WOOD INSTALLATION GUIDE

Similar documents
Laminate Flooring Alternative to Hardwood Flooring

Installation Instructions for Viking Hearth Engineered Wood Flooring

Engineered Hardwood Flooring Installation Instructions

Installation Instructions for Engineered Wood Flooring

Prior to installation, the installer assumes all responsibility for final inspection and quality of the product

INSTALLATION. GlUElEss CliCK BamBoo installation GUidE. Introduction. Tips for a successful installation

Engineered Strand Uniclic Floating Installation

¾ Solid Installation Instructions

SINCE 1995 HYBRID / LOFT / MANOR LINE INSTALLATION GUIDE

Installation Guide. When purchasing Aboeda flooring, add 5%-15% to actual square footage needed for cutting allowance.

Engineered Installation Instructions

Solid Installation Guidelines Elegance Plyquet

DuChâteau Vinyl DeLuxe Grand Collection LuxCor Click Installation Instructions

Lifestyle Laminates Uniclic Floating Floor

INSTALLATION INSTRUCTIONS

Nail-Down Installation Instructions Prefinished 3/4 and 5/8 solid

For ANGLE-DROP Styles

BOIS CHAMOIS VINTAGE HARDWOOD FLOORING

INSTALLATION GUIDE. Preparation

Manufacturer 12mm Laminate Flooring Installation Guidelines

INSTALLER / OWNER RESPONSIBILITIES

READ PRIOR TO BEGINNING INSTALLATION

TORLYS LEATHER PLANK INSTALLATION INSTRUCTIONS

FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING

TERRA HARDWOOD FLOORING

INSTALLATION GUIDE FOR MAZAMA MULBERRYWOOD HARDWOOD FLOORING

Engineered Hardwood Installation

INSTALLATION. Installer / Owner Responsibility. Basic Tools and Equipment. Putty and Filler Use. Recommended Installation Methods

Engineered Hardwood Installation

INSTALLATION GUIDE SOLID HARDWOOD FLOORING

TRIVERSA TRIVERSA ID. Triversa Triversa ID Installation Instructions. Remove the wall base and doorway trim. Always undercut wood door casings

BOIS CHAMOIS VINTAGE HARDWOOD FLOORING

Please read and review installation instructions completely before proceeding with the actual installation.

INSTALLATION GUIDE. Preparation The environment

Pompeii Birch & Hickory Engineered Hardwood Flooring Installation Instructions

INSTALLATION INSTRUCTIONS

TONGUE & GROOVE NAIL-DOWN INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Engineered Strand Bamboo Flooring

ENGINEERED WOOD INSTALLATION GUIDE: The Cardinal Collection

CFS Engineered Flooring Floating Installation Instructions

SOLID STRAND BAMBOO INSTALLATION GUIDE. Tips for a successful installation

INSTALLATION. Installation Guide. Installing Bamboo Flooring on Top of a Wood Subfloor

ENGINEERED TONGUE & GROOVE INSTALLATION INSTRUCTIONS 3/8, 7/16, 1/2, 9/16, 5/8, 3/4 Float-In / Glue-Down / Nail Down

TOOLS AND/OR ACCESSORIES NEEDED: NAIL/STAPLE-DOWN INSTALLATION

INSTALLATION GUIDE. Preparation. Subfloor Preparation. Installation of Vapour Barrier Paper (asphalt-free) Model repair and maintenance kit

Installation and Warranty

Carmel Bay & Touch of Euro Engineered Floors - Installation Instructions

Laminate Floor Installation Guide

Trendwood Flooring Installation Instructions

Installation Instructions Floating-Floor Application Thank you for choosing Indusparquet Hardwood Flooring (IP)

Engineered Prefinished & Unfinished Flooring

Columbia Laminate Installation Instructions

INSTALLER/OWNER RESPONSIBILITY

¾ Solid Hardwood Flooring Installation Information

BAMBOO FLOORING PRE-FINISHED SOLID BAMBOO INSTALLATION GUIDE

INSTALLATION GUIDE; ENGINEERED & HARDWOOD FLOORING (COMMERCIAL & RECLAIMED)

Wall Installations. Chapter 16 Wall Installations 16. 1

installation Prefinished 3/4 solid (including various widths such as 3 1/4, 3 5/8, 4 3/4, 5 ) naildown installation instructions

Laying instructions Installation of multilayer Herringbone / Basket-weave with tongue and groove joint.

