Onlot System Component Matrix

Similar documents
Product Dimensions (Width x Length x Height) (inches)

Thurston County Permitting System Policies &Procedures Page: 1 of 3

On-Site Sewage Disposal Application Packet

Crow Wing County Mound Design

Yavapai County Development Services

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

Module 6 : Design of Retaining Structures. Lecture 30 : Dewatering [ Section 30.1 : Introduction ]

Dewatering. Deep Wells Vacuum Wellpoints Eductor Wells Artesian Conditions System Design Water Treatment.

A. Dewatering observation wells are part of dewatering allowance.

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

ZONING R-LI Low Intensity Residential District. [Amended by Ord. No. 1684] PERMITTED USES BY RIGHT.

1. Architectural precast concrete cladding units.

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Aquaflex Universal Soil Moisture Sensor (Model SI.162-mA) -User Manual- ma Version -

Fee: Received By: Date: Application #:

Aquaflex Universal Soil Moisture Sensor (Model SI.162-Pulse) -User Manual- Pulse Version -

Aquaflex Universal Soil Moisture Sensor (Model SI.162-mA) -User Manual- ma Version -

Customer Requirements Commercial Secondary Service

Drip In Classic Turbulent Flow Dripline

Information for File # RMM

Site Plan/Building Permit Review

Third Grade Science Content Standards and Objectives

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

PRELIMINARY PLAT CHECK LIST

Noise walls Some Noise Facts

Planning Commission meeting

SIGN PERMIT APPLICATION

SECTION MANHOLES

Designer s NOTEBOOK CORNERS AND RETURNS

Sludge dewatering. Wolfgang Stump Öko-control GmbH; Burgwall 13a; D Schönebeck

GEO-SLOPE International Ltd, Calgary, Alberta, Canada Relief Well Spacing

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

CITY OF BAYTOWN CENTRAL DISTRICT WASTEWATER TREATMENT PLANT GRIT, SECURITY, AND SCADA IMPROVEMENTS SCOPE OF SERVICES

ARCHITECTURAL REVIEW COMMITTEE HOMESITE CONSTRUCTION SUBMITTAL FORM AND APPLICATION

Location of Structure on Site

Application for Site Plan Review

City of Aspen Water Review for Pitkin County Permits Submission Packet

What is Precision Technology?

Town of Skowhegan Application For Development Review

USE OF TEAR-OFF RECYCLED SHINGLES IN ASPHALT PAVEMENTS

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS. 1 Definitions. 2 Scope of Work. 3 Extent of Work

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.

National Radio Astronomy Observatory Socorro, NM EVLA Memorandum 41 Lightning Protection for Fiber Optic Cable. T. Baldwin June 05, 2002

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

Conceptual, Preliminary and Final Site Plan Review in Holladay City

580 - NOISE BARRIERS OPSS 580 INDEX

INDEX PAGE RELEASE SECTION NUMBER DATE

SUBMITTAL LIST Note: See tab below for Samples and Instructions. Attach to end of Specification Section when complete.

Bokashi Instructions from MyCrobz

City of Malibu Coastal Development Permit Onsite Wastewater Treatment System Submittal Checklist

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

EXCAVATION AND BACKFILL

2018 PARKING LOT MAINTENANCE & REPAIR

ATTACHMENT H TACOMA HYDROELECTRIC PROJECT DESCRIPTION OF PROJECT FEATURES

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

Aquaflex Soil Moisture Sensor (SI.60) -User Manual-

Minor Site Plan Application

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

Waterless dyeing process for DryDye fabrics

Electric Service Guide. Residential Subdivision

Vertical-Vibration Suppressing Design of Accumulator with New Vibration-Measuring Method

Attached please find a Provisional Special Provision and use guidelines for incorporating crushed glass in highway embankment construction projects.

UNIT 4 Math 621. Forms of Lines and Modeling Using Linear Equations

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST

Compost Mound. What You Need. Maintaining Your Compost Pile. Building a Compost Mound. Adding Wastes

4 Ways Tube and Core Manufacturers Can Reduce Waste. A Guide to Preserving Paper and Improving Production

COILED TUBING DESIGN & OPERATIONS

2015 Ag Mechanics CDE Prelim Exam

North Fork Alternative Plan Executive Summary

Section 1.3. Slope of a Line

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

PHAUCET 2012 version

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

TEMPORARY ROAD ENTRANCE (SEE DETAIL, FIGURE NO. 9) PAR-037 PAR-038 STREAM CROSSING (SEE DETAILS, FIGURE NOS. 19, 21 & 22) S-TQSM-03

IOM MALAWI EMERGENCY SHELTER CONSTRUCTION GUIDELINES

An alternative method for deriving a USLE nomograph K factor equation

Korean standards of visual grading and establishing allowable properties of softwood structural lumber

KEY CONCEPTS How GLEs are assessed on LEAP. BENCHMARKS Delineate what students should be able to do at the end of a grade cluster (K 4)

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

Subdivision Application Checklist

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION

B. Installation Instructions. Provide installation instructions, including any special equipment, to address the following.

