D25 Cutting Tools PM Callouts

Similar documents
merchandising guidelines

INLINES ~ Calendar Club and Go! Toys & Games

PROTOTYPICAL Sign Planogram: Light Bulbs Bay Name: Light bulbs 9.1

METALWORKS Concealed. Installation Instructions

Assembly instruction Shelving System Hi280 Silverline

R Form No MILLENNIUM GONDOLA / WALLCASE ASSEMBLY

Panel Grille Suspended Ceiling Installation Guide

Shelving for picking STORAGE TECHNOLOGIES & MATERIAL HANDLING

Interactive Monitor Arm

Fall 2018 Global Retail Toolkit

HEADS UP FOR SAFETY. A Safety Handbook for Elementary A.D.S.T. and Makerspace Teachers

Starbucks End Cap Kiosk Installation Training

Robert Bosch GmbH. Lounge light fixture

WOODWORKS. Linear Solid Panels. Installation Instructions CEILING SYSTEMS. 1. General

MAKER LAB Safety Instructions Power Tool Training

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

Installation Instructions

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

General Wood Shop Notes

INFUSIONS and METALWORKS Wings Accent and Acoustical Clouds

Step-by-step Installation Guide

Assembled Ez2 Positioning/Operating Instructions

Install Instructions for Corvallis Jurastone #4008 Mantel

Shopsmith Mobile Storage Cabinet.

WoodWORKS Channeled Plank

Product must be installed as shown using the screws and brackets provided. Use of incorrect hardware could result in damage to the product.

Two Panel Frameless Bypass Door

Install Instructions for Solano Jurastone #4012 Mantel

The World s Finest Skate Sharpening Equipment BLADEMASTER I-SH6000 OPERATORS MANUAL. REVISION DATE: September

INSTALLATION INSTRUCTIONS

metalworks Plank Assembly and Installation Instructions 2.1 Read this entire document before proceeding with installation.

Hyskore Bench Top 360 Armorer s Vise

STUDENT/FACULTY MACHINE SHOP SAFETY RULES

System 3000 specifications

Outdoor Deck Turf Tile. Installation Instructions

Booth Display Rules. Standard Inline booth. Perimeter booth. Island booth. Peninsula Booth

INTRO. Lighting plays a very important role in showcasing your store merchandise, as well as highlighting the design in your store.

Monroe Hardware 2016 Spring Show

POP PLUS / SPIDER SET-UP INSTRUCTIONS

Installation Instructions for Mincey Marble Manufacturing s Standard 3-Piece Panels [Not Extending to the Ceiling]

INSTALLATION INSTRUCTIONS

How to build a Ram for Challenge E: Twist-O-Rama

You are not allowed to install or place anything above the maximum height allocated for each type of booth.

Linear Open Style Suspended Ceiling Installation Guide

INSTALLATION AND CUSTOMER CARE INFORMATION FOR SC FREESTANDING STERILIZATION CENTERS

Please read this manual before installing the suite. This manual should remain with the homeowner.

SAFETY INFORMATION PACKET

metalworks Vector Assembly and Installation Instructions

SO YOU WANT TO PLAN YOUR GARAGE STORAGE?

GreatDeck Outdoor Hardwood, Plastic, Red Cedar, and Wood Deck Tile. Installation Instructions

Step-by-Step Instructions for Making the Wall-hung Bookcase

IMPORTANT INFORMATION! Attention all Operators, Managers & Store Associates PLANOGRAM (POG)

CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. International Version

To prevent accidents and damage please read these instructions before installation or use. Installation Instructions

Box Edge Plus Steel Shelving Installation Instructions

Product instruction manual Trimming Systems RO3016, RO3018, RO3919, RO3020, RO3021, RO3022, RO3026, RO3027

