The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Similar documents
Operation and performance of the CMS Resistive Plate Chambers during LHC run II

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

arxiv: v1 [physics.ins-det] 25 Oct 2012

The trigger system of the muon spectrometer of the ALICE experiment at the LHC

Aging studies for the CMS RPC system

Development of a Highly Selective First-Level Muon Trigger for ATLAS at HL-LHC Exploiting Precision Muon Drift-Tube Data

Test beam results of the GE1/1 prototype for a future upgrade of the CMS high-η muon system

The CMS Muon Trigger

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Introduction to TOTEM T2 DCS

The CMS Outer HCAL SiPM Upgrade.

Design and Performance of the ATLAS Muon Detector Control System

8.882 LHC Physics. Detectors: Muons. [Lecture 11, March 11, 2009] Experimental Methods and Measurements

THE MULTIWIRE CHAMBER REVOLUTION (Georges Charpak, 1968)

arxiv: v2 [physics.ins-det] 20 Oct 2008

A Cosmic Muon Tracking Algorithm for the CMS RPC based Technical Trigger

PoS(EPS-HEP2017)476. The CMS Tracker upgrade for HL-LHC. Sudha Ahuja on behalf of the CMS Collaboration

Installation, Commissioning and Performance of the CMS Electromagnetic Calorimeter (ECAL) Electronics

Hardware Trigger Processor for the MDT System

Construction and Performance of the stgc and Micromegas chambers for ATLAS NSW Upgrade

Discharge Investigation in GEM Detectors in the CMS Experiment

CMS RPC HL-LHC upgrade with fast timing detectors

ATLAS Muon Trigger and Readout Considerations. Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration

The CMS Muon Detector

THE LHC is expected to be upgraded to the HL-LHC

Hardware Trigger Processor for the MDT System

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

PoS(VERTEX2015)008. The LHCb VELO upgrade. Sophie Elizabeth Richards. University of Bristol

Design and Construction of Large Size Micromegas Chambers for the ATLAS Phase-1 upgrade of the Muon Spectrometer

Performance of the ATLAS Muon Trigger in Run I and Upgrades for Run II

Performance studies of large-area triple-gem prototypes for future upgrades of the CMS forward muon system

Large Size GEM Detectors for 12 GeV Program in Hall A at JLab

Micromegas calorimetry R&D

GEM beam test for the BESIII experiment

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland. CMS detector performance.

PoS(LHCP2018)031. ATLAS Forward Proton Detector

Phase 1 upgrade of the CMS pixel detector

1 Detector simulation

GEM chambers for SoLID Nilanga Liyanage. University of Virginia

RD51 ANNUAL REPORT WG1 - Technological Aspects and Development of New Detector Structures

Construction and Performance of the stgc and MicroMegas chambers for ATLAS NSW Upgrade

Pixel sensors with different pitch layouts for ATLAS Phase-II upgrade

Upgrade of the ATLAS Thin Gap Chamber Electronics for HL-LHC. Yasuyuki Horii, Nagoya University, on Behalf of the ATLAS Muon Collaboration

ATLAS ITk and new pixel sensors technologies

Construction and first beam-tests of silicon-tungsten prototype modules for the CMS High Granularity Calorimeter for HL-LHC

Development of large readout area, high time resolution RPCs for LEPS2 at SPring-8

Full characterization tests of Micromegas with elongated pillars

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Scintillators as an external trigger for cathode strip chambers

The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The LHCb Upgrade BEACH Simon Akar on behalf of the LHCb collaboration

What do the experiments want?

Track Triggers for ATLAS

AIDA-2020 Advanced European Infrastructures for Detectors at Accelerators

Tracking and Alignment in the CMS detector

Operational Experience with the ATLAS Pixel Detector

arxiv: v1 [physics.ins-det] 13 Jul 2018

A High Eta Forward Muon Trigger & Tracking detector for CMS

RADIATION MONITORING OF THE GEM MUON DETECTORS AT CMS

The CMS electromagnetic calorimeter barrel upgrade for High-Luminosity LHC

Recent Developments in Gaseous Tracking Detectors

Operation and Performance of the ATLAS Level-1 Calorimeter and Level-1 Topological Triggers in Run 2 at the LHC

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The CMS HGCAL detector for HL-LHC upgrade

Update to the Status of the Bonn R&D Activities for a Pixel Based TPC

The CMS Silicon Strip Tracker and its Electronic Readout

Silicon Sensor and Detector Developments for the CMS Tracker Upgrade

Characterization of the stgc Detector Using the Pulser System

Results of FE65-P2 Pixel Readout Test Chip for High Luminosity LHC Upgrades

FIRST RESULTS OF THE RADIATION MONITORING OF THE GEM MUON DETECTORS AT CMS

Status of UVa

CMS Tracker Upgrades. R&D Plans, Present Status and Perspectives. Benedikt Vormwald Hamburg University on behalf of the CMS collaboration

