Mechanical Engineering

Similar documents
Layout and prototyping of the new ATLAS Inner Tracker for the High Luminosity LHC

MuCool Test Area Experimental Program Summary

The ATLAS Toroid Magnet

3 General layout of the XFEL Facility

The Compact Muon Solenoid Experiment at the LHC. Images of Assembly and Installation

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction

Nano Beam Position Monitor

CEBAF Overview June 4, 2010

THE CRYOGENIC SYSTEM OF TESLA

Grounding for EMC at the European XFEL

Philippe Lebrun & Laurent Tavian, CERN

Status of ATLAS & CMS Experiments

HIGH MAGNETIC FIELD SUPERCONDUCTING MAGNETS FABRICATED IN BUDKER INP FOR SR GENERATION

Technology Transfer at CERN

SPECIFICATIONS FOR A 4.7 TESLA/310MM BORE ACTIVELY SHIELDED MAGNET SYSTEM

Preparing for the Future: Upgrades of the CMS Pixel Detector

RESULTS OF 3D PHOTOGRAMMETRY ON THE CMS BARREL YOKE

Insertion Devices Lecture 4 Undulator Magnet Designs. Jim Clarke ASTeC Daresbury Laboratory

Strip Detectors. Principal: Silicon strip detector. Ingrid--MariaGregor,SemiconductorsasParticleDetectors. metallization (Al) p +--strips

9/28/2010. Chapter , The McGraw-Hill Companies, Inc.

Packaging of Cryogenic Components

8.882 LHC Physics. Detectors: Muons. [Lecture 11, March 11, 2009] Experimental Methods and Measurements

SPECIFICATION FOR A 7.0 TESLA/400MM ROOM TEMPERATURE BORE MAGNET SYSTEM

The CMS Outer HCAL SiPM Upgrade.

Cryogenic Operations at SLAC

Recommended Locations of Beam Loss Monitors for the ATLAS Roman Pots

To produce more powerful and high-efficiency particle accelerator, efforts have

Production of HPDs for the LHCb RICH Detectors

Stato del progetto RICH di LHCb. CSN1 Lecce, 24 settembre 2003

The LHCb Vertex Locator : Marina Artuso, Syracuse University for the VELO Group

CERN (The European Laboratory for Particle Physics)

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension

High Voltage Instrumentation Cables for the ITER Superconducting Magnet Systems

Vertex Detector Mechanics

Cryogenic Testing of Superconducting Corrector Magnets for the LHC Main Dipole

TEST AND CALIBRATION FACILITY FOR HLS AND WPS SENSORS

The Commissioning of the ATLAS Pixel Detector

The LHCb Upgrade BEACH Simon Akar on behalf of the LHCb collaboration

ATLAS strip detector upgrade for the HL-LHC

Maurizio Vretenar Linac4 Project Leader EuCARD-2 Coordinator

Improving seismic isolation in Advanced LIGO using a ground rotation sensor

Construction and Performance of the stgc and Micromegas chambers for ATLAS NSW Upgrade

Status of the LHCb Experiment

BL39XU Magnetic Materials

The Inner Tracker detector of the LHCb experiment.

Metrology Studies and Baseplate-Pixel Sensor Gluing of the Pixel Strip Modules for the CMS II Phase Upgrade

Commissioning of Advanced Virgo

Supplementary Figure 1

+++ construction manual SR 71 Blackbird (EDF Version) from JetCom +++

Physical Properties Measurement System (PPMS): Detailed specifications: Basic unit cryogen- free

SRF Cavities A HIGHLY PRIZED TECHNOLOGY FOR ACCELERATORS. An Energetic Kick. Having a Worldwide Impact

200 MHz 350 MHz 750 MHz Linac2 RFQ2 202 MHz 0.5 MeV /m Weight : 1000 kg/m Ext. diameter : 45 cm

Micro-manipulated Cryogenic & Vacuum Probe Systems

The HERA-B Ring Imaging Cerenkov ˇ Detector

COIL WINDING ISSUES P. Fabbricatore INFN Genova LCD - Magnet 13Oct09. Coil winding issues

