Participant institutions: other INFN sections (Mi, RM1, RM2, Ba, Ca, Pi, Ts, Fe, Le, Fi, Na, LNS), ENEA-Frascat

Similar documents
Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs. Josef Frisch Pohang, March 14, 2011

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously

3 General layout of the XFEL Facility

System Integration of the TPS. J.R. Chen NSRRC, Hsinchu

Electro-Optical Measurements at the Swiss Light Source (SLS) Linac at the PSI. First Results

THE ORION PHOTOINJECTOR: STATUS and RESULTS

FLASH: Status and upgrade

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008

Femtosecond Synchronization of Laser Systems for the LCLS

Design considerations for the RF phase reference distribution system for X-ray FEL and TESLA

X-Ray Detection Using SOI Monolithic Sensors at a Compact High-Brightness X-Ray Source Based on Inverse Compton Scattering

CEBAF Overview June 4, 2010

NTA-PLASMONX. N. Drenska, R. Faccini, P. Valente Dip. Fisica Univ. La Sapienza, Roma

Feedback Requirements for SASE FELS. Henrik Loos, SLAC IPAC 2010, Kyoto, Japan

CLARA: A new particle accelerator test facility for the UK

Femtosecond-stability delivery of synchronized RFsignals to the klystron gallery over 1-km optical fibers

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory

Overview of enhancement cavity work at LAL

THz Pump Beam for LCLS. Henrik Loos. LCLS Hard X-Ray Upgrade Workshop July 29-31, 2009

New Tracking Gantry-Synchrotron Idea. G H Rees, ASTeC, RAL, U.K,

Beam Infrared Detection with Resolution in Time

Bioimaging of cells and tissues using accelerator-based sources

On-line spectrometer for FEL radiation at

Experiment to Measure Ramped Electron Bunches at the UCLA Neptune Laboratory Using a Transverse Deflecting Cavity 1

VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian

Electron Beam Diagnosis Using K-edge Absorp8on of Laser-Compton Photons

Note on the LCLS Laser Heater Review Report

FLASH II. FLASH II: a second undulator line and future test bed for FEL development.

VELA PHOTOINJECTOR LASER. E.W. Snedden, Lasers and Diagnostics Group

LUSI Pulse Picker System

GROUND MOTION IN THE INTERACTION. ensured that the final focus quadrupoles on both. rms amplitudes higher than some fraction of the

FAST RF KICKER DESIGN

Circumference 187 m (bending radius = 8.66 m)

ELECTRON BEAM DIAGNOSTICS AND FEEDBACK FOR THE LCLS-II*

Performance of the Prototype NLC RF Phase and Timing Distribution System *

RF-Based Detector for Measuring Fiber Length Changes with Sub-5 Femtosecond Long-Term Stability.

Proceedings of the Fourth Workshop on RF Superconductivity, KEK, Tsukuba, Japan

BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER

DEVELOPMENT OF CAPACITIVE LINEAR-CUT BEAM POSITION MONITOR FOR HEAVY-ION SYNCHROTRON OF KHIMA PROJECT

Nonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs

Beam Loss Monitoring (BLM) System for ESS

LUCX - THZ PROGRAM: OVERVIEW AND PROSPECTS

Workshop IGLEX Andromède & ThomX 23 June 2016, LAL Orsay. The X-line of ThomX.

Performance Evaluation of the Upgraded BAMs at FLASH

taccor Optional features Overview Turn-key GHz femtosecond laser

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY

FLASH II: an Overview

FLASH 2. FEL seminar. Charge: 0.5 nc. Juliane Rönsch-Schulenburg Overview of FLASH 2 Hamburg,

Engineering Challenges and Solutions for MeRHIC. Andrew Burrill for the MeRHIC Team

