ASSEMBLY INSTRUCTIONS TF Tent Flooring System. 125 Taylor Parkway Archbold, Ohio Phone: (419) Fax: (419)

Similar documents
ASSEMBLY INSTRUCTIONS

Multi-Stage ASSEMBLY INSTRUCTIONS ST-8100 SERIES. 125 TAYLOR PARKWAY ARCHBOLD, OH PHONE: (419) FAX: (419)

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Installation Instructions for the AlphaDeck Staging System

MARQUEE INSTALLATION HANDBOOK. Curved Structures

User Instructions Multiline Otter Scoreboard Caddy Assembly

Clopay Models 835/837 Sliding Door System Installation Guide

VARIABLE TERRAIN STAGE AND RISER SYSTEM

General Guidelines:

ASSEMBLY AND CARE INSTRUCTIONS JUST FOR KIDS 355

StageTek Staging System

π H-4408 ALUMINUM BLEACHERS 5-ROW x 15' PARTS uline.com TOOLS NEEDED

RAPID-EPS SAFETY INSTRUCTIONS AND INSTALLATION GUIDE. American Standard OSHA

Sunrise Deck Assembly Instructions for Kingston Left

Your order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled.

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

Sales & Service. JFK - Just For Kids. sasportonline.com. 135 Forestview Road 7879 Will Rogers Blvd.

Installation Instructions

ASSEMBLY OF THE KNOCKED-DOWN LADDERS: 8 to 12 STEPS STANDARD TOP AND SAFELOCK REQUIRED TOOLS

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

BY ALIEN TECHNOLOGIES CORP

Deck Mount Installation with Bench

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

Leveling Foot RB210. Leg Extender RLT66

Installation Instructions - Model V4JSD 1

SAM. Model: STV-C65 LCD Mobile Visualized Stand Instruction Manual. Weight Capacity: 1251bs / 56.7kg Suits LCD Flat Panel Display: 42"-55" Page 20

Installation Manual. Fortress OSHA Stair System Adjustable Temporary Stair Rated Load: 100 psf, 300 lbs. concentrated. 3-Tread at 25.

Section 1 Safety working at height

Bulk Storage Rack Assembly Instructions

Real Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions

Chapter 23. Garage Construction

Hover. Installation Instructions. Raised Panel. Version

KIT ASSEMBLY INSTRUCTIONS

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

flex Installation multiflex

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Aluminum Railing Installation. Glass Railing Spindle Railings Intimacy Railings and Panels

Installation and Assembly: Flat Video Wall Mount For 40" to 65" Flat Panel Displays

3/8-16 x 3/4 cap screw. 3/8-16 hex nut for above screws. 1/4-20 x 3/4 socket cap screw. 3/16 short arm hex key (not to scale)

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

2-PIECE STAIRWAY ASSEMBLY

Display Shelving Installation Instructions

INSTALLATION OF THE TRACK FOR THE STRAIGHT SIDE STEEL LADDER

Supplement. Assembly and Maintenance Guide Titan Series Commercial Step System. Manufactured in the USA

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

Original Gallery System

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

PATHWAY HD Code Compliant Modular Access System Assembly Manual

INSTALLATION INSTRUCTIONS

Office Installation Guidelines

Installation Instructions for. Before You Begin TOOLS REQUIRED

INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000

Dura-Lock Roof System

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Playground Assembly Instructions

MODEL T28173/T28174 ROLLER TABLES INSTRUCTIONS

HV Support System. The HV Support System is compatable with all CSS Support Systems:

Pickup Box Utility Rack Package Installation (Instruction ID: )

Real Life Ninja Starter Pack 1 Assembly Instructions

Track Rack. * Track Racks are not lockable

Open Up Your View With CABLE SYSTEMS

TITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF

Tilting & Swiveling Plasma/LCD Flat Panel Wall Mount Installation Guide Model: A380SM

13MM FLAT WRENCH FOR LEVELING THE GLIDES OF STRUCTURE 6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME

EASY POOL STEP (NE113)

LF Series Assembly Instructions

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

MPA-9000 Universal Ceiling Projector Mount Kit

Dublin Stalls Installation Instructions

PORTA~TRACE. GAGNE, INC. 41 Commercial Dr. Johnson City, New York Phone: Fax: ASSEMBLY INSTRUCTIONS