MULTIPACTING IN THE CRAB CAVITY

DQW HOM Coupler for LHC

Photonics in Particle Physics

Review of the magnetic measurement technique (experience of the SLC, LEP, CEBAF)

MRI SYSTEM COMPONENTS Module One

SURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

TECHNICAL SPECIFICATIONS. FOR AN MRBR 7.0 TESLA / 160mm ACTIVELY SHIELDED ROOM TEMPERATURE BORE MAGNET SYSTEM

What do the experiments want?

Lecture 11. Complex Detector Systems

HIGH POWER PULSED TESTS OF A BETA=0.5 5-CELL 704 MHZ SUPERCONDUCTING CAVITY

Recent work on Hall A magnets Present and future Jay Benesch January 2018

Roman Pots. Marco Oriunno SLAC, PPA. M.Oriunno, SLAC

PoS(EPS-HEP2017)476. The CMS Tracker upgrade for HL-LHC. Sudha Ahuja on behalf of the CMS Collaboration

2. Refraction and Reflection

Testing of the Toroidal Field Model Coil (TFMC)

(fb) Nevent/year for 50fb -1. s (GeV) ~ ~ qq q=t. ZZ cos <0.8 W + W tt 175GeV 500,00 5,000. Zh 120GeV. 230GeV. HA 400GeV 220GeV 410GeV

PoS(VERTEX2015)008. The LHCb VELO upgrade. Sophie Elizabeth Richards. University of Bristol

The CMS Silicon Strip Tracker and its Electronic Readout

INDUSTRIAL CONTROLS FOR TEST SYSTEMS FROM SUPERCONDUCTING STRANDS TILL MAGNET FIDUCIALISATION IN THE TUNNEL FOR THE LHC PROJECT

Magnetic measurement system for superconducting final focus quadrupoles for SuperKEKB

DEVELOPMENT OF A BETA 0.12, 88 MHZ, QUARTER WAVE RESONATOR AND ITS CRYOMODULE FOR THE SPIRAL2 PROJECT

AIDA-2020 Advanced European Infrastructures for Detectors at Accelerators. Milestone Report

Mosca-Genova: SMART CITY futuro o realtà?

PRELIMINARY SPECIFICATIONS MRBR 7.0 TESLA / 210MM ACTIVELY SHIELDED CRYO-COOLED MAGNET SYSTEM

A novel solution for various monitoring applications at CERN

SPECIFICATIONS FOR AN MRBR 7.0 TESLA / 210MM ACTIVELY SHIELDED MAGNET SYSTEM

The LHCb VELO Upgrade. Stefano de Capua on behalf of the LHCb VELO group

NON-TRADITIONAL MACHINING PROCESSES ULTRASONIC, ELECTRO-DISCHARGE MACHINING (EDM), ELECTRO-CHEMICAL MACHINING (ECM)

Technology Workpieces and processes in the automotive industry

Engineering Challenges and Solutions for MeRHIC. Andrew Burrill for the MeRHIC Team

The Superconducting Strand for the CMS Solenoid Conductor

Micromegas calorimetry R&D

RD51 ANNUAL REPORT WG1 - Technological Aspects and Development of New Detector Structures

Vertical Tests of ILC Cavities and Detection of X-Rays from Field Emission

QUARTER WAVE COAXIAL LINE CAVITY FOR NEW DELHI LINAC BOOSTER*

DEVELOPMENT OF OFFNER RELAY OPTICAL SYSTEM FOR OTR MONITOR AT 3-50 BEAM TRANSPORT LINE OF J-PARC

SIMULATION OF A SIGNAL IN THE BEAM LOSS

ATLAS NSW Alignment System. Study on Inductors

`First ep events in the Zeus micro vertex detector in 2002`

First data from the ATLAS Inner Detector FSI Alignment System

The ATLAS detector at the LHC

Spectrometer cavern background

attocube systems Probe Stations for Extreme Environments CRYOGENIC PROBE STATION fundamentals principles of cryogenic probe stations

