Learning Legacy Document. London Fire Brigade Incident Management Requirements. 1) Communications Equipment. Version 3 20/08/15 1 of 5. a.

Similar documents
Fire Safety During Construction, Tar Kettles, and Bituminous Melters

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

Virtual Reality Immersion: A Tool for Early Human Factors Intervention

CAUTION. RXM5010 Touchscreen Remote Installation and Operation Manual MODEL: RXM5010

SECTION PROJECT MANAGEMENT AND COORDINATION

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

UNSIGNED HARDCOPY NOT CONTROLLED. Reference Designation Marking and Miscellaneous Coding

Radiocommunications (Citizen Band Radio Stations) Class Licence 2002

A. Section includes administrative and procedural requirements for project record documents, including the following:

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

LIFE SAFETY DIVISION GUIDELINE. Subject: BDA Radio Amplification Checklist Date initiated: Date revised:

Rulemaking Hearing Rules of the Tennessee Department of Health Bureau of Health Licensure and Regulation Division of Emergency Medical Services

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

SECTION III SUBMITTALS AND APPROVALS

Tapping Screw (W/Flange) 46 Cord Armor 47 Tube (D) 48 Cord. 45 Cord Clip. Tapping Screw (W/Flange) 10 Gear Cover Ass'y. 12 Socket (B) Ass'y

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

A/E REVIEW CHECKLIST HVAC

Field Instruction Switching Activities. Purpose. Scope. Objective. Safety

SAQCC FIRE D&GS TRAINING SUB COMMITTEE TYPICAL COURSE CURRICULUM LAYOUT

Wireless Receiver E28Q Mounting and Operating Instructions (Original operating instructions)

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Health and Safety at Work (Hazardous Substances Markings for Pipework Connected to Above Ground Stationary Tanks) Safe Work Instrument 2017

Mx-D15 Intelligent Valve Actuator

800 System Procedures

Residential Construction Checklist Single and Two Family Construction

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

GENERAL OPERATIONAL PRECAUTIONS

OSMAC RDR Low-voltage Retrofit Kit

HomeRemodelingKC.com. Empire Basement Solutions DESIGN GUIDE.

Health and Safety at Work (Hazardous Substances Markings for Pipework Connected to Above Ground Stationary Tanks) Safe Work Instrument 2017

SECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS

Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15

JRC Response to the Consultation on. More Radio Spectrum for the Internet of Things

SECTION GPS WIRELESS CLOCK SYSTEMS

SECTION PROJECT COORDINATION VIA BIM

SHOP SAFETY AND TRAINING IN ACADEMIC DEPARTMENTS

L A M I N AT E F L O O R C U T T E R OWNER S MANUAL

Principal, Safe Hospital Services Former VP of Client Services, SiteFM 40+ Years in Healthcare Facilities Management Former Joint Commission Life

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

Clark County Fire Prevention Las Vegas Nevada

Ch.1 Rules & Regs Sect. 1.1 Bands & Privileges [29]

MIDDLE SCHOOL EXPLORING TECHNOLOGY (ONE PERSON LAB) New Construction

Kenwood USA Corporation

Absolute Block. Uncontrolled When Printed Document to be part superseded by GKRT0055 Iss 1 and GKRT0077 Iss 1 (published on 07/09/2013)

Challenger 400. Instruction manual

GE/GN8648. Guidance on Positioning of Lineside Telephones. Rail Industry Guidance Note for GE/RT8048

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

SECTION WIRELESS CLOCK/TONE GENERATOR SYSTEM

UK Broadband Ltd - Spectrum Access 28 GHz Licence Company Registration no: First Issued 22 July Licence Number: /01/18

Dust Collector. Model No: DC2200 (FM300S)

DISPLAY/BOOTH RULES AND REGULATIONS

Student Safety in Elementary Science and Technology Grades 7 and 8

TABLE OF CONTENTS. References

Example: COUNTY: Engine 225, County, are you requesting to 2nd alarm? UNIT: Engine 225, Affirmative.

FIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

TRAFFIC SIGNAL ELECTRICIAN, 3819

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

Commercial Infill Project Guide

Langton House, 19 Village Street, Harvington, Worcestershire. WR11 8NQ Tel: Fax: RTB5211 UHF FULL DUPLEX BASE STATION

COJSAWBX Electric Jig Saw Assembly & Operating Instructions

LOCKOUT / TAGOUT PROGRAM

Design Deliverables. Summary. A. Expectations for Design Deliverables:

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

Risk Management Department. Control of Hazardous Energy

Operating Instructions DBH03R - 80 Channel 0.5 watt UHF Hand held CB radios with rechargeable batteries & USB charge cable.

PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES

Trade of Plumbing. Module 1: Thermal Process and Mild Steel Pipework Unit 5: Drawing Phase 2

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

Missouri State Interoperability Executive Committee 700 MHz Interoperable Channel Template

Busbar and Modular Wiring Systems

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

Technical Requirements for Land Mobile and Fixed Radio Services Operating in the Bands / MHz and / MHz

SICLOCK DCFRS Industrial Version with TTY Interface 2XV9450-1AR21

CLARK COUNTY FIRE CODE AMENDMENTS

OWNER S MANUAL

B. Samples: For color, letter style, and graphic representation required for each identification material and device.


Licensing of Telemetry Systems in the VHF and UHF Spectrum Bands Guidelines for Applicants

User s Guide. Rock Sounder Wireless 900MHz Outdoor Speaker System. Model: GDI-AQRCK400 / AQRCK41

LATTIMORE SHOWER SET INSTALLATION

34 o Clipped Head Air Frame Nailer

On Channel Repeater Implementation for HD Radio Coverage Improvement

UK Broadband Ltd Spectrum Access Licence Licence Number: Rev: 4: 11 January 2018

Development of Explosion-proof Autonomous Plant Operation Robot for Petrochemical Plants

FOLDING MACHINE PF-45A OPERATOR MANUAL 1. FUNCTION

A holistic view on Safety Management

Trade of Metal Fabrication. Module 5: Pipe Fabrication Unit 3: Flanges Phase 2

EDACS WALL MOUNT STATION. Maintenance Manual. Mobile Communications LBI-31838A TABLE OF CONTENTS

Weatheradio Alert ( ) Features Faxback Doc. # 47648

Wiring Devices. Description. Lesson Outcomes. Assumptions. Electrician

KRONOsync Transmitter System Operations Guide

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

Mosier Fire & Emergency Services Standard Operating Procedure Communications

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

Minnesota Rules, Chapter 4732 X-ray Revision PROPOSED NON-MEDICAL CABINET X-RAY SYSTEMS, 1.0

Assemblies according to the Pressure Equipment Directive - a consideration provided by the PED-AdCo Group 1 -

COMMUNICATIONS MANUAL CHAPTER 12 January 4, 2011 POST RADIO / CROSS BAND REPEATER TABLE OF CONTENTS 1. INTRODUCTION...1

Brunata Optuna H Ultrasonic energy meter Type 775 Installation Guide Edition 1.2

Transcription:

