R&D Activities for ARES Upgrade

Similar documents
ARES Upgrade for Super-KEKB

Accelerating Cavities

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh

Couplers for Project X. S. Kazakov, T. Khabiboulline

Advance on High Power Couplers for SC Accelerators

HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK

Waveguides GATE Problems

TESLA RF POWER COUPLERS DEVELOPMENT AT DESY.

Construction Status of SuperKEKB Vacuum System

High Power Couplers for TTF - FEL

KEK ERL CRYOMODULE DEVELOPMENT

KEKB Status and Upgrade Plan with Crab Crossing

FAST RF KICKER DESIGN

Third Harmonic Superconducting passive cavities in ELETTRA and SLS

Superconducting RF cavities activities for the MAX project

Main Injector Cavity Simulation and Optimization for Project X

RF Design of Normal Conducting Deflecting Cavity

Cavity development for TESLA

Superconducting RF System. Heung-Sik Kang

MULTIPACTING IN THE CRAB CAVITY

CEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute

2 Theory of electromagnetic waves in waveguides and of waveguide components

IR assembly + BG simulation 2009/7/7 M. Iwasaki (Tokyo) For Belle-II MDI Group Tokyo / Tohoku / KEK

The transition for the Elettra Input Power Coupler to the standard WR1800

Mircea Stirbet. RF Conditioning: Systems and Procedures. Jefferson Laboratory

Progress in High Gradient Accelerator Research at MIT

Current Status of cerl Injector Cryomodule

RF power tests of LEP2 main couplers on a single cell superconducting cavity

COUPLER DESIGN CONSIDERATIONS FOR THE ILC CRAB CAVITY

Status and Plans for the 805 MHz Box Cavity MuCool RF Workshop III 07/07/09 Al Moretti

The HOM measurement of a TESLA cavity (Z84) for HOM-BPM and cavity alignment

Superconducting Accelerating Cavity for KEK B-Factory

SIGNAL TRANSMISSION CHARACTERISTICS IN STRIPLINE-TYPE BEAM POSITION MONITOR

Yongming Li Institute of modern physics 31/07/2017

3.9 GHz work at Fermilab

1.5 GHz Cavity design for the Clic Damping Ring and as Active Third Harmonic cavity for ALBA.

CST MWS simulation of the SARAF RFQ 1.5 MeV/nucleon proton/deuteron accelerator

NEW OPPORTUNITIES IN VACUUM ELECTRONICS USING PHOTONIC BAND GAP STRUCTURES

OVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW*

IR summary. 2009/7/9 M. Iwasaki (Tokyo) For Belle-II MDI Group Tokyo / Tohoku / KEK

SRF in Storage Rings. Michael Pekeler ACCEL Instruments GmbH Bergisch Gladbach Germany

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY

A 3 GHz SRF reduced-β Cavity for the S-DALINAC

SIGNAL TRANSMISSION CHARACTERISTICS IN STRIPLINE-TYPE BEAM POSITION MONITOR

Coupler Electromagnetic Design

S. Ghosh On behalf of Linac, IFR, Cryogenics, RF and beam transport group members. Inter University Accelerator Centre New Delhi India

RF thermal and new cold part design studies on TTF-III input coupler for Project-X

CAGE CAVITY: A LOW COST, HIGH PERFORMANCE SRF ACCELERATING STRUCTURE*

High Power Antenna Design for Lower Hybrid Current Drive in MST

QWR Nb sputtering. Anna Maria Porcellato. MoP04. S. Stark, F. Stivanello, V. Palmieri INFN Laboratori Nazionali di Legnaro

RF Issues for High Intensity Factories

DEVELOPMENTS OF HORIZONTAL HIGH PRESSURE RINSING FOR SUPERKEKB SRF CAVITIES

MEASURES TO REDUCE THE IMPEDANCE OF PARASITIC RESONANT MODES IN THE DAΦNE VACUUM CHAMBER

CRAB CAVITY DEVELOPMENT

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University

RFsystems for the KEK B-Factory

IR HOM Issues. Collection of HOM effects. Sasha Novokhatski SLAC, Stanford University. Parallel Session: RF, HOM, Power June 15, 2006