F-150 Structural Holding System

Large Wood Windmill Assembly Instructions

SM-RAZOR-T-M/L/XL. Strong Low Profile Tilt Mount for Ultra-Thin Flat-Panel TVs INSTRUCTION MANUAL

**MOUNTING YOUR MONITOR

BLADE N BULLET BLIND Cabela s Item Number:

a.k.a. casegoods instructions

10x10 Trellis Pergola

SM-RAZOR-ART2-L / SM-RAZOR-ART2-XL

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Paramount Enclosure. Installation Guide

DX-TVMLPTB03. Low-Profile TV Wall Mount ASSEMBLY GUIDE. For either wood-stud or concrete wall installations

EASY-IN POOL STEP SYSTEM NE132

INSTALLING YOUR NEW SPRING LIFT ARM KIT

Experience the Hi-Lite Advantage

REC Series Rack Installation Guide

Assembly Instructions. Table of Contents

Installation Instructions

Assembly Instructions

Installation Instructions

Mast and Antennas for Field Day & Emergencies

Revision Date: April 01, Paramount Enclosure

Straight Stringer Installation Instructions

Modular XP Ramp Assembly Manual

ATLANTIS RAIL Contact Information

Installation Manual for Metal Emperor Lockers

Assembly Instructions

MM750 Installation Instructions

Transcription:

125 Taylor Parkway Archbold, Ohio 43502 Phone: (419) 445-8915 Fax: (419) 445-0367 www.biljax.com TF-2100 Tent Flooring System ASSEMBLY INSTRUCTIONS ALL DRAWINGS ARE FOR ILLUSTRATION ONLY Revision: 1 1/21/16 1

Assembly Instructions Include: Step 1: Site Preparation Step 2: Jack Assembly Step 3: Connecting the Starter Columns Step 4: Connecting the Vertical Columns Step 5: Vertical Diagonals Step 6: Attaching Beams Step 7: Tie Down Brackets Step 8: Connecting the Deck Step 9: Side-Rail Installation Step 10: Upright Connectors Step 11: Guardrail Installation Step 12: Attaching the Stairway Step 13: Attaching the Ramp Components List Jack Starter Column Horizontal Vertical Diagonal Vertical Column TF2100 Understructure Part Number Description Jack 0032-0609 Jack Starter Column 0256-01-100 Starter Vertical Column 0256-19-105 1/2 M 0256-19-110 1 M 0256-19-115 1-1/2 M 0256-19-120 2 M 0256-19-125 2-1/2 M 0256-19-130 3 M Horizontals 0256-02-401000 1 M 0256-02-401500 1-1/2 M 0256-02-402000 2 M 0256-02-402500 2-1/2 M 0256-02-403000 3 M Vertical Diagonals 0256-11-101005 1 M x 1/2M 0256-11-101010 1 M x 1 M 0256-11-101015 1 M x 1-1/2M 0256-11-101020 1 M x 2 M 0256-11-101505 1-1/2 M x 1/2M 0256-11-101510 1-1/2 M x 1 M 0256-11-101515 1-1/2 M x 1-1/2M 0256-11-101520 1-1/2 M x 2 M 0256-11-102005 2 M x 1/2M 0256-11-102010 2 M x 1 M 0256-11-102015 2 M x 1-1/2M 0256-11-102020 2 M x 2 M 0256-11-102505 2-1/2 M x 1/2M 0256-11-102510 2-1/2 M x 1 M 0256-11-102515 2-1/2 M x 1-1/2M 0256-11-102520 2-1/2 M x 2 M 0256-11-103005 3 M x 1/2M 0256-11-103010 3 M x 1 M 0256-11-103015 3 M x 1-1/2M 0256-11-103020 3 M x 2 M Revision: 1 1/21/16 2