INSTALLATION INSTRUCTIONS FOR ELKALAMINATE. IN ORDER TO OBTAIN A GOOD RESULT, WE ADVISE TO FOLLOW ALL GIVEN INSTRUCTIONS CAREFULLY.

1INSTALLATION GUIDE: ENGINEERED WOOD FLOORING

AquaGuard - Water Resistant Flooring Installation guidelines

INSTALLATION LAMTON INSTALLATION INSTRUCTIONS. Lamton Laminate Flooring with Underlay Attached Glueless Installation. Tools and Accessories

Glueless Laminate Installation Instructions

ENGINEERED TONGUE & GROOVE

LATITUDES 6.5 INSTALLATION & MAINTENANCE INSTRUCTIONS HARDWOOD

STOP BEFORE YOU START

Artisan World Imports Terre Verte 1/2 Engineered Hardwood Installation Instructions

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY.

INSTALLATION INSTRUCTIONS

Quest ¾ and 5/8 Solid Installation Instructions

B e l l e F l o o r INSTALLATION GUIDE INSTALLER/OWNER RESPONSIBILITY

PLEASE READ THESE INSTRUCTIONS COMPLETELY BEFORE BEGINNING THE INSTALLATION.

1. Read all instructions/warranty first: Get all your questions answered before you start installing the floor by calling

Installation Instructions Glue-Down Application Thank you for choosing Indusparquet Hardwood Flooring (IP)

Lifetime Floors Engineered Flooring Installation Instructions

DL HARDWOOD FLOOR INSTALLATION INSTRUCTIONS CARE AND MAINTENANCE:

Artisan : Terre Verte 9/16 Engineered Hardwood Installation Instructions TOOLS AND/OR ACCESSORIES NEEDED: FLOATING INSTALLATION

INSTALLING YOUR UNICLIC FLOOR - Small planks / 3 sizes

Service Provider: the home depot inc.

Installation Information

Chapter 25 - Flooring

Glueless Laminate Installation Instructions Wood Designs

LUXURY VINYL FLOORING INSTALL INSTRUCTIONS

Glue-Down and Floating Installation IndusParquet 5/16 Engineered

General Installation Instructions

Required Tools. Installation of Hook Plates & Discs. Professional Installation Guidelines for Engineered Wood & Hardwood with LocPlate Products

Shapes Siding. Perfection Shingles. Chalk Line

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE.

PLEASE READ THIS FIRST

V3 Engineered Flooring- Installation Instructions

Installation, Care, Maintenance Windsor Park

PROJECT LOCATION. SECTION BAMBOO FLOORING Rev. 11/14/2012

LifeScapes ¾ and 5/8 Solid Installation Instructions

Staple-Down, Glue-Down and Floating Installation IndusParquet 1/2 Engineered

Landscape Collection

INSTALLATION GUIDE.

Unit5EustonStreet FreemensCommon Leicester LE27ST T: F:

Chapter 16. Underlayment and Finish Stairs

Transcription:

WOOD INSTALLATION GUIDE

WOOD INSTALLATION DEFINITION FLOOR PREPARATION UNDERLAYMENT INSTALLATION MOULDINGS TOOLS NEEDED

WHAT IS WOOD FLOORING? WOOD COMES IN A VARIETY OF SIZES, COLORS, SHADES AND INSTALLATION TYPES. DEPENDING ON WHAT TYPE OF SUBFLOOR YOU HAVE USUALLY DEPENDS ON WHAT TYPE OF WOOD FLOOR YOU CAN INSTALL TYPES OF WOOD SOLID WOOD: Solid wood flooring is completely lumber which is available unfinished or prefinished. Solid wood flooring can be used on grade and above grade, but not below grade. Solid woods should be a moisture controlled environment. They can be sanded and refinished over several generations of use. Solid wood floors are mostly for nail down installation. Solid wood floors can be sanded and refinished over several generations of use. ENGINEERED WOOD: Made of several layers of different woods or different grades of same wood stacked and glued together under heat and pressure. Engineered wood flooring is less likely to be affected by changes in humidity and can be installed above, on, or below ground level. Some engineered wood floors with thicker top layers can be sanded up to three times and others cannot be sanded at all. Engineered wood can be installed as glued, stapled, nailed or floating floor.

