The Status of ATLAS. Xin Wu, University of Geneva On behalf of the ATLAS collaboration. X. Wu, HCP2009, Evian, 17/11/09 ATL-GEN-SLIDE

Similar documents
Operation and Performance of the ATLAS Level-1 Calorimeter and Level-1 Topological Triggers in Run 2 at the LHC

The ATLAS detector at the LHC

LHC Experiments - Trigger, Data-taking and Computing

Tracking and Alignment in the CMS detector

arxiv: v2 [physics.ins-det] 20 Oct 2008

Hardware Trigger Processor for the MDT System

Performance of the ATLAS Muon Trigger in Run I and Upgrades for Run II

The LHCb Upgrade BEACH Simon Akar on behalf of the LHCb collaboration

Spectrometer cavern background

Operation and performance of the CMS Resistive Plate Chambers during LHC run II

The Run-2 ATLAS. ATLAS Trigger System: Design, Performance and Plans

The CMS Outer HCAL SiPM Upgrade.

Status of the LHCb Experiment

ATLAS Muon Trigger and Readout Considerations. Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration

Attilio Andreazza INFN and Università di Milano for the ATLAS Collaboration The ATLAS Pixel Detector Efficiency Resolution Detector properties

The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern

Measurement of the charged particle density with the ATLAS detector: First data at vs = 0.9, 2.36 and 7 TeV Kayl, M.S.

The ATLAS detector. P. Perrodo. To cite this version: HAL Id: in2p

The Commissioning of the ATLAS Pixel Detector

arxiv: v1 [physics.ins-det] 25 Oct 2012

Installation, Commissioning and Performance of the CMS Electromagnetic Calorimeter (ECAL) Electronics

Calorimeter Monitoring at DØ

8.882 LHC Physics. Detectors: Muons. [Lecture 11, March 11, 2009] Experimental Methods and Measurements

CMS Silicon Strip Tracker: Operation and Performance

LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring

Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4. Final design and pre-production.

Hardware Trigger Processor for the MDT System

Level-1 Calorimeter Trigger Calibration

Muon reconstruction in ATLAS

The ATLAS Muon System

Data acquisition and Trigger (with emphasis on LHC)

The ATLAS Trigger in Run 2: Design, Menu, and Performance

The Run-2 ATLAS Trigger System

ATLAS Phase-II trigger upgrade

Upgrade of the ATLAS Thin Gap Chamber Electronics for HL-LHC. Yasuyuki Horii, Nagoya University, on Behalf of the ATLAS Muon Collaboration

Layout and prototyping of the new ATLAS Inner Tracker for the High Luminosity LHC

Design and Performance of the ATLAS Muon Detector Control System

Phase 1 upgrade of the CMS pixel detector

The CMS Muon Detector

James W. Rohlf. Super-LHC: The Experimental Program. Boston University. Int. Workshop on Future Hadron Colliders Fermilab, 17 October 2003

The trigger system of the muon spectrometer of the ALICE experiment at the LHC

CMS electron and _ photon performance at s = 13 TeV. Francesco Micheli on behalf of CMS Collaboration

Design and Construction of Large Size Micromegas Chambers for the ATLAS Phase-1 upgrade of the Muon Spectrometer

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Status of ATLAS & CMS Experiments

Signal Reconstruction of the ATLAS Hadronic Tile Calorimeter: implementation and performance

Data acquisition and Trigger (with emphasis on LHC)

arxiv: v2 [physics.ins-det] 13 Oct 2015

What do the experiments want?

The LHCb trigger system

Nikhef jamboree - Groningen 12 December Atlas upgrade. Hella Snoek for the Atlas group

PoS(EPS-HEP2017)476. The CMS Tracker upgrade for HL-LHC. Sudha Ahuja on behalf of the CMS Collaboration

Track Triggers for ATLAS

EPJ C direct. The ATLAS trigger system. 1 Introduction. 2 The ATLAS experiment. electronic only. R. Hauser, on behalf of the ATLAS collaboration

Current Status of ATLAS Endcap Muon Trigger System

Construction and Performance of the stgc and MicroMegas chambers for ATLAS NSW Upgrade

The CMS Muon Trigger

Development and Test of a Demonstrator for a First-Level Muon Trigger based on the Precision Drift Tube Chambers for ATLAS at HL-LHC

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland. CMS detector performance.

