Installation Guide. 203 Chesterra Drive, Dahlonega, GA Toll-Free ~ Fax ~

Similar documents
Reference Guide and Installation Instructions

Installation Guidelines

Installation Guide (888)

Dura-Lock Roof System

Installation Guidelines

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

Installation Guide (888)

DECKING INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety.

COMPOSITE SIDING INSTALLATION GUIDE

COMPOSITE RAILING INSTALLATION

Austin Standing Seam Awning Assembly and Installation Instructions. Assembly Instructions

EASY INSTALLATION GUIDE WPC DECKING.

YUKON PATIO COVER INSTALLATION INSTRUCTIONS

Santa Fe Cover INSTALLATION GUIDE. Alumawood TM Newport with MAXX Panel TM Installation Guide

Double Beam Freestanding Pergola Installation Guide

Titan Series Awning Assembly and Installation Instructions

The following instructions will guide you through the installation of your new vinyl railing.

Chapter 1. Beam and Sill Plates

Underside Standard Installation Instructions For Existing Decks

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

Revision Date: April 01, Paramount Enclosure

Adorn Mortarless Stone Veneer Installation Natural Concrete Products

installation care & maintenance instructions moistureshield.com limited lifetime warranty

Curtain Wall Installation Guide

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

Sliding Glass Door Assembly and Installation Guide

SIGMADEK BOARD TM SAFETY AND ASSEMBLY GUIDE

RENU PANELING SYSTEM Installation Guide PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. Version 1.0 ALL STATED SIZES ARE NOMINAL DIMENSIONS.

Quick Hook SS & LS Standard and Low Height Hooks for Side Mount Rails

Garage Door Frame Retro-Fit Clad Installation Instructions

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

Office Installation Guidelines

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

TREX PERGOLA INSTALLATION INSTRUCTIONS

The following instructions will guide you through the installation of your new vinyl railing stair kit.

DekPro Prestige Aluminum Rail System Level Railing Installation Instructions

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

Harvest (8094) Mystic (8078) Niagara (8095) Shenandoah (8057) 2 DURATA MORTARLESS STONE DURATA FLAT KIT PROFILE #:

TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

METALWORKS TARTAN PANELS General Installation Instructions

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JAN01

Converting a Gutter to GC123

Pergola Installation Guide

Tuff-Rib Install Guide

How-To-build guide Garden shed

8 x 10 Timber-frame Garden Shed

Installation Instructions for. Before You Begin TOOLS REQUIRED

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Please read and understand all instructions before beginning. These instructions cover impact and non-impact aluminum French Door 650/750.

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Installation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation

Fireball Fab Welded Baluster Insert Panel System Installation Instructions

Installation Guide Simplicity Alfresco. V1.9 Lu070318

Lateral Support. Decks over 24 above grade require lateral support* *Exceptions to be discussed later

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

Installation Guide Contemporary Alfresco V1.3 LU

Metro Series Sauna. installation instructions

Quick Hook SB & LB Standard and Low Height Hooks for Bottom Mount Rails

Rigid and Flex Tubular Skylights Installation Instructions

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

3. Use base plate as template (see FIG. 4-1) to mark location for fasteners.

3-PIECE SHOWER INSTALLATION INSTRUCTIONS

How to Build Good Decks..

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

ONE AND TWO FAMILY DWELLINGS Uncovered Decks July, 2007

COMPACT DECK. Compact Deck SOUTHERN FOREST PRODUCTS ASSOCIATION SOUTHEASTERN LUMBER MANUFACTURERS ASSOCIATION

ATLANTIS RAIL Contact Information

woodworkersjournal.com MATERIAL LIST

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

Fortress Al Posts must always be secured to the deck framing. Fortress Al Posts should never be attached to only the deck boards.

