PRASAR BHARATI (BROADCASTING CORPORATION OF INDIA) DOORDARSHAN MAINTENANCE CENTRE PATHANKOT. NO: DMC/PKT/3(2)/2009-0/E DATE: 07..203 The Chief Engineer (NZ), (Kind Atten: Sh Sanjay Sethi DE-DDM), Akashvani & Doordarshan, Jamnagar House, Shahjahan Road, NEW DELHI -00. Subject: - Monthly report in respect of s/s/transposer for the month of October, 203. Sir, Kindly find enclosed herewith the monthly report for the month of October, 203 on the working of transmitters under this DMC as listed below for necessary action and records at your end :-. PATHANKOT 2. GURDASPUR 3. CHAMBA 4. UNA 5. BHARMOUR 6. HOLI 7. TISSA 8. CHAWARI KHAS 9. DALHOUSIE 0. TRANSPOSER TALWARA Yours faithfully, (Sat Pal) Assist. Engineer
MONTHLY REPORT OF DMC PATHANKOT For the month of October, 203 (Month & Year). DETAILS OF IMPORTANT TECHNICAL WORK DONE AT s / s DURING THE MONTH Name of Details of the important technical work done REMARKS Pathankot Working OK Repair of Air Conditioner:- The Air Conditioner unit of Pathankot was giving excessive noise as the fan of the outdoor unit was loose. The same was tightened along with lock washer, afterward the unit started working silently. Pathankot SCU OF MVV24:- Control unit received from BEL after repair and taken in circuit on.9.203. But again failed on 4.0.203 so sent back to BEL on 8.0.3. Transmitter in Manual Mode Under repair At BEL Bangalore Pathankot Maintenance of 25 KVA DG Set:- Servicing of 25 KVA DG set has got done from market. Following parts got replaced. Mobile Oil Lts 2. M/Oil filter Nos 3. Diesel Filter 2 Nos. DG set is working OK Working OK Pathankot DMC Pathankot Replacement of C-Band LNBCs (2 Nos) & Universal LNBC:- During night of 4.0.203 the signals of both the horizontal as well as vertical polarization of 7.5 dia PDA failed. On checking found both C-Band LNBC failed and were replaced with spare ones. Now both services are OK. Failure may be due to lightening and thunderstorm. The signal of 6.2 dia PDA was also not coming. On checking found Universal LNBC faulty. The same was replaced with spare one. Thereafter the signal of INSAT 3C received. Repair of Video Processor :- Video was not coming. After checking found transistors Q6,Q7,Q8 & Q9 faulty. Replaced with new ones. The unit is working OK. Working OK Working OK 2
DMC Pathankot Pathankot Pathankot Una Monitor Card of PA Sr. No. 872779 of Dalhousie:- Card was giving high reflected power signal. On checking found Capacitor C 00 mfd, IC SN5400 (U3) & SFC 22 (U9) faulty. Replaced with new ones. PA Supply Sr. No. 8844:- Supply was giving -V Output instead of -5V, Other voltages were OK. Found high frequency rectifier diode short. Replaced the same with new one. Antenna Change over Co axial switch has become faulty on 4.0.203, bypassed. Two N type I Connector (Female) used to bypass the switch. CE(NZ) is informed for procurement. 