Chapter 2 Definitions and Acronyms

Similar documents
CHAPTER 7: ALIGNMENT

S-1 (2016) QUALITY MANAGEMENT SPECIAL INTELLIGENT COMPACTION (IC) METHOD REVISED 04/11/14 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS.

Automated Machine Guidance

NEW MEXICO DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR

THERMAL PROFILE OF HOT MIX ASPHALT

SECTION XXX-INTELLIGENT COMPACTION. This section describes the requirements for implementing the use of Intelligent Compaction equipment.

The Technology and Use of Intelligent Compaction Equipment. Caterpillar Paving Products

Paver, Roller & Cold Planer Innovations

Pave-IR Scan TM Primer

Shoulder Wedge Maker

GNSS CONSTRUCTION INSPECTION EQUIPMENT

NEW TECHNOLOGY & APPROACHES TO ADDRESS PAVEMENT CONSTRUCTION ISSUES

670 10/26/17 SSD: 07/14/16, 09/16/17 Page 1 of 6

Non-destructive Evaluation of Bituminous Compaction Uniformity Using Rolling Density

Plan Preparation Checklist

The coordinate system and vertical datum shall be noted in the drawing in the metadata.

2012 PURDUE ROAD SCHOOL Session 56. JW Stanger, P.E. Rieth-Riley Construction Co., Inc.

Using RTK GNSS Wisely

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

ICDM-Veta Workshop. Intelligent Construction Data Management

CHC MINING DEFORMATION MONITORING SOLUTION

CHAPTER 7 Total Station Surveying. CE 316 March 2012

DOTD LTRC. Quality Control /Quality Assurance (QA/QC) (QA/QC) Influence Widths and Depths. Density vs. Stiffness

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

SECTION PHOTOGRAPHIC DOCUMENTATION

Jointing Rural Intersections

Texas Transportation Institute The Texas A&M University System College Station, Texas

Suveying Lectures for CE 498

Quality Assurance Where does the Future Lead US. John D AngeloD Federal Highway Administration

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

Prototype Software-based Receiver for Remote Sensing using Reflected GPS Signals. Dinesh Manandhar The University of Tokyo

INTEGRITY AND CONTINUITY ANALYSIS FROM GPS JULY TO SEPTEMBER 2016 QUARTERLY REPORT

GeoBase Raw Imagery Data Product Specifications. Edition

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

Validation of the QuestUAV PPK System

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

GNSS 101 Bringing It Down To Earth

Washington County Road Engineering Plan Submittal/Review Checklist

Step 1 Calculate the square feet of roadway covered with tack 1,000 ft. x 12 ft. = 12,000 square feet

Utilizing A GNSS Network Solution for Utility Applications

Section 4-02 Typical Sections TABLE OF CONTENTS. INTRODUCTION...2 General...2

SECTION SITE SURVEYS

CAESultra for Mining. Machine Compatibility. Shovels, Motor Graders, Hydraulic Excavators, Track-Type Tractors

STATE UNIVERSITY CONSTRUCTION FUND

Thermal Segregation. Wednesday, December 8, 2010 SEAUPG 2010 ANNUAL CONFERENCE OKLAHOMA CITY, OK. Acknowledgements. Thermal Segregation - Background

Roadside Range Sensors for Intersection Decision Support

Section 808. FENCING

DRAFTING STANDARDS 9.00 DRAFTING STANDARDS

GPS FOR LANDFILL COMPACTION

SURVEYORS BOARD OF QUEENSLAND. RTK GNSS for Cadastral Surveys. Guideline

QUANTITY SURVEYS. Introduction

3D-MC. Machine Control Systems

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

The Global Positioning Sytem II 10/19/2017

1. Land survey Work. 2. Civil and Structural engineering services.

Portable Signals: INDOT Design Guidance and Specifications

DEVELOPMENT PLAN CHECKLIST

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

MINNESOTA DEPARTMENT OF TRANSPORTATION OFFICE OF LAND MANAGEMENT SURVEYING AND MAPPING SECTION PHOTOGRAMMETRY UNIT

SECTION 6A ROADWAY PLAN PREPARATION

580 - NOISE BARRIERS OPSS 580 INDEX

Construction Tolerances - The following tolerances apply to cast-in-place structures:

OpenRoads Best Practice - Civil Cells

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Update: July 20, 2012

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

For crossing under a railroad, contact the specific railroad company's engineering department.

