ROCKFON System Olympia Plus

Similar documents
Olympia Plus Sports Ceiling Impact Class 1A

Rockfon System OlympiaPlus A Impact 1A

Installation guide. ROCKFON VertiQ. ROCKFON System T, ROCKFON System HAT. Impact-resistant and high impact-resistant acoustic wall panel solutions

CI/SfB. October RockLink Integra. Installation system

Installation Guide. Rockfon Eclipse

CI/SfB. January Rockfon Color-all

Installation Guide. Rockfon Eclipse

OWAtecta. OWA metal ceilings. OWAtecta Metal ceilings

CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. International Version

METALWORKS TARTAN PANELS General Installation Instructions

Colourful acoustic solutions

AXIOM Classic Trim. Assembly and Installation Instructions

CertainTeed Ceilings

Technical Data VARIABLES

Technical Data VARIABLES

AXIOM Classic Trim Installation Instructions

AXIOM Classic Trim. Assembly and Installation Instructions 1. GENERAL

ARMSTRONG METALWORKS BAFFLES Installation Guide

metalworks Plank Assembly and Installation Instructions 2.1 Read this entire document before proceeding with installation.

Wall mounting with holding profile

INTERIOR INSTALLATION

CEILING SYSTEMS. MADERA VECTOR Semi-concealed system on exposed 24mm grid. Technical Data Sheet. [Between us, ideas become reality.

Connect by Ecophon engineered for your convenience

Joiner Kit Joiner bracket (x1) Biscuit aligners (x2) Trim Flange

Technical Data VARIABLES

Commercial Systems

Cell Ceiling. Endless possibilities

ECOPHON Focus Ds 4x4 Installation Manual

METALWORKS Concealed. Installation Instructions

Ceiling mounting application, U support and bracket. Standard mounting of a cable tray with support, type US.., and suitable support bracket, type AW.

AXIOM KE CANOPY Installation Guide

How to Install the QuickHang Installation Kit

Connect by Ecophon engineered for your convenience

INSTALLATION INSTRUCTIONS - CEILING POWER TRAK, HANGER HOOKS AND RACKS I. CONTENTS CEILING POWER TRAK KIT

Hospital Grade Welded Ceiling System

ON-CENTER LINEAR LIGHTING WITH XAL Layout Guide

Standard Solo 8 planks in maple veneer with aligned 1/2 reveal create a panelized appearance. 1/2 Reveal. Plank thickness 5/8 (16 mm)

Light Structural Main Runner Light Structural Infill Tees. Straight Connector. Strut Structural Tee thread

Classic Exposed Tee System (24" x 24", 24" x 48", and 24" x 72") Floating Clouds and Perimeter Wall Attachment

INSTALLATION, I O OPERATION & MAINTENANCE M A N U A L. Flowline. Architectural Linear Diffusers

WOODWORKS Access Hook-on System

Installation Manual 0318

The fast track. in cable management systems for power, voice and data cables. Reduce installation time up to 50%

4300 Install Guide. Attention. Ceiling Accessories

Trim (Aluminum Substrate)

Ceiling Installation

WOODWORKS. Linear Solid Panels. Installation Instructions CEILING SYSTEMS. 1. General

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

Lightplane 3.5 Recessed

INTERIOR INSTALLATION

Panel Grille Suspended Ceiling Installation Guide

Perforation Options for Rockfon Specialty Metal Ceilings

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

General Installation Instructions LED

FOR PROFESSIONAL GARAGE DOOR INSTALLERS

ELiTE ProPanel Installation Guide

EXPOSED FASTENING SYSTEM WITH SCREWS OR RIVETS

Table and Furniture Base Fittings Plinth Adjusting Fittings

Roof fastener. Perfectly thought out for every roof

Tools needed. Supplies Needed

Walls Fact Sheets. Partition Walls and Walls Cladding. Perforated Board. Sandwich Board

Elam -range of products: Vanha Porvoontie 36 FIN MÄNTSÄLÄ Phone: +358 (0) Fax: +358 (0)

WoodWORKS Channeled Plank

SAVE THESE INSTALLATION INSTRUCTIONS

Updates Interior compensation of varying infill thicknesses. THERM + V curtain walls

NONIUS ceiling SUSPENSION SYSTEM

Perforated acoustic gypsum products

installation guide Villa

Installing Novi Siding Trim

T-GRID SYSTEM WIDE CLEANROOM CEILING GRID SYSTEM

Company profile WITH EVERY STEP WE MAKE, WE WANT TO KEEP CONTRIBUTING TO OUR GOOD REPUTATION OF A STRONG CZECH MANUFACTURER OF LOCKS AND FITTINGS

modular/panel-built sauna kit

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated

Art and Picture Hanging Rail Systems SYSTEMS. Display with Elegance

TEXTILE DIFFUSER MOUNTING INSTRUCTION

Inde-Pendants Family. 32L Ring Plaster Trim, Grid and Drywall Ceiling Types. Document No Installation instructions for 32L-Rxx-P