Tuning systems for superconducting cavities at Saclay

Electromagnetic characterization of materials for the CLIC Damping Rings and high frequency issues

FAST KICKERS LNF-INFN

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS

Project X Cavity RF and mechanical design. T. Khabiboulline, FNAL/TD/SRF

Status and Future Perspective of the HIE-ISOLDE Project

IR introduction + Beam BG simulation /12/11 M. Iwasaki (Univ. of Tokyo)

High-field test at KEK

LOW-β SC RF CAVITY INVESTIGATIONS

BESSY VSR: SRF challenges and developments for a variable pulse-length next generation light source

RECENT STATUS OF THE SUPERCONDUCTING CAVITIES FOR KEKB

MuCool Test Area Experimental Program Summary

Energy Recovering Linac Issues

Crab Cavity Systems for Future Colliders. Silvia Verdú-Andrés, Ilan Ben-Zvi, Qiong Wu (Brookhaven National Lab), Rama Calaga (CERN)

THE PROTOTYPE FUNDAMENTAL POWER COUPLER FOR THE SPALLATION NEUTRON SOURCE SUPERCONDUCTING CAVITIES: DESIGN AND INITIAL TEST RESULTS*

Status Alcator C-Mod Engineering Systems. DoE Quarterly Review October 27, 2005

SUPERCONDUCTING RF IN STORAGE-RING-BASED LIGHT SOURCES

Fabrication Techniques for the X-band Accelerator Structures. Juwen Wang WORKSHOP ON X-BAND RF TECHNOLOGY FOR FELs March 5, 2010

DEVELOPMENT OF A BETA 0.12, 88 MHZ, QUARTER WAVE RESONATOR AND ITS CRYOMODULE FOR THE SPIRAL2 PROJECT

Recent Progress in HOM Damping from Around The World

Nb 3 Sn Fabrication and Sample Characterization at Cornell

Report of working group 5

HIGH POSITION RESOLUTION AND HIGH DYNAMIC RANGE STRIPLINE BEAM POSITION MONITOR (BPM) READOUT SYSTEM FOR THE KEKB INJECTOR LINAC TOWARDS THE SuperKEKB

A few results [2,3] obtained with the individual cavities inside their horizontal cryostats are summarized in Table I and a typical Q o

LHC TRANSVERSE FEEDBACK SYSTEM: FIRST RESULTS OF COMMISSIONING. V.M. Zhabitsky XXI Russian Particle Accelerator Conference

Superconducting 1.3 GHz Cavities for European XFEL

LC Technology Hans Weise / DESY

On behalf of: Sang-hoon Kim Zack Conway Mark Kedzie Tom Reid Ben Guilfoyle

The report includes materials of three papers:

Projects in microwave theory 2017

DQW HOM Coupler for LHC

Maurizio Vretenar Linac4 Project Leader EuCARD-2 Coordinator

HOM coupler design for CEPC

RF Cavity Design. Erk Jensen CERN BE/RF. CERN Accelerator School Accelerator Physics (Intermediate level) Darmstadt 2009

2008 JINST 3 S The RF systems and beam feedback. Chapter Introduction

Design, Development and Testing of RF Window for C band 250 kw CW Power Klystron

The TESLA Linear Collider. Winfried Decking (DESY) for the TESLA Collaboration

Detailed Design Report

Current Industrial SRF Capabilities and Future Plans

BASIC STUDY ON HIGH-GRADIENT ACCELERATING STRUCTURES AT KEK / NEXTEF

Processing and Testing of PKU 3-1/2 Cell Cavity at JLab

J. Jacob: Status of the ESRF RF upgrade

Development of the 170GHz gyrotron and equatorial launcher for ITER

Transcription:

