where rustic meets modern, New York style loft

Design Technology Architectural Design 2 The second in a sequence of courses that prepares individuals with knowledge of residential architectural

ARCHITECTURAL DESIGN II (544)

NOTTINGHAM II E L E V A T ION 9

CLIPPER ESTATES HOMEOWNER S ASSOCIATION DESIGN GUIDELINES

Celestial. Celestial C

Module 1: Building Model Creation

Subscribe Past Issues Translate Cascade Cuts

Augusta. CRAFTSMAN 2,067 SQ. FT. (Elevation Shown with Optional Metal Roof Sections) 2 BEDS 2 BATHS 2 CAR GARAGE

SMALL PROJECTS & IMPROVEMENTS: DOG RUNS, PATIO ENCLOSURES & FENCES, EXTERIOR IMPROVEMENTS (Abbreviated Design Review Application)

Victoria Saunders, Assoc. AIA, LEED AP BD+C phone: website: vsaunders.com

Kankakee Community College

*Cover Picture Hoffman House by Richard Meier. *Drawn and Rendered by. Nicole Geier

COURSE OF STUDY UNIT PLANNING GUIDE ARCHITECTURE G RADE LEVEL: CREDITS CURT BANICKI 1 F ULL YEAR MICHAEL WEBER, ASST. PRINCIPAL JULY 2018

Residential Design Using AutoCAD 2018

PERFECT NEST PROGRAM NEEDS ANALYSIS

DESIGN TO BUILD = BUILD TO DESIGN

Get out your notes and turn to Understand, Identify, and Label Floor Plans. If you don t have notes yet you can pick up copies on the back counter.

Academic Standards Use the Nevada Career Information System (CIS) or a similar computerbased

Lesson 19: Computing Actual Areas from a Scale Drawing

National Association of Women in Construction Education Foundation CADIDESIGNIDRAFTING COMPETITION HIGH SCHOOL STUDENTS

s i m o n i n i. c o m c o n t a c t u s : i n f s i m o n i n i. c o m ( )

ALL TEN. Building Forms and Massing THE BIG QUESTIONS. chapter15

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015

Midterm Exam_STUDY GUIDE_70 questions

Monticello. Monticello A

Cherokee Heights Elementary School

THE MIDDLETON. Elevation E

Rules of Thumb: White space is your friend - Use it! Use line and tone first 3 strokes max, separate by 1.5 points

Off-Site Feng Shui Consultation

BIG SKY. Destination. Live the Adventure

Abigail by Drees Homes

E a s t o v e r C i t y H o m e s. c o m c o n t a c t u s : a n g e l s i m o n i n i. c o m

Entry Level Assessment Blueprint Architectural Drafting

185'-3 5/8" LOT DEPTH 92'-7 13/16" 92'-7 13/16" N89 54'02"W ' 24' HEIGHT LIMIT 31' HEIGHT LIMIT

THE ARCHITECTURE HANDBOOK:

Marshall by Drees Homes

Information herein is believed to be accurate, but is not warranted. We assume no liability for errors.

TO WHOM IT MAY CONCERN:

Staff Review Date: May 11, 2016 HDC PID#

THE WAIT IS OVER. Omega is a tower experience 25 years in the making. A new revelation of premier coastal tower living.

DOWNTOWN WESTMINSTER, CO KEY PLAN ARCHITECTURAL CONCEPT PLAN W 92ND AVE B-6 C-7 90TH AVE D-5 D-6 CENTRAL AVE C-6 B-7 A-5 D-4 EATON ST B-5

A Levitt and Sons Community Seasons at Laurel Canyon

Schematic Floor Plans Best Practices

LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS

Rembrandt THE. Colonial Series ELEVATION 5

Lesson 19: Computing Actual Areas from a Scale Drawing

Architectural Drafting

Southport. EUROPEAN 1 4,190 SQ. FT. (Elevation Shown with Optional Metal Roof Sections) 4 BEDROOMS 3.5 BATHS 2 CAR GARAGE

*For complete material(s) information, refer to

Interior Design I PRECISION EXAMS DESCRIPTION. EXAM INFORMATION Items

Disclaimer for Review of Plans

IT'S ALL ABOUT ATMOSPHERE ARTIST S RENDERING. FINISHED PRODUCT MAY VARY.

