A Review of Adaptive Under Frequency Load Shedding Scheme on Islanded Distribution System Using MATLAB/SIMULINK

Similar documents
SCIENCE & TECHNOLOGY

Combination of Adaptive and Intelligent Load Shedding Techniques for Distribution Network

A New Approach Applied to Adaptive Centralized Load Shedding Scheme

International Journal of Advance Engineering and Research Development

The Coupling of Voltage and Frequecncy Response in Splitting Island and Its Effects on Load-shedding Relays *

Effect of Load Shedding Strategy on Interconnected Power Systems Stability When a Blackout Occurs

DEVELOPMENT OF SMART UNDERFREQUENCY LOAD SHEDDING SYSTEM

Modle 6 : Preventive, Emergency and Restorative Control. Lecture 29 : Emergency Control : An example. Objectives. A simple 2 machine example

Representing an intelligent load shedding algorithm with utilization of frequency deviation integration

Doãn Văn Đông, College of technology _ Danang University. 2. Local Techniques a. Passive Techniques

Islanding and Detection of Distributed Generation Islanding using Negative Sequence Component of Current

Simulation Programs for Load Shedding Studies: Expermintal Results

INTERNATIONAL JOURNAL OF COMPUTER ENGINEERING & TECHNOLOGY (IJCET)

A. df/dt Measurement principle by relays

NPCC Regional Reliability Reference Directory # 12. Underfrequency Load Shedding Program Requirements

EH2741 Communication and Control in Electric Power Systems Lecture 2

An Improved Under-Frequency Load Shedding Scheme in Distribution Networks with Distributed Generation

Anti-IslandingStrategyforaPVPowerPlant

Keeping it up to Speed Off-Nominal Frequency Operations. CETAC 2018 San Ramon

Hybrid Anti-Islanding Algorithm for Utility Interconnection of Distributed Generation

Recently, the SS38 Working Group on Inter-Area Dynamic Analysis completed two study reports on behalf of the UFLS Regional Standard Drafting Team.

A Topology-based Scheme for Adaptive Underfrequency Load Shedding

Load shedding scheme based on frequency and voltage stability for an islanding operation of a distribution network connected to mini-hydro generation

Introduce system protection relays like underfrequency relays, rate of change of frequency relays, reverse - power flow

Massive Transient Stability Based Cascading Analysis and On-line Identification of Critical Cascades

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

An Improved Method of Adaptive Under Voltage Load Shedding

An Enhanced Symmetrical Fault Detection during Power Swing/Angular Instability using Park s Transformation

Smart Grid Where We Are Today?

A Novel Control Approach for Microgrids Islanded Operation - Load Step Pre-announcement and Bang-Bang Control

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

ESB National Grid Transmission Planning Criteria

The Role of Effective Parameters in Automatic Load-Shedding Regarding Deficit of Active Power in a Power System

P5 Policy 5: Emergency Operations

POWER systems are being operated closer to the stability

Controlled Islanding Followed by Load Shedding Based on Rate of Frequency Decline

Renewable Interconnection Standard & Experimental Tests. Yahia Baghzouz UNLV Las Vegas, NV, USA

System Protection and Control Subcommittee

Analysis and modeling of thyristor controlled series capacitor for the reduction of voltage sag Manisha Chadar

NERC Protection Coordination Webinar Series June 23, Phil Tatro

Islanding Detection Method Based On Impedance Measurement

PV CURVE APPROACH FOR VOLTAGE STABILITY ANALYSIS

New Techniques for the Prevention of Power System Collapse

System Protection Schemes in Power Network based on New Principles

1

Power System Protection Where Are We Today?

Identification of Critical Bus and Optimal Allocation of Facts Device

Lecture 15 EMS Application II Automatic Generation Contol. Davood Babazadeh

EE 742 Chapter 9: Frequency Stability and Control. Fall 2011

ENHANCEMENT OF POWER FLOW USING SSSC CONTROLLER

Power System Load Shedding: Key Issues and New Perspectives

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP

Overview. The Principles of Power System Operation module presents the following topics:

Considerations and Recommendations for the Harmonisation of Under Frequency Loadshedding Schemes in Multi Zone Meshed Grids

Power Plant and Transmission System Protection Coordination

World Academy of Science, Engineering and Technology International Journal of Energy and Power Engineering Vol:9, No:3, 2015

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

Hybrid Islanding Detection Method for Distributed Generators

Arvind Pahade and Nitin Saxena Department of Electrical Engineering, Jabalpur Engineering College, Jabalpur, (MP), India

A REVIEW OF SELF HEALING SMART GRIDS USING THE MULTIAGENT SYSTEM

Wide-Area Measurements to Improve System Models and System Operation

Aalborg Universitet. Published in: IEEE Transactions on Power Systems. DOI (link to publication from Publisher): /TPWRS.2014.