Components List, continued Upright Connector Saddle Beam Filler Side Rail Gable End Upright Connector Saddle Universal Beam Parts For TF2100 Part Number Description Upright Connector Non-Glass Glass Anchor-PZ 0109-01-003 Anchor-Venue 0109-01-004 Anchor-Event Losberger EasyFlex P5N 0109-01-016 Losberger UniFlex P3N 0109-01-017 Losberger-MultiFlex 0109-01-020 0109-01-014 Losberger-MaxiFlex Gable End Upright Connector Non-Glass Glass Anchor-PZ 0109-01-002 Anchor-Venue Anchor-Event Losberger-EasyFlex Losberger-UniFlex Losberger-MultiFlex Losberger-MaxiFlex Beam Filler Anchor-PZ 0109-01-006 Anchor-Venue 0109-01-005 Anchor-Event Losberger-EasyFlex 0109-01-018 Losberger-UniFlex 0109-01-022 Losberger-MultiFlex 0109-01-021 Losberger-MaxiFlex Saddle 0109-01-001 Saddle Insert 0109-01-019 Losberger Outside Saddle 0109-01-007 Base Plate With Saddle 0109-01-008 6" Riser and Saddle 0109-01-013 10" Riser and Saddle 0109-01-011 Adjustable Saddle 0109-01-015 Adjustable Saddle and Starter Universal Beams 0109-10-101000 1M Beam 0109-10-102000 2M Beam 0109-10-102500 2.5M Beam 0109-10-103000 3M Beam 0109-10A-101000 1M Beam- No Holes 0109-10A-102000 2M Beam- No Holes 0109-10A-102500 2.5M Beam- No Holes 0109-10A-103000 3M Beam- No Holes Side Rail 0109-03-101000-6 1M Side Rail 0109-03-102000-6 2M Side Rail 0109-03-102500-6 2.5M Side Rail 0109-03-103000-6 3M Side Rail Revision: 1 1/21/16 3

Components List, continued Deck Filler Parts For TF2100 Part Number Description Deck Filler 0109-04-102000 2M Filler 0109-04-102500 2.5M Filler 0109-04-103000 3M Filler Guardrail 0109-05-1010BK 1M Black Guardrail 0109-05-1005BK.5M Black Guardrail Aluminum Platform 0109-500-100200-6 1M x 2M Stained Wood 0109-500-100250-6 1M x 2.5M Stained Wood 0109-500-100300-6 1M x 3M Stained Wood 0109-500-100200-7 1M x 2M Quadripple 1M x 2.5M Quadripple 0109-500-100300-7 1M x 3M Quadripple Side Extension Beam 0109-02-1000 1M Side Extension Aluminum Platform Guardrail Revision: 1 1/21/16 4

Step 1 Site Preparation A. Determine the exact location where the platform will be erected. B. Planning the base of the structure is very important. The Gable Side (width) will be determined by the size of the tent opening, and the Side (length) will be at least the length of the tent. The base can be assembled in a variety of options depending on the size of the tent being used: Gable Side It is recommended to use as many 3- meter bays as possible and, if needed, the last bay will be either 1-meter or 2- meters depending on the width of the tent (see chart). See the Gable Side example in Fig. 1.1. Use the above graph when planning the base of the structure to determine which option is best for you. Fig 1.1 Length Side It is necessary to build the length in 5- meter segments. These can be made in two different ways: Alternating 2-meter and 3-meter bays (see Side on Fig. 1.1) or by using two 2.5-meter bays (see Fig 1.2). C. Depending on the tent being used, additional Verticals must be placed along the Gable side where gable upright supports are located. When a Gable Upright falls where a vertical is not present, an intermediary vertical will need to be added in the center of the bay, supporting the upright. See figure 1.3 for details Fig 1.2 Fig 1.3 Revision: 1 1/21/16 5

Step 2 Jack Assembly A. Place the Jacks in the corners of every bay in respect to the assembly option being used. Fig 2.1 Fig 2.2 All Jacks should be placed only on horizontal and level surfaces. Additional footing support may be required to distribute the weight under each Jack, preventing the legs from sinking and providing a level area. A local qualified person should determine the exact type of support needed (i.e. A person who, by possession of a recognizable degree or certificate of professional standing, or who by extensive knowledge, training, and experience, has successfully demonstrated the ability to solve problems related to the subject matter and work). Always comply with local ordinances. B. Set the Jack screws to an equal height by turning to raise or lower the Jack, if the assembly area is on uneven ground. Warning The Jack should never exceed 12 inches. See Fig 2.1. Stage Height Vertical Height 37" - 49".5M 57" - 69" 1M 76" - 88" 1.5M 96" - 108" 2M 116" - 128" 2.5M 136" - 148" 3M Add 19.7" For Every Half Meter Vertical C. Insert the Starter Column into each Jack. See Figure 2.2 for detail. Multiple Jack options are available to reach a large range of platform heights. Revision: 1 1/21/16 6