CONSTRUCTION / HOUSING

Dream Home Academic Lesson Plan

12 sq units. 48 sq units. 1/3 Scale factor: 54 sq units Actual Area = 6 sq units

STUDENT DESIGN COMPETITION

Lesson 19: Computing Actual Areas from a Scale Drawing

Lesson 19: Computing Actual Areas from a Scale Drawing

High Barn EFFINGHAM, SURREY

Gated Apartment Community. Silver Springs LUXURY LIVING SPACES

The Bureau: XCOM Declassified Game Guide. 3rd edition Text by Cris Converse. Published by

Monarch THE. Estate Series ELEVATION 3

State College Area School District

Kankakee Community College

American Institute of Architects New Hampshire Chapter High School Design Competition Program

Pacifica San Juan Pearl Site PACIFIC POINT DEVELOPMENT PARTNER, LLC A0.0 THE PEARL PACIFICA SAN JUAN SAN JUAN CAPISTRANO, CA. DEVELOPMENT SUBMITTAL

A2 A ' - 9" 5 1/2" 5' - 0 1/2" 3' - 4 1/2" Master Bedroom 9' - 11" Master Bath 2' - 6" Stor. 1' - 7" 1' - 7" 14' - 0" C Existing Crawl Space Acc

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

City of Whitefish Planning & Building Department PO Box E 2 nd Street Whitefish, MT Phone: Fax:

Project Affordable Housing Design Rubric

Unit A - 2 Bedroom 1,219 sq. ft. heated 146 sq. ft. balconies

New Denver, BC FEASIBILITY REPORT OCTOBER 2018 BOSUN HALL. p f

Living/ Dining Areas. Kitchen. Bedrooms. Bathroom

at Fiddler s Creek Offered by

City of Whitefish 418 E 2 nd St PO Box 158 Whitefish, MT Phone: Fax:

754 Sir Francis Drake Boulevard

Hall of Waters List of Historic Drawings

Fairmont at Carillon Club - Naperville. Fairmont Options drhorton.com/carillon facebook.com/drhortonchicago

Transcription:

INITIAL SKETCH RENDERING The path to a satisfying building design is not linear, and it is often quite long. I often read other creative individuals describe the ingredients to a successful creative effort. How does a choreographer come up with a new dance? How does a painter produce a painting? How does a poet...and so on? Inevitably, these people describe the long hours, the starts, stops, and regressions, and the commitment to working at their task until the work of art is satisfying. In this project, called the Peru House, we are at this moment still in schematic design. In other words, there is a lot of road ahead. We have traveled some distance, but my sense is there are insights still out there that have yet to be incorporated into this project. There are elements that will be thrown out. There will be transitions between elements that will feel much better, when we arrive at them. Our first rendering for the first client meeting is shown here. Where did this rendering come from? It did not jump out of a hat.

PRECEDENT EXAMPLE MAJOR ELEMENT BLOCK DIAGRAM SOLAR AND VIEW SKETCH The initial sketches for this project came after spending several hours looking at precedents. We looked at built works by architects ranging from Julia Morgan, Frank Lloyd Wright, and Louis Kahn. We looked at Donald Judd. We then sketched out the major plan elements by function: Private, Public and Guest. This would be a single family residence that could support many guests. The public area is shared. Once the rectiliear diagrams were developed, we began to look at solar and view conditions that came with the site. We recognized a tension between the two. The view was to the north. The sun was to the south. We began to see an affinity for a scheme based on view wedges that would allow significant southfacing exposures, and a materiality idea based on concrete and its use as a planar material. CONCRETE PLANES SKETCH INITIAL SKETCH PLAN

WEAPONS MASTER SUITE SHOOTING RANGE BASEMENT FIRST FLOOR SECOND FLOOR Scheme 1 laid out the rooms identified at an initial meeting with the client. The major elements are the shooting range and weapons; kitchen and great room, 3-car garage, guest suite, and master suite. Secondary rooms include bathrooms, closets, utility rooms and circulation.

SCHEME 1 SCHEME 2 Our own internal deliberations on the initital Scheme 1 looked at small geometry tweaks that could make the building a bit more successful. Dead space was removed, certain walls followed either one grid system or another.

SCHEME 2 SCHEME 3 Feedback from the first client meeting led us to mirror the scheme left to right. We also changed the north, or upper, side of the house. The idea was to create a concave elevation that would start to define an outdoor courtyard area.

SCHEME 3 SCHEME 4 Scheme 4 showed refinements to Scheme 3. How should the cluster of rooms around the front entrance work? There was an outdoor covered area at the front door, a mud room, closets, and a powder room. We played with the relative sizes of these rooms and their relationship to one another. The curved north elevation becomes much smoother in Scheme 4.