Beam Arrival Time Monitors. Josef Frisch, IBIC Sept. 15, 2015

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint

A Facility for Accelerator Physics and Test Beam Experiments

membrane sample EUV characterization

MEASURES TO REDUCE THE IMPEDANCE OF PARASITIC RESONANT MODES IN THE DAΦNE VACUUM CHAMBER

Extreme Light Infrastucture (ELI) Science and Technology at the ultra-intense Frontier. Bruno Le Garrec

Infrared Single Shot Diagnostics for the Longitudinal. Profile of the Electron Bunches at FLASH. Disputation

Investigations towards an optical transmission line for longitudinal phase space measurements at PITZ

Sub-ps (and sub-micrometer) developments at ELETTRA

Single Bunch Impurity Measurement at SPring-8 8 Storage Ring

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7

Niowave s Growth and the Role of STTR in its Development

Performance of the TTF Photoinjector Laser System

Today s Outline - January 25, C. Segre (IIT) PHYS Spring 2018 January 25, / 26

Status of the Electron Beam Transverse Diagnostics with Optical Diffraction Radiation at FLASH

REAL-TIME DISPLAY SYSTEM FOR THE OPTICAL FIBER BEAM LOSS MONITOR FOR THE PHIL AND THOMX FACILITIES

Shintake Monitor Nanometer Beam Size Measurement and Beam Tuning

R. J. Jones Optical Sciences OPTI 511L Fall 2017

SYNCHRONIZATION SYSTEMS FOR ERLS

Wisconsin FEL Initiative

Drive Beam Photo-injector Option for the CTF3 Nominal Phase

Strategy for the engineering integration of the ESS accelerator

Check the LCLS Project website to verify 2 of 7 that this is the correct version prior to use.

Development of a high-power coherent THz sources and THz-TDS system on the basis of a compact electron linac

NIST EUVL Metrology Programs

R.Bachimanchi, IPAC, May 2015, Richmond, VA

Status of Proton Beam Commissioning at MedAustron Ion Beam Therapy Center

PGx11 series. Transform Limited Broadly Tunable Picosecond OPA APPLICATIONS. Available models

Development of scalable laser technology for EUVL applications

High Repetition Rate Inverse Compton Scattering Source

S.M. Lidia, G. Bazouin, P.A. Seidl Accelerator and Fusion Research Division Lawrence Berkeley National Laboratory Berkeley, CA USA

RF Locking of Femtosecond Lasers

DEVELOPMENT OF OFFNER RELAY OPTICAL SYSTEM FOR OTR MONITOR AT 3-50 BEAM TRANSPORT LINE OF J-PARC

Ultrahigh precision synchronization of optical and microwave frequency sources

Interferometer signal detection system for the VIRGO experiment. VIRGO collaboration

Installation of the Optical Replica Synthesizer (ORS) at FLASH

Grounding for EMC at the European XFEL

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team

HIGH-PRECISION LASER MASTER OSCILLATORS FOR OPTICAL TIMING DISTRIBUTION SYSTEMS IN FUTURE LIGHT SOURCES

The Potential for the Development of the X-Ray Free Electron Laser

SURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE

Re-commissioning the Recycler Storage Ring at Fermilab

Supplementary Figure 1

RF-based Synchronization of the Seed and Pump-Probe Lasers to the Optical Synchronization System at FLASH

Physics Requirements for the CXI 0.1 micron Sample Chamber

Synchronization Overview

Attosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors

High Power and Energy Femtosecond Lasers

Dark Current Kicker Studies at FLASH

Coherent Synchrotron Radiation in the ANKA Storage Ring

HIGHER ORDER MODES FOR BEAM DIAGNOSTICS IN THIRD HARMONIC 3.9 GHZ ACCELERATING MODULES *

Transcription:

