DIRECTIONS FOR APPLICATION

Similar documents
A P P L I C A T I O N I N S T R U C T I O N S

DIRECTIONS FOR APPLICATION

DIRECTIONS FOR APPLICATION

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application

SIGNATURE CUT SHINGLES. Getting Started

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK

Hatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles

SECTION ASPHALT SHINGLES

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

HERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

Laminated Shingles. Landmark Series and Landmark TL. CertainTeed Shingle Applicator s Manual

PREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES

Cambridge English Application Instructions

LAMINATED SHINGLES CERTAINTEED SHINGLE APPLICATOR S MANUAL SUPPLEMENT

GlassMaster General Instructions - Ardmore, OK & Hampton, GA <br /> Atlas Roofing

C e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l. and Carriage House STEEP. Slope Application. (over 21/12)

Grand Manor Carriage House and Centennial Slate 16 YOUR OBJECTIVE: To learn the correct method of installing each of these roofing products.

HERITAGE LAMINATED ASPHALT SHINGLES Tuscaloosa, AL

STORMMASTER SHAKE GENERAL INSTRUCTIONS

ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION

BARDOLINE INSTALLATION INSTRUCTIONS

Timberline and Sovereign Expanded Fastener Placement Area

Turada Hardwood Shingles and Shakes Installation instructions

ROOFING APPLICATION STANDARD (RAS) No. 130

StormMaster Shake GENERAL INSTRUCTIONS For Spanish Instructions Click Here (Para las Instrucciones Españolas Haga Clic Aquí)

Laminate Shingle Installation Instructions

3-Tab Shingle Installation Instructions

PROJECT INSTRUCTIONS Roofing

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER:

ROOFING City of Grand Rapids Building Safety Division

SECTION SLATE SHINGLES. 1.1 SUMMARY A. Section Includes: 1. Slate shingles over underlayment nailed to roof sheathing.

Inspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square

Capstone Application Instructions

Application instructions

Inspire Aledora Slate Application Guidelines

Application instructions

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: IKO INDUSTRIES LIMITED

1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and Highlights

Hip & Ridge Shingles Installation Instructions

SECTION ASPHALT SHINGLES

1 Roof Substrate (Deck) OWENS CORNING BERKSHIRE SHINGLES INSTALLATION INSTRUCTIONS

Three -Tab Shingles. CertainTeed Shingle Applicator s Manual

eco-shake INSTALLATION INSTRUCTION

RED DIAMOND SHINGLES Roof Installation Introduction:

SmartVent Eave Edge Installation Instructions

b) Symphony comes pre-packaged in color and width blends. There is no need to mix Symphony at the job site. Currently Symphony is available in the

1.04 QUALITY ASSURANCE

SECTION WOOD SHINGLES

SECTION ASPHALT SHINGLES

OWENS CORNING LAMINATE SHINGLES INSTALLATION INSTRUCTIONS

THREE-TAB SHINGLES. YOUR OBJECTIVE: To learn the correct procedures for installing three-tab type strip shingles.

The proposal includes the replacement of the roof on the entire house (historic massing and later additions) and detached garage.

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY

B. Related Sections: The following Sections contain requirements that relate to this Section:

A201 3 PROPOSED SOUTH ELEVATION SCALE: PROPOSED EAST ELEVATION SCALE: EXISTING EAST ELEVATION EXISTING SOUTH ELEVATION WEST WORKSHOP

Table of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1

Installation Manual. Future Roof Shingle / Slate Products

Installation Instructions

4. Metal roof jacks at penetrations and attachments

6 STEP INSTALLATION GUIDE BY DCI

DECRA Shingle Installation Guidelines

INSTALLATION GUIDE LEARN MORE AT DECRA.COM

SECTION 9: ROOF STRUCTURE, ROOFING MATERIALS AND FLASHING, GUTTER, DOWNSPOUTS, AND SKYLIGHTS. Background

installation guide Villa

Installation Guide. Cedar Shake. Distributed by: BEST MATERIALS LLC, Phoenx AZ

ONDUVILLA. The Attractive Alternative to Shingles I N S T A L L A T I O N I N S T R U C T I O N S

Asphalt Shingle Installation at Roof Edges, Intersections and Valleys

Brava Old World Slate Installation Guide

TECHNICAL BULLETIN NEW ICC ES EVALUATION REPORT

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: GAF 1 CAMPUS DRIVE PARSIPPANY, NEW JERSEY 07054

