REC Series Rack Installation Guide

Similar documents
RE 2 Post Rack System

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

Mighty Mo GX Series Cabinet Installation Guide. OR Rev /11

STOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets

Gared Pro-S Portable Backstop

Paramount Enclosure. Installation Guide

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

NetShelter VS Enclosure. User s Manual

EF-Series EuroFrame Gen 2 Cabinet System User Manual

Eaton Data Center Racks

Medium HoneyBadger Chase Rack Installation Instructions

6 Foot/ 1800mm Aisle Width Net-Contain Aisle Containment for N-Type and S-Type Cabinets

CM340B STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING SERVER CABINET FROM SKID

V00029KX READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID

Jenny Legs Assembly Instructions

WPS crew Doors Installation instructions

MPA-9000 Universal Ceiling Projector Mount Kit

LOW-PROFILE WALLMOUNT CABINETS

Desk/Wall-Mount Rack

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)

General Prisoner Transport Install Instructions PT-2-INST

INSTALLATION INSTRUCTIONS

Important Loading Information. Tools Required. Meridian Lateral Files Instructions

Copyright Black Box Corporation. All rights reserved.

Assembly Instructions

LAN Locker Adjustable Shelves

INSTALLATION INSTRUCTIONS

GF-Series GlobalFrame

RMR Modular Enclosure

MODEL T28173/T28174 ROLLER TABLES INSTRUCTIONS

TOOLS REQUIRED FOR ASSEMBLY. Rubber Mallet or Plastic Tip Hammer PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER.

PROFILE Flat Panel Console System Installation Manual

INSTALLATION MANUAL H A

NetShelter VX. Four-Post Open Frame. User s Manual

Wooden Frame Type Instruction Manual

Installation Guide. Mounting Kit for Mounting Philips Avalon CTS Cordless Fetal Transducer System on Wall, 2'' Post, Rail, or Slide-on Mounting Plate

TABLE OF CONTENTS REQUIRED TOOLS

HARVIL 3-IN-1 FLIP TABLE ASSEMBLY INSTRUCTIONS

N-Series TeraFrame Gen 3 Cabinet System User s Manual

TOYOTA TUNDRA CARGO DIVIDER Preparation. Part Number: PT

INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000

PORTABLE ADJUSTABLE BASKETBALL SYSTEM

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

PULL-THRU USER S MANUAL

User Instructions Multiline Otter Scoreboard Caddy Assembly

Kawasaki Teryx 750 Cab Kit* Caution: Before using this product, read this manual and follow all Safety Instructions.

ETC Installation Guide

bridges Installation Manual

27693 Trend Podium Desk

S6 User s Manual USER S MANUAL ver. 1.0

Installation Instructions

Holden Colorado Isuzu DMAX - RIDB1

These 15U, 22U, 37U, 42U, and 51U racks provide exceptional stability.

Read Below! Read Below! Read Below! Read Below! Read Below! Read Below! STOP READ TIPS BELOW TO MAKE ASSEMBLY MUCH EASIER

INSTALLATION INSTRUCTIONS

Z4- Series SeismicFrame

RMD5000 Rackmount Kit Instructions

Constable Oak Extension Dining Table

INSTALLING YOUR NEW SPRING LIFT ARM KIT

Closet Carousel Installation Instructions. Models TKA 5 Through TKA 14 Equipped with Footswitch Controls

101B, 210X, ELM, VSTB Installation Manual

Hollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide

Arc Trainer Main Frame Assembly

Models 2230 and 2240

DEC 3000 Models 500/500S/800/800S/900/900S AXP Rackmount Installation Guide

O W N E R ' S M A N U A L

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

Lab Style Table Frame Part No Assembly Guide Automation Technology

SAM. Model: STV-C65 LCD Mobile Visualized Stand Instruction Manual. Weight Capacity: 1251bs / 56.7kg Suits LCD Flat Panel Display: 42"-55" Page 20

ABM International, Inc. Navigator Assembly Manual

Contractors Rack Assembly and Installation Instructions

#916 CLASSIC 16 GUN CABINET ASSEMBLY INSTRUCTIONS

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

RMD3000 DPO3000 Series Rackmount Kit

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT

Assembly Instructions

Installation for Full Size Polaris Ranger Crew Doors

Side Winder R o u t e r L i f t.