R&D Activities for ARES Upgrade Tetsuo Abe for KEKB-RF/ARES-cavity group High Energy Accelerator Research Organization (KEK) <Outline> 1. R&D programs for SuperKEKB 2. L-band HOM-load test stand 3. Input couplers with TiN coating 4. New copper electroplating for S-cav 5. Summary KEKB Review @KEK 2005.02.22

Accelerator Resonantly-coupled with Energy Storage 3-cavity system stabilized with the π/2-mode operation consists of HOM-damped accelerating cavity (A-cav) Energy-storage cavity with TE013 (S-cav) Coupling cavity (C-cav) with a parasitic-mode damper 1

Accelerator Resonantly-coupled with Energy Storage 3-cavity system stabilized with the π/2-mode operation Input Coupler Port consists of Top View HOM-damped accelerating cavity (A-cav) Energy-storage cavity with TE013 (S-cav) Coupling cavity (C-cav) with a parasitic-mode damper 2

Upgrade Items toward Measures against Larger detuning Increase the energy ratio: Us/Ua = 9 15. Reported in the previous KEKB review Skipped this time Δf Δf a π /2 = 1 + Us / Ua Higher HOM powers HOM-load upgrade Higher input RF powers (400kW/cav 800kW/cav) TiN coating on the coaxial line Coupler test stand upgraded for ~800kW(CW) 3

R&D Programs 2004(JFY) [1] Construction of a new L-band HOM-load test stand Using 1.25GHz klystron (1.2MW, CW) The 1 st stage just finished [2] Input couplers with TiN coating Against multipactoring in the coaxial line TiN(Titanium Nitride) has low secondary-electron yields and is good for vacuum. Two couplers have been completed. Being tested in the upgraded coupler test stand up to 800kW. [3] New highly-pure copper electroplating for S-cav The old facility has been retired. Reusing a facility being used for J-PARC. 4

[1] L-band HOM Test Stand ARES HOM-damped Structure HOM HOM HOM (Side view) 5

SiC Absorbers In the HOM Wave Guide (WG) Direct water cooling Limit: >26kW/cav (HPT) In the Grooved Beam Pipe (GBP) Indirect water cooling via the copper plate Limit: ~3.6kW/cav (HPT) Max. power which can be supplied by the old L-band klystron. 6

HOM Extrapolation for Super-KEKB LER HOM in WG load (LER): 26kW/cav (HPT) 80kW/cav (SuperKEKB) Need HPTs over 26kW Increase # of absorbers /WG Enhanced water cooling (KEKB) Nb: 1224 σz: 7mm (Super-KEKB) 4896 (full) 3mm HOM in GBP load (LER): 3.6kW/cav (HPT) 20kW/cav (SuperKEKB) Need direct water cooling like in 2 x GBP (Nb=1224, BL=7mm) 2 x GBP (Nb=4896, BL=4mm) 2 x GBP (Nb=4896, BL=3mm) 4 x HOM WG (Nb=1224, BL=7mm) 4 x HOM WG (Nb=4896, BL=4mm) 4 x HOM WG (Nb=4896 BL=3mm) 7

Winged chamber loaded with SiC Absorbers (used in the movable-mask sections) Y. Suetsugu et al., Development of Winged HOM Damper for Movable Mask in KEKB, Proc. PAC2003. Can be a prototype. Directly water-cooled SiC bullet 8

New A-cav Design with Winged Chambers Directly water-cooled SiC bullet 9

We cannot test HOM loads with high powers for SuperKEKB. More powerful klystron is needed to upgrade the HOM loads. 10

Construction of New Test Stand for the HOM-load Upgrade Reusing an L-band klystron, which is capable of 1.2 MW CW power ( freq. = 1.25 GHz). Operating conditions (HV & cooling system etc.) are going to be regulated for our purpose. The 1 st stage of the construction has been just finished. 11