POOL/GYM WEAPONS MASTER SUITE SHOOTING RANGE SCHEME 4 Scheme 4 also showed development of the basement and second floor. To wit, the basement grew significantly. The weapons room is much bigger, and an indoor pool and gym were added to the program. The shooting range runs down the middle of the house. To go from the pool/gym to the weapons room, one must cross the shooting range. We would soon realize this was a liability.

SCHEME 4 SCHEME 5 Scheme 5 led to another flip. Part of this was in response to the very long route between the garage and the kitchen. How far can one expect to carry groceries? Scheme 5 made that route as short as possible by incorporating a walk-through pantry between the garage and kitchen.

SCHEME 5 SCHEME 6 Scheme 6 shortened the distance between garage and kitchen over Scheme 4, while at the same time using a standard arrangement of garage, front door and mud room. The kitchen is also freed on its southern elevation from being blocked by the garage.

SCHEME 6 SCHEME 7 Scheme 7 flips the house once more. This is in response to the owner, who wishes the master bedroom be on the left as you approach the house.

SCHEME 7 SCHEME 8 Scheme 8 flips the garage geometry without flipping the whole house. Whereas the garage in Scheme 7 is very tight for three cars, Scheme 8 has a comfortably sized garage. The victim in this is the front entrance, which has become a little tight. We continued to look at the curved north elevation, which becomes much tighter and uniform in Scheme 8.

SHOOTING RANGE WEAPONS MASTER SUITE POOL/GYM SCHEME 8 Scheme 8 seemed to be working, at least on the first and second floors. The kitchen and guest wings had more or less settled down, and the curving north wall seemed to be working as well. At our next client meeting, we spent a long time discussing security and access to the basement, particularly the weapons and shooting range areas. We were not quite there yet, as the shooting range was directly accessible from the guest staircase. In the meantime we continued to move pieces around.

SCHEME 8 SCHEME 9 Scheme 9 shows us looking at two areas: How does the building envelope distinguish the guest wing? How does the piece either fit with the rest of the massing, or stand apart? Also, the kitchen, pantry and entry area still proved unsatisfying. We would continue to play with that area. We are also looking at the size of the kitchen area. It shrinks considerably in Scheme 9.

SHOOTING BELOW SHOOTING BELOW SCHEME 9 SCHEME 10 Scheme 10 is a response to the client meeting where we addressed access and security to the basement areas. While the ground floor does not change significantly, the shooting range ends up completely outside the above-grade building envelope. This is our answer to the weapons and shooting security question. It makes the house bigger, which means we punted on being able to find a clever solution within the area we were given. We also return to a rectilinear north elevation to the guest suite.

WEAPONS MASTER SUITE POOL/GYM SHOOTING RANGE SCHEME 10 Scheme 10 has a somewhat convoluted basement circulation diagram, but the security and access questions have been resolved. From the guest stair, one can follow a hallway to the pool/gym. From the master stair coming from the kitchen, one has direct access to the pool/gym, and access to a hall leading to weapons and shooting. Weapons is therefore behind two lockable doors: one to the pool/ gym, and one between pool/gym and weapons. A major design element shows up in the master suite: the hot tub turret.

SCHEME 10 SCHEME 14 We were not satisfied with the shooting range outside the ground floor envelope. The range requires a lot of excavation and foundation work, with no usable space to benefit. We also received structural framing feedback that suggested framing the garage roof with beams as shown in dashed red. However, the architecture was not aligning with the structure. After some sketching, we saw a way to solve the shooting range and structural framing issues. Moving the guest stair to the north of the garage would do the trick.

SCHEME 14 SCHEME 14B Our Scheme 14B adds some more tweaks. We moved some of the plumbing elements around to provide a larger guest bathroom, and decided to give up the powder room.

SHOOTING RANGE WEAPONS MASTER SUITE POOL/GYM SCHEME 14B Here is Scheme 14B. All the program elements are in place. Adjacencies and circulation seem to be working. A straightforward structural diagram appears to be working in concert with the architecture. Lastly, the strength of the initial concrete planes diagram has returned to the design. This is starting to feel satisfying.

SCHEMATIC DESIGN SKETCH RENDERING After 14 documented iterations and dozens of sketches with a Sharpie, the essential diagram of the design has stayed intact. Pieces have moved; pieces have been added; some pieces have been removed. The insight of the first successful sketch diagram took one or two days to arrive. The entire schematic design process unfolded over two months, including several client meetings.