Status Report. Design report of a 3 MW power amplifier

Transcription:

Mechanical Engineering The Mechanical Engineering within STFC Technology is project based, projects varying in time from a few days to many years. The larger projects are usually collaborations with other research institutes e.g. CERN (the European Particle Physics Centre), and the hardware may be built anywhere in the world. Our Engineering includes; Mechanical Engineering Design concepts, development of ideas Project Management financial management, Health & Safety, use of resources Project Engineering - planning, milestones, costings Structural Analysis Use of FEA, analysing designs, vibration, seismic calculations Procurement contractual requirements, delivery details Assembly Supervision, training, auditing Particular experience in Beamline Engineering, with associated Vacuum technology and motion control. Typical projects are International and are collaborative requiring both technical leadership and team member skills

STFC Technology Project areas detailed on following pages ATLAS (A Toroidal Lhc ApparatuS) CMS (Compact Muon Solenoid) LHCb (Large Hadron Collider beauty) SR (Synchrotron Radiation) Instruments Beamline components Magnet testing Advanced LIGO (Laser Interferometric Gravitational wave Observatory) MICE (Muon Ionisation Cooling Expt) T2K 4m Superconducting Helical Undulator

ATLAS (A Toroidal Lhc ApparatuS) Silicon Trackers (SCT) The SCT trackers lie in the centre of the ATLAS experiment. They determine the properties of the charged particles produced by the colliding beams. Demanding Mechanical Requirements: Stiff and extremely stable structures to accurately position the detectors and support power, cooling, and readout services. These must be constructed from non-magnetic materials and be radiation tolerant to withstand 10yrs+ of operation. The absolute minimum amount of material must be used since it will absorb particles and make the data less accurate.

STFC work areas on ATLAS 1) SCT Wheels 2) End Cap Main Structure 3) Environmental Housing 4) SCT Services 5) SCT Tooling 6) Services Arm Links to further information on ATLAS http://atlas.ch/index.html http://atlas.ch/photos/index.html An early prototype cylinder

1 SCT Wheels A set of 9 structural disks covered with silicon detector modules and services, there are termed Wheels.

2 SCT Structure A stable structure to support the Wheels. A carbon fibre reinforced plastic (CFRP) sandwich structure was chosen to give a lightweight, very stable structure. Positional stability better than a few 10s of m over a day required. Design analysed to ensure strong and stiff enough for 200kg load. Load tests on completed structure proved capability Analysis showed that deflections due to any likely vibrational input would be very small and not affect data.

3 Functions: 3 SCT Environmental Housing a) Enable the tracker to be a thermally neutral sealed containment for N2 dry gas purge with grounding & shielding requirements. b) Plastic foams, low emissivity surfaces and external heaters produce a partially active thermal enclosure to minimising insulating volume. c) Heat loads from the external environment and internal electrical services were balanced internally to ensure the assembly was thermally neutral.

4 SCT Services Routing of services (optical fibre, electrical, fluid cooling, gas purge) This included defining the length of each of the services. This routing shaped many of the other major parts (Internal patch panels, support structure, environmental housing). This required specialised cable trays, hardware & wrappings for thermal management / Grounding & Shielding, and the compact multi-service patch panels.

Required to 1) Assemble the detector 5 ATLAS SCT Tooling 2) integrate it into ATLAS

6 Services Arm The superconducting ATLAS end cap and barrel toroid magnets require copious quantities of cyrogens and other services. These services required an 18 metre long flexible support arm which was not commercially available.