W-H 1000 SYSTEM Wall cladding. Metal product

FORMATIONS Curves Clouds with AXIOM VECTOR Trim and Suspension System

UCO Vistabord Fixing Manual

INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL

MEFA mounting accessories

INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260

PORTABLE UNITS BASKETBALL SCHELDE SUPER SAM MULTI-ADJUST

Wire Mesh Cable Tray System for Channeling of Cable Wiring

STABILA compact lasers: For all finishing trades.

CARRIER OVERHANG 1'-0" MAX PANEL LENGTH 3'-0" MIN - 16'-0" MAX (RECOMMENDED) SPECIFICATIONS (unless noted otherwise)

SAGIREV Installation Manual

metalworks Vector Assembly and Installation Instructions

CURVING PROFILES & CONCAVE and CONVEX CURVING STUDS 60x27mm

Installation Instructions

East African Roofing Systems Ltd.

/AT /A A TB BuyLine 0259 BuyLine _ ATB01_08.indd _ ATB01_08.indd 1 10/19/07 5:49:21 AM 10/19/07 5:49:21 AM

Connector Technology, Shelf Supports Connection Fittings

Product Guide Specification

+ - 1a. 1b. c. 1d. 1e. Runway Suspended / Surface Cont. Run Installation. 2.0mm DIL DIL Revision - M 23/11/2018 Page 1

GE Monogram. Installation. Instructions. 36" Vent Hood. Model ZV750. Call anywhere in the US and Canada -

WOODWORKS Grille System

Technical Manual. ceiling - Seamless

DUALCASE VERSATILE ALUMINIUM SIGN SYSTEM

XL MAX. Suspension System Data Center Ceiling Solutions. Assembly and Installation Instructions

Transcription:

Installation guide ROCKFON System Olympia Plus Sports Ceiling Impact Class 1A

Suspension system Exposed impact-resistant 50mm grid system 11 6 9 8 12 7 11 4 1 5 3B 3A 10 2 1. 50 mm main runner CMC 3050 2. 50 mm cross tee CMC 3054 3. Hold-down C-profile Long: CMC 5134 Short: CMC 5132 4. ROCKFON Boxer/Samson panel 5. Grid cross connector CMC 3053 6. Grid wall connector CMC 1470 7. Nonius hanger CMC 3235 + 10200 8. Perimeter trim CMC 1470 9. Fire-resistant batten (top) Pinewood batten (bottom) 10. Straight C-profile connector CMC 5139 11. Angled C-profile connector CMC 5138 12. Grid coupling CMC3051 2

ROCKFON System OlympiaPlus Products used Exact size (mm) Module dimensions (mm) 1166 x 1166 1200 x 1200 Boxer (40 mm) Samson (40 mm) Suspension system description This high performance grid system is made from galvanized Z100 steel. The system consists of main runners, cross tees and perimeter trims. The profiles are painted white as standard.* The system is intended to be suspended from soffits using nonius hangers. The grid components have an exposed face width of 50mm. Grid cross connectors should be placed into cross tees and then hooked onto and mechanically fastened to main runners using self tapping screws 3.5 x 9.5mm (DIN 7504). At walls, the ends of the main runners and cross tees should be connected to the wall using grid wall connectors. The hold-down grid can be fitted after the ROCKFON Boxer / Samson tile has been installed. Connecting a cross tee to a main runner. * Other colours available on request. The system is intended for use with ROCKFON Samson and Boxer tiles. The main runner and the cross tee remain exposed after assembly. As a result of the space between the back of the ceiling tile and the bottom of the hold-down grid, the tiles can be raised approximately 10 mm. Every tile can be removed by disconnecting the angled C-profile connector. 40 Tile compatibility 40 A-edge tile. Installing ROCKFON Boxer / Samson. Hold-down grid The ROCKFON tiles (40 mm thick) are held in place by a hold-down H frame. This is made from 2 x 2 lengths of C-profile. The two long C-profiles bridge the distance from main runner to main runner, whilst the two short C-profiles bridge the distance between the two long C-profiles. The short and the long C-profiles are connected together by the straight C-profile connector. Angled C-profile connectors are fitted to the end of the long C-profiles and clicked into the grooves in the main runners. The hold-down H frame should be installed symmetrically in the 1200 x 1200 mm module. NB: Pay special attention to the location of the main runner grid connectors, so that the angled C-profile connectors can be clicked in place. 3

