UPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS

Similar documents
Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems

Distance Protection for Distribution Feeders. Presented By: Yordan Kyosev, P.Eng. & Curtis Ruff, P.Eng.

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin

Adaptive Relaying of Radial Distribution system with Distributed Generation

ARC FLASH PPE GUIDELINES FOR INDUSTRIAL POWER SYSTEMS

1 INTRODUCTION 1.1 PRODUCT DESCRIPTION

Distribution Feeder. Nazar Dhahir Sr. Transmission Engineer Tucson Electric Power Co. RMEL Distribution Conference March 11, 2010

POWER SYSTEM ANALYSIS TADP 641 SETTING OF OVERCURRENT RELAYS

Time-current Coordination

Protective Relaying for DER

Smart Grid Smarter Protection: Lessons Learned

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

PROTECTION of electricity distribution networks

Solutions to Common Distribution Protection Challenges

A NEW DIRECTIONAL OVER CURRENT RELAYING SCHEME FOR DISTRIBUTION FEEDERS IN THE PRESENCE OF DG

GRID CODE COMPATIBLE PROTECTION SCHEME FOR SMART GRIDS

Overcurrent relays coordination using MATLAB model

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016

How to maximize reliability using an alternative distribution system for critical loads

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP

1960 Research Drive, Suite 100, Troy, Michigan with. REVISION: December 10, 2007 (Supersedes previous versions) Prepared by:

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event

Distribution Feeder Principles

A Tutorial on the Application and Setting of Collector Feeder Overcurrent Relays at Wind Electric Plants

Utility Interconnection and System Protection

Company Replaces previous document Document ID Issue E.ON Elnät Sverige AB Ny engelsk utgåva D

Module 9. Fault Type Form 4.X RELIABILITY ACCOUNTABILITY

FRIENDS Devices and their Coordination

Table of Contents. Introduction... 1

PSV3St _ Phase-Sequence Voltage Protection Stage1 (PSV3St1) Stage2 (PSV3St2)

Arizona Public Service Company and the Transmission Partnership for National Electric Power Company of Jordan

FAULT LOCATING USING VOLTAGE AND CURRENT MEASUREMENTS

Voltage Sag Mitigation by Neutral Grounding Resistance Application in Distribution System of Provincial Electricity Authority

PLAN... RESPOND... RESTORE! Utility Automation & Information Technology... Automation Rising

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017

Transmission System Phase Backup Protection

Adaptive Autoreclosure to Increase System Stability and Reduce Stress to Circuit Breakers

Implementing Distribution Automation and Protection

The Effect of Various Types of DG Interconnection Transformer on Ferroresonance

A New Use for Fault Indicators SEL Revolutionizes Distribution System Protection. Steve T. Watt, Shankar V. Achanta, and Peter Selejan

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 1T-18

Notes 1: Introduction to Distribution Systems

Power Quality Notes 2-2 (AK)

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

A TECHNIQUE TO UTILIZE SMART METER LOAD INFORMATION FOR ADAPTING OVERCURRENT PROTECTION FOR RADIAL DISTRIBUTION SYSTEMS WITH DISTRIBUTED GENERATIONS

Electrical Protection System Design and Operation

ADVANCED VECTOR SHIFT ALGORITHM FOR ISLANDING DETECTION

U I. Time Overcurrent Relays. Basic equation. More or less approximates thermal fuse. » Allow coordination with fuses 9/24/2018 ECE525.

This document covers common questions concerning the design of an effectively grounded system.

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell

Performance Analysis of Various Types of Fault Current Limiters Using PSCAD

ALI UMAIR DETECTION ALGORITHM FOR THE CROSS COUNTRY EARTH FAULTS IN MEDIUM VOLTAGE NETWORK

Using smart grid sensors and advanced software applications as an asset management tool at Hydro Ottawa

Improving Transformer Protection

ENOSERV 2014 Relay & Protection Training Conference Course Descriptions

Babak Enayati National Grid Thursday, April 17

DISTRIBUTION DEVICE COORDINATION

REF 610 Feeder Protection Relay. Technical Reference Manual

Protection Challenges for Transmission Lines with Long Taps

Protecting Feeders With Distributed Resource Scott Elling HDR Inc HDR, all rights reserved.

