Overall Objectives and Plans for the Project

Similar documents
Beyond Unit Cost: Minimising the overall cost of new high power subsea electrical connector systems

By: Derek Watson and Lee Robins, Tracerco, UK

The COE scheme and CeSOS. by Torbjørn Digernes, Rector, NTNU at the seminar «CeSOS » 7 January 2013

Nomarna Construcciones e Ingeniería develops a high knowledge in solutions of design, consulting, training, supervision, manufacturing and management

Design and Performance of InGaAs/GaAs Based Tandem Solar Cells

Background Why? What are the business drivers? Subsea, Surface or FLNG? Subsea Dehydration & The SubCool Hybrid Concept

The project. The implementation phase 17/10/2014. Effects of insufficient human factors focus in a design phase of new automated technology.

Basic Policy for Management of the Impulsing Paradigm Change through Disruptive Technologies (ImPACT) Program

UNIT Fundamental Electronics (SCQF level 6)

An expanded role. ABB s 800xA Simulator is now being used throughout the complete life cycle of an automation system

Asset Integrity and Risk Management Practices for Subsea Equipment

OFFSHORE THERMAL TESTING OF AN ELECTRICALLY TRACE HEATED PIPE-IN-PIPE

Cost Reduction in Frontier Deepwater Riser Systems

TERMS, DEFINITIONS, ABBREVIATIONS, SYMBOLS AND UNITS FOR ELECTROMAGNETIC RELAYS. ESCC Basic Specification No

Robots at Work The growing role of robotic systems in the Oceans and Subsea Engineering. David Brookes Senior Advisor, Upstream Engineering, BP

Laser Surface Authentication TM : biometrics for documents and goods

Diverse Capabilities Targeted Solutions

4 Briefing. Responsible investor

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa

Pipeline Design & Installation Systems

Experiences on using gapless waveform data & synchronized harmonic phasors

SPE. Subsea Power Transfer. - What is the challenge APPLIED TECHNOLOGY WORKSHOP. Technology for for the Next Generation Subsea Systems

Learn more at

MARISSUBSEA.com. Core Values. People. Integrity. Quality. Contents. 02/03 What we do. 04/05 Representatives. 06/07 ROV personnel

STUDY PLAN. Aerospace Control Engineering - master

TI25 - Pre-Instructional Survey

Summary report RCN project no /I40

Heidrun Inverted Gas Lift System

Optimizing MEG Systems on Long Subsea Tiebacks. Patrick Wan DOT PERTH, Wednesday 28 Nov 2012

OneSubsea Subsea Sampling System

Hongtae KIM. 31 October Digital Ship Korea 2012, Busan

Applied Technology Workshop Twin Screw Multiphase Pump. Ove Jahnsen 08 February 2005

Life Extension of Subsea Umbilical Systems Assessment Process Marian Copilet Technical Solutions Manager - APAC November 2016

ADVANCED TOLL MODELING

Procurement Risk Management of Flexible Pipes and Umbilicals. Presented by Hanh Ha Kuala Lumpur Convention Centre 9 th June 2010

Using Critical Zone Inspection and Response Monitoring To Prove Riser Condition. M Cerkovnik -2H Offshore

Taking a broader view

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions

Effective and cost saving CP survey by use of FiGS technology FORCE Technology Norway

CHAPTER 3 EQUIVALENT CIRCUIT AND TWO AXIS MODEL OF DOUBLE WINDING INDUCTION MOTOR

On-Load Tap Changer Type M

Britcham Brasil X Seminário Internacional de Energia

Gender Pay Gap Report 2017

MULTI-PURPOSE FLOATING STRUCTURES Øyvind Hellan Vice President Research, SINTEF Ocean

SCIENCE IN THE CENTRE STRATEGIC PLAN

Onshore & Offshore Engineering and Management of Subsea Cables and Pipelines

BELARUSIAN NATIONAL TECHNICAL UNIVERSITY. BNTU was founded in 1920

Use of subsea Multiphase pumps as an alternative to ESP workover in a mature field development Kia Katoozi

10/14/2009. Semiconductor basics pn junction Solar cell operation Design of silicon solar cell

The programme has been approved by the Board of Science and Technology on

Superconducting Fault Current Limiter Modules for Power Transmission / Distribution

Review of the UK oilfield services industry. January 2016

United States 32" Features and Benefits of WEATHERMATE Sill Pan

Subsea Wellhead System Design for Fatigue Performance

R&D - Technology Development November Conference RJ, 3-4 November by Innovation Norway

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A

Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations. Presented by: James Young, JDR Engineering Director

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements.

Shipbuilding Principles: Planning, Production and Assembly

Mismatched Iron Connections. Shankar Narayan

National Certificate in Furniture (Manufacturing Upholstery) (Level 2)

Aleks Karlsen/Jan van Tiggelen 20 September 2017

7 Briefing. Responsible investor

SCS-WB INSPIRE ASSEMBLY AND OPERATION MANUAL

SECTION PANELBOARDS

Degree Requirements

DNVGL-CP-0338 Edition October 2015

A NEW APPROACH FOR VERIFICATION OF SAFETY INTEGRITY LEVELS ABSTRACT

Subsea Intervention: Is It Worth It? Drummond Lawson

Employability Enhancement Program for Engineers. Transformation of an engineering degree holder to a real Engineer, who can do more at work.