ATLAS and CMS Upgrades and the future physics program at the LHC D. Contardo, IPN Lyon

Triggers: What, where, why, when and how

Overview of the ATLAS Trigger/DAQ System

Development of a Highly Selective First-Level Muon Trigger for ATLAS at HL-LHC Exploiting Precision Muon Drift-Tube Data

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Lecture 11. Complex Detector Systems

Trigger and Data Acquisition Systems. Monika Wielers RAL. Lecture 3. Trigger. Trigger, Nov 2,

BaBar and PEP II. Physics

Triggering at ATLAS. Vortrag von Johannes Haller, Uni HH Am ATLAS-D Meeting, September 2006

The CMS ECAL Laser Monitoring System

PoS(LHCP2018)031. ATLAS Forward Proton Detector

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

D. Ferrère, Université de Genève on behalf of the ATLAS collaboration

Status of the PRad Experiment (E )

`First ep events in the Zeus micro vertex detector in 2002`

Expected Performance of the ATLAS Inner Tracker at the High-Luminosity LHC

Data acquisi*on and Trigger - Trigger -

The Compact Muon Solenoid Experiment at the LHC. Images of Assembly and Installation

ATLAS ITk and new pixel sensors technologies

TRIGGER & DATA ACQUISITION. Nick Ellis PH Department, CERN, Geneva

Construction and Performance of the stgc and Micromegas chambers for ATLAS NSW Upgrade

Field Programmable Gate Array (FPGA) for the Liquid Argon calorimeter back-end electronics in ATLAS

optimal hermeticity to reduce backgrounds in missing energy channels, especially to veto two-photon induced events.

1.1 The Muon Veto Detector (MUV)

The LHCb Vertex Locator : Marina Artuso, Syracuse University for the VELO Group

Detector for LHC collisions

CMS Paper. Performance of CMS Muon Reconstruction in Cosmic-Ray Events. arxiv: v2 [physics.ins-det] 29 Jan The CMS Collaboration

Muon Collider background rejection in ILCroot Si VXD and Tracker detectors

First-level trigger systems at LHC. Nick Ellis EP Division, CERN, Geneva

W/Z analysis with electrons

Construction and first beam-tests of silicon-tungsten prototype modules for the CMS High Granularity Calorimeter for HL-LHC

The design and performance of the ATLAS jet trigger

The LHCb Experiment. Experiment and what comes after. O. Ullaland Ljubljana January Theodor Kittelsen, Soria Moria (with modifications)

Physics at the LHC and Beyond Quy Nhon, Aug 10-17, The LHCb Upgrades. Olaf Steinkamp. on behalf of the LHCb collaboration.

Totem Experiment Status Report

Beauty Experiments at the LHC

Trigger Overview. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 12, 2000

Status of the LHCb experiment

Triggers For LHC Physics

CALICE Software. Data handling, prototype reconstruction, and physics analysis. Niels Meyer, DESY DESY DV Seminar June 29, 2009

Transcription:

ATL-GEN-SLIDE-2009-356 18 November 2009 The Status of ATLAS Xin Wu, University of Geneva On behalf of the ATLAS collaboration 1

ATLAS and the people who built it 25m high, 44m long Total weight 7000 tons 10 8 electronic channels 3000 km of cables ~2900 physicists (~1050 PhD students) Many engineers and technicians 172 Institutions from 37 countries and 5 continents Oct. 2009 numbers 2

20 years and the end of the beginning 1989: R&D starts 1992 : ATLAS LoI 1994: TP 1996: approval From 1996 on a series of TDR 1997: construction starts 2003: underground installation starts 2008: installation completed Sept. 2008: single-beam events recorded Dec. 2009: first LHC collision recorded? Closure of the LHC beam pipe inside the ATLAS cavern on 16 June 2008. First beam splash event,10 Sep. 2008 3