Transmission Line Protection Objective. General knowledge and familiarity with transmission protection schemes

No. SSIEC-PRC SHINSUNG. Polymer Recloser SIREC SERIES 15kV, 27kV, 38kV 400A, 630A, 800A

Protection Introduction

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS

Overcurrent and Overload Protection of AC Machines and Power Transformers

Coordination of protective relays in MV transformer stations using EasyPower Protector software

No. SSIEC-SEW SHINSUNG. Solid Insulation Eco Load Break Switch (SILO) SILO SERIES 15kV, 27kV 400A, 630A

S&C Vista Underground Distribution Switchgear Outdoor Distribution

EH2741 Communication and Control in Electric Power Systems Lecture 2

Protection of Electrical Networks. Christophe Prévé

RAIDK, RAIDG, RAPDK and RACIK Phase overcurrent and earth-fault protection assemblies based on single phase measuring elements

Hamdy Faramawy Senior Application Specialist ABB Sweden

Lightning test in lab. Symmetrical fault and protection. Olof Samuelsson

Relay Coordination in the Protection of Radially- Connected Power System Network

Comparison of recloser and breaker standards

Protection of Microgrids Using Differential Relays

Sequence Networks p. 26 Sequence Network Connections and Voltages p. 27 Network Connections for Fault and General Unbalances p. 28 Sequence Network

Protection of a 138/34.5 kv transformer using SEL relay

Impacts of the Renewable Energy Resources on the Power System Protection by: Brent M. Fedele, P.E., National Grid for: 11 th Annual CNY Engineering

Protection of distributed generation interfaced networks

Transmission Protection Overview

Power System Protection Manual

PROTECTIVE DEVICES CO-ORDINATTION TOOLBOX ENHANCED BY AN EMBEDDED EXPERT SYSTEM - MEDIUM AND LOW VOLTAGE LEVELS

DG TRANSFER CONNECTION SCHEME IN ACTIVE DISTRIBUTION NETWORKS

Feeder Protection Challenges with High Penetration of Inverter Based Distributed Generation

Module 10. Initiation Code RELIABILITY ACCOUNTABILITY

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 %

Event Analysis Tutorial

A Guide to the DC Decay of Fault Current and X/R Ratios

Electrical Arc Hazards

IDENTIFICATION OF THE OPTIMUM PROTECTION CO-ORDINATION IN MEDIUM VOLTAGE DISTRIBUTION SYSTEM OF SRI LANKA

Design and Simulation of superconducting fault current limiter

Using a Multiple Analog Input Distance Relay as a DFR

Solutions to Common Distribution Protection Challenges

Phase-phase/phase-neutral: 24/13.8 kv star, 13.8 kv delta, 12/6.9 kv star.

IEEE 2015 The Institute of Electrical and Electronic Engineers, Inc.

SWITCHING SAFETY & RELIABILITY CONFERENCE

Relaying 101. by: Tom Ernst GE Grid Solutions

Transcription:

UPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS 1 B. RAMESH, 2 K. P. VITTAL Student Member, IEEE, EEE Department, National Institute of Technology Karnataka, Surathkal, India Senior Member, IEEE, EEE Department. National Institute of Technology Karnataka, Email: rbant96@gmail.com, Surathkal, India Abstract Fast and reliable transfer of the system could be made automatic with the use of automatic tie breaker switch. Bus tie breaker considered is being manually controlled to supply the loads when one of the two sources is not available. This paper presents the PSCAD modeling of control circuits of reclosers and sectionalizers in the presence of the bus tie breaker. As the load connected changes when the bus tie breaker status is changed, automatic change in recloser setting is proposed. The bus system is modeled in PSCAD and the protection coordination between recloser and sectionalizer is achieved for different cases. Index Terms PSCAD, bus tie breaker, recloser, sectionalizer, distribution system I. INTRODUCTION Critical electric power distribution systems need automatic operation. Transfer of system from existing power source to a different source need to be done reliably. This improves the reliability goal of the system and the connected facility as well as speed of operation. Automatic transfer of system need to be given more importance than the present practice. Otherwise there could be catastrophic consequences related to reliability of the system [1]. There are several major concerns in the protection of complex distribution substations equipped with a bus-tie breaker and served by two transformers. For a fault in the transformer zone, the bus served by the faulted transformer experiences an outage if the bus-tie breaker is operating normally open. With manual operation, this outage lasts until a crew manually reenergize the bus by closing the bustie breaker. With this, all the loads are supplied through the second transformer. It is possible to deploy intelligent electronic devices (IEDs) and obtain an automatic bus transfer scheme as per requirement [2]. Self monitoring and automatic bus transfer which is having the ability to monitor the abnormal conditions and which transfers the power source from one to another is proposed in this paper. The paper also outlines the automatic recloser and sectionalizer coordination considerations during automatic transfer of the system through the bus tie breaker of a local substation. II. PROTECTION COORDINATION DURING AUTOMATIC BUS TRANSFER The electrical system considered consists of two 33 kv/11kv transformers are supplying six feeders through two buses and one bus coupler (Fig.1). One overhead line of 1mile length is connecting the 33kV/11kV substation with 11kV/440V substation located near the hostels. The study is about replacing the existing two substation relays with digital reclosers and to make the bus transfer automatic through the bus tie breaker. The recloser and sectionalizer coordination during two positions of the bus tie breaker will be analyzed. Reclosers are located in the main feeders to protect distribution systems from temporary faults and sectionalizers or fuses are used at the beginning of laterals and sublaterals to protect the system from permanent faults. Fig.1. Power distribution system under study 85