6KVA Liebert make UPS:- One battery of 26 AH,2V procured from local market & replaced in Battery bank of 6 KVA UPS to improve back up. Old battery returned on buy back basis. Backup of the UPS increased to 2 mts at full load. Repair of Video Processor :- Found transistors Q6, Q7 & Q8 faulty. Replaced with new ones. Working OK Working OK Transmitter in Manual Mode Working OK.2 DETAILS OF OFFICERS / STAFF RELIEVED / JOINED FROM / AT DURING THE MONTH DETAILS OF OFFICERS / STAFF JOINED DURING THE MONTH Name Desig nation Emp. No. Relieved from Relieving Date Joined at Joining date Transfer order No. and Date 3
.3 TOUR / LEAVE DETAILS OF ENGG. HEAD OF OFFICE / CONTROLLING OFFICERS DURING THE MONTH NAME OF OFFICER PERIOD Sat Paul ASE 7-0-203, 28-0-203 TOUR DETAILS PERIOD OF E.L. / PLACE MEDICAL LEAVE ALONG WITH ITS NATURE Gurdaspur 0-0-203 Chowari Khas 04-0-203 Chamba & Dalhousie 5-0-203 Una 24-0-203 to 25-0-203 09-0-203 Jalandhar Tissa,Chamba & Dalhousie.4 TRAINING DETAILS OF ENGG. HEAD OF OFFICE / STAFF DURING THE MONTH NAME OF OFFICER / STAFF DESIGNATION PERIOD PLACE NAME OF COURSE From To.5 DETAILS OF NEW EQUIPMENTS RECEIVED AT DMC / s / s DURING LAST SIX MONTHS Name of Name of equipment Date of receipt of equipment Received from Whether put in to circuit Performance of equipment Remarks 4
.6 DETAILS OF SCROLLER Name of Working Status of Scroller- Working Status of Scroller-2 Revenue generated in current month PATHANKOT OK OK GURDASPUR OK OK NIL NiL Progressive revenue generated in current financial year.7 ELECTRIC CONNECTION DETAILS Name of Availability of Electricity.8 LAND / BUILDING DETAILS Whether Single Phase / Three Phase Sanctioned Load PATHANKOT YES THREE PHASE 30 KW 0.94 GURDASPUR YES THREE PHASE 9.9 KW BHARMOUR YES SINGLE PHASE 2 KW CHAMBA YES SINGLE PHASE 2 KW CHAWARI YES SINGLE PHASE 2 KW 0.8 DALHOUSIE YES SINGLE PHASE 2 KW HOLI YES SINGLE PHASE 2 KW TISSA YES SINGLE PHASE 2 KW UNA YES SINGLE PHASE - TRANSPOSER TALWARA YES SINGLE PHASE 2 KW Power Factor 5
Name of Owner of Land Category of Owner (Deptt. / Govt. / Private) Type of Building (Porta Cabin / Permanent) Is Building / Porta Cabin construct ed departmen tally Rent of Setup (Rs. p.m.) Availabi lity of Lease Deed Due Date of Renewal of Lease Deed Due Date of Revision of Rent Remarks DMC PATHANKOT Zila Parishad Pb Govt. Permanent No 8676 Yes January,202 January, 202 PATHANKOT Co-sited GURDASPUR Animal Husbandary Pb Govt. Permanent No 8230 Yes June 205 June 205 -- BHARMOUR Forest Deptt. HP Govt. Permanent No No Rent not decided CHAMBA Deptt of HP Govt. Permanent No Public relation HP Govt. CHAWARI Doordarshan Deptt. Porta cabin Yes No DALHOUSIE HOLI Municipal council Dalhousie. HP, Govt. HP Govt. Porta Cabin Yes HP Govt. Permanent No No Rent not decided TISSA HP Govt HP Govt Porta cabin Yes No UNA Distt. Hospital HP Govt. Permanent No 985 No TALWARA BBMB Govt. Shacks No 6
