Contents Section 1 Cubicles Cubicle Components 3 Cubicle Installation 4-5 Cubicle Fittings Brackets 6 Hinges 7 Partition Support Leg 8 Indicator Bolt 9 Section 2 IPS Duct Panel Systems Frame, Flash & Panel Assembly 10 IPS Standard Configurations 11 Section 3 - Vanity Units Components & Assembly 12 Section 4 Basic Maintenance 13 Page 2
Section 1 Cubicles Cubicle Components Page 3
Fix Brackets to wall along the line Align & position Partition to brackets. Temporarily support Partition whilst doing so Mark vertical line on rear wall 3. Level across the top of the channel brackets to the position of the next cubicle channel brackets, mark and fix to the rear wall. (This ensures that the cubicles are all level even if the floor is not). Repeat for all remaining channel brackets to be fixed to the rear wall. Mid Pilaster 4. Position the partition(s) into the channel brackets on the rear wall, whilst providing temporary support, and level as necessary. The partitions should be set up 150mm off the floor. 5. Fix three channel brackets to the centre line of the Mid Pilaster(s), and where cubicles are in a corner, three Angle Brackets to the outer edge of the End Pilaster 6. Next check the squareness of the partition and then fit the Partition Support Leg(s) to bottom of the partition(s) approximately 100mm from the front edge. (please ensure before drilling that no under floor heating is present). 7. Position the Mid Pilaster(s) to the end of the partition, and push-fit the channel brackets over the 'open' end of the partition(s) ensuring the pilaster and partition tops are aligned. Page 4
8. Install End Pilasters to the side wall on the brackets provided, using 35x4mm screws and red plugs. The partitions should be set up 150mm off the floor and accurately aligned with the Mid Pilasters. 9. Drill through the pre-drilled holes in the sides of the channel brackets, and fix the partitions to the pilasters with the hex-head t-nuts provided 10. Adjust the height of the leg(s) as required, position the leg(s) to the correct cubicle centre dimension. 11. The Headrail braces the whole cubicle construction, so correct fitment is essential. Position the Head Rail over the tops of all the Pilasters & Fascia Panels, ensuring that all joints on the Header Rail are positioned over the top of a Pilaster or Panel. 12. Pilot drill the top of the Header Rail and screw down to top of front panels as necessary, ensuring door openings are equal top and bottom. 13. Drill through the pre-drilled holes in the sides of the channel brackets and fix the partitions to the rear wall. Fix the remaining End Pilaster(s) to the end wall(s), with the hex-head t-nuts provided. 14. Ensuring the Partition Support Leg(s) are at the correct height, drill and fix the inner part of the adjustable legs to the floor. 15. Unscrew the hinge assembly, and fix the double-bolt section to the Mid Pilaster(s) and 'hinge' pilaster(s). 16. The remaining part of the hinge fixes to the pre-drilled hole on the door panel. Note: the hinge contains a nylon insert, which can be turned to allow the doors to fall open, or closed. Adjust as required prior to hanging the door and refitting screws. 17. Disassemble indicator bolt, fit through the pre-drilled holes in the door, and reassemble. Fit and adjust keep for the bolt as necessary see instructions for your specific Indicator Bolt I Page 5
Individual Component Installation Detail BRACKETS 1. Mark off the central line on the wall 2. Position the brackets on the centre line 3. Mark the two holes per bracket 4. Drill the holes at 5.5mm / minimum depth 50mm 5. Secure the brackets using the wall plugs and screws provided 6. Repeat steps 1. to 3. on the Pilaster or Fascia Panel 7. Secure the brackets to the fascia with the screws provided 8. Position the partition in the brackets 9. Drill through the brackets using a 9.5mm drill 10. Secure the panel to the brackets using the T-Nuts and All-Thread provided Page 6
HINGES 1. The Hinges are face fixed to the back of the fascia and the EDGE of the door. 2. To ensure trouble free operation of the hinges it is important to be accurate and as vertical as possible to pre-vent binding of risers. 3. When dismantling the hinge remove the M5x10 Screw from the hinge pin and pull apart. 4. Align hinges to door and partition and 5. When fitting ensure the hinge pin is pointing downward. 6. secure with screws provided. Lift door into place and test for smooth operation. Hinges are supplied in the Door Open Position. 7. When satisfied with operation replace M5x10 Machine Screw to hinge pin. 25mm HINGE PIN THIS HINGE FITTED TO DOOR No.8x2 W/S No.8x3/4 W/S 79mm M5x10 M/HEAD 54mm INWARD or OUTWARD OPENING DOOR OUTSIDE HINGE INSIDE HINGE For outward opening door, turn bolt 1800 so that the slide bolt does not protrude beyond the edge of door. Use an outward opening Keep concealed behind door Page 7