WOOD INSTALLATIONS TYPES OF INSTALLATIONS NAILDOWN: For ¾ solid wood floor. To be nailed down over plywood (at least ½ thick); OSB (at least ¾ thick) and existing wood floor. GLUE DOWN WOOD: Engineered wood to be glued down over concrete or wood FLOATING WOOD FLOOR: To be installed over almost all types of flooring as long as existing is in good condition and no evidence of height difference issues. Floating wood should not be installed on steps F&I SITE-FINISHING: Unfinished solid wood which is installed, stained and finished on site REFINISHING: Sanding down existing wood floors to bare wood, staining and finishing

FLOOR PREPARATION FOR HARDWOOD INSTALL ALL HARDWOOD FLOORING SHOULD BE STORED IN THE AREA IN WHICH IT WILL BE INSTALLED FOR AT LEAST 72 HOURS IN ORDER ACCLIMATE A MOISTURE READING SHOULD ALWAYS BE TAKEN TO DETERMINE THE LEVEL OF MOISTURE PRIOR TO ANY HARDOWOD INSTALLATION IF RIP UP OF EXISTING FLOOR IS NEEDED, BE SURE TO CLEAN AREA THOROUGHLY PRIOR TO ANY INSTALLATION

EXAMINE ALL PIECES OF FLOORING PRIOR TO INSTALLATION TO CONFIRM PROPER MATERIAL AND CHECK FOR ANY DAMAGES CHECK FOR ADEQUATE CLEARANCE AT THE BOTTOM OF THE DOORS AND DOOR CASINGS SO THE NEW FLOOR WILL FIT BE SURE TO TAKE PIECES FROM SEVERAL DIFFERENT BOXES OF FLOORING TOMAXIMIZE COLOR AND SHADE MIXTURES ALWAYS LEAVE A 3/8 EXPANSION GAP AROUND THE WALLS OR ANY SOLID OBJECTS WOOD FLOORS SHOULD BE INSTALLED IN THE OPPOSITE DIRECTION TO YOUR FLOOR JOISTS. IF OVER CONCRETE, FLOORING SHOULD BE INSTALLED PARALLEL TO THE LONGEST WALL.

UNDERLAYMENT ALL SUBFLOORS SHOULD BE LEVELED TO A CERTAIN DEGREE OTHERWISE THE FOLLOWING MAY BE NEEDED TO LEVEL THE FLOOR (MUST SEE MANUFACTURERS SPECS). PLYWOOD: 1/4" (OR THICKER) IS NEEDED FOR INSTALLING OVER WOOD SUBFLOOR (BE SURE TO PATCH ALL SEAMS, NAIL HOLES AND REPAIR ANY IMPERFRECTIONS PRIOR TO SPREADING ADVESIVE) SELF LEVELER: FOR INSTALLING OVER CONCRETE THAT IS UNLEVEL OR DAMAGED

INSTALLING PLYWOOD

APPLYING SELF LEVELER

EXAMINING THE MATERIAL

CUT TO FIT AND STAGGERING

NAILDOWN WOOD THE ONLY PROPER SUBFLOOR FOR A NAILDOWN WOOD IS PLYWOOD (AT LEAST ½ THICK, OSB (AT LEAST ¾ THICK) AND EXISTING WOOD FLOOR PLYWOOD OSB EXISTING WOOD FLOOR

NAILDOWN WOOD ALL NAILDOWN INSTALLATIONS REQUIRE AN UNDERLAYMENT OF ROSIN PAPER OR FELT PAPER WHICH IS USED AS A PTROTECTIVE BARRIER AGAINST AIR AND MOISTURE PASSAGE FROM THE AREA BENEATH THE FLOORING AS WELL AS PROVIDING A MOVEMENT AND NOISE ISOLATOR

NAILDOWN INSTALLATION

NAIL DOWN WOOD TOOLS A few specialized tools are needed to install a nail down wood: a power nailer to secure floor; chalk line for installation guidance; 3M blue tape to secure planks together to avoid any movement or gaps; and spacers for maintaining expansion gap around walls and solid objects and a pull bar to tighten joints together around the edges.

GLUE DOWN WOOD GLUE DOWN WOOD IS INSTALLED OVER BARE CONCRETE OR WOOD SUBFLOOR ENGINEERED FLOORING CAN TYPICALLY BE INSTALLED WITH THE TONGUE OR THE GROOVE FACING YOU AND CAN BE STARTED IN ANY POSITION IN THE ROOM

GLUE DOWN WOOD TOOLS A few specialized tools are needed to install a nail down wood: a power nailer to secure floor; chalk line for installation guidance; 3M blue tape to secure planks together to avoid any movement or gaps; and spacers for maintaining expansion gap around walls and solid objects and a pull bar to tighten joints together around the edges.

