INSTALLATION INSTRUCTIONS FOR BALCO, INC. TYPES ACVS 6" & WIDER CEILING JOINT COVER SYSTEMS

Similar documents
INSTALLATION INSTRUCTIONS FOR BALCO, INC. TYPES ACWC CEILING JOINT COVER SYSTEMS

INSTALLATION INSTRUCTIONS FOR BALCO, INC. 75FCA SERIES ACOUSTICAL CEILING JOINT COVER SYSTEMS

INSTALLATION INSTRUCTIONS FOR BALCO, INC SERIES GYMNASIUM FLOOR JOINT COVERS

INSTALLATION INSTRUCTIONS FOR BALCO, INC. NBR SERIES EXPANSION JOINT COVER SYSTEMS

MICHAEL RIZZA COMPANY Premium Silicone Systems

INSTALLATION INSTRUCTIONS FOR RETROFIT STAIR NOSINGS FOR RENOVATION

INSTALLATION INSTRUCTIONS FOR BALCO, INC. BRONZE STAIR NOSINGS

INSTALLATION INSTRUCTIONS FOR BALCO, INC. TWO COMPONENT STAIR NOSINGS

INSTALLATION INSTRUCTIONS FOR BALCO, INC. TWO COMPONENT STAIR NOSINGS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

340 & 350 SERIES DELUXE FRAMELESS BYPASS

INSTALLATION INSTRUCTIONS

340 & 350 SERIES BATH ENCLOSURES

GENERAL INSTALLATION GUIDE: WARRANTY: PRODUCT INFORMATION T F

INSTRUCTION BOOK FOR. IDEA Screen & Panoramic for Nureva Span

INDUSTRIAL WORKBENCH

Instruction Sheet D-CPU. Secure CPU Holder

BASE & WALL CABINET SETUP GUIDE BY SUNSTONE

Installation and Assembly: Articulating Swivel Arm for 37" - 60" Flat Panel Displays

738 SERIES PIVOT SHOWER DOOR

By SP Partners, LLC. INSTALLATION GUIDE. ProTech

orientation Conergy SunTop Instructions for professional installation

Spa & Hot Tub Necessities. Cover Removal System Installation & Use Manual

Installation Instructions Ascend Ceiling Systems - Stainless Pan Ceilings

THANK YOU FOR PURCHASING OUR STUDIO RTA CREATION STATION

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

RITE-HITE RAINGUARD TM

300C6 CONTINUOUS HINGE SEMI-FRAMELESS DOOR KIT

LC200DS1 Double Stud Articulating Wall Mount for Flat Panel Screens up to 32" with up to 200mm x 200mm VESA Mounting Patterns

Shop Style Miter Saw Stand Kit

LC200DS2 Double Stud Dual Articulating Wall Mount for Flat Panel Screens up to 32" with up to 200mm x 200mm VESA Mounting Patterns

Single-Sliding Header Mount INSTALLATION INSTRUCTIONS

890 SERIES PIVOT STEAM DOOR

Independent Containment System (ICS)

Assembly Instructions

SawStop. T-GlideTM. Fence System- Professional Series II OWNER S MANUAL

ALEX. Assembly Instructions. PARTS - Supplied with Armless, Left and Right-End Chairs. Thank you for your purchase.

Page 1 of 18. SunRail System Installation Instructions

SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 90º PANEL

AM500-U Installation Guide

Installation & Assembly: Two Piece Suspended Ceiling Plate

Installation Instructions for Vista Air Vertically Folding Walls

METALWORKS Concealed. Installation Instructions

INSTALLATION INSTRUCTIONS

By SP Partners, LLC. INSTALLATION GUIDE. ProTech-12

INSTALLATION INSTRUCTIONS

Continuous Handrail Kit Installation Instructions

Installation Manual for Metal Emperor Lockers

791 SERIES STIKSTALL TM SHOWER ENCLOSURE

LC200C9F Ceiling Mount for up to 32" Flat Panel Screens with 200mm x 200mm VESA Mounting Patterns