Installation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation

AIA Specification. Section Slate Shingles PART 1 GENERAL

Slate Shingle Specifications

OAKRIDGE R SUPER TM Shingles Installation Instructions

Multi-Width Shake. Widths: 9", 8", 7", 6", 4" Length: 22" Thickness at butt: 5/8" Single-Width Shake. Widths: 9" Length: 22" Thickness at butt: 5/8"

Shingle Installation Guidelines

BARRELL VAULT BATTENLESS

Installation Manual. Future Shingle Products

IRONWOOD SHAKE & FLASHING SPECIFICATIONS

Application Guidelines - Shake General Information

Tuff-Rib Install Guide

Polytegola N. Bitumen Roof shingles. Application guide

Ekoroof LiteTile Dimensions

10 Steps to Performing a Roof Inspection Class. Ben Gromicko InterNACHI nachi.org/class

SLATE & SHINGLE INSTALLATION

IRONSTONE SLATE & FLASHING SPECIFICATIONS IRONSTONE SLATE

Installation Instructions

COMPOSITE SIDING INSTALLATION GUIDE

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: GAF 1 CAMPUS DRIVE PARSIPPANY, NEW JERSEY 07054

FLASHING: VALLEYS, WALLS, CHIMNEYS, ETC.

Installation Instructions

Installation Instructions

Table of Contents. Roof to Head Wall w/ Side Flashing DECRA Shake XD Roof Overview Roof Penetration - Pipes & Vents...

How To Install Asphalt Shingles. Part 1 of 3: Preparing the Roof. Tutorial

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: GAF EVALUATION SUBJECT:

REGAL. Installation Manual

Transcription:

Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS MAY ADVERSELY AFFECT THE ASSEMBLED ROOF SYSTEM PERFORMANCE, ROOF APPEARANCE, COMPLIANCE TO PRODUCT STANDARDS, COMPLIANCE TO CODES, AND STATED COVERAGE. See the PABCO Limited Shingle Warranty for details, limits, and conditions. Ask your supplier for a copy or visit our web site at www.pabcoroofing.com. Apply shingles exposing the bottom 4-1/2 to the weather. The step-by-step application instructions below apply to standard slope/inclines between 4" per foot and 2 per foot. For low slopes (between 2" and 4" per foot) and steep slopes (more than 2 per foot), modify the installation as described in Section #8. Do not apply these shingles on roofs having a slope less than 2" per foot. IMPORTANT: FROM COURSE TO COURSE UP THE DECK, END JOINTS MUST BE MAINTAINED WITH A HORIZONTAL OFFSET OF 5-3/4. THE INSTALLER MUST ASSURE THAT ALL END JOINTS ARE COVERED. UNCOVERED END JOINTS MAY RESULT IN LEAKS WHICH ARE NOT COVERED BY THE PABCO LIMITED SHINGLE WARRANTY. Ventilation: To prevent harmful condensation, air must circulate freely under the roof deck with air flow in all areas. A minimum of 1 ft2 of total net free ventilating area is required for each 150 ft2 of attic floor area. 1 ft2 for each 300 ft2 of attic floor area may be allowed if at least 40 percent and not more than 50 percent of the required ventilating area is provided by exhaust vents located in the uppermost portion of the attic or rafter spaces. Requirements: All Construction 2 Roof The minimum deck thickness must be either 3/8 plywood or 7/16 OSB type sheathing, conforming to the specifications of the APA - The Engineered Wood Association and the building code, or well-seasoned wood boards minimum nominal thickness, 6 maximum width. The deck must be sound and provide good anchorage for nails. THESE SHINGLES SHOULD NEVER BE APPLIED TO ANY OTHER DECK without first obtaining written approval from PABCO Roofing Products. Requests for approval must be accompanied by the deck manufacturer's recommended application procedure for asphalt shingles. APPLICATION DIRECTLY OVER POLYURETHANE OR POLYSTYRENE SURFACES WILL NOT BE APPROVED. 3 Underlayment On decks with a pitch of 4 per foot or greater, for new construction or when old roofing has been removed, apply a single layer of underlayment felt complying with ASTM D226, D4869, or D6757 and the building code, extended beyond the metal drip edge at the eaves 1/4 to 3/8. Overlap underlayment layers with a 2" top lap, 4 end laps, and a minimum of 6 over both sides of all hips, ridges, and valleys. See Section 8 for application on slopes between 2 and 4 per foot. Drip edges are made of corrosion resistant materials that extend 2 minimum back from the roof edges and bend downward over them. Apply drip edge directly to the deck along the eaves and over the underlayment along the rakes. Underlayment (over) Nails (under) 4 End Lap 2 Top Lap Page 1

