Space and Missile Systems Center

Similar documents
COM DEV AIS Initiative. TEXAS II Meeting September 03, 2008 Ian D Souza

SA Joint USN/USMC Spectrum Conference. Gerry Fitzgerald. Organization: G036 Project: 0710V250-A1

STABILITY AND ACCURACY OF THE REALIZATION OF TIME SCALE IN SINGAPORE

U.S. Army Training and Doctrine Command (TRADOC) Virtual World Project

Space and Missile Systems Center

RECENT TIMING ACTIVITIES AT THE U.S. NAVAL RESEARCH LABORATORY

A RENEWED SPIRIT OF DISCOVERY

Strategic Technical Baselines for UK Nuclear Clean-up Programmes. Presented by Brian Ensor Strategy and Engineering Manager NDA

GPS Modernization and Program Update

Solar Radar Experiments

THE CREATION OF DIFFERENTIAL CORRECTION SYSTEMS AND THE SYSTEMS OF GLOBAL NAVIGATION SATELLITE SYSTEM MONITORING

Defense Environmental Management Program

FAST DIRECT-P(Y) GPS SIGNAL ACQUISITION USING A SPECIAL PORTABLE CLOCK

REPORT DOCUMENTATION PAGE

REPORT DOCUMENTATION PAGE. A peer-to-peer non-line-of-sight localization system scheme in GPS-denied scenarios. Dr.

Durable Aircraft. February 7, 2011

Design of Synchronization Sequences in a MIMO Demonstration System 1

Frequency Stabilization Using Matched Fabry-Perots as References

DEVELOPMENTOFA MULTIPLE TIME SOURCECOMPARISONSYSTEMFOR DISSEMINATIVESERVICESINTAIWAN

Multipath Mitigation Algorithm Results using TOA Beacons for Integrated Indoor Navigation

RF Performance Predictions for Real Time Shipboard Applications

Investigation of a Forward Looking Conformal Broadband Antenna for Airborne Wide Area Surveillance

Global Positioning Systems Directorate

Wavelet Shrinkage and Denoising. Brian Dadson & Lynette Obiero Summer 2009 Undergraduate Research Supported by NSF through MAA

GLOBAL POSITIONING SYSTEM SHIPBORNE REFERENCE SYSTEM

Rump Session: Advanced Silicon Technology Foundry Access Options for DoD Research. Prof. Ken Shepard. Columbia University

Underwater Intelligent Sensor Protection System

The Energy Spectrum of Accelerated Electrons from Waveplasma Interactions in the Ionosphere

Fuzzy Logic Approach for Impact Source Identification in Ceramic Plates

Department of Defense Partners in Flight

Cross-layer Approach to Low Energy Wireless Ad Hoc Networks

14. Model Based Systems Engineering: Issues of application to Soft Systems

Effects of Radar Absorbing Material (RAM) on the Radiated Power of Monopoles with Finite Ground Plane

Best Practices for Technology Transition. Technology Maturity Conference September 12, 2007

Effects of Fiberglass Poles on Radiation Patterns of Log-Periodic Antennas

Space and Missile Systems Center

Coherent distributed radar for highresolution

PSEUDO-RANDOM CODE CORRELATOR TIMING ERRORS DUE TO MULTIPLE REFLECTIONS IN TRANSMISSION LINES

Signal Processing Architectures for Ultra-Wideband Wide-Angle Synthetic Aperture Radar Applications

INTEGRATIVE MIGRATORY BIRD MANAGEMENT ON MILITARY BASES: THE ROLE OF RADAR ORNITHOLOGY

REPORT DOCUMENTATION PAGE

TIME DISTRIBUTION CAPABILITIES OF THE WIDE AREA AUGMENTATION SYSTEM (WAAS)

Mathematics, Information, and Life Sciences

3. Faster, Better, Cheaper The Fallacy of MBSE?

Management of Toxic Materials in DoD: The Emerging Contaminants Program

August 9, Attached please find the progress report for ONR Contract N C-0230 for the period of January 20, 2015 to April 19, 2015.