2. TECHNICAL 2. DETAILS OF WORKING OF TRANSMITTER FOR THE MONTH Oct - 203 - PKT - GSP BHA RMO UR CHA MBA CHA WARI DALHO USIE HOLI TISSA UNA TRANS POSER TALWA RA Test Hours 2 Scheduled Prog. Hours 582.87 07.75 07.75 582.85 744 744 744 744 744 744 744 3 4 5 Gear Breakdown Hrs. Power Supply Breakdown Hrs. Other Causes Breakdown Hrs. Nil Nil Nil Nil Nil Nil -- 6 Total Breakdown Hrs. (3+4+5) Nil Nil 7 Prog. Hours Radiated (2-6) 582.87 582.85 744 744 744 744 744 744 744 8 Total Hours of Working (+7) 590.62 590.60 744 744 744 744 744 744 744 9 % B/D ={(Total B/D x 00)/ Scheduled Prog. Hrs.)} Nil Nil Nil Nil Nil Nil Nil Nil Nil 7
2.2 PROGRESSIVE TOTAL FROM APRIL OF CURRENT FINANCIAL YEAR Test Hours 2 Scheduled Prog. Hours PKT 53.5 0 404 6.58 GSP 2 3 4 5 6 7 53.5 0 4046.48 536 536 536 536 536 536 536 T/P TAL WAR A 3 Gear Breakdown Hrs. Nil Nil 72 48 24 4 Power Supply Breakdown Hrs. Nil Nil 5 6 Other Causes Breakdown Hrs. Nil Nil Total Breakdown Hrs. (3+4+5) Nil Nil 72 48 24 7 Prog.Hours Radiated(2-6) 404 6.58 4046.48 5064 536 5088 536 536 52 536 8 9 Total Hours of Working (+7) % B/D ={(Total B/D x 00)/ Scheduled Prog. Hrs.)} 40 0.08 4099.98 5064 536 5088 536 536 52 536 Nil Nil.42 Nil 0.94 Nil Nil 0.47 Nil 8
2.3 DETAILS OF POWER OF TRANSMITTER FORTHE MONTH-October,203 Rated Power of Transmitte r (in KW / Watts) Forward Peak Power of Transmitt 2 er Video Audio PKT. 500 watts 500 Watt s GSP. 500 Watts. 500 Watts BHAR MOUR 0 Watts. 0 Watts. CHAM BA 0 Watts. 0 Watts. CHAW ARI 0 Watts. 0 Watts. DAL HOUSI E 0 Watts. 0 Watts. HOLI 0 Watts. 0 Watts. TISSA 0 Watts. 0 Watts. UNA 0 Watts. 0 Watts. TRANS POSER TALWA RA 0 Watts. 0 Watts. 3 Reflected Power Video Audio 2W 4.3 W 0. 0. 0. 0. 0. 0. W 4 5 6 Since when Transmitter is on less than rated power (if applicable) Reasons for less than rated power Reasons for high reflection, if any 9
2.4 DETAILS OF LOW POWER RADIATION FROM TRANSMITTER (Sync Peak Video Power less than rated power) Dates 2 Duration 3 Power (Radiation) 4 Reasons PKT. GSP. BMR CBA CHW DAL HOLI TISSA UNA T/P TALWAR A 5 6 7 8 9 Total duration of Low Power in hours during the month No. of occurrences Progressive total of occurrences of Low Power Radiation Progressive total of duration of Low Power Radiation Complaints of reception, if any & Reason of complaints 0
2.5 DETAILS OF MAJOR BREAKDOWN DURING THE MONTH (More than 5 minutes) PATHANKOT (for each ) Date Duration Period Reasons for B/D Action taken to From To solve the B/D Preventive action taken to avoid such breakdown in future GURDASPUR Date Duration Period Reasons for B/D From To Action taken to solve the B/D Preventive action taken to avoid such breakdown in future 2.6 CATEGORY-WISE BREAKDOWN DURING THE MONTH PATHANKOT (separate for each ) GURDASPUR BHARMOUR CHAMBA CHAWARI
DALHOUSIE HOLI TISSA UNA TRANSPOSER TALWARA -- 2.7 CATEGORY-WISE PROGRESSIVE BREAKDOWN FROM APRIL OF CURRENT FINANCIAL 2.8 YEAR Pathankot (separate for each ) Gurdaspur BHARMOUR 3 72 -- -- 2
CHAMBA CHAWARI 2 48 -- -- DALHOUSIE HOLI -- -- TISSA 24 -- -- -- -- UNA TRANSPOSER TALWARA 3