WaterWell Synthetic Skirting for Aluminum Coping Supplemental Guide Page 1 of 9

...make offshore work OFFSHORE PROJECTS

CORESTA Recommended Method No. 46

STRATEGY FOR SAFETY CASE DEVELOPMENT: IMPACT OF A VOLUNTEER APPROACH TO SITING A JAPANESE HLW REPOSITORY

Offshore Spill Response Preparedness

Technology for a better society. SINTEF, Trondheim, Norway Phone: Fax:

Survey Sensors. 18/04/2018 Danny Wake Group Surveyor i-tech Services

Teledyne Marine Oil and Gas.

from ocean to cloud DUAL-CONDUCTOR CAPABILITIES IN WET PLANT DESIGN QUALIFICATION SEATRIALS

Report. Temporary abandoned wells on NCS. Subtitle. Author(s) Nils Totland. SINTEF Petroleum Research Well Integrity

ODU Graduate Seminar 10/31/17 Sara Langford Product Manager- Industrial Automation and Software Specialist

Marine Institute Job Description

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014

Compact Modeling of Silicon Carbide Lateral FETs for High Temperature Analog and Digital Circuits

Technical Memorandum# TM2

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro

Task on the evaluation of the plasma response to the ITER ELM stabilization coils in ITER H- mode operational scenarios. Technical Specifications

Flow Assurance. Capability & Experience

Effective Implementation of Subsea Integrity Management

Subsea Positioning In deep water

Acoustic Calibration Service in Automobile Field at NIM, China

Benchmarking Advanced Water Splitting Technologies. Presenter: Kathy Ayers November 15, 2017 HydroGEN Kickoff Meeting, NREL

Enabling Array Cable Cost Reduction

A Centre of Research-based Innovation Bridging Industry and Science. Erling Kolltveit, Manager

Deep Water Definitions

Electrical Engineering Graduate Programs

Reliability of Deepwater Technologies

ECOSSE Subsea Systems. because we think differently...

RESISTOR, FIXED, CHIP, METAL FOIL BASED ON TYPE SMP-PW, SMS-PW, SMT-PW. ESCC Detail Specification No. 4001/027

Towards a Reconfigurable Nanocomputer Platform

Transcription:

1 Project Main Objective Development of new knowledge on electrical insulating materials and insulation systems necessary for design and testing of reliable high voltage power equipment in harsh subsea environment.

2 Sub goals: Characterization of proposed and new electrical insulating materials Identification of failure mechanisms and long term ageing Development of methods for testing and qualification of insulating materials and insulation systems Development of methods for condition assessment Recruitment and education of new specialists (Master and Doctoral students)

3 Background The high voltage technology used for subsea components are initially developed for land based systems or for low voltage subsea systems. There is a big gap between technology need, and available technology as the components are taken into use at steady higher temperatures and voltage levels.

4

5 The research within this Petromaks KMB project will have a generic approach in order to provide knowledge for technical improvements and consequently long and reliable service performance of high voltage subsea power equipment.

6 Four main research tasks are defined within the project: T1: Development of New and Modification of Proposed Electrical Insulation Materials T2: Identification of Failure Mechanisms T3: Development of Methods for Testing and Qualification of Insulating Materials and Insulation Systems. T4: Development of Equipment and Methods for Condition Assessment Recruitments There will be one Ph D student working with some activities within Task T1 and T2. Another student will work with subjects within Task T4. The Ph D students will be affiliated at NTNU.

7 T1: Development of New and Modifications of Proposed Electrical Insulation Materials Task T1 will consists of four activities: T1.1: Survey actual and new electrical insulation materials and additives T1.2: Examine the possibilities to apply nanotechnology or other additives for the enhancement of the long term properties of electrical insulation materials T1.3: Manufacture and examine morphology and intrinsic properties of modified materials T1.4: Examine the possibilities to include barrier materials in electrical designs

8 SiO 1.5 Organic branch PP Materials Borealis (2) Basell (2) Atofina (1) Dow (?)

9 T2: Identification of Failure Mechanisms and Long Term Ageing Task T2 will consist of three activities: T2.1: Materials and test objects T2.2: Material ageing T2.3: Characterization of materials

10 T3: Development of Methods for Testing and Qualification of Insulating Materials and Insulation Systems. Task 3 will consist of three activities: T3.1: Establish necessary high pressure vessels for Tasks T1, T2 and T3 T3.2: Propose and verify qualification tests for reliable subsea electric power materials and equipment based on findings of Task T2 T3.3: Establish necessary equipment for condition monitoring of Task T4

11 Hasteloy C276 Working pressure: 300 bars Volume:1 litre

12 T4: Development of Equipment and Methods for Condition Assessment Task T4 will consist of three activities: T4.1: Survey of candidate methods T4.2: Development of new or modified methods T4.3: Testing and applicability of selected methods

13 Progress plan