3DMC. Reference Guide

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Three-dimensional investigation of buried structures with multi-transducer parametric sub-bottom profiler as part of hydrographical applications

E:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM

Innovations in Marine & Dredging Engineering. 3D GNSS Depth Monitoring System. pcx-pro

GPS for GIS Data Collection - 101

The Global Positioning System II Field Experiments

RRR Design & Modeling with the FDOT Civil 3D State Kit

APPENDIX I Geophysical Data. Geophysical data is provided in the electronic copy of this report.

Computer Aided Earthmoving System

Leica MNS1200 GNSS Series Toughest GNSS solution for toughest sites

INDEX TO CLAUSES PART 1 - GENERAL

Developing a National Real-time CORS Network in New Zealand

Design of Roundabouts using Corridor Models (Part 1 of 2)

INTEGRITY AND CONTINUITY ANALYSIS FROM GPS JANUARY TO MARCH 2017 QUARTERLY REPORT

Orthoimagery Standards. Chatham County, Georgia. Jason Lee and Noel Perkins

Leica GRX1200 Series High Performance GNSS Reference Receivers

CHAPTER 11 SURVEY CADD

Comparative analysis of GNSS Real Time Kinematic methods for navigation

Introduction to GNSS Base-Station

APPENDIX E INSTRUMENT VERIFICATION STRIP REPORT. Final Remedial Investigation Report for the Former Camp Croft Spartanburg, South Carolina Appendices

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations

GAVIN DOCHERTY & CRAIG ROBERTS School of Surveying & Spatial Information Systems. University of NSW

Record Drawing Standards for Projects Version 2.1

Windstorm Simulation & Modeling Project

Chapter 1 Overview of imaging GIS

REVIEW TOPICS CEEN 2320 FINAL EXAM

OLC Turnbull. wsidata.com

Chapter 23. Signing and Pavement Marking Plans

Automated Machine Guidance An Emerging Technology Whose Time has Come?

CONTRACT PLANS READING

Transcription:

Advanced Materials and Technology Manual

TABLE OF CONTENTS.0 Introduction... 1.1 Definitions... FIGURE.1 Schematic of Gridded All Passes Data and Gridded Final Coverage Data.... 4 FIGURE. Schematic of gridded IC data.... 5 FIGURE. Schematic of Raw IC data.... 6. Glossary of Acronyms and Abbreviations... 9 TABLE.1 Acronyms and Abbreviations Used... 9 i P age

.0 INTRODUCTION This chapter provides a listing of definitions, acronyms and abbreviations that are used in this manual and associated special provisions. 1 P age

.1 DEFINITIONS Advanced Materials and Technology Manual March 16, 017 Unless another intention clearly appears, words and phrases (including technical words and phrases and such others as have acquired a special meaning) shall be construed according to rules of grammar and according to general usage. Wherever the following terms, or pronouns in place of them, are used in this manual and in contract documents, the intent and meaning shall be interpreted as follows: ADVANCED MATERIALS AND TECHNOLOGY MANUAL. A Department manual that contains requirements, best practices and examples related to the use of technologies such as the paver mounted thermal profile method, intelligent compaction method and D production monitoring for excavation. References to the Advanced Materials and Technology Manual from the contract are to the edition in effect on the letting date. ATTRIBUTES. Are extra pieces of descriptive information about a survey point that are contained within a Feature Code Library (e.g., centerline offset, material type, lift, etc.). AUTOMATED MACHINE GUIDANCE (AMG) EXCAVATION. A grade control system attached to excavation equipment that uses either a D GNSS or Universal Total Station System to document and record excavation depths. The system is integrated with an onboard documentation system that displays a real-time color-coded maps of the excavation depths, current excavator location, depth above or below design and more. AUTOMATIC FEEDBACK CONTROL. Automatically adjusts roller Operating Settings, such as vibration frequency and amplitude, based upon real-time feedback from the drum vibration measurement system. AUXILIARY LANE. (See MnDOT 110 Definitions ). The intelligent compacting method and paver mounted thermal profile method are required only on continuous left turn lanes and passing lanes. Exclude auxiliary lane tapers, ramps, shoulders, cross-overs, non-continuous turn lanes, loops, bypass lanes, acceleration/deceleration lanes and intersecting streets. CLOUD. A web-based user interface. CLOUD COMPUTING. The use of computing resources (hardware and software) that are delivered as a service over a network to enable near, real-time visualization (maps) and manipulation of geo-spatial data. CLOUD STORAGE. A network storage (typically the internet) where the geo-spatial data is stored in virtualized pools of storage. CONTROL POINT. (Sometimes referred to as survey markers, monuments, hubs, control markers) are temporary or permanent objects placed to mark key survey points on the earth s surface. These markers are used to indicate elevation and/or horizontal position. P age