Technical Service Note

Cyclone Upcut Cut off saw

Western Illinois University Department of Art Woodshop Orientation

Chapter 19. Interior Finish Work

Install Instructions for Torrance Jurastone #4004 Mantel

Bulk Storage Rack Assembly Instructions

SkillsUSA California Carpentry 2019 Regional Competition SCOPE OF THE COMPETITION:

No Base Wall End Connector Installation Instruction

192 GENERAL WOODWORK (CMW 11, 12 & 13) Examination Scheme

FliteLine Post & Wire Bird Deterrent Includes specifications for: FliteLine system components

WESTERN ILLINOIS UNIVERSITY DEPARTMENT OF ART

TOGGLER Specialty Anchors

Policy Sponsor: Assistant Vice President Facilities Management. Responsible Unit: Trade Services

COMPOSITE RAILING INSTALLATION

Vanity Installation Instructions

Install Instructions for Corvallis #4008GRC Mantel

Assembly Instructions

Vinyl Cutter Instruction Manual

Self adhesive die cut hangers

WOODWORKS Grille System

Kitchen Step Stool. Premium Plan. In this plan you ll find: America s leading woodworking authority

60 DIRECT-TO-STUD SHOWER WALL SET

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

Transition Range Installation, Care & Adjustment Instructions

Before Assembling the Storage Wall

Read Below! Read Below! Read Below! Read Below! Read Below! Read Below! STOP READ TIPS BELOW TO MAKE ASSEMBLY MUCH EASIER

HZ101 & HZ121. Concealed And Low Level Cistern Installation Instructions

INSTALLATION AND CUSTOMER CARE INFORMATION FOR SC FREESTANDING STERILIZATION CENTERS

Rolling Curtain door Manual

METALWORKS Linear (Interior & Exterior Applications)

Read Below! Read Below! Read Below! Read Below! Read Below! Read Below! STOP READ TIPS BELOW TO MAKE ASSEMBLY MUCH EASIER

compile system INSTALLATION GUIDE Updated January 2019

Laminate Cabinet Installation Instructions

OWNER S MANUAL CONTENTS. The only table saw fence with Automatic Positioning Control TM

Frameless Inline Door With Return QCI5263

WOODWORKS Concealed. Assembly and Installation Instructions

HARDINGE Installation booklet For: Dead-Length Collet Adaptation Chucks Stationary Collet

Little Wizard II. Product Familiarity for Retailers. Contents

8 x 10 Sandwich Panel

Using hand tools Prepared by. Paul Roberts Neville Comins

Nojo Design: Large Step Cabinet: February 2012

INSTALLATION INSTRUCTIONS

Agricultural Mechanics and Technology Power Tool Safety Rules

T-5 Floor Model SunLite Garden Assembly Instructions

Transcription:

D25 Cutting Tools PM Callouts EXECUTION New product will be arriving direct to stores mixed with existing product and may require sifting through There is a fair bit of clearance and buyback for this initiative which is time consuming Teams will need to pull from elevations and from the overheads POP There are only Aisle Violators for POP, ensure they are set according to SIGN POG SIGN POG Sign POGs can be found like this: REPORTING Initiative: Cutting Tools Bay Description: Cutting tools (include Woodworking in this also), Handsaws Use whatever is available in store when it comes to Peg/slot hooks shortage DO NOT order additional material