Module dimensions This ceiling system has a module dimension of 1200 x 1200 mm. 1200 mm 1200 mm Perimeter trims There are two methods for connecting the ceiling to a wall. Both methods use perimeter trims. Depending on the technical requirements placed on the room, they can be fitted against a wall either with or without a batten. Grid component attached to a wall. Hold-down C-profile attached to a wall. Fit the grid wall connector to the main runner using self tapping screws. Fasten the connector to the wall using appropriate fixings. Fit the angled C-profile connector to the C-profile using self tapping screws. Fasten the connector to the wall using appropriate fixings. 4

Grid components The main runners should be suspended from the soffit using nonius hangers. The length of the nonius hangers can be adjusted. The centre-to-centre distance of both the main runners and the cross tees is 1200 mm. The maximum distance from the wall to a nonius hanger is 450 mm for each grid member. The distance between the nonius hangers for each grid member must not exceed 1200 mm. max. 1200 mm max. 450 mm Cross tees The cross tees should be placed at right angles to the main runners. The centre-to-centre distance of the cross tees is the module width (1200 mm). Grid cross connectors should be connected to the ends of the cross tees. These should be screwed on to the main runner where the perforation on the top of the connector piece is located, as well as through the vertical side of the cross tees. Recommended screw: self-tapping, 3.5 x 9.5 mm (DIN 7504). 90 Cutting tiles to the correct size If necessary, the tiles can easily be cut to the correct size using a sharp knife. We recommend the use of clean nitrile or PU coated gloves when installing ROCKFON tiles in order to avoid fingerprint marking on the surface. Cross tees are placed at right angles to the main runners. For an optimum work environment, we recommend installers always observe common work practices and follow installation advice as shown on our packaging. 5

Assembly Suspension points The grid should be suspended using nonius hangers. The maximum distance from the wall to a nonius hanger is 450 mm. When using nonius hangers, the minimum suspension height is 200 mm. Larger suspension heights are possible. A larger suspension height makes it easier to fit the ceiling tiles. Ceiling layout Unless otherwise specified, the suspension system must be symmetrical within the room. If size (a) is used at the start of the longitudinal direction, then this size must also be used at the other end of the room. It is not recommended to fit tiles which have been cut to a length which is shorter than half the width or length of the tile. The length of the nonius hangers can be adjusted. a b a b A symmetrical distribution of tiles gives the most attractive final result. Connection between the ceiling and a wall The battens and perimeter trims must be levelled against a wall (and be aligned). The distance between fixing points on a perimeter trim must not exceed 400 mm. For fire-resistant constructions, the perimeter trims must be attached directly against the wall or be fitted with fire-resistant battens. Connection between the ceiling and curved vertical surfaces When the ceiling connects with a curved vertical surface, pre-shaped and/or flexible perimeter trims must be used. 6

Demounting Demounting ROCKFON tiles The tiles can be easily demounted. A hold-down H frame should be fitted above each ROCKFON tile. Push the ROCKFON tile upwards and click two of the four angled C-profile connectors out of the cross tees using the removal tool supplied or pliers or a hook. The tiles can now be removed from the grid system. The tiles can be easily demounted. Accessories Installing air handling and light fixtures A number of manufacturers supply a wide range of light and air handling fixtures whose dimensions are suitable for the various suspension systems. The suitable fixtures can be placed in and/or separately suspended at the desired positions in the grid system. If the fixtures are fitted in a tile, then extra precautions must be taken. Further information Resistance to corrosion The system meets corrosion class B in accordance with table 7 of the European product standard EN 13964. All the parts are made from Z100 steel (minimum zinc layer of 100 g/m 2 ). As a result, the system is suitable for use in rooms with a maximum relative humidity of 90% at a maximum temperature of 30 C. 7

We believe our acoustic stone wool and metal solutions for ceilings and walls are a fast and simple way to create beautiful, comfortable and safe spaces. Easy to install and durable, they protect people from noise and the spread of fire. They are our way of making a constructive contribution towards a sustainable future. Create and Protect is what drives us. It means putting people first, sharing success and maintaining trust. It s our rock-solid promise to you. At ROCKFON, Create and Protect is what we do - and it s inspired by you. 03.2016 All colour codes mentioned are based on the NCS - Natural Colour System property of and used on licence from NCS Colour AB, Stockholm 2010. Subject to alterations in range and product technology without prior notice. ROCKFON accepts no responsibility for printing errors. ROCKFON A trading division of ROCKWOOL Limited 26-28 Hammersmith Grove, London, W6 7HA Tel: +44 (0) 208 222 7457 Fax: +44 (0) 208 222 7458 www.rockfon.co.uk