The THOMSON SOURCE AT SPARC_LAB C. Vaccarezza (Resp. Naz.), M.P. Anania (Ass. Ric.), M. Bellaveglia (Art. 23), M. Cestelli Guidi (Art. 23), D. Di Giovenale (Art. 23) G. Di Pirro, A. Drago, M. Ferrario, A. Gallo, G. Gatti, A. Ghigo, A. Marcelli, E. Pace, L. Palumbo (Ass.), F. Villa (Ass. Ric.). Participant institutions: other INFN sections (Mi, RM1, RM2, Ba, Ca, Pi, Ts, Fe, Le, Fi, Na, LNS), ENEA-Frascat In the 2013 the SL-Thomson project has seen the completion of the hardware installation by means of the interaction region finalization and the vacuum connection between the two electron and laser transfer lines. More over the first steps of the electron beam commissioning have been performed in a few days dedicated shifts between September and October 2013 The SL-Thomson project consists in a monochromatic source of ultra-fast X-ray pulses by Thomson back-scattering (TS) between the SPARC photoinjector high-quality electron beam and the 200 TW laser FLAME laser pulse, see Fig.1. The key points of this configuration are the flexibility and the potential compactness with respect to conventional synchrotron sources. Fig.1 The SPARC-LAB Thomson Source layout The source is meant to provide X-rays ranging between 20-500 kev able to produce, for example, suitable radiation for medical imaging at the lower energies and the possibility to investigate the inner quantum nature of the Compton process in the higher part of the spectrum. The Thomson system To bring the two beams in collision a 30 m long double dogleg electron beamline has been constructed that extracts the electron beam at the exit of the the linac and brings it in the outer bay of the SPARC hall (Fig. 2), while the laser pulse coming from the FLAME building enters the hall behind a protective concrete labyrinth and propagates for around 20 m under vacuum (10-6 Torr) up to the Interaction Point, Fig. 3. The two beams parameter table is reported below:

IP Fig. 2 Pictures of the electron beam line Fig. 3: Pictures of the photon beam line: the protection wall for the photon pipe insertion (left above), a mirror chamber(left below), the photon beamline inside the SPARC hall.

The Interaction Chamber A special care has been devoted to the interaction chamber design that in the most compact arrangement provides the housing for both the electron and photon beam focusing systems and for the diagnostic and vacuum pumping as well. In Fig. 4 the CAD 3D design is reported that shows the two beams propagation directions together with the parabolic mirror location (right side) for the focusing of the incoming photons (rightside) while on the leftside the electron beam focusing solenoid is located. In Fig. 5 the Thomson interaction chamber is shown as realized and installed in the beamline. IP solenoid parabolic mirror Fig. 4 CAD design of the Interaction chamber. Fig. 5 The installed Thomson Interaction chamber.

Experimental Results The foreseen first commissoning phase was meant to provide a 200pC electron beam transport at two energies between 80-30 MeV with the final focus obtained by means of the quadrupole triplet upstream the Interaction Point. The first measurements have been performed in the month of September 2013 with a four day shift: the goal was to transport the electron beam bunches up to the interaction chamber. The measurements have been performed using the electron beam diagnostics of the beam line consisting in fluorescent screen mounted on movable supports for the beam imaging and in Beam Position Monitors to record the beam transverse position along the beamline Electron Beam transport and measurements In fig. 6-7 the results of the very first few days of commissioning in September 2013 are reported as the beam pictures grabbed on the Thomson-IP fluorescent screens for two different beam energies: 75 and 50 MeV, while in fig. 8 the beam image on the final dumper screen downstream the IP is reported. The quadrupole focusing has been kept as low as possible in order to minimize the steering effect due to the off-center electron orbit inside the quadrupoles and an rms beam size of σ x =0.50±0.02 mm and σ y =0.28±0.02 mm have been obtained as a first attempt at IP for the 150 and 75 MeV beams with a charge Q=230 pc, while a beam size of σ x =0.18±0.02 mm and σ y =0.17±0.02 mm has been otained in the 50 MeV case. Fig. 6: 75 MeV electron beam on the THMFLG03 screen at the Interaction Point of the SL_Thomson beamline, Q ~ 230 pc, σ x =0.55±0.02 mm and σ y =0.36±0.02 mm.

