EXTRUTECH PLASTICS, INC. Custom Extruder of Close Tolerance Profiles

Similar documents
IDP Entry-Fit Steel Door Frames. Installation Instructions K2A and NK2A Series Frames

FIB-R-MAX STANDARD SINGLE DOOR

Parveneer Positive Pressure Fire Rated Frames Double rabbet with T stop for 20 minutes

Chapter 18. Interior Doors

Chapter 9. Windows and Exterior Doors

2. Skid should contain the following: A door & jamb B casing C seal cover kit & D extension jamb set (if ordered), E hardware box.

Common Safety Concerns

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

How To Install Windows: Nail-Fin Application

Chapter 9. Windows and Exterior Doors

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

western window systems westernwindowsystems.com installation instructions non-pocket 2-1/4 panels

Acoustical Surfaces, Inc.

L e g e n d Inline panel shower enclosure installation Instructions (400 Series)

Installation Instructions. 45 and 60-Minute Fire-Rated Neutral Pressure Veneered Door Frame UBC & UL-10C

C-Series & S-Series Classic Frame with Transom (Single or Pair)

PREHUNG DOOR SYSTEM INSTALLATION INSTRUCTIONS: FIBRECOMP COMBINATION UNITS

Installation of Fiberglass Windows

IMPORTANT NOTICE WARRANTY WILL BE HONORED ONLY IF THE JAMBS HAVE BEEN INSTALLED IN ACCORDANCE WITH THESE INSTALLATION INSTRUCTIONS

series 9500 top load bi4fold installation instructions

2300 BI-FOLD INSTALLATION GUIDE

1 PREPARE HEADER AND ROUGH OPENING

Thermally Broken Framing and Door Installation

INSTALLATION INSTRUCTIONS

FOLDING DOOR INSTRUCTIONS

Flashing Materials. Rough Opening Preparation

INSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING

End of Row Doors. Revision Number 1

INFITTING & OVERLAP HINGED DOORS

Installation Instructions. 45 and 60-Minute Positive Pressure Fire-Rated Veneered Door Frame UBC & UL-10C

Please read and understand all instructions before beginning. These instructions cover impact and non-impact aluminum French Door 650/750.

Knock Down Patio Door Assembly Instructions Regular & Impact

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

FIG. #1 - ASD-90 & USD-90 Shower Door Assembly

Pre-Hanging Information

INSTALLATION INSTRUCTIONS for Pre-Hung Exterior Entry Doors (JII106) IMPORTANT INFORMATION AND GLOSSARY. Estimated Install Time for New Construction

FIBERGLASS DOOR SYSTEM Installation Instructions for High Wind Velocity Areas

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

MANUFACTURING INC. Specifications

Chapter 12 - Windows and Doors

INSTALLATION INSTRUCTIONS

Ballistic Fiberglass Doors & Frames

Pet Door Panel Installation Manual

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

Heavy Wall Applied Stop Tube Frame and Door Installation

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

INSTALLATION MANUAL FORTRESS SERIES

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

VINYL REPLACEMENT WINDOW INSTALLATION STANDARDS

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

WOOD OUT SWING AWNING, CASEMENT, & HOPPER WINDOW

UNIT 5: EXTERIOR DOORS AND WINDOWS

ICU TRACK SLIDING DOOR

Murphy Door DIY Flush-Mount Bookshelf & Hardware Installation Manual

Tools required by installer: Materials required by installer:

ESA-200 Fixed Sidelite

western series 9500 f loor load The Volume Program window systems westernwindowsystems.com bi fold installation instructions

Please read and understand all instructions before beginning. These instructions cover the non-impact aluminum sliding glass door.

FIG. #1 - ASD & USD 180/280 Shower Door Assembly

Wood Hinged Patio Door Installation Instructions

ICU TRACKLESS SLIDING DOOR

RECREATIONAL VEHICLE DOOR INSTALLATION INSTRUCTIONS

Instructions for the installation of Ellison Bronze balanced door models #137 & 138

4-lite Patio Door. Installation Instructions

DOOR INSTALLATION GUIDE WOOD FRAMING New Construction

3/16 FRAMED SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

Before installation, check your local and state requirements for this type of install.

INSTALLATION INSTRUCTIONS for Wood Patio Doors without Exterior Trim or Nailing Fin (JII027)

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

WINDOW INSTALLATION GUIDE

PREHUNG INTERIOR DOOR INSTALLATION

Make every component count.

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

ESA-300 Full Breakout

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Installation Instructions. Oakmont Folding Doors

How To Measure Your Finished Opening

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

Figure #1 - VSNEO Shower Door Assembly

Installation Instructions

Chapter 12 - Windows and Doors

READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION

SWINGING SCREEN DOOR FIELD INSTALLATION INSTRUCTIONS

FIBERGLASS DOOR SYSTEM Installation Instructions

Pocket Door Installation Instructions

STACKING MULTI-SLIDE DOOR SYSTEM

Vinyl Windows Manufactured by VPI Quality Windows

Double Swing Door With Header QCI5114

Vinyl Windows and Doors Manufactured by VPI Quality Windows

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

For installation assistance, contact SARGENT at DOORS SHOWN HERE SWING IN FOR ILLUSTRATION PURPOSES ONLY.