RUN-IN SHED INSTRUCTIONS

Panel Grille Suspended Ceiling Installation Guide

INSTALLATION GUIDE SM SOLAR MOUNT PUB15JUN15

SINGLE TRACK BYPASS (patent pending) barn door hardware

12-16 Ft Wide Enclosure Assembly Guide

Oceanside Outdoor Vinyl Shower Kit (3 x 3 Enclosure)

Featuring TJ Rim Board and TimberStrand LSL

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

Panel Guard Installation For Adhesive Attachment

LAS VEGAS PATIO COVER INSTALLATION INTSRUCTIONS

Step 1: Planning the project

SECTION SHEET METAL FLASHING AND TRIM

Panel Installation Instructions

Installation Instructions for Vista Air Vertically Folding Walls

Effective February, 2015

RAILING R A IL ING 51

western window systems westernwindowsystems.com installation instructions non-pocket 2-1/4 panels

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

SolarMount (E)volution

12, 14 & 16 Wide Enclosure Assembly Guide

Transcription:

Congratulations and Thank You for your purchase! DryJoistEZ is an easy to install structural aluminum joist that also provides an under-deck drainage system that you install over your deck framing system and under your decking material. This installation guide provides general instructions for the installation of the system and additional engineering details. If you have any questions along the way, please don t hesitate to call Customer Service toll-free at 877-270-9387 or visit our Resource Library at wahoodecks.com/resources/. Please follow these steps closely to ensure the durability and safety of your deck. Deck Structure Requirements: The structural frame drawings in this guide are intended to illustrate the support requirements of DryJoistEZ and are not to be considered as a recommendation for actual deck construction. Check with your local municipality on permitting and always consult a professional engineer to ensure code compliance. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid-span beams. Framing shall be built with a minimum pitch toward the drainage end of no less than 1/8 per foot drop. Refer to page 7 for load ratings and maximum joist spans. General tools and materials required for proper installation: (Not supplied by Wahoo Decks) Tape measure Drill driver Circular saw and/or Miter saw Carbide tip steel saw blades for cutting non-ferrous metals for circular saw, table saw, and/or miter saw Safety glasses and gloves Hammer / Rubber mallet Caulk gun and Exterior flashing sealant Framing square Decking material and fasteners. If using decking material that requires installing hidden fasteners then we can provide self-tapping stainless-steel trim head screws for the purpose of installing onto our aluminum system. 1

The structural frame drawings in this guide are intended to illustrate the support requirements of DryJoistEZ and are not to be considered as a recommendation for actual deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all midspan beams. Framing shall be built with a minimum pitch toward the drainage end of no less than 1/8 per foot drop. 4 x3 Ledger Flashing (Included) Drip Edge (Included) Important! Ensure that the ledger board and flashing have been secured properly and are free from debris such as protruding nails or screws. DryJoistEZ should be installed perpendicular to the structure. This allows water to flow AWAY from the structure and foundation. 2

The 4 inch wide and 2 inch tall board is used where railing posts are attached or when the decking is used for special situations such as picture framing or angled layouts. Ripped Multi board Start board The 4 inch Multi board serves double duty as the start and finish piece of the deck. If a 2 Start board was NOT INCLUDED then measure and rip a 4 Multi board to create a 2 Start board. The 6 inch wide and 2 inch tall board covers more space than most decking planks and because it can span 6 feet, the savings on deck substructures makes DryJoistEZ more affordable. 3

Wahoo Decks provides a color matched rigid profile trim that is installed where the deck attaches to the structure and provides both protection from water infiltration to the below structure. This is installed between the header board and DryJoistEZ at the drainage end of the deck. It is helpful for prolonging the life of your deck framing by helping to prevent water infiltration at the header board under the DryJoistEZ. Infiltrating rainwater can travel downward, sideways, and even a bit upward, so special flashings must be used. We include enough ledger flashing for your project. 4

DryJoistEZ boards should be cut to their desired length prior to installation. Remember when measuring, unlike wood joists that are cradled by hangers and suspended between the ledger and supporting beam, DryJoistEZ is secured on top of these perimeter joists. A two inch (2 ) overhang is strongly recommended at the header beam to allow water to run off the channels. If a 2 Start board was NOT INCLUDED then measure and rip a 4 Multi board to create a 2 Start board. (see page 3) It is important to have an even and clean ledger and drip edge flashing surface to seal the DryJoistEZ to. It is also ideal to have the vertical side of the ledger flashing installed behind the first course of siding. Install the drip edge flashing on top of the drainage end header beam. The drip ledge should be facing down. 5