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Tracking properties of the two-stage GEM/Micro-groove detector

Current Status of ATLAS Endcap Muon Trigger System

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The design and performance of the ATLAS jet trigger

CMS Silicon Strip Tracker: Operation and Performance

The CMS Pixel Detector Phase-1 Upgrade

The VELO Upgrade. Eddy Jans, a (on behalf of the LHCb VELO Upgrade group) a

PMF the front end electronic for the ALFA detector

Spectrometer cavern background

Commissioning Status and Results of ATLAS Level1 Endcap Muon Trigger System. Yasuyuki Okumura. Nagoya TWEPP 2008

Plans for RPC DHCAL Prototype. David Underwood Argonne National Laboratory

LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring

Trigger Rate Dependence and Gas Mixture of MRPC for the LEPS2 Experiment at SPring-8

Small-pad Resistive Micromegas for Operation at Very High Rates. M. Alviggi, M.T. Camerlingo, V. Canale, M. Della Pietra, C. Di Donato, C.

ATLAS Phase-II Upgrade Pixel Data Transmission Development

Status of the LHCb Experiment

A spark-resistant bulk-micromegas chamber for high-rate applications

Metrology Studies and Baseplate-Pixel Sensor Gluing of the Pixel Strip Modules for the CMS II Phase Upgrade

The Status of ATLAS. Xin Wu, University of Geneva On behalf of the ATLAS collaboration. X. Wu, HCP2009, Evian, 17/11/09 ATL-GEN-SLIDE

The Commissioning of the ATLAS Pixel Detector

Preparing for the Future: Upgrades of the CMS Pixel Detector

Test Beam Measurements for the Upgrade of the CMS Phase I Pixel Detector

CALICE AHCAL overview

Development of Telescope Readout System based on FELIX for Testbeam Experiments

The CMS ECAL Barrel HV system

A Large Low-mass GEM Detector with Zigzag Readout for Forward Tracking at EIC

Transcription:

Available on CMS information server CMS CR -2017/402 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 06 November 2017 Commissioning of the first chambers of the CMS GE1/1 muon station Martina Ressegotti on behalf of the CMS Muon Group Abstract The upgrades of the LHC planned in the next years will increase the instantaneous luminosity up to 5x10 34 cm 2 s 1 after Long Shutdown 3, a value about five times higher than the nominal one for which the CMS experiment was designed. The resulting larger rate of interactions will produce a higher pileup environment that will challenge the trigger system of the CMS experiment in its original configuration, in particular in the endcap region. As part of the upgrade program of the CMS muon endcaps, additional muon detectors based on Gas Electron Multiplier (GEM) technology will be installed, in order to be able to sustain a physics program during high-luminosity operation without performance losses. The installation of the GE1/1 station is scheduled for Long Shutdown 2 in 2019-2020; already a demonstrator composed of five superchambers has been installed during the Extended Year-End Technical Stop at the beginning of 2017. Its goal is to test the systems operational conditions and also to demonstrate the integration of the GE1/1 chambers into the CMS online system. The status of the installation and commissioning of the GE1/1 demonstrator is presented. Presented at ICPPA2017 3rd International Conference on Particle Physics and Astrophysics

Commissioning of the first chambers of the CMS GE1/1 muon station Martina Ressegotti 1,2 on behalf of the CMS Muon Group 1 Unversity of Pavia, via Bassi 6, Pavia, IT 2 INFN Pavia, via Bassi 6, Pavia, IT E-mail: martina.ressegotti@cern.ch Abstract. The upgrades of the LHC planned in the next years will increase the instantaneous luminosity up to 5 10 34 cm 2 s 1 after Long Shutdown 3, a value about five times higher than the nominal one for which the CMS experiment was designed. The resulting larger rate of interactions will produce a higher pileup environment that will challenge the trigger system of the CMS experiment in its original configuration, in particular in the endcap region. As part of the upgrade program of the CMS muon endcaps, additional muon detectors based on Gas Electron Multiplier (GEM) technology will be installed, in order to be able to sustain a physics program during high-luminosity operation without performance losses. The installation of the GE1/1 station is scheduled for Long Shutdown 2 in 2019 2020; already a demonstrator composed of five superchambers has been installed during the Extended Year-End Technical Stop at the beginning of 2017. Its goal is to test the system s operational conditions and also to demonstrate the integration of the GE1/1 chambers into the CMS online system. The status of the installation and commissioning of the GE1/1 demonstrator is presented. 1. Introduction The CMS muon system [1] employs several detection technologies: Drift Tubes (DTs) and Cathode Strip Chambers (CSCs) are present in the endcaps in the region 1.0 < η < 2.4 to provide precise position measurements and trigger, while Resistive Plate Chambers (RPCs) are installed up to η < 1.8 both in the barrel and in the endcaps to provide redundant trigger and coarse position measurement. In addition, among other future upgrades the installation of a new station, the GE1/1 station, based on Gas Electron Multiplier (GEM) technology [2] is scheduled in 2019 2020 in the region 1.6 < η < 2.2. 1.1. Triple-GEM detectors The fundamental element of a GEM detector is the GEM foil, a 50 µm thick polymer foil coated with copper on each side and covered with biconical holes arranged in a regular pattern. A triple-gem detector is composed of a stack of three GEM foils, completed at its ends by a drift cathode and a readout plane, as shown in figure 1. It is operated by applying an appropriate potential to the seven conductor surfaces, so that the electric field between the foils causes the electrons to drift toward the next GEM foil and the field inside the holes causes electron avalanche multiplication. The signal produced on the readout plane is collected by an appropriate electronic.