INSTALLATION INSTRUCTIONS for Wood Patio Doors with Exterior Trim or Nailing Fin (JII026)

INSTALLATION FRIENDLY

RV ENTRY DOOR REMOVAL AND SHIPPING BLOCK INSTALLATION AND ALIGNMENT

Transcription:

PVC SINGLE DOOR INSTALLATION INSTRUCTIONS Single Pre-Hung Doors are shipped assembled in most cases ready for installation. Check the sill; in some cases you may want a sill in this door or if not requested a foam board is fastened to the bottom of the frame for shipping purposes. You may remove it by drawing out the two screws, on each side, at the bottom of the frame before installing the door. Adjustable Door Sweep - If you remove the door sill you may want to adjust the bottom door sweep on the door panel. Adjust up or down according to your floor and install sweep with enclosed screws. Determine if the door is to swing left, right, inside or outside. With the door in closed position, set the door into the rough opening. Plumb and square the door assembly in the rough opening using accessible mounting holes supplied through the jamb. Temporarily install nails or screws for proper positioning. These nails or screws may require removal for final adjustment in Step Three and Step Four. Open the door and permanently install the supplied screws through the hinge holes and into the rough opening. At the hinge location, use shims between the door jamb and rough opening. These hinge screws should be tight. The shims installed should locate the door panel with proper clearance from the jamb. Step Six: Adjust lock jamb up or down, shim and permanently install the remaining screws supplied. Being sure not to upset the proper position of the door established in Step Five above. NOTE: Be sure to properly shim at all position of these added screws. IMPORTANT: After the door is installed, both hinge jamb and lock jamb must be plumb. They must also be square to the header and threshold. The space between the rough opening and the jamb should be shimmed at all door mounting screw locations. If installed properly, there will be a uniform gap between the door panel and the jamb. The door panel will have a continuous contact to the weather stripping located on the jamb. Step Seven: Install the lockset or barn latch. Instructions are found in the lockset carton. NOTE: The strike plate is adjustable for the in and out positioning of the door panel. Step Eight:

PVC DOUBLE DOOR INSTALLATION INSTRUCTIONS Double Doors are pre-assembled and knocked down for shipping. Assembly is required on site. With screws (provided), screw the frame (jamb header) to the side jambs at the screw hole locations that are pre-drilled into the side jamb screw holes. in the Mount door panels to the frame by lining up the holes of the hinges to the hinge holes on the jamb. Install one screw into each of the hinges. These hinges should be tight. Check door for fit and adjust shims as required. Open the doors and permanently install the remaining screws. If installed properly, there will be a uniform gap between the door panel and the jamb. The door panel will have a continuous contact to the weather stripping. Install the lockset per instructions in the lockset carton. Please note the strike plate is adjustable for the up and down position of the panel. Step Six:

PVC DOUBLE SWING SINGLE DOOR INSTALLATION INSTRUCTIONS Single Pre-Hung Doors are shipped assembled in most cases ready for installation. in the Mount door panel to the frame by lining up the holes of the hinges to the hinge holes on the jamb. Install one screw into each of the hinges. These hinges should be tight. Check door for fit and adjust shims, for a uniform gap between the door panels. Open the doors and permanently install the remaining hinge screws. IMPORTANT: After the door is installed, both hinge jamb and lock jamb must be plumb. They must also be square to the header and threshold. The space between the rough opening and the jamb should be shimmed at all door mounting screw locations. If installed properly, there will be a uniform gap between the door panel and the jamb. The door panel will have a continuous contact to the weather stripping located on the jamb. Set the tension on the double swing hinges per the manufacture instructions. Adjust hinges so both doors close to the center of the frame properly.

PVC DOUBLE SWING DOUBLE DOOR INSTALLATION INSTRUCTIONS Double Doors are pre-assembled and knocked down for shipping. Assembly is required on site. With screws (provided), screw the frame (jamb header) to the side jambs at the screw hole locations that are pre-drilled into the side jamb screw holes. in the Mount door panels to the frame by lining up the holes of the hinges to the hinge holes on the jamb. Install one screw or as needed into each of the hinges. These hinges should be tight. Check door for fit and adjust shims, for a uniform gap between the door panels. Open the doors and permanently install the remaining hinge screws as needed. Set the tension on the double swing hinges per the manufacture instructions. Adjust hinges so both doors close to the center of the frame properly.

Extrutech Rough Opening Buck Installation ( 3/4 FOAM BOARDS ) Extrutech Plastics manufactures solid PVC foam boards in different sizes, for rough opening bucks we use solid 3/4" thick PVC boards in 5 1/2" and 7 1/2" widths that provide a solid flat surface for door frame installation. To install the rough buck boards use the following steps. Step one: Remove the old door frame, if required. Make sides of rough opening as smooth as possible. Step two: Step three: Install rough opening buck ( 3/4" thick foam boards) Check size of opening Screw header bucks to top of side bucks Check fit in opening, shim, square and plumb Secure rough opening frame to your opening For wood framed walls use Stainless Screws provided For masonry walls use Masonry screws Shim as required. Check rough opening buck for plumb and square Install door frame, follow door installation instructions