FLOATING WOOD FLOATING A WOOD FLOOR MEANS THE WOOD PLANKS ARE NOT FASTENED OR GLUED TO ANY PART OF THE SUBFLOOR, INSTEAD THE PLANKS FLOAT FREELY OVER THE TOP OF THE SUBFLOOR AND CONNECT SOLELY TO EACH OTHER. FLOATING WOOD CAN BE INSTALLED OVER ALMOST ALL TYPES OF FLOORING AS LONG AS EXISTING IS IN GOOD CONDITION AND THERE IS NO EVIDENCE OF ANY HEIGHT ISSUES ALL FLOATING INSTALLATIONS REQUIRE SOME TYPE OF MOISTURE BARRIER IN ORDER TO GUARD THE WOOD PANELS AGAINST MOISTURE THAT COULD SEEP THROUGH FROM SURFACES TYPES OF MOISTURE BARRIERS: 6 MIL POLYETHYLENE FILM: A PLASTIC SHEET USED TO RESIST PASSAGE OF MOISTURE FROM THE SUBFLOOR TO THE LAMINATE PANELS 2-AND-1 FOAM UNDERLAYMENT: A FOAM CUSHION AND A VAPOR BARRIER 3-AND-1 FOAM UNDERLAYMENT: A FOAM CUSHION, VAPOR BARRIER AND SEAM TAPE

MOISTURE BARRIER FOAM UNDERLAYMENTS

FLOATING INSTALLATION

FLOATING WOOD TOOLS A few specialized tools are needed to install a floating wood floor: a hammer and tapping block to tighten joints as you install or a rubber mallet; spacers for maintaining expansion gap around walls and solid objects and a pull bar to tighten joints together around the edges

WOOD COMPLETIONS BEFORE INSTALLATION AFTER INSTALLATION

F&I SITE-FINISHED WOOD A SITE FINISHED WOOD INSTALLATION IS WHEN A SOLID UNFINISHED WOOD IS INSTALLED, STAINED AND FINISHED ON SITE THE ACTUAL INSTALLATION OF THE UNFINISHED WOOD WILL FOLLOW THAT OF THE NAILDOWN OR GLUEDOWN INSTALLATION PRECEDURES. DUE TO THE EXCESSIVE AMOUNT OF DUST CAUSED BY SANDING, ALL PRECAUTIONS TO PROTECT ALL AREAS MUST BE TAKEN CARE OF PRIOR TO SANDING

REFINISHING WOOD REFINISHING WOOD FLOORS CONSISTS OF COMPLETELY SANDING DOWN THE EXISTING HARDWOOD FLOOR TO THE RAW WOOD, REMOVING LAYERS OF OLD EXISTING FINISH, DEBRIS AND SCRATCHES. THEN, THE FLOOR IS BUFFED AND THOROUGHLY VACUUMED AND THEN FINISHED WITH TWO TO THREE COATS DUE TO THE EXCESSIVE AMOUNT OF DUST CAUSED BY SANDING, ALL PRECAUTIONS TO PROTECT ALL AREAS MUST BE TAKEN CARE OF PRIOR TO SANDING

REFINISHING

TOOLS FOR SANDING AND REFINISHING ALL THE BASIC TOOLS APPLY FOR A GLUE DOWN OR NAIL DOWN INSTALLATION. A FEW SPECIALIZED TOOLS ARE NEEDED IN ORDER TO SAND AND FINISH OR REFINISH A FLOOR: A LARGE BELT SANDER IN ORDER TO SAND OFF THE TOP LAYER OF FLOORING; A EDGE SANDER TO GET TO ALL THE CORNERS AND PERIMETER OF THE ROOM AND OF COURSE, THE STAIN AND FINISH ALONG WITH APPLICATOR.

MOULDINGS FOR ALL WOOD FLOORS WHEN INSTALLING ALL TYPES OF WOOD, AN EXPANSION GAP MUST BE LEFT IN ORDER TO ALLOW THE WOOD TO EXPAND AND CONTRACT WITH THE SITE CONDITION. A MOULDING IS USED TO COVER THE EXPANSION GAP AND GIVE INSTALLATION A FINISHED LOOK

MOULDINGS FOR WOOD WOOD WITH MATCHING WALLBASE WOOD WITH MATCHING WALLBASE AND QUARTERROUND WOOD WITH PRIMED WALLBASE AND QUARTERROND

MOULDINGS UNFINISHED QUARTERROUND STAINED TO MATCH QUARTERROUND

HARDWOOD STAIRS

BEFORE AFTER SQUARED OFF STEP