RMD2000 DPO2000 and MSO2000 Series Rackmount Kit Instructions

TITAN2-EDGE Public Access Computer Station Dual Track

======================================================================================== ( DR / DR) JK WRANGLER MOD RACK

COPPER / FIBER MANAGER RACK INSTALLATION INSTRUCTIONS PX Standard Release A March 2008

TorqueMaster Replacement Spring

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Replacing the Reciprocator on an SWF Multi-head.

Revised

BLADE N BULLET BLIND Cabela s Item Number:

DOOR KIT P/N APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Instr Rev Page 1 of 6. Verify accessory fitment at Polaris.com.

FLOE DOCK FURNITURE WARNING ASSEMBLY INSTRUCTIONS

Move System Swivel Caster Installation ( )

Assembly Instructions

Installation and Assembly: Flat Video Wall Mount For 40" to 65" Flat Panel Displays

ASSEMBLY INSTRUCTIONS FOR SL500A AND SL500AL

ShorePort PWC Lift Instructions " x 138" Sandstone ShorePort " x 138" White ShorePort " x 138" Tan ShorePort

KWIK-KIT KK-S INSTALLATION INSTRUCTION PACKAGE

INSTRUCTION MANUAL DWX723-XE HEAVY-DUTY MITER SAW STAND FINAL PAGE SIZE : 8.5IN X 5.5IN

IMPORTANT: installation. FLOOR ANCHORED CEILING HUNG OVERHEAD BRACED FLOOR-TO- CEILING ANCHORED

CM543 STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID

INSTALLATION INSTRUCTIONS

Transcription:

REC Series Rack Installation Guide 1

REC Series Rack Installation Guide TABLE OF CONTENTS SECTION SAFETY WARNINGS 1 600 WIDE EXPLODED VIEW 2 800 WIDE EXPLODED VIEW 3 SWITCHING DOOR HANDING 4 STABILIZING 5 BAYING THE ENCLOSURE 6 SIDE PANEL 7 RACK MOUNT ADJUSTMENT 8 RACK EARTH BONDING 9 AISLE CONTAINMENT 10 2

1. SAFETY WARNINGS This manual contains important instructions that you should follow during installation and maintenance of the REC Series Enclosure. Please read all instructions before operating the equipment and save this manual for future reference. 1. WARNING! REC Series enclosure components can be very heavy. It is recommended that several people take part in the unpacking process. When lifting heavy components or electronic equipment, ensure that all safety regulations are observed. 2. WARNING! The REC Series enclosure is designed to support a Static Load of 1100kg or a Dynamic Combined Load of 200kg. Dynamic Combined Load is the combined weight of the rack and installed equipment. The fitted casters are for transit only and are not intended to be used to move the rack when it is configured with equipment where the weight of the rack and equipment total over 200kg. The levelling feet (refer to Section 5 of this manual) must be in contact with the floor and supporting the rack before the rack is configured with equipment. 3. WARNING! The enclosure must be stabilized before installing any roll-out type accessory, component or electronic device. Failure to stabilize prior to installing equipment may cause the enclosure to tip over. 4. WARNING! First, load the heaviest electronic devices and accessories into the bottom of the enclosure to prevent the enclosure from becoming top-heavy. 5. WARNING! Never extend more than one roll-out type electronic device or accessory from a stabilized enclosure at a time. Do not sit, stand, or climb on any extended roll-out type electronic device or accessory. Never extend a roll-out type electronic device or accessory component from an enclosure rack that is supported by casters. Doing so may cause a stabilized enclosure rack to tip over. 6. WARNING! Ensure that the floor has a structural load capacity that will safety bear the weight of the REC Series enclosure and installed components. 7. WARNING! There must be an uninterruptable safety earth ground from the main power source to the Power Distribution Unit s (PDU) power cord set. Whenever it is likely that ground has been impaired, disconnect the PDU s power cord until the ground has been restored. 8. WARNING! High leakage current may be present. Grounding connection essential before connecting supply. 9. WARNING! Rack is intended to be used with equipment complying with IEC 60950. Use with non-compliant equipment may result in electrical hazard. 10. WARNING! A grounding kit is supplied with REC Series enclosures. The installer is responsible for grounding the enclosure to the building electrical system. Additional equipment can be electronically bonded to the rack's frame using additional grounding points. 3