COORDINATE SYSTEM. A system that uses one or more numbers, or coordinates, to uniquely determine the position of a point or other geometric element on a manifold such as Euclidean space. CUMULATIVE MEASUREMENT PASS COUNT. The Gridded Final Coverage Data for pass count (the number of passes). The pass count reflects the number of roller passes in one area of the mat (e.g., 0. m by 0. m [1 ft by 1 ft area]), not the total number of passes across the width of the mat for a given roller. DATA. Measurements recorded by a data acquisition system, or information generated/processed from these measurements (e.g., GNSS coordinates, stiffness, temperature, pass count, speed, frequency, amplitude). DRIVING LANE. (See Traffic Lane.) FEATURE CODE LIBRARY. Is a library used, with a rover, to describe each survey point using an alphanumeric code. These codes are later processed to assist with generation of plans and other documentation. Some Feature Codes also contain Attributes. FINISHING ROLLER. The final roller used in the compaction process for the given Lift. GEO-SPATIAL DATA. Data collected by instrumentation that uses a Global Positioning System (GPS) and other sensors to measure in-situ conditions during construction efforts. GRIDDED ALL PASSES DATA. Includes all Measurement Passes recorded for a given grid (see Figure.1). This data is generally used to build compaction curves for establishment of rolling patterns. P age

FIGURE.1 Schematic of Gridded All Passes Data and Gridded Final Coverage Data. Gridded All Passes Data Mesh Pass Gridded Final Coverage Data Pass 0 No. of Passes Pass 1 1 0 GRIDDED DATA. Data processed from the raw data using Meshes. For the intelligent compaction method, the raw data is duplicated over the meshes for the entire roller drum width, resulting in multiple data points covering the drum width (see Figure.). This process is used to track partial drum overlaps among passes. 4 P age

FIGURE. Schematic of gridded IC data. Mesh Roller Width Rolling Direction Data Point GRIDDED FINAL COVERAGE DATA. Data that summarizes the final (last) Measurement Pass recorded for a given grid (e.g., total pass count, last stiffness, last temperature). Grid sizes are typically at a mesh size of 1 ft (0. m) in the X and Y direction for post-processed data. See Figure.1. INSTRUMENTED ROLLER. A self-propelled roller integrated with a global navigation satellite system and onboard documentation system that can display real-time color-coded maps of roller location, number of passes, roller speeds, and amplitude and vibration frequencies of the roller drum. Some systems are also equipped with drum vibration instrumentation, infrared temperature sensors, and/or Automatic Feedback Control. The onboard documentation system on these rollers would also display real-time color-coded maps of stiffness response or pavement surface temperatures, or both. INTELLIGENT COMPACTION. Compaction efforts completed using an Instrumented Roller. INTELLIGENT COMPACTION MEASUREMENT VALUE (ICMV). The stiffness of the materials based on the response of the roller drum vibrations and underlying material responses. INTELLIGENT COMPACTION (IC) ROLLER. (See Instrumented Roller.) INTELLIGENT COMPACTION SUPERVISOR. The Contractor s person responsible for performance and compliance with intelligent compaction requirements. LAYER. The total thickness of each material type; composed of a single or multiple Lifts. LIFT. A unit of material within a Layer that is placed for compaction. 5 P age