On MIMO Signal Processing for Adaptive W-CDMA and OFDM Wireless Transceivers

REPORT DOCUMENTATION PAGE

Non-Data Aided Doppler Shift Estimation for Underwater Acoustic Communication

Analytical Evaluation Framework

Robotics and Artificial Intelligence. Rodney Brooks Director, MIT Computer Science and Artificial Intelligence Laboratory CTO, irobot Corp

Synthetic Behavior for Small Unit Infantry: Basic Situational Awareness Infrastructure

Sky Satellites: The Marine Corps Solution to its Over-The-Horizon Communication Problem

Innovative 3D Visualization of Electro-optic Data for MCM

Loop-Dipole Antenna Modeling using the FEKO code

0.18 μm CMOS Fully Differential CTIA for a 32x16 ROIC for 3D Ladar Imaging Systems

Experiences Linking Vehicle Motion Simulators to Distributed Simulation Experiments

Adaptive CFAR Performance Prediction in an Uncertain Environment

Ground Based GPS Phase Measurements for Atmospheric Sounding

SIMPLE METHODS FOR THE ESTIMATION OF THE SHORT-TERM STABILITY OF GNSS ON-BOARD CLOCKS

Army Acoustics Needs

GPS WEEK ROLL-OVER AND Y2K COMPLIANCE FOR NBS-TYPE RECEIVERS, AND ABSOLUTE CALIBRATION OF THE NIST PRIMARY RECEIVER"

Drexel Object Occlusion Repository (DOOR) Trip Denton, John Novatnack and Ali Shokoufandeh

GPS/GLONASS TIME TRANSFER WITH 20-CHANNEL DUAL GNSS RECEIVER

DESIGNOFASATELLITEDATA MANIPULATIONTOOLIN ANDFREQUENCYTRANSFERSYSTEM USING SATELLITES

Acoustic Change Detection Using Sources of Opportunity

IREAP. MURI 2001 Review. John Rodgers, T. M. Firestone,V. L. Granatstein, M. Walter

Environmental Data Collection Using Autonomous Wave Gliders

BIOGRAPHY ABSTRACT. This paper will present the design of the dual-frequency L1/L2 S-CRPA and the measurement results of the antenna elements.

Joint Milli-Arcsecond Pathfinder Survey (JMAPS): Overview and Application to NWO Mission

FAA Research and Development Efforts in SHM

LITHUANIAN NATIONAL TIME AND FREQUENCY STANDARD

Technology Maturation Planning for the Autonomous Approach and Landing Capability (AALC) Program

A Comparison of Two Computational Technologies for Digital Pulse Compression

SYSTEMATIC EFFECTS IN GPS AND WAAS TIME TRANSFERS

Fall 2014 SEI Research Review Aligning Acquisition Strategy and Software Architecture

ONE OF TIlE MORE RAPIDLY GROWING AREAS OF ECONOMIC RESEARCH

Exploitation of Extra Diversity in UWB MB-OFDM System

Validated Antenna Models for Standard Gain Horn Antennas

A HIGH-PRECISION COUNTER USING THE DSP TECHNIQUE

MERQ EVALUATION SYSTEM

0.9Vo II. SYNTHESIZER APPROACH

Department of Energy Technology Readiness Assessments Process Guide and Training Plan

AUVFEST 05 Quick Look Report of NPS Activities

Modeling Antennas on Automobiles in the VHF and UHF Frequency Bands, Comparisons of Predictions and Measurements

Satellite Observations of Nonlinear Internal Waves and Surface Signatures in the South China Sea

ADVANCED CONTROL FILTERING AND PREDICTION FOR PHASED ARRAYS IN DIRECTED ENERGY SYSTEMS

GPS Status and Modernization

CALIBRATION OF THE BEV GPS RECEIVER BY USING TWSTFT

THE NATIONAL SHIPBUILDING RESEARCH PROGRAM

SILICON CARBIDE FOR NEXT GENERATION VEHICULAR POWER CONVERTERS. John Kajs SAIC August UNCLASSIFIED: Dist A. Approved for public release