2. 600 WIDE EXPLODED VIEW ITEM DESCRIPTION 1 Vented Door Assembly Option 2 Enclosure Frame 3 Roof Panels 4 Side Panel 4

3. 800 WIDE EXPLODED VIEW 6 5 6 ITEM DESCRIPTION 1 Vented Door Assembly Option 2 Double Vented Door Assembly Option 3 Enclosure Frame 4 Vented Door Assembly Option 5 Double Vented Door Assembly Option 6 Side Panels 7 Roof Panels 5

4. SWITCHING DOOR HANDING 1. Remove the three hinge pins (Fig 1). 2. Remove the hinge section from the enclosure frame (Fig 2). 3. Re-install the three hinge sections to the opposite side of enclosure frame (Fig 2). 4. Rotate the door 180 degrees. 5. Re-install the three hinge pins (Fig 1). 6. Loosen the two screws which secure the locking rods (Fig 3). 7. Remove the two screws on the back of the door lock and fixing plate (Fig 3). 8. Remove and rotate the door handle 180 degrees. 9. Replace the fixing plate and two screws (Fig 3). 10. Tighten the two screws which secure the locking rods (Fig 3). 6

5. STABILIZING CAUTION: BEFORE THE RACK IS CONFIGURED WITH EQUIPMENT (IF THE COM- BINED WEIGHT OF THE RACK AND EQUIPMENT IS OVER 200KG) THE FOLLOWING PROCEDURE MUST BE IMPLEMENTED AND THE RACK MUST REMAIN STATIC. IF THE RACK IS TO BE RELOCATED THEN EQUIPMENT MUST BE REMOVED BEFORE MOVING THE RACK. Each enclosure is equipped with four leveling feet (Fig 1). Use a 13 mm spanner to adjust the leveling feet. Ensure that each foot is in firm contact with the floor. Using a level, adjust the leveling feet as required to level the enclosure. For enclosures that have casters, extend the leveling feet so that the casters are approximately 3 mm off the floor. 7

6. BAYING THE ENCLOSURE 1. Remove 4 blanking grommits per enclosure (Fig 1). 2. Position and level the adjacent enclosure frames. Ensure that the frames are precisely aligned both vertically and front-to-back. 3. Ensure a shake proof washer contacts the painted surface and Bolt the adjacent frames together with the four nuts, bolts and washers included in the baying kit, part number NRA BTK. IMAGE WITH DOORS AND SIDE PANELS REMOVED FOR CLARITY 8

7. SIDE PANEL Removal of side panel 1. Unlock the side panel with the key supplied (Fig 1). 2. Tilt the panel to clear the upper flange. 3. Lift the panel upwards to clear two locating pins (Fig 2). Reinstall side panel 1. Align the two holes on the bottom of the side panel with the two pins on the enclosure frame. (Fig 2) 2. Then lower the side panel on to the pins. 3. Lock the side panel with the key supplied (Fig 1). 9

8. RACK MOUNT ADJUSTMENT 1. Loosen the four bolts using a 5mm Allen key, do not remove the bolt (Fig 1). 2. Slide rails to desired location. 3. Ensuring the rails are vertical, tighten the bolt with 5mm Allen key (Fig 1). 10

9. RACK EARTH BONDING Earth Kit Components (note; not all components used in every application); ITEM REF IMAGE DESCRIPTION LENGTH QUANTITY 1 M6 x 25mm Zinc Plated Setscrew 25mm 4 2 M6 Shake proof Washer 8 3 M6 x 12mm Setscrew (4mm Allen) 12mm 4 4 M6 Plain Washers 24 5 M6 Serrated Hexagonal Flange Nut 18 6 Earth Lead 500mm 2 7 Earth Lead 350mm 8 TOOLS REQUIRED: SPANNER (WRENCH) - 10mm (x2) ALLEN KEY - 4mm 11