D01C/ARES HOM-load Test Stand L-band klystron Water dummy load Output from the klystron (Taken on 2005.02.20) 12

The 1 st RF Power Comes! 2005.02.21 Output power beyond the max. obtained in the old L-band test stand (3.3kW) Tuning to deliver more RF power up to 100 kw 13

[2] Input Couplers with TiN Coating The problem is the multipactoring in the coaxial line. Coupling Loop Coaxial Line (WX77D) Example of the TV-camera snapshots of the multipactoring in the coaxial line 14

Simulation Study Solving eq. of motion with the Runge-Kutta method Assuming the SEY of conditioned copper Count number of collisions. 15

On Which Side? On the inner conductor On the outer conductor Almost single-side side multipactoring on the outer conductor 16

Coating Area 17

Setup of the TiN Coating (DC Sputtering) 3E-4Pa before coating Injected gas: Ar and N2 Being used for TiN coating(10nm) of RF Ceramic windows Outer conductor Ti electrode @MHI 18

Studies on Total gas pressure Gas mixture ratio (Ar:N2) set Thickness meas. done by direct observation using SEM ~50nm TiN coating Glass plate Secondary electron yields For the details, see the slides presented in the 6th Workshop on a Higher Luminosity B Factory: http://belle.kek.jp/superb/workshop/2004/hl6/program.html. 19

Two input couplers have been TiN-coated with the final condition. (taken on 2004.11.10) 20

After Coating Before coating 21

Fabrication Leak test Tested in the upgrade coupler test stand 22

Old Setup of the Coupler Test Stand No RF output S-cav works as a dummy load. Input powers are limited: <400kW. 23

1MW DL Coupler Test Stand Upgraded for Higher Power Capability: 400 800kW Input coupler used as output coupler S-cav Input coupler To 1- MW Water Dummy Load From 1- MW CW Klystron 24

Another characteristic: The coupling-loop angles of the input and output couplers are set to be the same. 0 r Z No reflection (Γ~0.0) No Z-dependence The hardest ordeal for couplers 25

Power History (Data taken in 2005.02.01-10 @D01A/ARES TS) (β=3) (β=1) Routes of the old and upgraded test stands Any operating condition can be simulated in the test stand by changing the coupling-loop angles of the input and output couplers! To be compared with results on a coupler w/o TiN coating To be tested in the D04C station? ( genuine test stand?) 26

[3] New Copper Electroplating for S-cav S-cav is made from Iron with copper electroplating. Present S-cav --- electroplating in a pyrophosphate bath With brightener little defect on the surface The facility has been retired. S-cav for SuperKEKB --- new electroplating in an acid sulfate bath aaaaaaaaaaaaaaaaaaaaaaaaperformed in the periodic reverse (PR) process H. Ino, et. al, "Advanced copper lining for accelerator components", Proc. of LAC2000, Monterey, CALIFORNIA, 1015 (2000) Without brightener high purity, high electric conductivity (102%IACS), but possible defects on the surface Using the facility being used for J-PARC Ex. DTL tank 27

Difference between J-PARC and SuperKEKB J-PARC case Thickness:~1mm Mechanical polishing(-0.5mm) Electrolytic Polishing (EP) SuperKEKB case Thickness:~0.2mm Electrolytic Polishing (EP) Studies on Thickness (targets) Ground(alkalinity): ~50µm Main(acidity): ~150µm Electrolytic Polishing: about -40µm Less defect Electric performance Check Q0. 28

Pillbox Test Cavity Diameter: 451.2mm Height: 260.0mm Made from iron (SS400) (After copper electroplating) (Before copper electroplating) 29