London Fire Brigade Incident Management Requirements 1) Communications Equipment a. General This requires the provision of radio equipment such that firefighters, while attending emergency incidents below ground, are able to use their normal radio equipment to communicate anywhere between the Rendezvous Point (RVP), the pre arranged point that the LFB will arrive at, and the furthest point that the Tier 1 contractor has responsibility, as though the entire area were in the open. There is also a requirement for a communications system to enable personnel, at a large scale incident, to have verbal contact from the main marshalling area to any control rooms on the site and from the on site control rooms to the Fire Brigade access points. b. Provision of UHF Radio Communication The UHF requirement would be a fixed two-frequency duplex base station on UHF channel 5 on permanent talk through (repeat) and having the transmitter triggered by the receiver squelch. Such a base station has to provide radio cover to and from handheld radios (with a effective radiating power of 1 watt) at the Rendezvous Point (RVP) where fire appliances will draw up when attending emergency incidents at the site. Radio cover must not extend beyond the designated RVP, as there would be a risk of clash with the use on the same radio channel from base stations at nearby incidents not associated with the site. The frequencies of channel 5 are: Base transmit Base receive 457.1375 MHz 462.6375 MHz The bandwidth should be specified for 25 khz channel spacing but should be readily convertible to 12.5 khz channel spacing should this be called for in the future. The equipment should also be capable working in the frequency reversal bands should this be called for in the future. The modulation is to be frequency modulation. At present the Brigade does not use CTCSS on any of its UHF channels. It is possible that in the future CTCSS might be required on UHF equipment so the base equipment should be specified to be capable of modification for CTCSS encoding (transmit) and decoding (receive) using tones listed in MPT 1306. The London Fire and Emergency Planning Authority, as the user of channel 5 will be responsible for obtaining the radio license form the OFCOM. As the license holder the Authority will be responsible for satisfying OFCOM that the equipment meets the stipulations of MPT 1326. The base equipment should therefore be specified to meet MPT 1326 (except that it must be for 25 khz channelling, MPT1326 specifies 12.5 khz channelling. Version 3 20/08/15 1 of 5

c. INSTALLATION AND MAINTENANCE All communications equipment installed at the site for the purposes of LFB Incident Management is to be installed, commissioned and maintained at no expense to the London Fire Brigade or the London Fire and Emergency Planning Authority. d. FURTHER INFORMATION The above information should be sufficient to enable a technical specification to be written. In the event of any technical queries relating to matters contained within this requirement, please contact The London Fire Brigade s Radio Systems Manager, Mr Robert Donovan on 0208 555 1200 x38561 2) Fire Fighting Water Supply a. The fire fighting water supply system should be designed, installed, maintained and tested in accordance with BS9990:2015 and BS6164:2011. These documents cover the specification for any wet and dry riser incl. the water pressures and the need for 25mm drain down valves for dry risers to be cleared after use. b. As a minimum, there should be one hydrant outlet on the surface worksite, one outlet at each floor level in a shaft and at every 50m along a tunnel length however, the final spacing should be relative to the assessed life risk and flammable material (fire load) within the space. c. Each hydrant point should be marked on site with the standard black H in a yellow box sign placed at eye level. Further signage should remind the workforce not to obstruct the access to the hydrant point or store materials etc. for a distance of 5m either side. 3) Reception Point Information The purpose of the Reception point information (Grab Pack) is to be a simplified information folder/pack that is immediately available to the London Fire Brigade on arrival at an incident. Its core function is to provide the incident commander with readily accessible key information needed for them to put the first phase of any plan in to place. Contents should, as a minimum, be the following:- a. Contact Information for:- Responsible Person On Site 1 st Tier Contractor s Emergency Team Leader 1 st Tier Contractor s Silver Representatives 1 st Tier Contractor s Gold Representatives Any relevant person who can assist in making the site safe (i.e. electricians, mechanical fitters/plumbers etc.) b. Up to date A3 sized laminated site plans & sections for all levels (i.e. every level descending through a shaft structure as well as platform and ground levels) which are clearly titled with what is shown. Sections should be provided that indicates any change in levels within any specific level shown (i.e. ramps / steps / ladders etc.). The drawings should be as simplistic as possible to aid rapid Version 3 20/08/15 2 of 5

understanding by LFB. Beware using construction layout drawings as they are likely to contain superfluous and so confusing information that has the potential to confuse and so misinform / del ay the emergency response. c. Hazards and equipment should be clearly indicated on the above plans using the following standardised symbols:- Access (blue) / Egress (green) Points FP COSSH Diesel Storage / Bowser Gas Cylinder Location Flammable Materials Storage Electrical Supply Cabinet / Isolation Point (Use Text To Specify) Gas Supply / Gas Supply Isolator (shut off point) state which Fire Fighting Hydrant Point Fire Point (locations on site where fire extinguishers etc. are found that have been provided by the Principal Contractor) Domestic / Drinking Water Supply Isolation Point (esp. where they separate from a combined source also feeding the fire fighting supply) COSSH Store Should it be necessary to store any relevant chemicals / materials on site, the standard HAZMAT / HAZCHEM signage and annotation should be used. Assembly / Muster Point RVP Rendezvous Point (Emergency Services) Ventilation Fan (with Controls) Location In addition, any items of large fixed plant stating what it is and how it is powered (Diesel / Electric etc.) should be shown. Version 3 20/08/15 3 of 5