Factory Fitted Component Earth Snap in grommet M6 Thread forming screw M6 Shake proof washer Earth grounded cage nut X 4 Positions The bolt together method for the rack frame ensures earth continuity of the rack frame components. The rack roof panel, infill roof plates and base corner gussets are factory assembled using fixings which ensure that the components are earthed to the rack frame. X 4 Positions M6 Shake proof washer M6 Thread forming screw 12

Rack Earth Kit Fitting Instructions STEP 1 - MAIN RACK EARTH BONDING POINTS Fit main rack earth bonding points to corner gussets adjacent to door hinge positions. If double doors are fitted then fit main earth points to both adjacent corner gussets. Note - Main earthing points must be assembled so that the M6 Shake proof washer is fitted under the head of the M6 Setscrew as shown in Fig 1.0. Tighten to 12Nm. Fig 1.0 Repeat this step at the rear of the rack. M6 x 25 Setscrew M6 Shake proof washer M6 Serrated hex flange nut 13

STEP 2 - DOOR EARTH BONDING Locate the door bottom earth stud (closest to the bottom hinge). Fit earth lead to door as shown in Fig 2.0. Tighten to 6Nm. Repeat this step at the rear of the rack M6 Plain washers (X2) M6 Earth lead Fig 2.0 M6 Serrated hex flange STEP 3-19-INCH RAIL EARTH BONDING Remove the side panel to improve access. Fit earth assembly as shown in Fig 3.0 and tighten assembly using a torque of Fig 4.0 Use the same process for earth bonding the 19-inch mounting rails in an 800mm wide rack as shown in Fig M6 Shake proof washer M6 Earth lead (350mm) - connect to corner gusset M6 X 12 Setscrew M6 Plain washer M6 Serrated hex flange Fig 3.0 14

STEP 4 - SIDE PANEL EARTH BONDING Connect the 500mm lead to the earth stud inside the side panel as shown in FIG 5.0. Tighten to 6Nm. Complete STEP 4 on opposite rack side connecting the RH side panel to the rear corner gusset. M6 Plain washers (X2) M6 Earth lead (500mm) Fig 5.0 M6 Serrated hex flange nut STEP 5 - EARTH BONDING TO MAIN EARTH POINTS Taking the loose ends of the leads fitted in STEP 3 & STEP 4, connect the leads to the earth bonding point detailed in STEP 1 as shown in FIG 6.0. Tighten to 12Nm. Repeat STEP 5 at the rear of rack. Fig 6.0 M6 Earth lead (350mm) - To 19-inch rails M6 Earth lead (500mm) - To side panels M6 Serrated hex flange nut M6 Plain washers (X2) M6 Earth lead (350mm) - To doors 15

10. AISLE CONTAINMENT 1200mm aisle (images used in these instructions) 1800mm aisle (shown for reference). Fitting instructions follow same process, but 1800mm wide aisles have wider side and roof panels. TOOLS REQUIRED: SPANNER (WRENCH) - 8mm SPANNER (WRENCH) - 10mm ALLEN KEY - 5mm NOTE: End of aisle kits should be ordered to suit either 1200mm or 1800mm wide aisles. Kit height will cover both 42U and 47U REC racks. Roof panels should be ordered separately. CROSS HEAD SCREWDRIVER 16

Step 1 Ensure cabinets are aligned, level and the correct distance apart (either 1200mm or 1800mm, depending on the aisle configuration) as shown in diagram below; FLOOR 17