DoDTechipedia. Technology Awareness. Technology and the Modern World

PULSED POWER SWITCHING OF 4H-SIC VERTICAL D-MOSFET AND DEVICE CHARACTERIZATION

Presentation to TEXAS II

Headquarters U.S. Air Force

Electromagnetic Railgun

N C-0002 P13003-BBN. $475,359 (Base) $440,469 $277,858

Tom Cat Designs LLC Protective Hull Modeling & Simulation Results For Iteration 1

Digital Radiography and X-ray Computed Tomography Slice Inspection of an Aluminum Truss Section

Using Radio Occultation Data for Ionospheric Studies

Transcription:

UCLASSIFIED/APPROVED FOR PUBLIC RELEASE Space and Missile Systems Center Civil avigation Signal Status Maj Michael Zollars 29 Apr 15 215 4 29 _GPS Civil avigation Signal Status UCLASSIFIED/APPROVED FOR PUBLIC RELEASE

Report Documentation Page Form Approved OMB o. 74-188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 124, Arlington VA 2222-432 Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number 1. REPORT DATE 29 APR 215 4. TITLE AD SUBTITLE Civil avigation Signal Status 2. REPORT TYPE 3. DATES COVERED --215 to --215 5a. COTRACT UMBER 5b. GRAT UMBER 5c. PROGRAM ELEMET UMBER 6. AUTHOR(S) 5d. PROJECT UMBER 5e. TASK UMBER 5f. WORK UIT UMBER 7. PERFORMIG ORGAIZATIO AME(S) AD ADDRESS(ES) Air Force Space Command,Space and Missile Systems Center,Los Angeles AFB,El Segundo,CA,9245 8. PERFORMIG ORGAIZATIO REPORT UMBER 9. SPOSORIG/MOITORIG AGECY AME(S) AD ADDRESS(ES) 1. SPOSOR/MOITOR S ACROYM(S) 12. DISTRIBUTIO/AVAILABILITY STATEMET Approved for public release; distribution unlimited 11. SPOSOR/MOITOR S REPORT UMBER(S) 13. SUPPLEMETARY OTES Presented at the GPS Partnership Council 215 (GPSPC15), held April 29 to May 1, 215, at the Los Angeles AFB, CA. 14. ABSTRACT 15. SUBJECT TERMS 16. SECURITY CLASSIFICATIO OF: 17. LIMITATIO OF ABSTRACT a REPORT unclassified b ABSTRACT unclassified c THIS PAGE unclassified Same as Report (SAR) 18. UMBER OF PAGES 9 19a. AME OF RESPOSIBLE PERSO Standard Form 298 (Rev. 8-98) Prescribed by ASI Std Z39-18

UCLASSIFIED/APPROVED FOR PUBLIC RELEASE Civil avigation(cav) History SPACE AD MISSILE SYSTEMS CETER SMC/GPEV SUMMER 213 CAV LIVE-SKY TEST EVET OV213 AFSPC/CC DIRECTS COTIUOUS CAV BROADCAST PRIOR TOOCX SOFTWARE DEV & ITEGRATIO TRASITIO A TEST TOOL ITO A OPS CAPABILITY MGUE LIVE-SKY TESTIG SUPPORTMGUE DEVELOPMET \I '\ DIRECT COECT OF MODAV LAPTOP MODAV TOOL VERIFICATIO CLOSED-LOOP ED-TO-ED SIGAL VERIFICATIO OPS ITEGRATIO TRAIIG MATERIALS AD UPDATED TECH ORDERS 25 APR 14 AFSPC/A3AUTHORIZATIO FOR CAV BROADCAST R.llWL: APR 21 2 UPLOADS PER WEEK WALK: JU 214 3UPLOADS PER WEEK 11/I. DEC 214 DAILY UPLOADS DEC 214 MODAV SOFTWARE ITEGRATED ITOAEP 215 4 29 _GPS Civil avigation Signal Status UCLASSIFIED/APPROVED FOR PUBLIC RELEASE 2

