MyStudio VS53 Versa Sweep Setup Instructions

Similar documents
RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

Queen Wingback Bed King Wingback Bed

F l a t S c r e e n A R M S I n s t a l l a t i o n

AUTOMATIC ADVANCE MANUAL

RAMPAGE P R O D U C T S. INSTALLATION INSTRUCTIONS BRONCO ZIPPER FASTRACK TOP PART #984xx BRONCO TOOLS REQUIRED

SINCE 1922 P UBLICATION N O

Machine Quilting Frame assembly, and instruction manual

Q-Zone Hoop-Frame. Assembly Instructions. Copyright July 11, 2018 Grace Company (Reproduction Prohibited) Version 1.8

PORTA~TRACE. GAGNE, INC. 41 Commercial Dr. Johnson City, New York Phone: Fax: ASSEMBLY INSTRUCTIONS

The Queen Quilter Professional Quilters Kit Frame

S OLAR RADIATION S HIELD MANUAL

6000 Horizontal Router Table Owners Manual Please Read Carefully!

MODULAR BUMPER INSTALLATION MANUAL

7878 K940. Checkpoint Antenna. Kit Instructions. Issue B

STEP 1 : DESTROYER FRONT BUMPER INSTALL GATHER YOUR TOOLS AND LAY OUT YOUR PARTS... *shorty bumper to show hardware* Tools Required:

Electric Skein Winder

Installation Guide. Mounting Kit for Mounting Philips Avalon CTS Cordless Fetal Transducer System on Wall, 2'' Post, Rail, or Slide-on Mounting Plate

IAC INDUSTRIES 895 BEACON STREET BREA, CA Phone (714) Fax (714) Workmaster Assembly Instructions

INSTALLATION MANUAL FRONT. See pages 2 and 3 of this manual for configuration options. Level of Difficulty. Product Photo (center section only)

OPERATIONS MANUAL. Port-O-Slitter

Quilting with The GraceHoop 2 TM

Installation Guide Philips MP80/90 Installation Kit for Penlon Anesthesia Machine

User Instructions Multiline Otter Scoreboard Caddy Assembly

Installation Guide Philips MP40/50/60/70 Installation Kit for Penlon Anesthesia Machine

MACHINE QUILTING FRAME

INSTRUCTION BOOKLET #C20

WPS crew Doors Installation instructions

The Bowflex Revolution XP Home Gym Assembly Instructions. P/N: Rev ( /0 )

RBP-1215B-RX DODGE RAM QUAD CAB RX3

Passenger/Right Front Mounting Bracket

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

Stuff-Your-Stuff Platform Bed (Twin and Full)

WOLF PUP LOOM TM & WOLF PUP LT LOOM TM

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Miter Saw Super Stand

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS GRILLE GUARD 09-ON DODGE RAM PART #

High Rise Sit-Stand Desk Converter

Sunrise Deck Assembly Instructions for Kingston Left

Thanks for shopping with Improvements! Mandarin Tansu Step Cabinet Item #512735

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

ABM International, Inc.

INSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058

Custom Pendant- Hardwire Assembly and Installation Instructions

For additional assistance call

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Figure A. Figure B. Figure C. Figure D

HQ Precision-Glide Track Upgrade 2 Extension Kit for HQ Studio Frame Part# QF09750

INSTALLATION INSTRUCTIONS GRILLE GUARD RAM 1500 PART # 5058/5058-2

CV1B Sliding Table Installation and Setup Guide

Contractors Rack Assembly and Installation Instructions

BELGIAN EXT. REC DINING TABLE

BABY WOLF LOOM. Assembly Instructions for Knocked-Down Looms

(6) Plastic Retainers. Passenger/Right. Passenger/Right Support Brackets

VIEWPOINT ALUMINUM RUNNING BOARD TOYOTA RAV4

Two Panel Frameless Bypass Door

Gared Pro-S Portable Backstop

Melamine Plastic Laminate. Toilet Partition Installation Manual

INSTALLATION INSTRUCTIONS

General Features. Low Profile. The SMART BOXX stands only 1.5 off of the bed of your truck so cargo space is maximized

THANK YOU FOR PURCHASING THE M/T METAL SERIES MODULAR JK FRONT BUMPER

Heavy-Duty Bypass Track System

WALLBED Assembly Instructions

TYGER GUARD. Parts List BEFORE INSTALLATION WARNING TG-GD6D /7. Tyger Guard. Tube Brackets (Bull Bar) passenger or driver side

Therma-Tru Door Gallery Setup Instructions Swing Unit with Hardware Kit - Hardware Part # MADGSWU15 (Swing Unit) Part # MADGHKSU10 (Hardware Kit)

(2) 12mm x 40mm Bolt Plate (long) pictured w/plastic retainer. (6) 12mm x 40mm Bolt Plate (short) Support Bracket Driver/left Front

Assembly Instructions

Continuum Frame Assembly Instructions

Installing the Profile Privacy Panel. Assemble top mounting bracket. Prerequisites. Tools

Jenny Legs Assembly Instructions

RAMPAGE P R O D U C T S. BRONCO ZIPPER FASTRACK TOP PART #984xx BRONCO TOOLS REQUIRED

Tools Required: - Utility knife - 11/16 Deep socket - Ratchet - 11/16 Crescent wrench - Ratchet Extension - 1/4 socket - Electrical tape

Workbench Instructions for Assembly

G. H. I. N. J. O. 22"x 28" Poster Holder. P. Q. romotional wall displ

Strata. urniture. Adriana Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at

INSTALLATION INSTRUCTIONS SLBU / SLMU UNIVERSAL INTERFACE BRACKETS

Before returning this product to the store of purchase

GRAMERCY POWDER WASHSTAND ASSEMBLY INSTRUCTIONS. 1. Storage. 1. Keep marble top in its crate until installation.