Fig. 7: 50 MeV electron beam on the THMFLG03 screen at the Interaction Point of the SL_Thomson beamline, Q ~ 230 pc, σ x =0.18±0.02 mm and σ y =0.17±0.02 mm. Fig.8: 75 MeV electron beam on the THMFLG04 screen about two meter downstream the final dumper, Q ~ 230 pc, σ x =1.60±0.02 mm and σ y =0.34±0.02 mm Laser Pulse transport @IP The laser beam transfer line to the interaction region is composed by a series of high reflectivity mirrors inserted in a vacuum pipe 50 m long see fig. 3. The mirrors, 8 inches diameter, are supported by motorized gimbal mounts in order to assure the alignment up to to the off-axis parabola that focuses the laser pulse on the electron beam. The design of the line has been performed with ZEMAX optical code to simulate the effect of the misalignment of the mirrors on the final spot. The FLAME laser beam is extracted from the FLAME target area and guided up to the Thomson IP by means of an under vacuum beamline: the vacuum of the photon beam line is a the level of 10-6 Torr suitable for the transport of the compressed laser pulse ( 10fs length) as needed for the plasma acceleration experiment. A concrete wall has been realized in order to stop any radiation draft from the FLAME area towards the SPARC bunker, and to allow people entering in the SPARC hall during the FLAME laser operation and viceversa. The synchronization system The Thomson scattering experiment needs an extremely precise synchronization between electron bunch and laser pulse. The relative time of arrival jitter of the two beams is fundamental to obtain a repeatable and efficient interaction. The electrons and photons have to be synchronized with a relative jitter < 500 fs RMS. This is obtained with a standard electrical distribution of the reference signal, already present at SPARC. A Reference Master Oscillator (RMO) with a good phase noise performance (60fs RMS, measured from 10Hz to 10MHz from the carrier) is used to lock the subsystems with different feedback loops. They can be divided in two general types: slow (bandwidth <10 Hz) and fast (10 Hz to some MHz bandwidth). The formers are used typically to compensate slow drifts caused by thermal elongation of cables and are implemented by means of high resolution stepper motors. The others are designed to compensate the high frequency noise suffered by the systems that is normally due to mechanical vibrations or electrical noise in the RF circuits or power amplifiers (klystron tubes and driver amplifiers). For the photocathode laser oscillator we have enhanced the performance of the PLL modifying the loop error amplifier, providing a RMO relative phase noise jitter <50fs RMS. We also added a new electronic board to choose the relative delay to the FLAME laser oscillator pulses (already locked to the RMO) to ensure the longitudinal superposition of the electron beam and the photon pulse at the interaction point.

Pubblicazioni: Petrillo, V.; Bacci, A.; Curatolo, C.; Maroli, C., Serafini.L.; Rossi A.R. 'Time evolution analysis of the electron distribution in Thomson/Compton back-scattering' JOURNAL OF APPLIED PHYSICS Volume: 114 Issue: 4 Article Number: 043104 Published: JUL 28 2013 Bacci, A.; Alesini, D.; Antici, P.; et al. 'Electron Linac design to drive bright Compton back-scattering gamma-ray sources' JOURNAL OF APPLIED PHYSICS Volume: 113 Issue: 19 Article Number: 194508 Published: MAY 21 2013 Maroli, C.; Petrillo, V.; Tomassini, P.; Serafini L. 'Nonlinear effects in Thomson backscattering' PHYSICAL REVIEW SPECIAL TOPICS-ACCELERATORS AND BEAMS Volume: 16 Issue: 3 Article Number: 030706 Published: MAR 27 2013 Petrillo, V.; Chaikovska, I.; Ronsivalle, C.; Rossi, A.R., Serafini L.; Vaccarezza C. 'Phase space distribution of an electron beam emerging from Compton/Thomson back-scattering by an intense laser pulse' Europhysics Letters Volume: 101 Issue: 1 Article Number: 10008 Published: JAN 2013