LOT ROLLER COVERAGE. The percent of Roller Coverage (RC) for the given lot. MEASUREMENT PASS. A Roller Pass, performed by an Instrumented Roller, where all required information is recorded in a data file. MESH. A collection of vertices connected to other vertices that defines the shape of the measurement area (e.g., roller drum in two () Dimensional (D) polygons (typically multiple squares)). The defined data mesh size is generally 0. m by 0. m (1 ft by 1 ft) in horizontal directions (see Figure.). MINNESOTA CONTINUOUSLY OPERATING REFERENCE STATION / REAL TIME REFERENCE NETWORK GLOBAL NAVIGATION SATELLITE SYSTEM (MNCORS/RTRN GNSS). Consists of over 10 permanent GNSS base stations, communications links, and server computers that together calculate connections and send them to other mobile GNSS receivers in order to acquire real-time survey-quality field positions. Each CORS includes a highly accurate receiver that continuously collects radio signals broadcast by GNSS satellites. ONSITE IC SUPPORT. The Contractor s personnel responsible for the onsite execution of the intelligent compaction requirements. OPERATING SETTINGS. Roller settings, such as: speed, direction, frequency, peak vertical force amplitude). OPERATOR OF INSTRUMENTED ROLLER. The Contractor s personnel operating an Instrumented Roller. PAVER MOUNTED THERMAL PROFILE METHOD. This method uses a system that continually monitors the surface temperature readings of the mat immediately behind the paver screed during placement operations. QUALITY CONTROL PERSONNEL. The individuals employed by the Contractor to execute the work. RANGE. The difference between the surface temperature readings at the 98.5 and 1 percentile. RAW IC DATA. Data recorded during compaction operations prior to the gridding process. Raw Data collected by Instrumented Rollers consists of one data point for a roller drum width, recorded at approximately 10 Hz or 0. m (1 ft) intervals. Therefore, the data mesh (data footprint) is about one drum width by 0. m (1 ft) (see Figure 10-). FIGURE. Schematic of Raw IC data. 6 P age

Data Foot Print Roller Width Data Point ROLLER COVERAGE (RC). The percent of required compaction area where the minimum required Cumulative Measurement Pass Count is achieved. ROLLER PASS. The area covered by one width of the roller in a single direction. SITE. The Project where the given technology (e.g., IC, PMTP, AMG) is required. SITE ANALYSIS. The process where the Contractor determines whether the MnCORS network or local ground base stations will be used within the project limits. For cases requiring local ground base stations, the site analysis also considers the number of GNSS repeaters that may be needed to cover the entire working length of the project and to address project staging of GNSS repeaters and base station(s) when used. This process should be completed before or during Site Setup/Calibration. SITE SETUP/CALIBRATION. The process of setting up the local base station, repeaters, and GNSS receiver. It also includes determining the coordinate information of each Control Point and storing this information within the given technology s software. SPOT TEST DATA. Data resulting from Quality Assurance and Quality Control testing (e.g., moisture, density, stiffness). Veta uses the term Spot Test Data for these types of tests. SURFACE TEMPERATURE READINGS. The temperatures of the mat immediately behind the trailing edge of the screed plate during placement operations. THERMAL COVERAGE (TC). The percent of the total paving area, for the given lift, where surface temperature readings (meeting the requirements of the PMTP Method) are collected and stored. THERMAL PROFILES. The surface temperature readings and associated GNSS coordinates and time stamps. THERMAL PROFILING. (See Paver Mounted Thermal Profile Method.) 7 P age

THRU LANE. (See Traffic Lane.) TRAFFIC LANE. (See MnDOT 110 Definitions.) The intelligent compaction and paver mounted thermal profile method are required on all traffic lanes with the exception of traffic lane tapers and roundabouts (including the traffic lane between the roundabout and mainline transition prior to and after the radius point of the roundabout). VETA. A standardized intelligent construction data management (ICDM) software that stores, maps and analyzes geospatial data resulting from intelligent compaction, thermal profiling and Spot Test Data (e.g., density, moisture). This software can perform standardized data processing, analysis and reporting to provide Project summary results quickly in the field from various intelligent compaction and thermal profiling manufacturers. In particular, the software can provide statistics, histograms, correlations for these measurements, document coverage area and evaluate the uniformity of compaction and surface temperature measurements as part of the Project quality control operations. Veta can be downloaded from the Advanced Materials and Technology Website (http://www.dot.state.mn.us/materials/amt/veta.html). 8 P age

. GLOSSARY OF ACRONYMS AND ABBREVIATIONS The acronyms and abbreviations in this manual and the Contract Documents represent the full text shown in Table.1. TABLE.1 Acronyms and Abbreviations Used Acronym or Short Form Full Name or Meaning AMG Automated Machine Guidance D Dimensional GNSS Global Navigation Satellite System GPS Global Positioning System IC Intelligent Compaction ICDM Intelligent Construction Data Management ICMV Intelligent Compaction Measurement Value MnCORS/ RTRN GNSS Minnesota Continuously Operating Reference Station/Real Time Reference Network Global Navigation Satellite System PMTP Paver Mounted Thermal Profile System RC Roller Coverage Rover Remotely Operated Video Enhanced Receiver RTK Real Time Kinematic RTRN Real Time Reference Network TC Thermal Coverage UTC Coordinated Universal Time UTM Universal Transverse Mercator 9 P age