Rajasthan Technical University, Kota

P5 Policy 5: Emergency Operations

Hydro-Québec s Defense Plan: Present and Future

FAULT AND STABILITY ANALYSIS OF A POWER SYSTEM NETWORK BY MATLAB SIMULINK

Power System Reliability and Transfer Capability Improvement by VSC- HVDC (HVDC Light )

Loss of Mains Protection

Load Shedding Algorithm Using Voltage and Frequency Data

Grid Code Violation during Fault Triggered Islanding of Hybrid Micro-grid

NERC / TVA STABILITY WORKSHOP

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

ENERGISING INRUSH CURRENT TRANSIENTS IN PARALLEL-CONNECTED TRANSFORMERS

Analysis of Modern Digital Differential Protection for Power Transformer

Microgrids and Energy Management SURYANARAYANA DOOLLA POWER ENGINEERING LAB DEPARTMENT OF ENERGY SCIENCE AND ENGINEERING INDIAN INSTITUTE OF

GridLiance Reliability Criteria

Power Frequency Droop Controller For Stability Analysis In Micro Grids

USING THE RATE OF CHANGE OF FREQUENCY AND THRESHOLD FREQUENCIES IN LOAD SHEDDING IN A DG- FED ISLANDED SYSTEM

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event

Digital Object Identifier: /PTC URL:

Abstract The identification and operation of islands in the presence of Distributed Generation (DG) Units has become challenging.

Step-Response Tests of a Unit at Atatürk Hydro Power Plant and Investigation of the Simple Representation of Unit Control System

Transmission System Phase Backup Protection

TRADITIONALLY, if the power system enters the emergency

Transient stability improvement by using shunt FACT device (STATCOM) with Reference Voltage Compensation (RVC) control scheme

Performance of Relaying During Wide-area Stressed Conditions

Power Plant and Transmission System Protection Coordination Fundamentals

Implementation of Revised IEEE Standard 1547

A Novel Approach for Reducing Proximity to Voltage Instability of Multibus Power System with Line Outage Using Shunt Compensation and Modal Analysis

Damping Power system Oscillation using Static Synchronous Series Compensator (SSSC)

Non-detection zone of LOM protection for converter connected wind turbines

Considerations for Power Plant and Transmission System Protection Coordination

The Value of Frequency Keeping and Governor Response to New Zealand

Advantages and Disadvantages of EHV Automatic Reclosing

STATCOM WITH POD CONTROLLER FOR REACTIVE POWER COMPENSATION Vijai Jairaj 1, Vishnu.J 2 and Sreenath.N.R 3

Power System Stability Improvement in Multi-machine 14 Bus System Using STATCOM

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/

NVESTIGATIONS OF RECENT BLACK-

System Operating Limit Definition and Exceedance Clarification

Transcription:

A Review of Adaptive Under Frequency Load Shedding Scheme on Islanded Distribution System Using MATLAB/SIMULINK Dhananjay 1, Vijay Garg 2 1 M.Tech Scholar, Electrical Engineering, U.I.E.T, Kurukshetra, Haryana, India 2 Assistant Professor, Electrical Engineering, U.I.E.T, Kurukshetra, Haryana, India 1 dhananjayyadav31@yahoo.com, 2 vkgarg_kuk@yahoo.com Abstract: Adaptive Under-Frequency Load Shedding (UFLS) scheme is a reliable and accurate method to maintain the frequency of the system in accessible limit by shedding the right amount of load from system during abnormality. The purpose of this paper is to review work carried on Adaptive UFLS. It consists of combination of under frequency relay and rate of change of frequency (RCOF) relay. During the abnormal condition, the frequency of system deviates below from its normal value. To bring back the frequency to their normal load shedding is only reliable method. Adaptive UFLS scheme works only if the frequency is dropping from their normal value. It plays a vital role in reducing the power deficiency stress from generator in the case of islanding operation. Under balance condition the frequency of system remain stable (50 Hz or 60 Hz). Behavior of frequency with different condition is shown in table. Keywords: Adaptive UFLS, Load Shedding, Under-frequency load shedding, RCOF, Power System Stability I. INTRODUCTION Large demand and deregulation of electricity are major factors, which force the interconnected power system to operate closer to its limit. Due to these factors, cases of cascade power outages rises which force the system to shut down. To face the situation of complete blackout, a fast restoration method intentional islanding is developed which split the system in number of island during initial stage of disturbance. In case of islanding, a portion of system is separated from grid and the supply of that portion is maintained by Distributed Generator (DG). DG has many benefits and it play a vital role in maintaining the continuous operation of electrical island. For Secure and reliable operation of electrical island load shedding scheme is integral part of strategy to maintain the power balance in islanded part. During the formation of electrical island the load demand is more than the generation capacity in islanded part. Due to load imbalance, the frequency of that part starts decreasing. To bring back the frequency to their normal value Adaptive UFLS scheme is implemented. Benefit of Adaptive UFLS is that it avoids unnecessary load shedding as in case of conventional load shedding. Adaptive UFLS sheds the load in number of stages for smooth transition. II. 37 LOAD SHEDDING BASIC Load shedding is process in which an excess load is shed from system to maintain the stability of system. Load shedding is helpful to enhance the transient stability of the power system. Total Generation (TG) = Total Load (TL) + Losses Fig 1 Test system load shedding for an islanded network Table I: Behavior of frequency with different condition System Frequency Increase No change Decrease System Condition TG > TL + Loss TG = TL + Loss TG < TL + Loss Load shedding is used in under frequency condition, when frequency is deviated below from normal value. There are many type of load shedding scheme but, three are main. Firstly, Traditional LS is simple but unreliable to shed accurate amount of load and also do not use sophisticated relays like RCOF. Secondly, Half Adaptive LS is similar to traditional relay at some extent but RCOF relays are used for shedding of right amount of load. Thirdly, Adaptive LS

use both under frequency relay and rate of change of relay to shed the right amount of load. Criteria for Load Shedding Load shedding relay should be able to shed load equal to maximum value of overload. Load should be shed in number of stages, rather than in single stage for smooth transition and accurate load shed Pe =Total Load Power. H = Inertia Constant H = Stored kinectic enaergy at syncronous s speed MJ Generator MVA rating For Multi-machine, H = 1 JWs 2 2 MVA Frequency setting should be done for maximum and minimum setting. 2H 1 df 1 fo dt = Pm 1 Pe 1 macine 1 III. Each stage should shed enough loads to handle the next, more serious contingencies. Time delay should be short for frequency relay. Load shedding relay should be spread throughout the interconnected system to avoid unnecessary power loss and undesirable islanding. Load priorities should be created for load shedding. 38 ADAPTIVE UNDER-FREQUENCY LOAD SHEDDING. This technique is works only if the system frequency falls below a certain threshold value.adaptive UFLS scheme is an advanced technique of load shedding. It consists of UFLS relay and sophisticated relays RCOF to shed the accurate amount of load shed with enhanced reliability. During the initial stage of electrical island, generation capacity is less than the total demand. Due to this power imbalance, frequency is start decaying to bring back the frequency to normal value Adaptive UFLS scheme is best suited scheme of load shedding. In this scheme RCOF calculate the total amount of power imbalance and shed the right amount of load by both relays in number of stages for smooth transition. The objective of adaptive under frequency control mechanism of the power system to maintain the power balance between the generation and consumption by shed a right amount of load with safe and smooth and thus, guarantee the reliability and the security of the system. The first step of scheme is to estimate the total power mismatch between load and generator. Total power mismatch can be determined as follows. Swing equation for single machine is given by Where, fo = rate frequency, Pm = Total Generated Power 2H df = Pm Pe fo dt Heq = Pm eq = Pe eq = 2H 2 df 2 fo dt = Pm 2 Pe 2 macine 2 2H n df n fo dt = Pm n Pe n macine n individual inertias of eac macine for all te macines in system. individual mecanical power of eac macine for all te macine in te system. individual electrical power of eac macine for all te macine in te system. The relation between power imbalance and rate of change of angular speed are given by: P = 2H d( w) + D w dt Where P is power imbalance, w is angular speed, D is damping factor, H is inertia constant. A. Different Component used in Adaptive UFLS Scheme. 1) Frequency and RCOF Detector Frequency measuring device measure the frequency of the system it is connected to the low voltage side of the potential transformer. The output of the frequency measurement device is feed to the load shedding controller. The RCOF is to calculate the total load mismatch between generated power and load power. RCOF relay is fast acting relay. Expression of initial rate of change of frequency df dt = P 2H 2) Load Shedding Controller The output of the frequency measuring device and rate of change of frequency is feed to the load shedding controller. Load shedding controller is responsible for control load shedding with the use of frequency and RCOF. It also checks whether the system is in island mode or not. Output of load shedding controller is feed to the circuit breakers which connect loads. If frequency decays, reaches the first limit then certain amount of load will be shed and if the