PARTITION SUPPORT LEG Edge Design Washrooms supply several styles of Partition Support Leg. The following instructions relate to our most popular leg configuration. If the leg supplied to you is different and you have not received specific instructions for your support leg, please call us on 0116 332 1175 and we will be pleased to assist or send instructions. Page 8 1. Mark all holes / centre line positions as accurately as possible. 2. Take care not to damage hardware or chip powder coatings. 3. Mark off the vertical centre line of the support onto the front edge of the partition, ideally this should be within 250mm from the front edge 4. Loosen the retaining screw in the Leg Shroud and lift up the Shroud to access the adjuster mechanism. adjust the block up into the support as far as it will allow. 5. Offer up the support to the partition and mark out the hole position on the centre line. 6. Drill through using a ø9.5mm drill. 7. Fix support to partition using the M6 T Nuts. 8. The partition can now be mounted to the wall, ensure that the front edge is supported by the use of packing pieces. 9. Once the partition is secure, the support block can be adjusted to floor level taking full support of the partition. 8. Using a ø5.50mm masonry drill, drill through the block following the angle to a depth of 50mm 10. Fit red wall plugs and secure the foot to the floor using the No.8 x 2 Woodscrews. 11. The shroud can now be lowered to the floor and secured using
INDICATOR BOLT Edge Design Washrooms supply several styles of Indicator Bolt. The following instructions relate to our most popular styles. If the Indicator Bolt supplied is different to that shown and you have not received specific instructions for your support leg, please call us on 0116 332 1175 and we will be pleased to assist or send instructions. 1. Holes are normally factory pre-drilled. If not Mark out hole centres and slot as shown. 2. Once holes have been drilled, position up the Bolt Housing and Face Plate 3. Secure together with the 2 x M4 Bolts supplied, ensure the Bolt mechanism operates signal correctly. ( Green - Open / Red - Closed) 4. Using 2 x No8. x 1 woodscrews secure the bottom two holes of the Bolt Housing to the Door. 5. Check for free movement of Bolt and Signal. 6. Once satisfied, position the keep to the correct position on the fascia and fix in place with the 2 x No.8 x 5/8 woodscrews supplied. 7. Fit Buffers to top and bottom of the door STANDARD INDICATOR BOLT ECLIPSE INDICATOR BOLT Page 9
Section 2 IPS Duct Panel Systems Page 10
Optional postformed vertical edges to Access Panels Page 11
Section 3 Vanity Units Page 12 1. Fix support timber batton to rear wall at the appropriate height. Ensure batton is square and does not foul service pipes 2. Fix support timber batton to floor at the appropriate distance from the rear wall 3. Screw through under carcass into bottom of downstand or use angle bracket to fix Under Carcass to Downstand 4. Screw through wall batton into underside of Vanity Top 5. Screw through floor batton into rear of Under Carcass or Vanity Plinth 6. Fix Access Panels to front of Under Carcass using the concealed Keku Clips supplied. Ensure panels are aligned with each other and parallel to the Downstand apron
Section 4 Basic Maintenance Cubicle Pilasters, Partitions and Doors Cleaning: Remove general stains and marks with a proprietary non-abrasive bathroom or kitchen surface cleaning solution on a damp cloth. Do not use excessive amounts of water or solution. Avoid scrubbing or using anything with sharp edges. Periodic Inspection: Every 3 months check the cubicle hardware. Spares may be ordered by calling Customer Service on 0116 3321175. Every 12 months check all panels and edgings for integrity, particularly if they have for any reason become exposed to water or damp atmosphere. Cubicle Hardware Cleaning: The hardware should be cleaned frequently. Satin anodised hardware use a mild anti-bacterial detergent and damp cloth. Powder coated and polished hardware use a polish and non-abrasive cloth. Do not use corrosive chemicals. Lubrication: Lightly lubricate the indicator bolt mechanism every 6 months to ensure continuity of movement. Light lubrication of the hinges is also required to avoid the door sticking and deterioration of the riser. Periodic Inspection: Periodically inspect all fixings, adjust to secure as and when needed. Ensure correct sized allen keys, screw drivers and drill bits are used. Safety mechanisms must also be inspected frequently in case of vandalism. If vandalism occurs the part should be replaced as soon as possible to avoid any accidents. Fitting of 'T' Nuts: When 'T' Nuts are used they should be fitted securely but not too tight to allow movement of the laminate. As the material expands with moisture, pressure is put on the `T' Nuts causing them to sheer off if they are fitted too tight. TO ORDER SPARE PARTS PLEASE CONTACT US ON 0116 332 1175 Page 13