Detector hardware status summary in one page Sub-detector Number of channels Operational fraction (%) Pixels SCT Silicon Strips TRT Transition Radiation Tracker 80 M 6.3 M 350 k 98.0 99.3 98.2 LAr EM Calorimeter Tile Calorimeter Hadronic Endcap LAr Calorimeter Forward LAr Calorimeter 170 k 9.8 k 5.6 k 3.5 k 98.8 99.5 99.9 100 MDT Muon Drift Tubes CSC Cathode Strip Chambers RPC Barrel Muon Trigger Chambers TGC Endcap Muon Trigger Chambers 350 k 31 k 370 k 320 k 99.7 98.4 97.0 99.8 Trigger and DAQ: routinely taking long runs of cosmic data with all detector integrated at >300 MB/s 4

More detailed report on ATLAS Status Magnet System Muon Spectrometer Calorimeters Inner Detector Trigger and DAQ Computing Combined Performance with Cosmics 5

Magnet System 6

Magnet System Barrel toroid 8 superconducting coils, each 25 m long, 5m wide, 100 tons I=20.5 ka, T=4.5 K Typical field 0.5 T Endcap toroid (x2) 8 coils in common cryostat 11m diameter, 240 tons I=20.5 ka, T=4.5 K Typical field 1T Solenoid 5.8m long, 2.5m diameter. I=7.7 ka, T=4.5 K Field 2 T Closure of Endcap toroid in May 2009 Insertion of solenoid in LAr Calo in Feb 2004 7

Full barrel toroid in place in October 2005 8

Operation of the magnet system The full magnet system has been operated at full current for long periods since August 2008 June - July 2009 9

Muon Spectrometer MDT RPC TGC CSC 10

Barrel Muon Spectrometer Precision chambers Trigger chambers 700 barrel precision chambers (MDT) 600 barrel trigger chambers (RPC, η <1.05) Momentum resolution: <10% up to ~1 TeV Field integral: 2-6 Tm η <1.3, 4-8 Tm 1.6< η <2.7 11

Forward Muon Spectrometer Big wheels (and end-wall wheels): Small wheels : ~400 MDT precision chambers ~32 CSC precision chambers ~3600 TGC trigger chambers ~80 MDT chambers Small wheels End-wall wheels Big wheels 12

Muon System Hardware Status MDT Sub-detector Number of channels Operational fraction MDT CSC RPC TGC 341 k 31 k 359 k 318 k 99.7% 98.4% 97.0% 99.8% RPC 13

Triggering on Cosmic Muons Both RPC and TGC have been providing stable cosmic muon triggers since August 2008 Access shafts Elevators 14

Muon Detection Efficiency TGC layer efficiency ~94% as designed TGC preliminary phi sector MDT segment efficiency ~99% as designed MDT RPC Barrel middle chambers RPC layer efficiency ~94% will be improved to ~97% designed eta sector 15

Muon Detector Alignment with Cosmics Unbiased sagitta of straight tracks for MDT middle barrel chamber BML2C03 Nominal geometry Alignment procedure has been tested with cosmic muons With tracks from collisions, will align to ~30 µm of accuracy, to achieve 10% p/p at 1 TeV. B~0.5T sagitta ~ 500 µm at 1 TeV With optical alignment y L~5m z Details in O. Kortner s talk this afternoon After track alignment 2008 cosmic data 16 12,232 optical sensors

Muon Detector Tracking Performance Standalone tracking efficiency standalone momentum resolution with cosmics Efficiency calculated with respect to Inner Detector tracks Degradation due to limited alignment statistics and cosmic timing jitter Details in O. Kortner s 17 talk this afternoon

Calorimeters Fe/Scint Tile LAr 18

Tile Hadronic Calorimeter Sampling calorimeter with Fe/scintillator (4.7:1), 7.4λ, covering η <1.7 Projective geometry cells with η ϕ=0.1x0.1 (0.2x0.1 in third layer) Double PMT readout via WLS fibers (5000 cells 10k channels) Expected jet energy resolution E E ~ 50% E 3% 19