CMS (Compact Muon Solenoid) CMS is also a particle measuring instrument on the LHC. The requirement here was to provide a mechanical support structure for the large mass of 7500 detector crystals, yet allow them to be extremely precisely positioned. This was achieved with D shaped backplates which are cantilevered from the main body of CMS by a large aluminium support ring. This ring had to be specially cast. The back plates have hundreds of holes carefully machined in them (see picture) to allow the accurate location of the detectors. The design allows the services to be routed back through the backplate and support ring. Following pictures Backplate and Support Ring:machining and attachment Perspective view from pit Accurately positioning the detectors Links to further information on CMS: Wikipedia http://en.wikipedia.org/wiki/compact_muon_solenoid CMS Public domain http://cms.cern.ch/ CMS Outreach http://cmsinfo.cern.ch/outreach/

CMS

CMS

Accurately positioning the detectors CMS

LHCb Experi ment Photo shows CERN (European Particle Physics Research Centre) near Geneva and the path of the large underground accelerator

LHCb Experiment RICH1 RICH2 Key components are the RICH (Ring Imaging Cherenkov) detectors. The largest of these is RICH2 which measures the velocity of charged particles. In combination with the momentum this permits their identification.

RICH1Detector STFC responsibility VELO Seal STFC responsibility: Composite Exit Window & Beam Pipe Seal

RICH2 CF4 gas volume : ~100 m³

FEA of RICH2 Superstructure Distortions due to gravity < 1mm in 10m

RICH2 in Final Position Magnet RICH2 RICH1 E Cal

Multi Polarimeter SR (Synchrotron Radiation) Instruments The Multilayer Polarimeter is a collaborative project between STFC and Diamond Light Source Ltd (DLS) Working Principle This is based on the polarising properties of reflecting surfaces and transmitting thin films referred to as multilayers. The polarimeter will be a mobile instrument and will be connected to existing beamlines in the region between 90 and 1200eV. Incident light will pass into a UHV vessel and through the retarding multilayer to introduce phase retardation before being reflected by the analyser multilayer. The intensity of the reflected light will be measured by a suitably positioned detector. The instrument comprises of other associated optical elements mounted on an optical bench within a vacuum vessel and uses pinholes to define the beam axis and includes a beam filtering system. The instrument is mounted on a Hexapod support and manipulation system. Following pages give more details on: Hexapod Rotation of Multilayers Multilayer Exchange System

Hexapod The Hexapod, supplied by Oxford Danfysik, has 6 degrees of motorised motion and is supported and driven by 6 high precision actuators. The linear actuators are driven by stepper motors and gearboxes with linear encoders giving positional feedback and include end of travel limit switches. The Hexapod is controlled using EPICS software with a Delta-Tau based motion control system. The user software is capable of orientating the instrument supported from the upper plinth around any pre-determined co-ordinate system or point in space with positional feedback.

Rotation of Multilayers The retarder and analyser multilayers each require two axes of rotation and the detector also has one rotation axis. The five axes of rotation are provided using in-vacuum Huber goniometers with Renishaw encoders providing an angular resolution of as small as 0.001. A motor driven linear stage positioned onto the analyser stage will be used with graded multilayers.

Multilayer Exchange System The multilayers are prone to degradation and to allow continuous operation of the polarimeter at different beamline energies, a magazine-type arrangement will be required to store the multilayers within the instrument. Individual multilayers will be mounted in their own dedicated frame holders, transfer arms and a manual rack driven transporter will be used to facilitate transfer of frame holders between the magazine and their working positions in both the retarder and analyser positions

Beamline Components STFC have 50 years experience of designing and manufacturing beamline components, whether for a proton synchrotron such as ISIS, or a light source e.g SRS and DIAMOND. This includes the range of magnets, accelerating cavities, monochromators, undulators/wigglers, sample positioning devices, and spatial detector systems that are required. Fundamental engineering of adjustable magnet stands, support systems and alignment tooling are vital to produce a good working beamline. Following pages: Example pictures of High Specification beamline components

Beamline Components 1

Beamline Components 2

Magnet Testing STFC have extensive experience in testing different magnet types e.g. quadrupoles, undulators etc.