KIT ASSEMBLY INSTRUCTIONS

SawStop. T-GlideTM. Fence System- Professional Series II OWNER S MANUAL

southpaw enterprises, inc.

Elements Pole Mounting System

Customer Notice: Congratulations again on your SawStop purchase, and thank you! -SawStop Tualatin, OR

7902 Dado Jig. Owners Manual Please Read Carefully! Hardware List: 7902 Parts List:

s t o r a g e & i n s t a l l a t i o n o f y o u r m a r b l e t o p

M10 x 75mm Sockethead Cap Screws. 5mm Fender Washer (12) Included - (8) Required. #10 x 2.5" PH Wood Screws. (30) Included - (24) Required

Constable Oak Extension Dining Table

OPERATIONS MANUAL. Port-O-Slitter

INFINITE RANGE - CENTRE FOLDING DOOR

Assembly Instructions for model: VMPR1

Assembly Instructions 10 X 10 Aluminum Frame Building

SIGNATURE FRONT BUMPER INSTALL

Assembly Instructions. Copyright May 01, 2013 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited)

P a r k c o n s o l e s i n k a s s e m b l y i n s t r u c t i o n s

mila-wall (Series100) General Operating Instructions page 1 of 15

This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently.

Cabinet Storage Products

PROFILE Flat Panel Console System Installation Manual

Transcription:

MyStudio VS53 Versa Sweep Setup Instructions MISSION STATEMENT Pro Cyc, Inc. is the world leader in design and sales of modular infinity backgrounds. Our studio systems are recommended by every major company providing chroma key and virtual technology to the film, video and still photography markets. The MyStudio line continues our tradition by bringing Pro Cyc advantages to the home user, providing the very best to our customers. MyStudio gives you the best results possible to accurately portray your products and produce perfectly lit, professional quality photos with virtually no prior photography experience. You will need the following tools: Phillips screwdriver (Flathead screwdriver is optional for all ¼ -20 x 1/2 screws) 7/16 (11mm) wrench or nut driver, or crescent wrench Your contents include the following items, separated below for both the AL2 Accent Lights and the VS53 Versa Sweep Photo Studio. We recommend separating the parts out for each item before beginning assembly: 2 x AL2 Accent Lights: (Fig. 1) 1) 2 24 powder coated aluminum housings 2) 2 powder coated aluminum L-brackets 3) 4 fluorescent lamp fixtures 4) 4 5000K daylight fluorescent light bulbs 5) Hardware included: two sealed packets, each with six ¼ -20 x 1/2 screws; six ¼ - 20 hex nuts VS53 Versa Sweep Photo Studio: (Fig. 2) 1) 1-53 W x 96 L white background roll 2) 2 48 long powder coated white aluminum light reflectors 3) 1 48 long powder coated white aluminum crossbar 4) 2 48 T8 fluorescent lamp fixtures 5) 4 48 daylight fluorescent light bulbs 6) 4 powder coated white aluminum legs 7) 4 powder coated white aluminum feet 8) 4 powder coated white light support brackets 9) 5 2 background clips 10) Hardware packet includes: eight ¼ -20 x 1/2 screws eight ¼ -20 hex nuts twelve ¼ -20 x 1/2 thumb screws (with black knobs) eight 3/16 zinc plated washers four #10-24 x 3 pan head screws four #10-24 wing nuts AL2 Accent Lights Assembly Separate out the parts for the AL2 accent lights (Fig.1) and see separate instruction sheet included for complete accent light assembly instructions.