frequency still decays then LSC wait for second limit and so on until the frequency restore to normal value by cutting suitable load at each stsge. A certain delay time like communication time, calculation and circuit breaker opening time is included. Fig 2 Load shedding at different frequency limit IV. MATLAB SIMULATION In this test model 502 Mw load is feed by 2 X 200 MVA generator with 30 MVA spinning reserve capacity and rest power is supplied by grid. Power balance and frequency is shown in fig 4 and fig7. Grid is disconnected from the network by a circuit breaker. Circuit breaker connecting the grid with electrical island shows the status of islanding. After disconnection of grid the supply of 503 MW is maintained by 2X 200 MVA generators, but the generation capacity is less than the total load. This create a power imbalance and frequency of the system starts decay as shown in fig 5 and fig 8.To bring back the frequency to normal value Adaptive UFLS scheme initiated after the sensor sense the condition of power imbalance because of islanding. In this scheme, load shedding activated as the frequency decay to stage 1 but due to of large imbalance it still decay to stage 2 and so on up to stage 5. In each stage certain amount of load is shed and after stage 5 frequency again restore to 50 Hz as show in fig 9 and also the power is balanced after load shed as shown in fig 6. There is certain delay in each step of load shedding to avoid unnecessary load shedding. Fig 3 Isolated Electric Island 39

V. SIMULATION RESULT Fig 4 Power balance before islanding. Fig 6 Power imbalance correction using Adaptive UFLS Fig 5 Power imblance after grid disconnected. Fig 7 Frequency before grid disconnected. 40

International islanding with Adaptive UFLS provides more security and reliability to the electric island and power system. In this paper Adaptive UFLS scheme in electric island is sucessfully demonstarted with the help of MATLAB Simulink. With the use of Adaptive UFLS codition of overloading in electric island can be smoothly eliminated with enhanced stability. In this scheme RCOF and frequency relays sheds right amount of load and avoid the unnecessery load shedding. VII. REFERENCES [1] Alireza Saffarian and Majid Sanaye-Pasand, "Enhancement of power system stability using adaptive combinational load shedding", IEEE Transaction, 2012,Vol 26, No 3,pp. 1010-1020, 2012. [2] Diana Zalostiba, "Power System blackout prevention by dangerous overload elimination and fast-restoration", IEEE, Vol. 4, pp. 001-005, 2013. Fig 8 Frequency variation after grid disconnected. [3] Haibo You and Zhong Yang Self Healing in power systems: An Approch using islanding and rate of frequency decline-based load shedding, IEEE Transactions,, Vol 18, No 1.pp:174-180, 2003. [4] Mokhlis and Abu Bakar, A new under frequency load shedding scheme for islanded distribution network. IEEE PES, 2013. [5] A. A. M. Zin, H. M. Hafiz, and W. K.Wong, Static and dynamic under frequency load shedding: A comparison, IEEE/POWERCON, pp. 941-945, November 2004. [6] P.Kundur, Power System Stability and Control, Newyork: Mchraw-hill Inc, 1994. [7] M.Karimi, and H.Mohamad, "Under-Frequency Load Shedding for islanded distribution network connected with mini grid", IJEPES, 2012, pp. 127-138. Fig 9 Frequency recovery after grid disconnected using Adaptive UFLS. VI. CONCLUSION 41