If by placing the symbol on the correct location on the plan too much other information is obscured, please place it to the side with an arrow pointing to the precise location (especially for HAZMAT / HAZCHEM symbols where the symbol needs to be large enough for the data to be legible) d. Keys / Security cards for personnel access as well as to get to isolation switches etc. should be held on a specific emergency key ring. It is not recommended that these are left in the Grab Bag as they prone to going missing but they should be in a secure location that is easily accessed by the Responsible Person on Site in the event of an incident as well as their deputy and the security guard should that Responsible Person be caught up in the incident. The Grab Pack should be located in a RED painted box clearly marked LFB INCIDENT USE ONLY, preferably fixed to the secure side of all security huts at the entrance to each and every site location with clear access maintained at all times i.e. as drawn below:- Location of Grab Pack storage box marked with sign:- LFB Incident Use Only Where a worksite does not have a security hut, the box should be located immediately adjacent to the gates, fixed to the worksite-side of the hoarding. 4) Emergency Preparedness To ensure that all site personnel are familiar with the emergency procedures, that key personnel are trained in their duties and that the procedures work as planned and anticipated, a drill exercise should take place regularly. Minimum requirement is once every six months but it is suggested that once every three months will ensure that the turnover of labour and trades is accounted for. The drills should be recorded detailing date and time of the drill, time to clear site, comments/issues arising, planned resolution dates for the issues, sign-off of the resolutions when in completed. The LFB would welcome the opportunity to input and observe the drill(s) and to help suggest improvements for any issues that may be identified but, where their attendance is not possible, the exercises should go ahead as proposed by the Principal Contractor. 5) Maintenance & Testing Security Hut Worksite Barrier / Gates It is the 1 st Tier Contractor s duty to ensure that the equipment is in full working order at the time it is required. To That end, the following minimum testing and inspection regime is suggested for each of the Version 3 20/08/15 4 of 5

required provisions set out above but the actual regime is to be decided upon by the 1 st Tier at each location, taking account of risk of damage / interference to the equipment / installation etc. a. Communications Equipment. This should be tested weekly across the site with a record kept of all tests, issues arising from the test and confirmation of closeout of resultant actions. Where a full communications test shows that the signal is not working and will not be rectified for a period of more than 24 hours then the local fire station must be notified. b. Fire Fighting Water Supply. This should be tested weekly at every hydrant outlet. The test should also include for an inspection of the following:- i. The rubber seal ring inside the outlet for damage (and replace if necessary) ii. The spin lock / release on the outlet to ensure normal operation i.e. returns into place freely. iii. Required signage is in place, free from obstruction and clean/clearly visible. iv. 5m of clear area either side of the hydrant point is being maintained i.e. no storage of materials. v. Valve handle is not obstructed and that the optimum pressure is achieved when the handle is in line with the outlet pipe (and off when at precisely 90 degrees to the outlet. c. Reception Point Information A checklist should be created that lists in detail each of the items held in the pack (incl. down to individual drawing numbers/titles and a regime put in place for that to be checked and the inspection recorded at required intervals assessed according to risk of tampering (max weekly). Furthermore, the packs should be reviewed for accuracy of content at maximum three monthly intervals but more frequently if necessary due to integral changes on site i.e. changes to access egress routes, introduction of additional cylinders, cylinder movements etc. 6) Further Information Should you require further information or assistance in evaluating provisions of this equipment, frequency of inspections and testing etc, is the LFB Liaison assigned to Crossrail and he can be contacted by email at: @london-fire.gov.uk or @crossrail.co.uk Version 3 20/08/15 5 of 5