VS53 Versa Sweep Photo Studio Assembly 1. Light assembly: (follow steps a thru c below for both light fixtures) a) Reflectors First, remove the loosened screw on the end of the lamp that is not attached to the green wire. Then take one 48 long powder coated white aluminum light reflector and attach it, concave side up, over the exposed part of one of the 48 fluorescent lamp fixtures. To attach, slide the notched part of the reflector at one end under the loosened screw on the lamp fixture (Fig. 3) and tighten with a Phillips screwdriver (Fig. 4). Repeat on the other end of the lamp. b) Brackets Using the pieces shown in Fig. 5 for each lamp, attach one bracket to each side of the lamp. To attach, position the bracket over one end of the lamp as shown in Fig. 6, and line up the holes in the bracket with the holes in the metal lamp housing. Put one 3/16 washer over the end of a #10-24 x 3 pan head screw and insert it through the top side of the bracket (Fig. 6), through the lamp and through the hole in the bracket on the other side. Secure with 3/16 washer and a #10-24 wing nut and finger-tighten (Figs. 7, 8). Note: the clamps do not have to be super tight once they are mounted on the stand they will be secure. c) Light bulbs with the lamp laying flat on its back resting on the brackets, install both 48 fluorescent bulbs one at a time by lining up the pins on either end of the bulb with the slots in the lamp (Fig. 9). Push the bulb down carefully until it is snug on both ends, then twist it about ¼ turn until it clicks into place. 2. Legs and Feet assembly: While all the powder coated legs and feet are identical, it is important to note that the way each pair is attached differs slightly, so please study the photos carefully and make sure to follow the instructions below exactly. This becomes important when hanging the lights and installing the background. a) Assemble two leg and foot combos at a time. To begin, separate out two legs and two feet, along with four ¼ -20 x 1/2 screws and four ¼ -20 hex nuts (Fig. 10). b) Refer to Fig. 13 and attach the legs to the feet as shown using the ¼ -20 x 1/2 screws and hex nuts with a screw driver and 7/16 nut driver or wrench (Figs 11, 12). Note the slightly different orientation of the flange on the leg in relation to each of the feet. c) Following the same steps a and b above, refer to Fig. 14 and assemble the remaining legs and feet, again being careful to match the orientation shown in the photo. Fig. 15 shows how each leg and foot combo will be positioned in the final setup in relation to the others (note: the distance between the parts shown in the photo is much closer than the actual final setup). 3. Attach the crossbar to the rear legs: Refer to Fig. 15 and Fig. 19 to note the direction and orientation of the rear feet in relation to the front feet and choose the two leg/foot assemblies that match the two in the rear. Now attach the 48 powder coated white aluminum crossbar in between the rear legs using two ¼ -20 x 1/2 black thumb screws to the top two holes on the legs (Fig. 18). The front face of the crossbar should be facing the same direction as the flange on the two legs, which will ultimately face towards the light stand in the front. 4. Attach the white background to the crossbar: Using two people place the roll of white plastic in front of the rear legs and crossbar and remove the tape securing the roll. Taking care not to fold or crease the plastic, gently roll it out away from the rear legs. Next, raise the end of the white background closest to the crossbar up to the crossbar and secure it across the top with three of the 2 black clips. Place one of each of the remaining

two clips on each side, approximately 12 18 below the top (Fig. 20). You can now adjust the radius of the background sweep by pulling the background out further (larger sweep) or pushing it back towards the rear legs for a smaller radius sweep. You are now ready to place the light stand over the other end of the white background and facing the crossbar. 5. Attach the 48 lights to the front leg/foot assemblies: At this phase we recommend using two people when attaching the 48 lights to the front leg/foot assemblies. a) Referring to Fig. 15, select the leg and foot combos that match the ones in the front right and front left of the photo (note: the flanges of the upright legs are towards the rear of each foot). b) With one person holding the left front leg and another holding the 48 lamp fixture, position the lamp bracket on the inside of the leg with the holes of the bracket facing the grouping of holes second down from the top of the leg. Line up the top left (rear) hole of the bracket with the top rear hole on the leg (Fig. 16) and secure with one of the ¼ -20 x 1/2 black thumb screws. Repeat this procedure with the right leg/foot assembly on the other end of the lamp fixture. c) The light stand should now be able to stand on its own, with the first lamp hanging horizontally. Next, choose one of the three holes on the leg and line it up with the bottom front hole on the bracket on each leg to determine the angle of the light. We suggest choosing the middle hole as a default which will position your lights at a 45 degree angle (Fig. 17). Make sure to use the same hole location on each leg. The angle of the lights can be changed at any time by simply removing the bottom thumb screw from each side of either or both of the lamps, then swiveling the lamp until it lines up with one of the other holes on the legs. d) Repeat steps a, b and c above to attach the second light above the first light. You will be using the top set of holes on each of the legs to attach the second light. 6. Final set up: Fig. 21 shows the VS53 Versa Sweep completely set up and in-use in the basic configuration. Different types and sizes of products may call for you to adjust the position and angle of the lights. Please see the separate Camera Tips & Settings document for suggestions on how to get the most from your MyStudio VS53 and experiment on your own to see what works best for you and your products. 7. Positioning AL2 Accent Lights: The accent lights (assembly instructions included separately) are independent lights which can be positioned in many ways to achieve different lighting effects. They may be used in either a horizontal or vertical position. When using them in the vertical position, please be careful to ensure the cords are placed under the notches in the aluminum housing in order to maximize stability. 8. Turn on the lights: Plug the lamps in and turn them on. You are now ready to use your MyStudio VS53. Maintenance of your MyStudio : Wipe away any dust before using your MyStudio. When you need to clean the surface, you may use a damp cloth or a mild liquid cleaner such as Fantastik or 409. If you find you are missing parts (or any other problems) please contact Pro Cyc at: mystudio@procyc.com Ph: 615-832-8540 Fax: 615-760-5726