UCLASSIFIED/APPROVED FOR PUBLIC RELEASE ~,,~ ~, 4,, Civil avigation(ca~}ac~~~~~s~l~~y~ T~M~~~~T~R CAV Message Types 1, 11, 3, 33 currently transmitted on seven GPS IIR-M (L2C) & eight GPS IIF SVs (L2C & L5) - MODAV Tool integrated w/aep providing CAV message generation - Daily CAV uploads as of 31 Dec 14 Signal Performance - CAV performing on par with Legacy during daily uploads - Total RMS URE from 31 Mar- 7 Apr 15 Legacy:.517 m (URE for this week aided by additional LAV uploads) Modernized:.584 m - Best week: 22 Mar - 29 Mar 15 Modernized:.397 m GPS IIF Launch & Constellation Upgrade - SV 68 & SV 69 Ops Accepted to users for Legacy Signals CAV message broadcast as of 23 Feb 15 - SV 71 successful launch 25 Mar 15 - SV 72 Launch scheduled for Jul 215 CAV message broadcast for SV 71 & SV 72 expected Aug 215 Pre-operational CAV Broadcast Performance As Expected 215 4 29 _GPS Civil avigation Signal Status UCLASSIFIED/APPROVED FOR PUBLIC RELEASE 3

UCLASSIFIED/APPROVED FOR PUBLIC RELEASE L2C Performance: 28 Apr to 28 Feb 14 CAV Performance SPACE AD MISSILE SYSTEMS CETER CAV & LAV Performance from Modernized SVs (IIRM & II F) 6. _ - - LAV_URE. -- 1- - 7 5. 6. ~ ~ l 1--------- r --- CHAV-AOO - - - - - - - - -- - ---- -- - -fi-1-!{--: ~~~ ~-- ~---- - - --... - =--.. -. - - ---- - ---- - -- - ----- -- 11 : II 1 t t -- -. ---- -- -- --- -- - la 4. +-~*::~;r: -~;;:~: ~; ~:~ ~ ~:~~- -+~- 1 ~-- --i _: 3. 2 1.. 1. :;t, :} 1: :t ~~ ~ r: ' 1- ~r +=-~ -~-+- --~~ - -r----+~~- ;r _ _,_--_--~ ~ -~ 1 - - --- - - - - -- --CHAV_URE - - - -- - - -- --- -- - -r l - -~- f---1---- ~...-:-_: ~::~-~~:v - ::: - f ::::::: ~ :=~-~~ - - - ---- ==- - - --_ ~.--~;, ~- r-- -_-,_-~-- +*_-_-_,_ -_=-_ --+-=-:- ~r ::=-+ 5 ~ J,::.... ~~-- :.... i l. - _---t-- ~ ~t11-ffi ~( h c- ~l-{~ -!- -- r--- :-- -* -:- - --}- -+, - 3--< -) + -- -- ~ -== = 4 ci I~ 1,1-n- I.I i.'!l f ll I U I I II C!': I II M I ll A I I II.!: lo ~ ~~.. ""~o"jl r"\t~ 1 ~,..- r-!r-: 1. 1...). _,.. "I "" -- ~ 1 r " lr" - o 1 " lj "" --- ---- - \ V ~.-~, I... _,.... ~; p--i _, "'"1 1 - -!- I ~-- ~. J. 11..:.. I..... :.!:... ~- -'. ll. --:: --14--- - - ------- --- c 1 11 1 I ~ ~ 1 1 1 t : :~; : II - - :1 1 : ' J o.!l~.li.j 1: : U. J!.! i II 1 I...i.. I 1 I 1 I T 1 1 I '"" 1 1 11 I 11 1 " II!i 1 3!" 1 1 I., ~ I I 1.. -- ~ I 1.1! ~~ :J. : : 1 I ~: ~ :.l _. :: ol : 1} -- - --1- ~ 1 : I 1 1 1 1-- ---1-1,} -.-- IJIAlJp.f ~ ~~~ ~:! -~~~::: ----- ;.f-i { r1' ~ d -~~:~~ t 1; :i!+!]-~- --- ------------ -- &,..... II w o ~ ~. 1 Iii'.IT~ I 't- -- -,--+---1--J A l ILl..... 1-1-- -lt- I.. IW IH-J l-l lj ~~ I I:A ~J. -- ~-... - 2 ~ f- ~~\L~A ~ ~ ~~~LI~, J1~;:'{'~-,..... ~;~~~.,~1~f=r-~}=1 ~=~ ~k-=+~~:~- [~U:l.f..~-= - ~;~~- ~'~ ~=~~ ~-- ~~!~-.!.% ~ ~ MAV LIVE-SKY 1 1....... Daily Uploads r - - t l -. - -"--- "--- ----.= -- - - r. CL l1. ~= - L-J._ TEST EVET. ~.... --...... (\') '"; '<t ~.... '<t '";.... '<t '<t CD q I() (7) q '"; q q I() I() Daily uploads of pre-operational CAV performance within expectations 215 4 29 _GPS Civil avigation Signal Status UCLASSIFIED/APPROVED FOR PUBLIC RELEASE 4 q q I()