2 Start board (ripped Multi board) 6 Main board Before fastening your DryJoistEZ boards, make sure the Hook Receiver side of the ripped 4 Multi board is facing toward the inside of the deck so you can attach the next 4 DryJoistEZ Multi board to your ripped Multi board (2 Start board). Use the self-drilling hex head fasteners provided with your system to secure the DryJoistEZ multi board to the framing. Use the 1-1/2 hex head fasteners on both the Start board and the Finish boards, fasten the edges every 24 along the rim joist. Screw Flange Rim Joist Hook Receiver Hook Receiver Screw Flange To install your first 4 Multi board or 6 Main board to the 2 Start board, tilt the board at an angle and slide the hook edge up into the hook receiver of the 2 ripped Multi board. After the first 4 or 6 board has been installed and secured, continue installing the remaining joists by repeating either 6 Main board or 4 Multi board profiles. Both the 6 Main board and the 4 Multi board have Screw Flanges for positioning your self-drilling hex head fasteners that came with your materials. Use the 2-1/2 stainless steel self-drilling hex head fasteners provided when installing the 6 Main boards and 4 Multi boards on the interior of your deck layout. On longer runs, you will need at least three people, two positioned approx. two feet from each end and the other(s) spaced along the middle of the board. You must perform this operation in unison. When time to install the final 4 Multi board, secure the same way you did the 2 Start board, with a 1-1/2 stainless steel fastener, to the outer edge of the board. This will also give the substructure a finished appearance. Face mount with stainless steel fastener. (Not Included) 1-1/2 SS selfdrilling hex head screw 2-1/2 SS selfdrilling hex head screw Screw Flange Screw Flange Rim Joist 6 Main Board Installation 4 Multi/End Board Installation 6

Using an exterior flashing sealant, seal the profile of each DryJoistEZ board to the ledger flashing. Make sure the aluminum is clean and free of debris before sealing. Seal the seam where the DryJoistEZ sits on the drip edge flashing, at the drainage end of the framing, with gutter sealant. Any water that runs back under the bottom of the DryJoistEZ will hit the drip edge flashing and then drop into the gutter, if installed. (Gutter not provided by Wahoo Decks) 7

Install the supplied neoprene channel plugs into each dry channel before installing the Profile Trim. The 2 x3 Profile Trim should be installed before the decking. Use rivets or temporary screws to hold in place. The decking boards will be fastened through the trim, holding the trim permanently in place. Be sure the rail anchors are in place BEFORE installing the trim and decking, if installing Wahoo Rail. Make sure to leave at least a 3/8 gap at the drainage end to allow water and debris to drain out freely. The decking can be secured via surface mounting or with hidden fasteners. All cut joints in the deck board should be aligned on top of a Multi Board. These multi boards will need to be placed in desired locations at the time of installation. 8

Single-Span, Total Load (PSF) Span Length, ft. TL (PSF) Joist Spacing L/180 L/240 L/360 4 447.58 335.68 223.79 5 229.16 171.87 114.58 6 123.29 99.46 66.31 7 66.55 62.64 41.76 8 39.01 39.01 27.97 9 24.35 24.35 19.65 10 15.98 15.98 14.32 12 deep x 24 wide Sample Framing Multi-Span, Total Load (PSF) Span Length, ft. TL (PSF) Joist Spacing L/180 L/240 L/360 6 deep x 24 wide Sample Framing Double-Span, Total Load (PSF) Span Length, ft. TL (PSF) Joist Spacing L/180 L/240 L/360 4 828.26 808.62 539.08 5 454.50 414.01 276.01 6 219.18 219.18 159.73 7 118.31 118.31 100.59 8 69.35 69.35 67.38 9 43.30 43.30 43.30 10 28.41 28.41 28.41 18 deep x 24 wide Sample Framing 4 1397.69 1397.69 1118.95 5 766.96 766.96 572.90 6 369.87 369.87 331.54 7 199.65 199.65 199.65 8 117.03 117.03 117.03 9 73.06 73.06 73.06 10 47.94 47.94 47.94 9

By installing rail anchors, most standard top-mount rail posts can be integrated into DryJoistEZ s structural design. No penetration through the waterproof barrier is necessary to add railing. (Trim is not shown in photo) Alternatively, two Multi boards can be used to mount railing posts. (Trim is not shown in illustration) For mounting at 6 Main boards, slide the rail into the water channels before you install your trim and deck boards. After the decks surface boards have been installed, secure your rail mounts using the 3/8 x 3-1/2 stainless steel lag bolts. Pre-drilling of the rail anchors is required. NEVER ATTACH RAIL POSTS TO THE 6 MAIN BOARDS WITHOUT USING A RAIL ANCHOR. (Trim is not shown in illustration) 10