2.9 PERFORMANCE FIGURES OF TRANSMITTER Frequency of Vision Carrier Frequency of Aural Carrier - Pathankot Gurdaspur Bhar mour 82.25 527.25 89. 25 87.75 532.75 94. 75 Cha wari 27. 25 222. 75 Cha mba 96. 25 20. 75 Dalh ousie 82. 25 87. 75 Holi 20. 25 25. 75 Tissa 89. 25 94. 75 Una Transposer Talwara 224.25 27.25 229.75 222.75 K Factor () K-Bar 0.7% (2) K Pulse to Bar (3) K2T -.7% 0.76% Differential Gain 2.5% Differential Phase Signal to Noise Ratio Vision Peak Power x 500 Watts. 90 Watts. 0 Watt 0 Watt 0 Watt 0 Watt 0 Watt 0 Watt 0 Watt 0 Watt 2.0 VIDEO FREQUENCY RESPONSE PKT.. Freq (MHz) -.25-0.75 0.0.0.5 2.0 3.0 4.43 5.0 5.30 5.50 Gain in db -- 0-0.2-0.25-6.02.. -.. 4
2. AUDIO PERFORMANCE FIGURES Aural Carrier - Pathankot Gurdaspur Bharmour Chawari Chamba Dalhousie Holi Tissa Una Transp oser Talwar a 87.75 532.75 94.75 222.75 20.75 87.75 25.75 94.75 229.75 222.75 Frequency response 50 Hz to 5 KHz Distortion Factor F.M. Noise level Frequency Deviation at 00% Modulation 5
2.2 WORKING STATUS OF 500W AUTO MODE TRANSMITTERS (Wherever applicable) S. No. 2 Name of PATHANKOT GURDASPUR Xtr. Make, Model, Channel BEL MVV-24, CH#6 WEBEL WML-2U-500--V.2 CH#28 Whether Operating on Auto / Manual Mode Manual Manual Details of Fault occurred NIL Current Working Status (in detail) ACs, DG & BOTH TXs. ARE WORKING OK ACs, DG &. ARE WORKING OK. One 500W PA low output due to failure of one PA pallet 2.3 WORKING STATUS OF s (Wherever applicable) Remarks Control unit received from BEL after repair and taken in circuit on.9.203. But again failed on 4.0.203 again sent back to BEL on 8.0.3.Tramsmitter in Manual Mode Transmitter in Manual Mode. Sr. No. Name of Ch. No. Type of Transmitter Rated Power O/P Power Reflected Power Ex- Ex-2 PA PA2 ASU Bharmour 7 GCEL 0W 0W 0. ok ok ok ok OK 2 Chamba 8 GCEL 0W 0W 0. ok ok ok ok Ok 3 Chawari (+) GCEL 0W 0W -- Ok Def Ok OK Def 4 Dalhousie 6 GCEL 0W 0W 0. Ok Ok Ok Ok Def 5 Holi 0 GCEL 0W 0W Ok Ok Ok Ok Ok 6 Tissa 7(+) GCEL 0W 0W 0. Ok Ok Ok Ok Ok 7 Una 2 GCEL 0W 0W W Ok OK Ok Ok Ok 8 Talwara Transposer GCEL 0W - - - - 6
Sr. No. Name of Bharmour 24 cells of HBL make 2 Chamba 2 Old Batteries + New Battery Bank of 24 Cells HBL make Batteries Solar Panel (In circuit) Installed Damaged Remark Installed Damaged Remark Nil Nil 3 Chawari 24 Please see remarks New Battery Bank Made HBL 24V/650 AH installed on 30//200 New Battery Bank Made HBL 24V/650 AH installed on 2//20 Low backup + self discharging Battery Charger 48 8 Aplab 24V/25A Charge Controller SC352C 64 -- CEL CC82 48 2 Aplab 24V/25A 4 Dalhousie 24 Nil 48 40 Water seepage in Panels 5 Holi 24 cells of HBL make Nil New Battery Bank Made HBL 24V/650 AH installed on 7/3/20 Aplab 24V/25A 48 4 Aplab 24V/25A 6 Tissa 24 Nil 48 -- Aplab 24V/25A 7 Una 2 cells of UNION make + 24 cells of HBL make 8 Talwara Transposer Nil New Battery Bank Made HBL 24V/650 AH installed on 05/2/200 -- -- Damaged &stolen 48 40 Water seepage in Panels BLS2440M Spectron SC352C CC82 SC352C SC352C CC82 -- -- stolen Damaged &stolen 7