D25 Cutting Tools - Scope Of Work New Product will be arriving direct to stores an will be mixed with existing product New Product will most likely be in overheads already with No Home EXECUTE, regardless of how much new product is received. TIP: It s a good idea to secure a scan gun to help you quickly identify Article # s for RTV/buyback and for new product DE-MERCHANDISE / DECONSTRUCT EXISTING SET Remove MES articles and action accordingly. Ensure accurate quantities are recorded. MES articles will be RTV/Buyback and clearance De-merchandise existing bay(s) and keep products on hooks TIP: Cutting Tools bay does not need to be fully de-merchandised (mostly shuffling) TIP: Handsaws Bay will need to be fully de-merchandised for ease in resetting (new articles) RESET BAY(S) CR is only responsible for setting the Chisels (woodworking) section of the bay along with all of Cutting Tools and Handsaws Clean bay(s) thoroughly (sweep floor, wipe down beams and H-Frames, scrape beams and H-Frames as needed, etc.) Ensure all product, elevations and shelving is set to POG. Ensure no product is sticking out of the bay. Clamps may need to be shuffled in a woodworking + Clamps combined bay ONLY work on the side of the bay that contains Woodworking You may come across Clamps within the half woodworking section which you will need to set to POG DO NOT spend time correcting the other half that contains Clamps Use Peg/slot hooks and shelving from within the set where ever possible Eg. Use same length Peg/slot hooks on higher rows and use odd sized Peg/slot hooks on lower rows of product Use whatever is available in store NEW Handsaw Tool bar (white peg hook) (A) are to be used for ALL horizontal saw on POG handle end onto Handsaw tool bar and other end onto regular Peg/slot hook) If there are no NEW Handsaw Tool bars available at store, merchandise Handsaws using two Peg/slot hooks as normal LABEL STANDARDS (Sequence ALL bays) Wood working bay (sequence full bay and print off only what you need for woodworking section) BIN (for peg/slot hooks and gondola shelves) 1 per facing Only Label the regular peg/slot hook POP If no white Handsaw Tool bar is available (label both Peg/slot hooks that hold the handsaw up) B/C 1 per facing on hang tags (for base elevation product under the gondola shelving) 1 per facing on beam (for product on base elevation not directly under gondola shelving) Ensure Aisle Violators are correctly positioned as per SIGN POG A Page 1

D25 Cutting Tools - Completion Checklist The area is clean from trash. All shelf heights are set to the new POG. Beams and H-Frames have been cleaned to remove sticky residue and/or marks. Display and/or fixtures are installed correctly. Displays and/or fixtures are clean of any dust, debris and fingerprints. POP and any Tear Pads and/or Brochures are installed correctly. POP is clean of any dust, debris and fingerprints. All product is set to the new POG. Missing product has been communicated to the store and logged correctly. All price labels are installed correctly. Bay re-sequenced. POG and Sign POG placed in the MET pouch and BSR has been filled out properly. Required after photos are taken. Bay is grand opening ready. Handsaws Cutting Tools Clamping Woodworking Page 2

D25 Cutting Tools Reporting Instructions Item How To Log Important Call Outs Handsaw Tool Bar (White Peg Hook) DEFICIENCY: CRT - Additional Components Required night of reset LOCATION: Accessories Item Number / Description CAN600007424/Handsaw Tool Hook ( Cool Grey) Regular Shelf DEFICIENCY: CRT - Additional Components Required night of reset LOCATION: Steel Fixtures -> Shelf Item Number / Description CAN600000897/16X48 REGULAR SHELF - WHITE HA01- CAN600000899/18X48 REGULAR SHELF - WHITE HA01- Gondola Shelf DEFICIENCY: CRT - Additional Components Required night of reset LOCATION: Steel Fixtures -> Shelf Item Number / Description CAN600007215/Gondola Shelf 16 X47 Madix CAN600007217/Gondola Shelf 24X47 Madix Peg Hooks DEFICIENCY: CRT - Additional Components Required night of reset LOCATION: Accessories Size will vary by store (use existing from store (MET supply) before ordering any new peg hooks) POP/Signage DEFICIENCY: VM - POP not on site/missing some elements/hardware missing LOCATION: Signage -> Cutting Tools Order as needed based on Sign POG Page 6

Supervisor Checklist CR SEP Cutting Tools (National): Date project runs (9/1-9/26) A B POP: A: Three new Aisle Violators to be set as per Proto Sign POGS B: Sign POGS listed under window and Department E C FIXTURE C: Handsaw bay has a Tool Bar for each horizontal handsaw- one peg hook with price, one tool bar per article GENERAL: NOTE: Not all stores have a Woodworking/Clamps shared bay- Stores that do not have this shared bay will have a new POG with woodworking in the Cutting Tools bay.