Town of Apex, North Carolina

Nail guns come in a variety of configurations

Advanced Machining Processes Professor Vijay K. Jain Department of Mechanical Engineering Indian Institute of Technology, Kanpur Lecture 06

Fourth Grade. Course of Study For Science

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

MODULE 5 ACCOUNTING FOR EXPLORATION, DRILLING AND DEVELOPMENT COSTS

EARTH-POTENTIAL ELECTRODES PERMAFROST AND TUNDRA

2. Sort it Out Objective: Correctly sort objects into 4 categories waste, recyclable, compostable, and reusable.

School:_RES, SRES, EIES Grade Level: _1st_ Content Area/ Course: Science

Recycling Glass into a New Green Building Material

Major Site Plan Application

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

2.5 Design of Channels

Transcription:

Onlot System Component Matrix Absorption Area Component Classification and Secondary / Advanced Treatment Options Slope Minimum Suitable Soil Depth to a Seasonal High-Water Table Limiting Zone Minimum Suitable Soil Depth to a Rock Limiting Zone Percolation Rate Seepage Bed Standard Elevated Sand Mound Bed 0-8% 60 inches (1) 60 inches (1) 6-90 minutes per inch (If perc reading is 6-60 minutes per may be taken with peat 0-25% 60 inches (1) 60 inches (1) 6-90 minutes per inch (If perc reading is 6-60 minutes per may be taken with peat 0-12% 20 inches (1) 20 inches (1) 3-180 minutes per inch (If perc reading is 3-60 minutes per may be taken with peat Page 1 of 5

Elevated Sand Mound (Media) Filter Bed 0-12% 20 inches (1) 20 inches (1) 3-180 minutes per inch (If perc reading is 3-60 minutes per may be taken with peat 0-8% 72 inches (1) 72 inches (1) >90 minutes per inch at 12 to 36 inches (Media) Filter 0-25% 72 inches (1) 72 inches (1) >90 minutes per inch at 12 to 36 inches IRSIS 1) Free-access gravity sand 2) Peat filter 0-4% Agriculture 0-12% Grassed 0-25% Forested 10 inches 16 inches Test not required At-Grade Absorption Area 1) None needed 2) Free access gravity sand (media) filter 3) Peat filter 0-12% 1) 48 inches (1) 2-5) 20 inches 1) 48 inches (1) 2-5) 20 inches 1) 3-180 minutes per inch 2) 3-180 minutes per inch 3) 3-60 minutes per inch (Up to 40 percent reduction in can be taken, but new proposals must prove a full area is available.) 61-180 minutes per inch (No reduction in for new structures; repair situations must maximize system sizing up to the square footage of a fullsize system.) Page 2 of 5

At-Grade Absorption Area (cont.) Shallow Limiting Zone At-Grade Absorption Area Drip Irrigation 4) CO-OP RFS III recirculating 5) Recirculating subsurface sand (media) 1) Peat 2) CO-OP RFS III recirculating 3) Recirculating subsurface sand (media) 1) Intermittent sand (free access or buried) 2) Free access gravity sand (media) filter 3) Aerobic tank (primary & secondary treatment) 4) Peat filter 5) CO-OP RFS III recirculating 4) 3-180 minutes per inch 5) 3-180 minutes per inch 0-12% 10 inches 16 inches A soil scientist must do a soil morphological evaluation. 0-25% 20 inches Must be 20 inches minimum below drip tubing A soil scientist must do a soil morphological evaluation. (Media) Filter Bed or (12 inches of sand may be eliminated in bed) Peat filter 0-8% Bed 0-25% 72 inches 72 inches >90 minutes per inch at 12 to 36 inches Modified Subsurface Sand (Media) Filter for Fast Percolation, Shallow Bedrock Sites With No Water Table Present 0-8% (only beds permitted) 72 inches (1) See Guidance Section 10 for explanation for LZ of rock with open joints. 72 inches (1) Slowly permeable rock formation or other <3 minutes per inch at 12 to 36 inches and 3-180 minutes per inch at a depth Page 3 of 5

Shallow Placement Pressure-Dosed System Steep Slope Elevated Sand Mound Beds Evapotranspiration Bed within a Greenhouse Leaching Chambers as substitute in seepage bed or trenches, elevated sand mound bed or trenches, subsurface sand (media) filter bed or trenches Individual Designed Composting Toilet Graywater System (with the use of a waterless toilet) Flow Equalization (for facilities with regular, predictable, fluctuating flows; alternating high and low flows) Aggregates: 1) Round, natural, Type C, coarse or tire chip 0-8% Beds 0-25% stratum 58 inches (1) 58 inches (1) 6-90 minutes per inch >12-<15% 20 inches (1) 20 inches (1) 3-30 minutes per inch No requirements No requirements No requirements No requirements absorption area absorption area (Up to a 40 percent reduction in may be taken in some cases. See Guidance.) dispose of the dispose of the (Up to a 40 percent reduction in may be taken in some cases. See Guidance.) absorption area The must be sized for the controlled daily flow volume plus 15 to 20 percent. absorption area Page 4 of 5

2) Glass cullet 3) fine (sand) recycled glass fine (1) The top of the limiting zone must be at least four feet below the bottom of the. Page 5 of 5