2.4 EARTH RESISTANCE (in Ohms) TX EARTH PS EARTH DG Set PDA- PDA-2 TO WER Date of measurement -PKT 0.66 0.65 0.5 2.66 2.3 3.69 08.0.203 Make, Model and type of Instrument used for measurement Waco, 98600 -GSP 2.2 2.25 8.9 9.4 9.9 9.5 09-04-200 Do - BHARMO UR 3 Ω (Very high resistance 35 Ω so shunted with other two earths) 3.5 3 9-06-3 Do CHAMBA 0.5 3 2 3-0-2009 Do CHAWARI -- DALHOUSI E 3.6 30-0-209 Do HOLI 0.86 0.8 0.5 8.8.203 TISSA.3.03.5 3-2-2009 Do UNA 0.5 0.5 0.6-2-2009 Do T/P TALWARA -- 3. EQUIPMENTS & SPARES 3. REQUIREMENT OF SPARE COMPONENTS Name of Component Part No. Name of Unit of transmitter for which required Quantity Required Qty available at Qty issued to during last six months Justification for requirement (separate for each ) 8
(Tissa) 3.2 REQUIREMENT OF SPARE EQUIPMENTS / CARDS / MODULES Name of Equipment / Card / Module Part No. Name of Unit of transmitter for which required Quantity Required Qty available at Qty issued to during last six months Justification for requirement Gurdaspur (separate for each ) PA Pallet (P500-UHF- 7A) 666 07 20 WML-2U- 500-V2 Power Amplifier 2 Nos. nil No One spare pallet has been provided since commissioning of the. Two pallets are presently required as one PA is defective. Chawari 3.3 AVAILABILITY OF SPARE -- COMPONENTS / MODULES / TRANSMITTER UNITS Spare Components (separate for each ) (separate for each ) Name of Spare Component Spare Transmitter Modules Name of Spare Transmitter Modules (pallets) Qty. in Stock Qty. in stock Working Status Working Status 9
Pathankot ) Gurdaspur (separate for each ) Exciter Control OK Card ICPM Corrector OK Card Modulator Card OK Rectifier card of OK Exciter Main Control OK Board PA Control Card OK Pre- Amplifier Pallet of PA Driver Amplifier 75W For PA PA Pallet THV450C OK OK OK Driver Card Require adjustment PA Pallet Spare Card taken in circuit, new demanded Spare Transmitter Units (separate for each ) (separate for each ) Name of Spare Transmitter Unit Qty. in Stock Working Status 20
3.4 DETAILS OF DEFECTIVE TRANSMITTER EQUIPMENT Make & Model of Transmitte r Name of defective Tx equipment Since when it is defective Action taken by for the repair Shortcoming if any, being faced by station for the repair Remarks WEBEL,U HF 500 Watt Pathankot MVV24 Control Unit of Gurdaspur Power Amplifier No Exciter No Control unit 3..0 The equipment sent for repair to M/S Webel on 26.6.20 6.5.3 PA is not giving full power because failure of one PA pallet in Power Amplifier Two pallets are required to make PA healthy and one as spare 8.9.203 LO2 unlock Problem intermittently, some dry soldering observed, but the fault still not located. 4.0.203 Sent back to BEL on 8.0.3 Control unit received from BEL after repair and taken in circuit on.9.203. But again failed on 4.0.203 again sent back to BEL on 8.0.3. Tansmitter is in Manual Mode Estimate of Rs 96500/- received from Webel which sent for Approval of CE(NZ) One PA pallet received from CP&S as spare and replaced in defective PA 3.5 WORKING STATUS OF AVR FOR TRANSMITTER Capacity of AVR Make and Type Working Condition ( Auto/Manual/def) Action Taken for repair, if defective Pathankot 0KVA Sylvan, Servo Auto Gurdaspur 0KVA Sylvan, Servo Auto Dalhousie 3KVA HICOMP, Servo Auto Bharmour 3KVA TCI, Servo Auto 2