It has been measured that triple-gem detectors have a high rate capability up to 100 MHz/cm 2 and a muon detection efficiency of about 97% or more, hence they are suitable for the operation in the environment of the forward muon region.[3] The voltage can be applied to each detector s stage either using one single high voltage channel per triple-gem detector and distributing it with a divider, or by supplying the seven high voltage channels independently from each other. The naming convention used for the seven channels is the following: the surface of the first GEM foil facing the drift cathode is named G1top (GEM 1 top), the one facing the readout plane is named G1bot (GEM 1 bottom). Similarly the surfaces of the other GEM foils are named G2top, G2bot, G3top, G3bot. 1.2. The GE1/1 station The GE1/1 station consists in 36 chambers per endcap, called Gemini, each one spanning 10. Each Gemini will be composed of a stack of two triple-gem detectors, called Layers. Its installation is motivated by the increase in luminosity, up to about 5 10 34 cm 2 s 1, that the Large Hadron Collider (LHC) has scheduled in the next years. As a consequence, the background rate in the 1.6 < η < 2.2 region is expected to reach about 1000 Hz/cm 2, so that achieving an acceptable L1 trigger rate for muons with transverse momentum p T < 25 GeV will not be possible with the current muon system configuration without increasing the threshold on muon momentum. The GE1/1 station will allow to keep a trigger rate smaller than 5 khz without increasing such threshold, by adding redundacy in front of the existing ME1/1 station and working combined with CSCs to measure the muon bending angle in the magnetic field.[3] Figure 1: Schematic representation of a triple-gem detector. From the top down, the drift cathode, the three GEM foils and the readout plane are encountered. The sorrounding volume is filled with an Ar : CO 2 gas mixture. The voltage is applied to the drift cathode and to the top and bottom surfaces of each GEM foil. In the figure the detection of a particle and the subsequent production of charge is also represented. 2. The GE1/1 Slice Test Even if the full installation of the GE1/1 station is scheduled in 2019 2020, five Gemini chambers have already been installed in the CMS experiment at the beginning of 2017 as shown in figure 2. They consist of the GE1/1 Slice Test, whose goal is to prove the system s operational conditions and to demonstrate its integration into the CMS online system. Figure 2: Outline of the negative endcap of the CMS experiment showing the positions where the five Gemini chambers of the Slice Test have been installed. Four of them are placed almost vertically in the portion indicated as Slot 1, one of them is located horizontally in the Slot 2.

3. The High Voltage system The high voltage is supplied in two different ways: four Gemini chambers are supplied with a CAEN A1526N module (one HV channel per Layer), and a ceramic divider is used to distribute the voltage to each detector s stage; one Gemini chamber is supplied with a CAEN A1515TG module (one HV module per Gemini chamber) providing seven independent HV channels per Layer. The latter method will be used for the production chambers for the full GE1/1 system. The stability of the high voltage provided with both methods has been evaluated in the first moths of operation, both with and without collisions. Time intervals of 7 and 12 hours during collisions have been taken into account; time intervals of 7 and 10 days without collisions have been considered. In all cases an overall stability < 1% or better has been observed. As an example, figures 3 and 4 show the monitored voltage during collisions for a Layer supplied with a CAEN A1526N and a CAEN A1515TG module respectively. Figure 3: Measured voltage (crosses) and current (dots) through the divider for one Layer supplied with a CAEN A1526N module, in a time period of about 10 hours with collisions. Each marker corresponds to a value that has been archived into the database. Values are archived only if a change is observed, so time intervals without markers indicate that the value has remained unchanged during that time interval. The dashed line is added to complete such time intervals. Figure 4: Measured voltage during 12 hours time interval with collisions, for one Layer supplied with a CAEN A1515TG module. Each curve corresponds to a voltage applied in a different part of the detector. They are named Drift, G1top, G1bot, G2top, G2bot, G3top, G3bot following the naming convention explained in figure 1.1. 4. The Readout and Low Voltage system The readout system of the slice test is based on VFAT2 chips and OptoHybrids V2B (OH). For the production chambers VFAT3 chips will be used instead of VFAT2. In addition 8 optical fibers for data flow and control are used per Layer.[4, 5] VFAT2 chips are powered with about 3.3 V, while OHs need two low voltage channels of about 4 V and 1.7 V. As a consequence three low voltage channels are necessary per detector Layer. As an example, figure 5 shows the monitored voltage and current of one of the LV channels powering the VFAT2 chips. Two different modes are clearly visible: when the VFAT2 chips are