Step 2 Identify components and fixings detailed in table below and refer to image right. 11 5 8 6 7 4 3 7 1 9 9 2 10 13 12 Master Door Slave Door Doors viewed from inside ITEM # DESCRIPTION QTY 1 FRAME UPRIGHT LEFT 1 2 FRAME UPRIGHT RIGHT 1 3 CROSS BEAM 1 4 TOP PANEL 42U 1 5 TOP PANEL 47U 1 6 BACK FILL PANEL (USED WITH 47U ONLY) 1 7 SCREW M6 x 16mm 12 8 CAGE NUT M6 2 9 HINGES 4 10 SCREW M5 X 8mm FOR HINGES 16 11 CLAMP PLATE 4 12 BRUSH (FOR DOOR BOTTOMS) 2 13 DOOR (PAIR) 1 18

Step 3 3 Referring to the images on page 18, assemble the frame uprights (items 1 & 2) to the frame cross beam (item 3) using 4 off M6 x 16mm screws (item 7). 7 Tip: This is best done with the components laid flat on a level floor. 2 (1 = LH Vertical) 42U Height; Fit 42U Top Panel (item 4) to frame uprights using 2 off M6 x 16mm screws (item 7). Discard Item 5 and Item 6. 47U Height; Fit 47U Top Panel (item5) to frame uprights using 2 off M6 x 16 screws (item 7) and to Cross Beam (item 3) using 2 screws (item 7). Fit Back Fill Panel (item 6) to rear of Top Panel (item 4) using 2 off screws (item 7) and 2 off M6 Cage Nuts (item 8). Discard Item 4. Step 4 Fit the hinges (item 9) to the frame uprights (items 1 & 2) using M5 x 8mm screws (item 10) shown in image below; Note the hinges are handed Left or Right. Fit hinges to corresponding door. Hinge half with pin to be fitted to frame upright. (Right hand hinge shown). 10 Step 5 Fit the brush (Item 12) to the brush carrier on the door bottom by pushing it into place (this is easier before doors are hung). 12 = 19

Step 6 Referring to images below, offer-up door frame to cabinets and attach using clamp plates, item 11, and M6 x 16mm screws, item 7 from inside the cabinets, in 4 positions. M6 x 16mm CLAMP PLATE 11 SCREW 7 CABINET VERTICAL Step 7 Fit roof panel using 4 off M6 x 16mm screws, item 7. 7 ROOF PANEL DOOR FRAME 11 7 20

Step 8 Fit the doors by orientating them at right-angles to the frame and lifting them onto the hinge pins. Note the door positions and panel gaps can be adjusted by loosening the hinge fixing screws and altering their relative positions. The gap between the door and frame should be approximately 3 to 4mm all around. The hinge adjusting screws are accessed from the rear of the frame and doors (inside the aisle). DOOR HINGE ADJUSTMENT SCREWS. 21

Step 9 Fit the self adhesive bump-stops to doors as shown (refer to image below) Bump Stop positioned on doors. Step 10 The door-set is fitted with an opening mechanism which enables the master door to be opened from inside the aisle. To open the door from inside the aisle pull button while lifting latch (refer to images below), and push master door to the open position. Release latch shown in Closed position Release latch shown in open position STEP 1 PULL STEP 2 LIFT 22

Eaton is dedicated to ensuring that reliable, efficient and safe power is available when it s needed most. With unparalleled knowledge of electrical power management across industries, experts at Eaton deliver customised, integrated solutions to solve our customers most critical challenges. Our focus is on delivering the right solution for the application. But, decision makers demand more than just innovative products. They turn to Eaton for an unwavering commitment to personal support that makes customer success a top priority. For more information, visit www.eaton.eu/electrical Eaton Industries Manufacturing GmbH Electrical Sector EMEA Route de la Longeraie 7 1110 Morges, Switzerland Copyright 2012. Changes to the products, to the information contained in this document, and to prices are reserved; so are errors and omissions. Only order confirmations and technical documentation by Eaton is binding. Photos and pictures also do not warrant a specific layout or functionality. Their use in whatever form is subject to prior approval by Eaton. The same applies to Trademarks (especially Eaton, Moeller, and Cutler-Hammer). The Terms and Conditions of Eaton apply, as referenced on Eaton internet pages and Eaton order confirmations. Eaton is a registered trademark of Eaton Corporation. All other trademarks are the property of their respective owners. 23