Flashing 4 Eaves If winter temperatures average 30 F or less, and ice may form along eaves to cause a back-up of water, install an eaves flashing for ice dam protection. Install a self adhering, peel and stick type underlayment sheet complying with ASTM D1970 parallel to the eaves, applied per the manufacturer s instructions. This sheet overhangs the drip edge 1/4 to 3/8. This sheet extends up the roof to at least 24 inside the interior wall line. Horizontal laps (when needed), are located outside the wall line. Underlayment (over) Self Adhering Underlayment (under) Eaves flashing applied to a point at least 24" inside the interior wall line. Interior side of exterior wall. Eaves flashing overhangs metal drip edge 1/4" to 3/8". Top lap is located outside of the exterior wall line and fully adhered. Instructions 5 Nailing PABCO recommends the use of nails. Use five nails per shingle for normal application, positioned in the nail zone as shown below. The nail zone is a band of light colored granules running across the face of the shingle 9-1/2 to 11 up from the leading edge of the teeth. Nails must be at least long, aluminum or galvanized, 3/8 head, 11 or 12 gauge roofing nails. Drive nails flush with shingle surface. NAILS MUST NOT BE OVER DRIVEN. See Section 8 for six nail application location and use. See our Paramount Application Details Nailing Instructions for additional details. 9" 9" Nail Zone Placement for 5 Nails Improperly Driven Properly Driven 3/ " Under Driven Over Driven Crooked 8 Asphalt Shingles ing Nail straight and flush with the shingle surface. Page 2

6 Valleys Valley application must comply with the building code. Where allowed, PABCO recommends using open metal valleys (closed cut valleys are also accepted). This valley starts with a 36 underlayment centered down the valley. PABCO recommends self adhering underlayment (ASTM D1970) for this bottom layer. The underlayment felt covering the decks is trimmed to overlap this at least 6. Apply a second layer of underlayment felt over this, centered down the valley. The metal valley flashing must be at least 26 gauge galvanized metal or an equally corrosion resistant metal, at least 24 wide. It is formed with a "W" shape and center rib. Apply the metal valley without puncturing it. Center the metal in the valley over the second layer of underlayment, extending beyond the eaves drip edge 1/4 to 3/8. If more than one piece of flashing metal is needed, the lower piece is nailed at the top. The upper piece laps over the lower piece nails by at least 8" and the lap is cemented together with asphalt roof cement complying with ASTM D4586. Snap 2 chalk lines down the valley, starting 2 on either side of the valley center line at the top of the valley and diverging 1/8 from each other per foot down the valley. Apply the shingles into the valley in the normal sequence of application for the rest of the roof. Trim the shingles to the chalk line, but never use a piece less than 12 wide. If necessary, trim the preceding shingle on the course. Apply the shingles into the valley so that no nails pass through the valley metal. Clip the upper shingle corner (in the valley) 1 at 45. Embed each shingle in a 3 wide strip of asphalt roof cement. See our Paramount Application Details - Valley Application for additional details. Metal Valley Flashing Valley Center Line Chalk Lines Cement flashing lap. clipped off corner at 45o. Asphalt Roof Cement End shingles trimmed to match chalk line and set in 3" width of asphalt roof cement. Page 3

5-3/4 Diagonal Offset Pattern 7 Application, FIRST STARTER COURSE: Use PABCO Universal Starter or a self sealing three tab shingle with the tabs cut off. Remove 7-1/2 from the end of the first piece and apply it at the lower left hand corner of the roof, with the adhesive at the eaves, overhanging the drip edge 1/4 to 3/8. Nail in place with 4 nails about 2 up from the eaves, spaced evenly across the shingle. Continue the Universal Starter across the deck with full shingles. SECOND STARTER COURSE: Use Paramount Starter to assure matching colors. Cut 5-3/4 off the length of the first slab of Paramount Starter and apply at the lower left hand corner of the roof. This Starter is applied flush with the first starter course at the rake and eaves. Continue the Starter across the deck with full shingles. See Paramount Laminated Shingle Getting Started Technical Bulletin at pabcoroofing.com for more detailed information. FIRST COURSE: Start with a full Paramount shingle aligned with the edges of the Paramount Starter at the lower left hand corner of the roof. SECOND COURSE: Cut 5-3/4 from the left end of a shingle and apply the 34-1/4 long piece over the headlap of the first course shingle, exposing the first course 4-1/2. THIRD COURSE: Cut 11-1/2 from the left end of the shingle and apply the 28-1/2 long piece over the headlap of the second course shingle, exposing the second course 4-1/2. SUCCEEDING COURSES: Start courses four through seven with a partial shingle 5-3/4 shorter progressively, establishing the overall diagonal offset pattern. See illustration below. (Pieces cut from shingles along the left rake can be used to finish off courses at the right rake.) Now apply full shingles to courses one through seven. Repeat the diagonal pattern from the first seven courses by starting course eight as a full shingle and proceeding with partial shingles 5-3/4 shorter progressively each time. See our Paramount Application Details - Getting Started for additional details. Eaves flashing (if required) Start 3rd course with 11-1/2" removed. 1st Universal Starter 2nd Paramount Starter Start 2nd course with 5-3/4" removed. 4-1/2" exposure Start 1st course with full shingle. Page 4