Tile Calorimeter Noise Stability Noise stability Aug-Nov 08 RMS (10k channels)= 0.31 % Mean ~ 1.44 ADC counts Noise remains stable over months as measured in random events Minimum ionizing particle signal from cosmic muons cleanly above noise 20

Tile Calorimeter Uniformity Cells in second layer phi Cell response in eta and phi extrapolated from the Inner Detector track Cells in first layer eta Good response uniformity and ID-TileCal alignment 21

Liquid Argon Calorimeter Electromagnetic: Barrel + End-cap ( η <3.2) Pb+LAr accordion, ~22-35 X 0 σ/e ~ 10%/ E 0.7% Hadronic: End-cap (1.5< η <3.2) Cu+LAr flat-plate, 11 λ σ/e ~ 50%/ E 3% Forward: (3.1< η <4.9) EM: Cu+lAr, HAD: W+LAr small LAr gaps between rods and tubes σ/e ~ 100%/ E 10% 22

LAr Hardware Status ~182k channels in total LAr HV correction factors: ~94% with nominal values 0.02% irrecoverable ~1% with dead readout, mainly due to bad optical transmitters on front end boards, to be fixed at next access 23

LAr Noise and Stability Electronics noise in MeV Etmiss in random triggers Pedestal stability Gain stability 24

LAr Pulse Shape and Drift Time Measurement Pulse shapes are validated with cosmic data with 32 samples readout Agreement is better than 2% Drift time extracted from pulse shape measurement in good agreement with expectation Relation between drift time and gap size allows to set limit on contribution to the energy resolution constant term In the barrel T dr /T dr =1.37±0.03% C gap < 0.32% (test beam ~0.,2%) E cell > 1 GeV 25

Energy Reconstruction and Uniformity of LAr S1 S2 Select projective tracks Associated energy reconstructed across the EM barrel in the first and second layers Measured non-uniformity in η sets a limit of 1.1% at 95% CL for the middle layer Details in T. Koffas talk Thursday afternoon 26

Inner Detector Silicon TRT 27

Inner Detector Pixel : 80 M 50x400µ pixels TRT : 350k straw tubes (Xe) SCT : 6.3 M 80µ Si strips 28

Inner Detector Tracking Tracking in η <2.5, B=2T A track in barrel passes: 36 TRT straws 4x2 silicon strips 3 pixels Expected performance: σ/p T ~ 3.4x10 4 p T (GeV) 0.015 σ d0 ~ 10 140/p T (GeV) µm 29

Noise Occupancy Very good noise occupancy Pixel: < 10 9 SCT: < 5 10 4 TRT: 2% SCT 10 10 Pixel 30

Hit Efficiency SCT 99.5% Very good hit efficiency Pixel, SCT: >>99% TRT: > 97% 99.7% TRT Pixel 31

Alignment with Cosmic Ray Tracks Details in L. Vacavant s talk Tuesday morning Pixel SCT TRT Results of alignment using 2008 cosmics Pixel: σ x perfect 16µ, achieved 24µ σ y perfect 127µ, achieved 131µ SCT: perfect 24µ, achieved 30µ TRT: perfect 136µ, achieved 165µ standalone and using full ID track in good agreement 32

Detector Mechanical Stability Pixel SCT Residual distribution of 2009 cosmic data using 2008 alignment Pixel x: 26µ, SCT : 36µ Detector is mechanically stable 33

Tracking Performance Details in L. Vacavant s talk Tuesday morning Fitting a cosmic ray passing through the full detector as two separate tracks (upper and lower) allows to measure the track resolutions directly Already close to ideal detector performance! Impact parameter resolution momentum resolution 34

Trigger and DAQ (TDAQ) High Level Trigger CPU Farm L1 Trigger racks HLT farm: 850 multi-core PCs installed (35% of the total planned for high luminosity) 35

TDAQ Architecture Level 1 (L1) Custom electronics identifies Region of Interest (RoI) using info from calorimeter and muon detectors High level Trigger (HLT) L2: PC farm runs fast algorithms to reconstruct e/γ, µ, τ, in a RoI using full granularity info from all detectors EF: PC farm runs offline algorithms accessing the full event 300 MB/s to mass storage ~3 PB/year stored DAQ Pipelined front end electronics Readout System with custom built buffers in PC farm Event building in PC farm on Data Network 36