~ l'tjftci;f UCLASSIFIED/APPROVED FOR PUBLIC RELEASE CAV Performance ' ~ ~. ot'.fl~'4: S'? --=======---c::::======-------: SPA C E AD MISSILE SYSTEMS CETER L2C Performance starting with Daily Uploads: 1 Jan 15 to Present day 2.2... tn 2. Q) 1.8 -Q) E 1.6 w 1.4 ::: ::J 1.2 en 1. en.8 en ~.6 :::.4.2. CAV & LAV Performance from Modernized SVs (IIRM & II F) 3. - LAV_URE 16 2.8 - CAV_URE - - CAV-t.HAV 2.6 - LAV_AOO 14 2.4 CAV AOO.., II. A. J. '\'.. +''~ I\" / ''V-'',,,,, "\Jv: ~... ~..J.~ ~...At, ~i'ac-.! l"vt,j \ ~~ ~,._,.. \f,. _,..._,..., ~..("',~,~,,..,., \ I., '. 4' I ' I" : S' " \ I ~..,A V\ ~ rn 1:\ AlA A. ~ ~ J \AI' 1\ ~ \ AI\J \{ v -..a. ~ JJ\)- ~ -v v-' ~.A VJ y 'IIIII ' -..,_, I " 1,.,!'., /" -... ;.,_,... '- - ~ ~~A\ ~,,,..,.,. I 1',] I.-..- /\,, " I\ /' '"'"' -.2 (X) I() > I() > <D I() > <D q q '<;' ~ ~ q ~ q ~ q (I? M M (I? ~ q q q q q q q q q q q q q q I() I() I() I() I() I() I() I() I() I() I() I() I() I()... 12 tn ::J 1 J:~ ( 8 -( ~ Q) 6 C) <( (!) 4 ~ 2 LAV slightly better than CAV due to addition LAV uploads 215 4 29 _GPS Civil avigation Signal Status UCLASSIFIED/APPROVED FOR PUBLIC RELEASE 5