METALWORKS TARTAN PANELS General Installation Instructions

INSTRUCTION BOOK FOR. Da-Snap Screen

TIC-TAC-TOE Instruction Manual Model #7764

FSCTD Dual Back to Back Flat Screen Ceiling Mount

Models 2130 and 2140

LC200WT Security Wall Mount with Tilt for up to 32" Flat Screens

GB-AVSTOR5 Ceiling Equipment Storage Box with Pipe Coupler

Installation Manual Roof Zone Ladder Rack

T-GRID SYSTEM WIDE CLEANROOM CEILING GRID SYSTEM

394 SERIES STIKSTALL TM SHOWER ENCLOSURE

Owner s Manual AE PLUG AERATOR MANUFACTURING QUALITY LAWN CARE EQUIPMENT SINCE Made In CHINA REV

Tilting, Swiveling & Rotating Flat Panel Wall Mount

LC6X4WTM Security Wall Mount with Tilt for up to 60" Flat Screens with VESA 600mm x 400mm or less

Installation Instructions for. Hy-dit. Toilet Plunger Storage. English. Patent # 7,156,476 B2. Manufactured by:

Installation Instructions

Models 2030 and 2040

OWNER S MANUAL STORAGE SHED MODELS: STOR-96-G-W-1RH & STOR-912-G-W-1RH

694 SERIES NEO-ANGLE PIVOT SHOWER ENCLOSURE

ADJUSTABLE MOUNTING POST

Installation & Assembly: Suspended Ceiling Kit

Tilting Flat Panel Wall Mount Installation Guide

NX7 SERIES 5-1/2 HANDRAIL

Desk/Wall-Mount Rack

Tilting & Swiveling Plasma/LCD Flat Panel Wall Mount Installation Guide Model: A380SM

#27541 Mobile Laptop. Charging Station. Assembly Instructions

Grounding and Utility Enclosure

Installation Procedures 2015 Corvette C-7 Z06 With Carbon Fiber Kit SNS 50a

ApexDesk Assembly Guide

Two Panel Frameless Bypass Door

Owner s Manual ODYSSEY BENCH MODEL. O4100B shown REV E. Southern Avenue, Phoenix, AZ USA Workhorseproducts.

SERIES M MIXER MASTS

Owner s Manual & Safety Instructions

AST-2446 INSTALLATION INSTRUCTIONS

391 SERIES STIKSTALL TM SHOWER ENCLOSURE

794 series stikstall tm shower enclosure

Your order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled.

Video Wall Installation Instructions 2W X 3H, 3W X 3H

INSTALLATION INSTRUCTIONS

Models 2130 and 2140

INSTALLATION INSTRUCTIONS

Flushglaze For Framed Openings and Horizontal Panels. Window System Installation Guide

SHED-5932-F, MANUAL.doc

LSP inc. READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

Models: PLAV70-UNL, PLAV70-UNLP. Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 95" Plasma Screens

#27541 Mobile Laptop Charging Station

Office Installation Guidelines

Sliding Glass Door Assembly and Installation Guide

PORTA-FAB Cleanroom Wall Systems

Transcription:

2626 South Sheridan PO Box 17249 Wichita, Kansas 67217 Phone: (316) 945-9328 Fax: (316) 945-0789 INSTALLATION INSTRUCTIONS FOR BALCO, INC. TYPES ACVS 6" & WIDER CEILING JOINT COVER SYSTEMS 2012, Balco, Inc. Document Control No. EJCI3049

INSTALLATION INSTRUCTIONS FOR BALCO, INC. TYPES ACVS-6 AND WIDER CEILING JOINT COVERS The following installation instructions are very important. Read them carefully, and be sure you understand them completely before you begin any work. STORAGE & HANDLING The expansion joint covers are shipped unassembled. Store this product in the horizontal position in a clean, dry location. This is a finished product. Store this product in a protected area. here Figure 1 2