TDAQ in full action since early 2008 3 major cosmic data taking (24/7) periods with fully integrated detectors ~200M events recorded in Sept/October 2008 ~90M event recorded in June/July 2009 global cosmic data taking with full detector resume in October 2009 L1 triggered by L1Muon, L1Calo, MinBias scintillator triggers HLT used to select tracks passing through Inner Detector many HLT algorithms are exercised 37

Trigger Performance with Cosmics Correlation between L1Calo and offline Track trigger efficiency at L2 L2 and EF shower shape for electron id comparison of EF and offline muon reconstruction 38

Computing The LHC computing universe 39

Computing Infrastructure ~ 50 PB/year of ATLAS data to be moved across the Grid 10 Tier-1s ~70 Tier-2s 10 9 raw events per year to be processed/reprocessed ~ 300 MB/s RAW DATA CERN Tier-O Hundreds of physicists analyzing data simultaneously CA Tier-1 DE Tier-1 ES Tier-1 FR Tier-1 IT Tier-1 NL Tier-1 NDGF Tier-1 TW Tier-1 UK Tier-1 US Tier-1 Tier-2s Tier-2s Tier-2s Tier-2s Tier-2s Tier-2s Tier-2s Tier-2s Tier-2s Tier-2s World-wide LHC Computing Grid 40

Computing Infrastructure Performance # of jobs 32k Oct 2008 - Oct 2009 >32k simultaneously running jobs reached Several reprocessing campaigns using 2008 and 2009 cosmics datasets 4GB/s June 2009 Higher than nominal data transfer (T0 to T1s and between T1s) sustained over 2 weeks (1-2GB/s at LHC). 41

Combined Performance with Cosmics hundreds of millions of these Highlights given here. More details in later talks: e, µ, τ : this afternoon by O. Kortner Tracking and b-tag: Tuesday morning by L. Vacavant Jet and Etmiss: Wednesday morning by S. Resconi Photon: Thursday afternoon by T. Koffas 42

First Electrons Identified in ATLAS 2-tracks 1-tracks Electrons produced by ionization (δ-rays) Look for EM cluster with E>3 GeV loosely associated to a track Signal sample: events with 2 tracks Background: events with 1 track (muon Bremsstrahlung) Select on TRT signal and E/p TRT ratio>0.8 both 1&2-tracks 43

Event display of an electron candidate 44

Combined Muons φ difference θ difference d 0 difference Good agreement between track parameters measured in ID and MS Difference in momentum agrees with expected energy loss in the calorimeter (~3 GeV) p difference 45

Tau Identification Do not expect real taus in the cosmic data but it is nevertheless useful to check the tau identification variables reconstructed with real data isolation fraction : ratio of E T in a cone of 0.1< R<0.2 over E T in a cone of R=0.4) visible mass: invariant mass of the charged and neutral decay products, where the energy deposits associated to tracks are replaced by measurements in the Inner Detector 46

Jets Studies Jet transverse energy distribution for events triggered by the L1Calo trigger, compared to Monte Carlo EM fraction of jets with E T >20 GeV compared to cosmic MC and QCD dijet MC 47

Expectation of the first 100 pb -1 Example channels J/ψ µµ ϒ µµ W µν Z µµ tt WbWb µν µν+x QCD jets p T >1 TeV Expected statistics in ATLAS after cuts s = 10 TeV, 100 pb -1 ~ 1 M ~ 50 K ~ 300 K ~ 30 K ~ 350 ~ 500 1 TeV gluino, squark ~ 5 Goal in 2010: Commission and calibrate the detector in situ SM measurements at s ~ 7-10 TeV: W, Z, tt, QCD jets Early discoveries? big (good) surprises? 48

Summary Hundreds millions of cosmic events and one major access later ATLAS is very well prepared to receive first collisions. The next challenge is the final commissioning and calibration with collision data and to maintain a high operational efficiency. The era of exciting new discoveries is beginning. 49

Thank you! 50