powered but in sleep mode the current is about 2 A, when they are in running mode the current is higher, up to about 6.5 A. Figure 5 shows an overall stability over 10 days. Figure 5: Measured voltage (crosses) and current (dots) supplying the VFAT2 chips of one Layer. Each marker corresponds to a value that has been archived into the database. Values are archived only if a change is observed, so time intervals without markers indicate that the value has remained unchanged during that time interval. Initially the VFATs were in sleep mode and moved to the running mode on April 11 at about 12 pm. On April 14 both curves assume zero values because the LV has been off for a short time. 5. System Calibration and Timing Performance Several steps are performed to calibrate the electronics. Threshold scans scan the number of measured hits per channel as a function of applied threshold. S-curves scan the response of the channels to an injected pulse calibrated to a given charge at a given threshold. It indicates at which amplitude of the calibration pulse a signal becomes visible, i.e. a conversion between the threshold and the charge, to evaluate the equivalent noise charge of the system. As the threshold value of each strip can be adjusted using programmable registers, this scan allows the perform such a correction in order to level out the response of the channels. Figure 6 shows an example of S-curves performed on a VFAT before and after trimming the threshold. Latency scans scan the ratio of events with detected hits over the total number of events, per different latency values. The latency is the time difference between the time of arrival of a L1Accept (L1A) and the time at which the related event was stored. After such calibration, it has been possible to detect the first real muon data. Figure 7 shows the arrival time of some events attributed to the detection of a cosmic ray muon. Summary The installation of the GE1/1 station, based on GEM technology, in the CMS muon system has been scheduled in order to allow to maintain an acceptable trigger rate after the LHC upgrades. A Slice Test composed of five Gemini chambers has started at the beginning of 2017 and is currently under commissioning. The operation and stability of the high voltage and low voltage systems have been verified, the electronics has been successfully calibrated. It has been possibile to successfully detect first muona data, coming from cosmic ray muons. Several other aspects being part of the commissioning of the slice test have not been covered here: for example the gas system, cooling system, cable routing and other necessary services have been installed and are working properly. In addition the production of GE1/1 chambers for the full installation of the GE1/1 station is currently in full swing.

Figure 6: S-curves performed on two VFATs reading one sector [3] of a Layer, before and after adjusting the thresholds of each channels. Before trimming the channels display a dispersion of the 50% of hit-per-pulse ratio, indicating that the effective threshold is not constant across the chips. After trimming the channels display a reduced dispersion of the 50% of hit-per-pulse ratio around the average one. Acknowledgments We gratefully acknowledge support from FRS- FNRS (Belgium), FWO-Flanders (Belgium), BSF-MES (Bulgaria), BMBF (Germany), DAE (India), DST (India), INFN (Italy), NRF (Korea), QNRF (Qatar), and DOE (USA). References [1] CMS collaboration 2008 The CMS experiment at the CERN LHC JINST 3 S08004 [2] Sauli F 1997 GEM: A new concept for electron amplification in gas detectors Nucl. Instrum. Meth. A 386(1997)531 [3] Colaleo A et al. 2016 CMS Technical Design Report for the Muon Endcap GEM Upgrade CERN-LHCC-2015-012 CMS-TDR-013 [4] Aspell P 2007 VFAT2: A front-end system on chip providing fast trigger information, digitized data storage and formatting for the charge sensitive readout of multi-channel silicon and gas particle detectors Topical Workshop on Electronics for Particle Physics (TWEPP07), Prague, Czech Republic, 3-7 September 2007 p 292 [5] Lenzi T 2017 A micro TCA based data acquisition system for the Triple-GEM detectors for the upgrade of the CMS forward muon spectrometer Journal of Intrumentation JINST 12 C01058 Figure 7: Number of measured hits, integrated over all VFATs, as a function of the delay from a L1A for cosmic ray muon data. The observed delay (175 BX) corresponds to the expected one for cosmics ray muon data.