Figure 2

PARTS 1. Base Member 2. Base Member Fasteners 3. Face Seal Subchannel 4. Centering Bar 5. Centering Bar Bolt 6. Centering Bar Nuts 7. Face Seal(s) TOOLS REQUIRED This is a list of tools and materials recommended for use in the installation of these joint systems. Tools and materials in this list are not provided by Balco, Inc. A. Drill Bits for Base Members (Metal). B. Drill Bits for Concrete (if required) C. Electric Drill D. Phillips, Slotted and Hex Drivers E. Channel Locks F. Crescent Wrench INSTALLATION These installation instructions are for use in the installation of Balco, Inc. ACVS-6 and wider Expansion Joint Cover Systems. The System is illustrated in Figure 1 and Figure 2. The joint cover system shall be installed as follows: STEP 1. Review Balco, Inc. approved shop drawings for types and locations. STEP 2. Attach the ceiling tees (ceiling tile supports, by others) to the slab above in accordance with the ceiling tee manufacturer's installation instructions. Ensure that the ceiling tees are set at the proper width to form the joint. Ensure that the ceiling tees are properly aligned with one another. Make any necessary adjustments. STEP 3. Mark the locations for the anchor holes on one of the ceiling tees, see Figure 3. Ensure that the base member is level and properly aligned. Standard anchor hole spacing is 20" O.C., with anchor holes a nominal 3" from each end of the base member. Repeat this procedure for the opposite ceiling tee. Figure 3 STEP 4. Drill the anchor holes into the ceiling tees at the marked locations. Repeat this procedure for each section of the base member. STEP 5. Select a section of the base member. Place the base member into installed position on the ceiling tee. Ensure that the base member is straight, level and properly aligned. Using the ceiling tee as a template, mark the locations for the anchors on the base member section (see Figure 4). Remove the base Figure 4 3

member from its installed position, and drill the anchor holes into the base member at the marked locations. Repeat this procedure for each section of the base member. STEP 6. Select the base member section and the anchors. Place the base member into its installed position on the ceiling tee, ensuring that the base member is level and properly aligned and that the anchor holes in the base member are aligned with the anchor holes in the ceiling tee. Using the fasteners provided by the factory, attach the base member to the ceiling tee (see Figure 5). NOTE: THE RECOMMENDED FACE SEAL LENGTH, IF POSSIBLE, IS THE JOINT LENGTH. THIS ALLOWS THE SAME SECTION OF FACE SEAL TO BE INSTALLED INTO MULTIPLE SECTIONS OF BASE MEMBER AND WALL MEMBER, IF NECESSARY, MINIMIZING FACE SEAL SPLICING AND ENHANCING THE OVERALL APPEARANCE OF THE SYSTEM. Figure 5 STEP 7. Determine the number of centering bars required for the section of the joint cover system. The centering bars are spaced 20" O.C. with a centering bar placed at one-half the nominal joint width from each end of the base member sections. Select those centering bars, the centering bar nuts, and the centering bar bolts. Figure 6 NOTE: CENTERING BAR INSTALLATION MUST BE UNIFORM. ALL CENTERING BARS MUST BE INSTALLED DIAGONALLY AND MUST BE PARALLEL WITH ONE ANOTHER. STEP 8. Select one of the centering bars and insert one of its spheres into the corresponding base member subchannel. Insert the other sphere into the opposite base member channel (see Figure 6). Repeat the centering bar installation procedure for each of the centering bars for the section of the joint cover system. Figure 7 4

STEP 9. Select a section of the subchannel, If the subchannel supports a transition in the face seal, miter the subchannel as necessary for the transition. Determine the location of each centering bar along the subchannel and mark those locations on the subchannel STEP 10. Select centering bar bolts and nuts for each centering bar in the section of the joint cover being installed. Determine the location of each centering bar along the subchannel and mark those locations on the subchannel. Determine the location of each centering bar along the subchannel and mark those locations on the subchannel. STEP 11. Insert the head of each centering bar bolt into the subchannel receiver and slide each bolt into its installed position, the locations marked in Step 15 (see Figure 7, A or B). Figure 8 STEP 12. Using the lock nuts provided by the factory, fasten each centering bar bolt into position along the subchannel (see Figure 8). STEP 13. Place the subchannel, with attached bolts, in its installed position between the installed base members. Slide the first centering bar along the base members tracks until the anchor hole in the centering bar is aligned with the first bolt in the subchannel s receiver. Figure 9 STEP 14. Insert the bolt through the centering bar, and attach the centering bar to the subchannel using one of the jamb nuts provided by the factory (see Figure 9). Ensure that the centering bar maintains the proper position. Repeat this procedure for each subsequent centering bar in this section of the joint cover system. STEP 15. Abutting sections of the subchannel must be spliced together. This applies to all transitions as well as standard splices. NOTE: MATING SECTIONS OF THE SUBCHANNEL MUST BE MITERED, AS APPROPRIATE, AT INSIDE CORNER Figure 10 5