UCLASSIFIED/APPROVED FOR PUBLIC RELEASE Live-sky event summer of 213 - Test & Verification of 8/15 defined CAV Message Types - Led to pre-operational use beginning 28 Apr 14 Planned live-sky event fall of 215 CAV Development SPACE AD MISSILE SYSTEMS CETER - Incorporate Midi Almanac (MT37) GPS IIF SV require only MODAV Tool software updates GPS IIR-M SVs require MODAV Tool & SV software updates as well as changes to ICDs - Exercise functionality of GSS off-set parameters (MT35) Integration efforts in progress with GA and USO for direct feed of GGTO, UTC and ISC values into AEP Future development TBD - Software development and test of differential corrections & text messaging require additional knowledge on COOPs and/or intended use MT13 (Clock Differential) MT14 (Ephemeris Differential) MT15 (Text) MT34 (Clock & Differential) MT36 (Clock & Text) - Broadcast of reduced almanac (MT 12 & MT 31) is unlikely; pending further direction 215 4 29 _GPS Civil avigation Signal Status UCLASSIFIED/APPROVED FOR PUBLIC RELEASE 6

UCLASSIFIED/APPROVED FOR PUBLIC RELEASE CAV Development Msg CAV Message Title Function/Purpose Type Default Default message (transmitted when no msg data is available) 1 Ephemeris 1 SV position parameters for the transmitting SV 11 Ephemeris2 SV position parameters for the transmitting SV 12 Reduced Almanac Reduced almanac data packets for 7 SVs 13 Clock Differential Correction SV Clock differential correction parameters 14 Ephemeris Differential Correction SV Ephemeris differential correction parameters 15 Text Text, 29 eight-bitascii characters SPACE AD MISSILE SYSTEMS CETER 3 Clock, IOO & Group Delay SV Clock Correction Parameters, Ionospheric and Group Delay correction parameters (Inter-Signal Correction parameters) 31 Clock & Reduced Almanac SV Clock Correction Parameters, Reduced almanac data packets for 4 SVs 32 Clock& EOP SV Clock Correction Parameters, earth orientation parameters; ECEF-to-ECI coordinate transformation 33 Clock& UTC SV Clock Correction Parameters, Coordinated Universal Time (UTC) Parameters 34 Clock & Differential Correction SV Clock Correction Parameters, SV clock and Ephemeris differential correction parameters 35 Clock& GGTO SV Clock Correction Parameters, GPS to GSS Time Offset parameters. 36 Clock& Text SV Clock Correction Parameters, Text, 18 eight-bit ASCII characters 37 Clock & Midi Almanac SV Clock Correction Parameters, Midi Almanac parameters 15 Defined Message Types D Tested & verified summer of 213 D Development planned for fall test event 215 D Conops/direction required for development & test 215 4 29 _GPS Civil avigation Signal Status UCLASSIFIED/APPROVED FOR PUBLIC RELEASE 7

UCLASSIFIED/APPROVED FOR PUBLIC RELEASE CAV Monitoring Operational monitoring of civil modernized signals - Joint Propulsion Lab (JPL) world-wide monitoring stations Initial capability and procedures delivered to 2SOPS Dec 214 Capability upgrade scheduled for Feb 216 SMC/GP MODAV Database & Website SPACE AD MISSILE SYSTEMS CETER - SMC/GP & MITRE COUS CAV website data bits (L2C & L5) updated every 15 min or less @ https://gps-modnavdb.mitre.org - GA global CAV data bits (L2C only) updated daily - Expansion of GA L5 Signal Monitoring by 3 215 L2C and LS updated every 15 min or less Legacy signals remain the priority during CAV pre-operational broadcast - If URE or AOD limits are exceeded, the path forward will not affect the broadcast of legacy signals - Collaboration with GPE, GPL and FFRDC teams to include the GPE/MITRE MODAV database & website will occur to determine the best course of action if the URE or AOD limits are exceeded 215 4 29 _GPS Civil avigation Signal Status UCLASSIFIED/APPROVED FOR PUBLIC RELEASE 8

UCLASSIFIED/APPROVED FOR PUBLIC RELEASE Questions SPACE AD MISSILE SYSTEMS CETER 215 4 29 _GPS Civil avigation Signal Status UCLASSIFIED/APPROVED FOR PUBLIC RELEASE g