LIGO The STFC team has played a major role in the Advanced LIGO (Laser Interferometric Gravitational wave Observatory) which is being assembled in the USA. Development: STFC developed the suspension concept from a physics model and previous prototypes built in the US. We optimised the structure to achieve a high enough stiffness and developed the mass designs to make the whole system easy to assemble and cost effective to manufacture. Manufacture We have manufactured and built the Noise Prototype and the final articles are in production.

LIGO CAD Model Real Framework

LIGO QUAD Assembly

MICE (Muon Ionisation Cooling Expt) MICE is an essential step in accelerator R&D towards the realisation of a neutrino factory, which is the physicists next generation tool for probing matter; and could prove decisive in understanding the matter-antimatter asymmetry of the universe. MICE is a Technology Demonstrator to prove the vital cooling mechanism -It requires a large new dedicated facility with a precursor Muon beam line into which the novel cooling channel is assembled This facility is being built by STFC at RAL Major STFC Responsibilities Project Management, together with support from international committee of collaborators Co-ordination and integration of beamline components from abroad Creation of the facility and all the infrastructure Provision of key components e.g. Liquid Hydrogen system, Superconducting Pion decay channel Running of the experiment in conjunction with ISIS, our proton accelerator More info on following pages: Model of cooling channel Infrastructure Hall layout Photos Links for further information http://mice.iit.edu/ http://hepunx.rl.ac.uk/uknf/mice/?submeetings=1

MICE 3D Model of proposed cooling channel 3 Absorber Focus Coil Modules Tracker Module 4 RF Cavities/module

MICE Infrastructure The MICE facility requires construction of major infrastructure to support the muon beamline and cooling channel e.g. ; A Hall with power, lighting, ventilation, lifting equipment Massive 200 tonne magnetic shielding walls Provision of flat stable support for 20+ tonne beamline items Biological shielding Liquid Hydrogen handling plant High Voltage equipment Chilled water plant RF Amplifiers Magnet power supplies This infrastructure is near completion

Layout of MICE Hall

MICE Photos of Early construction/integration work on the facility and components

T2K The T2K experiment is a second generation long-baseline neutrinooscillation experiment to study nature of neutrinos. Artificial neutrino beam generated in the JHF 50GeV high-intensity proton accelerator in JAERI (Tokai, Ibaraki) is shoot toward the 50kton water Cherenkov detector, Super-Kamiomande, which is located about 1000m underground in Kamioka mine(gifu) and is 295km away from Tokai. STFC areas of work Target and Remote Handling Management (Info on following 2 pages) Near detector (the ND280) Baffle and the Beamline Remote Seals

T2K TARGET components TITANIUM GRAPHITE Ø46mm ~960mm Ø226mm

T2K Remote Handling Design work

Superconducting Helical Undulator An exciting development programme has been carried out to produce a highly accurate and very long 4m helical undulator. The HeLiCal collaboration consisting of Technology, ASTeC, the German institute DESY and the universities of Liverpool and Durham have designed and manufactured the prototype magnet as part of research work for linear colliders. The following photographs show the mechanical construction of the former/cables, and the final 4m long module.

Superconducting Helical Undulator The ribbon is required to run in the grooves in continuous layers with no gap between the layers. The picture below shows a sectioned undulator prototype. The former is a two-start helical spring with a tube inserted in the bore. The picture below shows a short length prototype.

Superconducting Helical Undulator Machining the long former was very challenging. Firstly a steel cylinder was gun drilled to get the accurate centre bore. This was subsequently turned concentric to the bore using an optical alignment technique and then the two helixes were progressively milled using a special technique developed in our workshop. The essential copper tube down the centre is added afterwards. A technique of unusually winding the superconducting filaments as a flat ribbon has been perfected, before finally the former is potted and machined to accurate dimensions. The picture shows the 1.8m former being machined, with four supporting stays along its length

Superconducting Helical Undulator The development team with the completed 4 metre long undulator

Update: Success! The undulator magnets have now been powered up to 280 Amps with no quenching and left running for a period. The helium cryogen is only being boiled off very slowly, and a constant vacuum is being maintained. This represents an excellent success for the project.