The bus tie breaker is ON only when one substation (SS) transformer or its supply line is off. For instance, if transformer T1 is off, transformer T2 will be supplying all the loads through the bus coupler. Then the relay setting has to change for the recloser R2 connected to this transformer T2. The major part of the study is for feeder 1 faults as it is the overhead line. The maximum load current flowing through feeder 1 = 1.25x 1.41x 10 6 / (1.732 x 11 x 1000) = 92.49 A Based on this the feeder 1 conductor data are indicated in Appendix I. Three possible fault scenario cases are considered in the forthcoming sections. The scenario of the tie breaker switch is in OFF position, and both sources are available is considered under case 1 as normal condition. When the source 2 is not available, and source 1 is supplying Load 1 and Load 2 with the tie breaker switch in ON condition is studied under case 2. When the source 1 is not available, and source 2 is supplying both loads with the tie breaker switch is in ON position is studied under case 3. The need for these three cases is that the recloser settings need to be changed for these three cases. LINE CALCULATIONS: Transmission line side base current = = 5248.63 A Generator side base current = = 1749.54 A a) 3 Fault at 10% of feeder length b) 3 Fault at 100 % length of feeder Z Total = 3.38 + j 2.576 I sh p.u = 0.2353 x 5248.6 I sh = 1235 A Max value of I sh = 1746.55 A c) L-L fault at the end of line Fig.4: Equivalent circuit for AB fault at 100% length I fb = 0.22568 p.u Fault current = 1184.5 A Fault current + Load current = 1250.6 A Maximum value = 1750A III. RECLOSER SETTING Fig.2: Equivalent circuit for ABC fault at 10% length For generator, Impedance = 1+j1 Base impedance = 33 2 /100 = 10.89 Ω p.u impedance = (1+j1)/10.89 = (0.091 + j 0.091) For transformer, Reactance = j 0.06 x 100/5 = j 1.2 p.u Z Total = 0.42 + j 1.3285 72.45 Ω ے = 1.3933 72.45 ے (1.3933) / 0 ے = 1 p.u I -72.45 ے = 0.7177 I sh = 5248.6 x 0.7177 = 3767 A Max Value of I sh = 5.18kA Recloser will sense and interrupt fault currents and reclose automatically while attempting to reenergize the line. If the fault is temporary in nature, it will be cleared when the line is de-energized [4]. Whenever there is a detection of fault, the recloser opens its contacts for a pre-programmed period. After this dead time, it will close automatically. If the fault is permanent, the recloser will finally remain open which is called as recloser lock-out. Case 1: Normal condition During normal conditions, transformer T 1 is supplying power to combined load 1 and transformer T 2 is supplying power to combined load 2. The load 2 comprises of local loads fed by underground cables. The recloser model has fault detecting, interrupting and reset unit. The fault detecting unit will sense faults. The fault interrupting unit has four shots, each operating in different modes as specified 86

by the time current characteristic curves. The time current characteristics are represented by the curves A, B, C, and D. s B and C are of inverse time overcurrent type. The recloser pick up current is selected as two times the maximum load current. The first trip signal is by fault detection using ANSI 50 element from the instantaneous blocks. The second and consecutive trip signals are by fault detection using ANSI 51element (for curve B and C). Relay settings of recloser 1 for different curves are as indicated in table I. The recloser 1 control flow diagram is indicated in Fig. 7. The control signal R1 is generated using curve A, B, C and D. TABLE I RECLOSER SETTINGS FOR CASE 1 The recloser settings for this condition are given in table IV. The fault current levels in this case are listed in table V. One current waveform is indicated in Fig.5 Case 3: Source 1 unavailable In this condition, source 2 is supplying all the loads through transformer 2. All the load currents will flow through the recloser 2. The fault current levels in this case are listed in table VI. One current waveform for this case is indicated in Fig.6 Fig.5. Recloser 1 currents for abc fault at feeder 1 (case 2) A B C D TABLE II RECLOSER 2 SETTINGS FOR CASE 1 Recloser 2 settings I pickup (ka) I pickup (ka) TDS (s) type 0.179 0.37 0.001 Instantaneous 0.179 0.37 0.1 IEEE Very inverse 0.179 0.37 0.2 IEEE Extremely inverse 0.179 0.37 0.25 Instantaneous TABLE III FAULT CURRENTS FOR CASE 1 Fig. 6. Recloser 2 currents for ABC fault (case3) Case 2: Source 2 unavailable In this condition, source 1 is supplying all the loads through transformer 1. The maximum load current through the recloser 1 = 274A. Fig. 7. Recloser control 87