Step 3 Connecting the Starter Columns A. Insert the wedge of each Horizontal Bar into the Connector Ring of each Starter Column by sliding the end of the bar into place over the ring and hammering the wedge firmly into place (see Fig 3.1) on the narrow opening of the ring (see Fig 3.2). B. Begin connecting the Horizontals in one corner of the structure, creating a four-sided bay. Then expand on this bay along the gable side, then along the length until the entire structure is connected. See figure 3.3 Fig 3.2 When completing each bay, be sure the following conditions have been met: Fig 3.3 All corners are at 90 0 angles. Measure the distances diagonally between the corners of each bay to confirm. The two measurements should be equal. All Horizontals are level. Adjust the Jacks if necessary. See figure 3.4. Fig 3.4 Fig 3.1 Revision: 1 1/21/16 7

Step 4 Connecting the Vertical Columns A. Insert the Vertical Column into each Starter Column. Fig 4.1 Note: The Connector Rings on the Vertical Column are set at ½ meter and 1 meter above the bottom ring (see figure 4.1 for detail). Horizontals must be connected to the bottom and top Connector Ring, as well as at least every 1-meter interval in between. B. Insert the wedge of the Horizontal into the desired Connector Ring of each Vertical Column in the same way as illustrated in Step Three. C. If increased height is desired place the Insert on top of the existing Vertical Column, and add an additional Vertical Column above the insert. See figure 4.2. Secure in place with a nut and bolt or spring rivet through the designated holes. Horizontals will need to be added at least every 1-meter interval. D. Again, be sure that the structure is level and all corners are at 90 0 angles. See figure 4.3. Fig 4.2 Fig 4.3 Revision: 1 1/21/16 8

Step 5 Adding the Vertical Diagonals A. On the corner Vertical Column, attach the top end of the Vertical Diagonal to the upper Connector Ring and the lower Connector ring of the adjacent column, hammering the wedges firmly into place. Fig 5.3 These wedges will be placed in the wide openings of the Connector Rings. See Figure 5.1. B. Repeat the Vertical Diagonals on every other bay along the outside of the structure. See example in figure 5.2. C. Repeat Vertical Diagonals on every two segments on the inside of the structure. Note: The following areas must be braced with the Vertical Diagonals: Both sides of all four corners All areas where the tent uprights will be placed according to the tent being used. o On these areas Vertical Diagonals must be placed in each direction to the side and one going towards the inside of the structure. Must be connected to the top connector ring where the tent upright will be. See the example in Figure 5.3, where the dark lines represent Vertical Diagonal placement. Fig 5.1 Fig 5.2 Revision: 1 1/21/16 9

Step 6 Attaching the Beams Fig 6.1 A. Insert the Universal Saddle into the top of each Vertical Column so that they are parallel with the Gable Side of the structure. Secure in place with a nut and bolt. B. Place the appropriate length Universal Beams on the saddles, and secure with pins. See figure 6.1. C. Attach the Upright Connectors to each Universal Saddle where the tent uprights will be, depending on the tent being used. Attach the Beam Fillers to the Universal Saddles in each column along the side of the structure on both ends, wherever the Upright Connectors are not needed. See figure 6.3 for example. Pin into place on the saddle, and secure the Universal Beam end with two bolts. See figure 6.2 for detail. Fig 6.2 D. Connect each of the Universal Beams together from one end of the structure to the other on each of the rows according to the assembly option being used. Different Saddles may be required where upright supports are needed on certain tent models. Contact BilJax for support. Fig 6.3 Revision: 1 1/21/16 10

Step 7 Tie Down Brackets A. Connect the Tie Down Brackets to the underside of the Universal Beams wherever required as determined by the qualified person. Secure with a nut and bolt through the circular hole. The appropriate stakes and anchoring devices should be determined by the qualified person. Note: Cable Tie Downs may be installed on any of the four reinforced holes on the underside of each Universal Beam. Warning The maximum working load is 10,000 lbs. total for each pair of Tie Down Brackets. Fig 7.1 Step 8 Connecting the Deck A. Beginning at one end of the structure, place the Deck across the lip of the Universal Beam, and push it flush against the end of the structure. See Figure 8.1. Note: The sizes of the Decking are 1x3M, 1x2M and1x2.5m which should be used with respect to the size of the tent being used. There are also 3- inch Deck Fillers, which will be needed to complete the length of the structure. Fig 8.1 Revision: 1 1/21/16 11