Holi 3KVA Hindustan, Servo Auto Chowari Khas 3KVA Sylvan, Servo Auto Una 2KVA Cybex, Automatic Auto Tissa 3KVA NEI, Servo Auto Chamba 2KVA Cybex, Automatic Auto 3.6 WORKING STATUS OF DIESEL / PETROL / KEROSENE GENERATOR SETS AT s / s Capacity of Generator Make, Model and Type Working Condition Bharmour.4 Kva Birla Yamaha OK LG2000 Chamba.4 Kva Birla Yamaha OK LG2000 Chawari.4 Kva Honda EBK-2000 OK Dalhousie.4 Kva Honda EBK-2000 OK Holi.4 Kva Honda EBK-2000 OK Tissa.4 Kva Honda EBK-2000 OK Una.4 Kva Birla Yamaha LG2000 Talwara - NA Transposer 3.7 TVRO ELECTRONICS OK Action Taken for repair, if defective Make & Type of IRDs Total No. available Pathankot.Scopus 2800 2. Beetal 3. Thomson Gurdaspur.Scopus 2900 2.Scopus 2800 Bharmour Chamba 3.Alto-Commercial IRD.Sharp 2V DC 2.Beetal (AC operated ) 3. Sharp-BR8, 24V 4.Sharp AS500, 24 V.Sharp 2V 2. Chong hong 3. Beetal 4. Sharp AS500, 24 V 2 2 2 Total No. Defective Action taken by for repair Remarks 22
Chawari Dalhousie Holi Tissa Una.Sharp 2V 2.Sharp-BR8 3.Sharp AS500, 24V 4. Beetal (AC operated).sharp-br8, 24 V DC 2.Beetal (AC operated) 3.Sharp AS 500,24 V.Sharp-BR8,24 V DC 2.Sharp2V 3.Wisplus.Sharp2 V 2. Wisplus 3. Sharp-BR8, 24 VDC 4.Sharp AS 500,24 V.Wisplus, 2.Sharp BR8, 2VDC 3. Sharp AS900,2 VDC 2 Talwara Nil -- -- 3.8 UPS Pathankot Gurdaspur Make, Model & Rating of UPS Emerson, 6KVA Emerson, 6KVA Total No. available Total No. Defective Action taken by for repair Remarks -- Low backup Battery Bank demanded. -- -- Low backup Battery Bank demanded. 23
3.9 AIRCONDITIONERS & AVRs Total No. at Defective Nos. Make and Model of defective Date from which defective Reason for Being defective Action taken by for the repair Pathankot 3 Nil Airconditioner Gurdaspur 3 Nil - - - Pathankot 3 Nil - - - AVRs for ACs Gurdaspur 3 Nil - - - - 3.0 DETAILS OF DEFECTIVE INPUT / MONITORING AND MEASURING EQUIPMENTS Name of defective equipment Make and model of defective equipment Date from which defective Action taken by for the repairing 24
3. WORKING FIGURES OF DIESEL GENERATORS Pathankot -Gurdaspur Make Kirloskar Kirloskar Capacity 25KVA 25KVA Test Hours 0.75 04.83 Utilization for transmission 33.92 32.84 during the month Total Working Hrs. for the month 35.67 37.67 Progressive utilization 35.42 309.92 Occasion of utilization during the month 43 22 Progressive Utilization(occ.) 350 2286 Breakdown in service due to failure of D/G during the month Average consumption of Diesel 02.40 02.40 Date of commissioning of DG set Nov. 2006 3..2009 Total Hours of working since 4858.65 2093.4 date of commissioning Reading of Hour Meter installed at DG Set at the end of month Reading of Hour Meter installed at LT Panel at the end of month 25
4. CABLE OPERATORS MONITORING REPORT North Zone Sep, 203 Punjab Space Satellite Service Yes No Yes Yes No Yes No No Yes H.No.4,Gali No.4 Indira Colony, PATHANKOT 26