TABLE IV RECLOSER 1 SETTINGS FOR CASE 2 AND RECLOSER 2 SETTING FOR CASE 3 TABLE V FAULT CURRENTS FOR CASE 2 Fig. 9. Tie breaker control flow diagrm TABLE VI FAULT CURRENTS FOR CASE 3 The bus tie breaker is normally in open position. It is closed only when any one source is not available. When the recloser 1 is open, the tie breaker switch will be ON connecting the second source to supply all the loads. Similarly when the recloser 2 is open, all the loads are supplied by source 1. (Fig.9). The Recloser settings will be automatically changed with the change in tie breaker switch condition (Fig. 10). Fig.10. Recloser 1 curve setting flow chart Fig.11. Sectionalizer control flow chart 88

ii) A fault of 14 s duration is applied at 2s of simulation time. The recloser 1 signal is indicated by Fig. 13. As the fault is cleared by the opening of the sectionalizer after the third shot, the recloser will finally close as the fault is cleared. Fig.12. Recloser 1 status for a fault of 4s on feeder 1 (Case1) With the tie breaker control, during any fault in source 1 circuit, source 2 will take over and supply both the loads. CONCLUSION Fig.13. Recloser 1 status for fault of 14s duration IV. SECTIONALIZER CONTROL The sectionalizer does not interrupt fault current. Instead it counts the number of operations of the interrupting device upstream and opens while the interrupting device is open [3]. If the fault is temporary and cleared before the count reaches the programmed count, the unit does not operate and after the reset time expires, the count is reset. If the fault is permanent, the unit will see multiple instances of fault current followed by recloser opening and in each instance, the count will be incremented. After detecting the preset number of counts, the sectionalizer will open. The sectionalizer presented will open after the third trip of the recloser and clears the fault (Fig. 11).By this, the recloser could close the contacts. But if the fault is not cleared, recloser will remain open after the fourth shot. V. SIMULATION OF OPERATING CONDITIONS The coordination setting selected here is such that the first recloser opening takes place with instantaneous curve A. There will be a dead time of 0.5s after this trip. The second and third trips are following the curve B and C respectively with dead time delays of 5s and 10s respectively after the trip. If the fault is not cleared during this time, the last trip is following the instantaneous curve and recloser will remain open. Simulation study was conducted for the three cases. Test results for case 1 are described below. i) A fault of 4s duration is applied at 2s of simulation time. As the fault is cleared before the preset count, sectionalizer will not open (Fig. 12). The benefits of the proposed method are: i) Automatic transfer of load to second source whenever there is a fault in the source 1 circuit. This reduces the operation time of system transfer. ii) Automatic change in the recloser settings when the tie breaker status changes. iii) Coordination between recloser and sectionalizer in the three scenarios. An intelligent recloser with self configuring features is proposed. This type of reclosers and sectionalizers will support protection feature, much desired in smart grid environment. APPENDIX I REFERENCES TABLE VII FEEDER 1 CONDUCTOR DATA [1] P.E.B. Brown, and J. Guditis, Critical power automatic transfer systems- design & applications, Square D Critical Power Competency Center, Revision 0, 10/06, Schneider Electric, 2006. [2] T. Zhao, L. Savior, and C. Wester, Advanced bus transfer and load shedding applications with IEC 61850, GE Digital Energy Multilin. [3] V.A.S. Rones, and K.P. Vittal, Modeling of recloser and sectionalizer and their coordination using PSCAD, IEEE Conference on Circuits, Power and Computing Technologies, 2/13, pp. 679-684, (2013). [4] IEEE guide for automatic Reclosing of Line circuit Breakers for AC Distribution and Transmission lines, IEEE std C37.104-2002. 89