Dept #25 Cutting Tools CATEGORY LOCATIONS VENDORS RTV Hand Tools & Tool Storage 180 Stores MET: Apex, Stanley, Innovak, Olfa, Leatherman Factory: Milwaukee 70002887 Disposition & Direction- Refer to Sharepoint for Specific Vendor Instructions Key Service Expectations Key Service Callouts (3-5 points) Remove and return foreign product to returns Repair damaged packaging for resale Ensure similar articles are not mixed on peg hooks Operational callouts (3-5 points; Easy find, blocked displays etc) Ensure lighting in bay (if applicable) is operating Change burnt out bulbs as required Safety Callout (2-3 points) Ensure there are no loose blades or open knives left in bay Ensure peg hooks are not overfilled A UPDATED: August 15, 2014

D25 Cutting Tools Parts & POP POP DESCRIPTION Cutting Tools Aisle Violator ITEM NUMBER BAY LOCATION D25041C-AV1 Refer to Sign POG for installation details epop POP DESCRIPTION AV Clips ITEM NUMBER BAY LOCATION GA001C Refer to Sign POG for installation details epop UPDATED: August 15, 2014

Dept #25 Handsaws CATEGORY Hand Tools & Tool Storage Key Service Expectations LOCATIONS 180 Stores VENDORS RTV MET: Stanley, Trademark, Footprint Factory: Milwaukee 70002887 Disposition & Direction- Refer to Sharepoint for Specific Vendor Instructions Key Service Callouts (3-5 points) Remove and return foreign product to returns Repair damaged packaging for resale Ensure similar articles are not mixed on peg hooks Operational callouts (3-5 points; Easy find, blocked displays etc) A: Handsaws hung vertically require 1 peg hook w/price label and 1 Tool Holder Peg Ensure lighting in bay (if applicable) is operating Change burnt out bulbs as required Safety Callout (2-3 points) Ensure handsaw blades have cardboard sleeve/plastic guard over teeth Ensure peg hooks are not overfilled A UPDATED: August 15, 2014

D25 Saws Parts & POP POP DESCRIPTION Saws Aisle Violator ITEM NUMBER D25041C-AV3 BAY LOCATION Refer to Sign POG for installation details epop POP DESCRIPTION ITEM NUMBER BAY LOCATION AV Clips GA001C Refer to Sign POG for installation details epop PART DESCRIPTION PART NUMBER HANDSAW TOOL HOOK (COOL GREY 9) CAN600007424 Ariba UPDATED: August 15, 2014

Dept #25 Woodworking CATEGORY LOCATIONS VENDORS RTV Hand Tools & Tool Storage 180 Stores MET: Stanley, Innovak, Footprint Factory: NA Disposition & Direction- Refer to Sharepoint for Specific Vendor Instructions Key Service Expectations Key Service Callouts (3-5 points) Remove and return foreign product to returns Repair damaged packaging for resale Ensure similar articles are not mixed on peg hooks Operational callouts (3-5 points; Easy find, blocked displays etc) This program is not a full bay program in all stores- some stores have the chisels and planers in a shared bay with Cutting Tools Ensure lighting in bay (if applicable) is operating Change burnt out bulbs as required Safety Callout (2-3 points) Ensure peg hooks are not overfilled Ensure all chisel blades are properly packaged and sharp edges are not exposed UPDAT ED: August 15,

D25 Woodworking Parts & POP POP DESCRIPTION ITEM NUMBER BAY LOCATION Chisels Aisle Violator D25041C-AV2 Refer to Sign POG for installation details epop POP DESCRIPTION ITEM NUMBER BAY LOCATION AV Clips GA001C Refer to Sign POG for installation details epop UPDATED: August 15, 2014