TRANSITIONS, AT OUTSIDE CORNER TRANSITIONS, AND AT 90 o SAME PLANE TRANSITIONS. STEP 16. If necessary for a transition, miter the subchannel to match the mating, installed subchannel (see Figure 10). STEP 17. Select the splice bar, the splice bar bolts and the lock nuts. Slide two (2) splice bolts into the splice end of the receiver of each section of mating subchannel. Ensure that the splice bar conforms to the splice or transition. STEP 18. Insert the splice bolts in one of the subchannel s receivers through the anchor holes in one leg of the splice bar. Figure 11 STEP 19. Place the mating subchannel into its installed position abutting the installed section of the subchannel, inserting the splice bolts in the other subchannel s receiver through the anchor holes in the other leg of the splice bar. Ensure that the splice bar is nominally centered over the splice or transition. STEP 20. Using the lock nuts, attach the splice bar to both of the mating subchannels (see Figure 11). NOTE: IF TRIMMING OR MITERING THE FACE IS NECESSARY, BALCO, INC. RECOMMENDS USING A HACKSAW. Figure 12 STEP 21. Select the face seal(s). Determine the length of face seal or face seals, for systems requiring two seals, required for the installation. Mark the face seal(s) at the location at which it (they) need(s) to be cut to attain the required length. STEP 22. If the face seal(s) has (have) not been cut to length, cut the face seal to the required length. Ensure that there is no stretch in the face seal as it is measured and trimmed. Figure 13 6

STEP 23. Attach the face seal to the subchannel by inserting the face seal's center arrow continuously into the subchannel's receiver (see Figure 12). For side by side seals, insert one of each face seal's arrows into one of the subchannel's receivers. STEP 24. Attach the face seal to the base member by inserting the face seal's arrow continuously into the base member's receiver. Attach the face seal to the corner wall member by inserting the face seal's arrow continuously into the base member's receiver (see Figure 13). NOTE: IF THE JOINT REQUIRES THE USE OF MULTIPLE SECTIONS OF THE BASE MEMBERS, ASSEMBLE THE SYSTEM SO THAT EACH BASE MEMBERS WILL BE INSTALLED AT THE LOCATIONS ALONG THE JOINT WHERE THEY WERE USED TO MARK THE ANCHOR HOLES INTO THE SUBSTRATE. Figure 14 STEP 25. Install the ceiling tiles (by others) onto the tees in accordance with the tee manufacturer's instructions (see Figure 14). 7

WARRANTY POLICY Balco, Inc. warrants to its purchasers that all products sold by it will be free from manufacturing and material defects. Any defective product will be replaced or repaired free of any charge, provided a claim is brought to our attention, in writing, within the established warranty period following the date of shipment by us and provided our examination shows the product has failed under the terms of this warranty. The established warranty period for exterior joint cover systems (Duraflex TM) is five (5) years provided the systems are installed by a Balco Certified Installer. The established warranty period for grids and mats is two (2) years. The established warranty period for all other Balco, Inc. products is one (1) year. Balco, Inc. will not be responsible for installation costs involved in such repair or replacement. Balco, Inc. shall have no obligation under this warranty if owner subjects materials to improper conditions (refer to Balco's installation instructions) This is in lieu of all other warranties, expressed or implied, and is the sole warranty extended by Balco, Inc. Our liability under this warranty is limited to repair or replacement and does not include any responsibility for consequential or other damage of any nature. It is further agreed and understood that the price stated for the seller's products is consideration for the limitation of seller's liability hereunder. REGISTERED TRADEMARKS: BALCO, INC. PATENT NUMBERS: "VINYLINES" "SAF-T-GLO" 5,782,044; 5,829,216; 5,832,678; "METAFLEX" "SAF-TEN BEVEL" 6,014,848; 6,115,980; 6,581,347; "SENTRY" "DURAFLEX" 6,942,419; 6,955,017; 6,962,026; "ILLUMI-TREAD" "METABLOCK" 7,104,717; 7,856,781; 7,946,784; "MICHAEL RIZZA COMPANY" 8,079,190; 8,245,471; 8,464,485; 8,607,519; 8,601,760; 8,646,235; Fire Resistant Joint Covers Patents Pending