Step 8 Connecting the Deck, continued B. Push another Deck tightly against the next, and lock them together by turning the Rotor Locks on the tops of each Deck. See Figure 8.2. D. On the underside of each connected Deck, pull down the spring mechanism and twist to secure it to the Universal Beam, as depicted in figure 8.3. C. Add the Deck Filler between Decks to even the length as necessary per the size of the tent being used. Whenever a Filler is used it must be between two Decks. See figure 8.4 The number of Fillers you will need is dependent on the size of the tent. More than one may be required. These will also serve as an easy access point when disassembling, or when a specific Deck needs to be removed. Fig 8.3 Fig 8.2 Fig 8.4 Revision: 1 1/21/16 12

Step 9 Side Rail Installation A. Install the appropriate length Side Rail to each outer Universal Beam lip along the Gable Sides. Secure by bolting through the holes on the side of the Universal Beam. See figure 9.1 Fig 9.1 Step 10 Installing Gable Side Upright Connectors A. Attach the Upright Connectors along the gable side to the Universal Beam wherever an upright on the gable end will be. Secure to the Universal Beam by inserting the latch into the channel along the Side Rail, and screwing the bolt firmly into place. See figure 10.2 for detail. Fig 10.2 Fig 10.1 Revision: 1 1/21/16 13

Step 11 Guardrail Installation A. Set the lower lip of the Guardrail inside the channel on the Side Rail on the Gable side, or any side of the Deck. See figure 11.1. B. Tilt the Guardrail up until the top lip is fully inserted into the channel. See figure 11.2. C. Tighten the Hex Nut on each Guardrail to secure in place. Fig 11.1 Fig 11.2 Fig 11.3 Revision: 1 1/21/16 14

Step 12 Attaching the Stairway Fig 12.1 A. Each set of stairs requires a T-lock adapter to secure the staircase to the structure. Attach the T-lock adapter to the top end of the stair assembly using nuts and bolts. B. At the end of the T-lock adapter there is an upper and lower lip, which will be inserted into the channel along the perimeter of the platform. Insert the lower lip into the channel as shown in figure 12.1. Fig 12.2 C. Tilt the stair assembly upwards until the top lip is fully inserted into the channel, as in figure 12.2. D. While holding the lips in place within the channel, extend the stair section so that the opposite end is touching the ground. See figure 12.3. E. Tighten the top bolt using the T-shaped handle wrench as shown in figure 12.4, securing the stairs to the structure. Be sure that both lips are fully engaged in the Channel. Fig 12.4 Fig 12.3 Revision: 1 1/21/16 15

Step 12 Attaching the Stairway, continued F. Tighten the wing nut attached to the banana clip on each side of the stairs. See Fig 12.5. Fig 12.5 G. Move the secondary lock from the stowed position (Fig 12.6) to the engaged position (Fig 12.7) and secure by tightening the wing nut. H. Install handrails on both sides of the stairs by inserting the handrail panels into the designated sockets. Secure with snap pins or nuts and bolts. Fig 12.6 When removing the stair section, loosen the secondary lock and return it to the stowed position, loosen the wing nut on the banana clip, loosen the top bolt with the T-shaped handle, lift the end out of the channel, and collapse the staircase for storage. Fig 12.7 Revision: 1 1/21/16 16

Step 13 Attaching the Ramp A. Each ramp requires angled legs to achieve the correct slope. Attach the angled legs in the sockets of the ramp, as seen in figure 13.1. Fig 13.1 B. Add the ramp end by lowering it into place at the bottom of the angled stage, as seen in figure 13.2. Fig 13.2 C. Guardrails can be added to the sides of the ramp as seen in figure 13.3. For more detail see step 11, guardrail installation. The bottom Guardrails are attached with bolts. Fig 13.3 Revision: 1 1/21/16 17

Step 13 Attaching the Ramp, Continued D. Attached the middle handrails to all the guardrails except the top most ones, as seen in figure 13.4. Fig 13.4 E. Add the handrail ends to the top and bottom sections of the ramp, as seen in figure 13.5. Fig 13.5 Revision: 1 1/21/16 18

Step 13 Attaching the Ramp, Continued F. Attached the filler guardrail to take up any space remaining between the ramp guardrails and the platform guardrails, see figure 13.6. Fig 13.6 G. Insert the ramp filler plate in order to seamlessly bridge the ramp to the platform, as seen in figure 13.7. Fig 13.7 Revision: 1 1/21/16 19