Applications 8 Special For areas where local knowledge indicates exposure to high winds may occur, shingles must be applied with 6 nails (spaced as shown below) and sealed to qualify for wind damage warranty coverage. Steep Slope Application: On slopes greater than 2 per foot (Mansard type roofs), 6 nails are required, spaced as shown below. These shingles must be hand sealed at the time of application with asphalt roof cement complying with ASTM D4586 Type II, applying 4 spots about the size of a quarter, each horizontally centered behind and about 1 up from the bottom edge of the covering tooth. Placement for 6 Nails 6" 6" 6" Nail Zone Cement Under (on shingle below) Low Slope Application: On slopes between 2" and 4" per foot, where allowed by code, apply one layer of a self adhering ASTM D1970 sheet per the manufacturer's instructions. As an alternative, provide a double layer of underlayment felt (ASTM D226, D4869, or D6757) by applying a 19" wide underlayment strip across the eaves. Over this, apply a full 36" wide sheet. Continue 36" wide sheets, lapping each 19" over the preceding course. Alternate Low Slope Application 36" 17 " E xp o s e 19" d (over) 12" End Lap 19 First Underlayment Strip First full course and succeeding courses are 36" wide with 19" lap. Page 5

Flashing 9 Base The base flashing for the front of the chimney is installed as illustrated over the headlap of the last course of shingles below the chimney, and extending up the chimney. Set the roof and chimney overlaps in asphalt roof cement. Where shingle ends are against a vertical surface (sidewall or chimney), the shingles must be flashed with metal step flashing shingles applied over the end of each shingle. The flashing shingles are at least 8" by 7-5/8, bent to extend 4" out over the shingles on the roof deck and 4" up the vertical surface. Each flashing shingle is placed so that it s leading (bottom) edge is just back from the exposed edge of the shingle which will overlap it. It is secured to the deck with one nail near the top corner. See ARMA Residential Asphalt Roofing Manual for additional details. Cap Flashing Cap Flashing (Counter) Flashing 10 Cap The base flashing of chimneys, skylights, vents, and adjoining walls must be covered by a metal cap flashing. The cap flashing extends at least into the masonry mortar joints and is caulked with asphalt roof cement to insure a water-tight connection. The base flashing is cut to cover the cricket and extend 6" up the brickwork on the chimney. Cap Flashing Cap Flashing Page 6

and Ridges 11 Hips Trim shingles even with the ridge and cover with PABCO Shadow Cap shingles exposed 5-5/8" to the weather. Nail 6-5/8" back from the exposed end (just behind shadow line) and up from the bottom edge with galvanized roofing nails long enough to penetrate into the deck 3/4", or through if the deck is less than 3/4". Applying PABCO Shadow Cap double thick is recommended to accent the hip & ridge lines. IMPORTANT: In cold weather (40 of or below) store shingles for hip & ridge in heated location 24 hours prior to application to assist in bending the shingles without damaging or cracking them. At intersection of hip and ridge, trim shingles to fit and set in asphalt roof cement. 5-5 6-5/8" Nail 6-5/8" back and up from edge, just behind the shadow line. /8" 12 Reroofing PABCO recommends that this shingle not be used for covering over an existing shingle roof. Remove all roofing materials from the deck. Inspect and repair the deck as needed. Proceed with the application as with a new roof. The PABCO Limited Shingle Warranty PABCO warrants that our shingles are free from manufacturing defects that adversely affect their performance. PABCO is not responsible for failures of any roof system that are not directly attributable to a PABCO product. See the PABCO Limited Shingle Warranty for details, limits, and conditions. Page 7