Theoretical Calculation of Q0 (=Q0(cal)) Analytical solution of the electromagnetic field in the pillbox cavity TEmnp mode jωµ 0 m j' mn pπ z Er = A J ( )sin sin 2 m r mθ k r b d jωµ 0 j' mn j' mn pπ z Eθ = A J' ( )cos sin 2 m r mθ k b b d E = 0 z 1 pπ j' j' pπ z H = A J' ( r)cosmθ cos r mn mn 2 k d b m b d 1 pπ m j ' pπz H = A J ( r)sinmθ cos θ mn 2 k d r m b d j ' mn pπ z Hz = AJm( r)cosmθ sin b d TMmnp mode 1 pπ j j pπ z E = A J' ( r)cosmθ sin r mn mn 2 k d b m b d 1 pπ m j pπz E = A J ( r)sinmθ sin θ mn 2 k d r m b d jmn pπ z Ez = AJm( r)cosmθ cos b d jωε 0 m jmn pπ z Hr = A J ( )sin cos 2 m r mθ k r b d jωε 0 jmn jmn pπ z Hθ = A J' ( )cos cos 2 m r mθ k b b d H = 0 z Q0(m,n,p) = U ωmnp ε 0 2 µ 0 2 P U = dv E = dv H wall P wall 2 cavity 2 1 ωµ = 2 2σ cavity ds H 2 cavity Assuming 100%IACS electric conductivity (=1/1.72E-8Ωm) flat surface (i.e. no defect) 30

IACS International Annealed Copper Standard 100%IACS electric conductivity: 1/1.72E-8Ωm The electric conductivity of the highest-class oxygenfree copper: 102%IACS Cf. Electroplating in an acid sulfate bath w/o brightener: 102%IACS 31

32

33

After Trial and Error Copper Electroplating in an acid sulfate bath w/o brightener (PR process) Barrel Fine! Endcap 34

After Trial and Error Copper Electroplating in an acid sulfate bath w/o brightener (PR process) Barrel Fine! Electrolytic polishing Endcap 35

After Trial and Error Copper Electroplating in an acid sulfate bath w/o brightener (PR process) Barrel Fine! Electrolytic polishing Gorgeous! Endcap 36

Thickness Measurement Thickness [µm] 膜厚 (μm) 280 260 240 220 200 180 160 140 120 100 シアン化銅メッキ + 硫酸銅メッキ膜厚 Barrel before electrolytic polishing 1 3 5 7 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 Distance 上端面からの距離 from the mm) edge [mm] 37

Setup of the Q0 Measurement 38

Setup (close view) Loop couples with magnetic field. Antenna couples with electric field. 39

Results of the Q0 Measurements Electroplating in a pyrophosphate bath with brightener (applied to the present S-cav s) (no temperature correction) 40

Results of the Q0 Measurements DC electric conductivity (102%IACS) Frequency dependence comes from defects on the surface. TM modes TE modes Electroplating in an acid sulfate bath without brightener before electrolytic polishing (@20degC) Electroplating in a pyrophosphate bath with brightener (applied to the present S-cav s) (no temperature correction) 41

Results of the Q0 Measurements DC electric conductivity (102%IACS) No defect! Electroplating in an acid sulfate bath without brightener after electrolytic polishing (@20degC) Frequency dependence comes from defects on the surface. TM modes TE modes Electroplating in an acid sulfate bath without brightener before electrolytic polishing (@20degC) Electroplating in the pyrophosphate bath with brightener (applied to the present S-cav s) (no temperature correction) 42

Next Step: Vacuum Test The test cavity has been fabricated. The electroplating is ongoing. A vacuum test will be done next month. φ500mm Endcap Barrel 43

Summary ARES R&D programs are ongoing well. A new L-band test stand has been constructed For the HOM-load upgrade. The 1 st stage has been finished. To be tuned for supplying high powers. Input couplers with TiN coating Against multipactoring in the coaxial line. Two TiN-coated couplers have been completed. Being tested in the upgraded coupler test stand up to 800kW(CW). New highly-pure copper electroplating for S-cav On the slightly different condition from J-PARC. The electric performance is estimated to be excellent. A vacuum test to be done next month. 44