Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Similar documents
Maintenance of Traffic sequence of operations including any phasing and detour maps;

Survey Data and TOPO Checklist

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

Chapter 23. Signing and Pavement Marking Plans

DEVELOPMENT PLAN CHECKLIST

SECTION 6A ROADWAY PLAN PREPARATION

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

TABLE OF CONTENTS 1200 PLAN PREPARATION

Construction Plan Reading Basics & Applications

Porter County Plan Commission

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

TURNPIKE DESIGN HANDBOOK (TDH) PLANS PRODUCTION PART 3

B-PERMIT PLAN CHECK MANUAL

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER

CONTRACT PLANS READING

Plan Preparation Checklist

TURNPIKE DESIGN HANDBOOK (TDH) PLANS PRODUCTION PART 3

Appendix E-4. City of Fort Collins. Requirements for Utility Plans

Town of Westlake Construction Plans Review Checklist

Section 4-02 Typical Sections TABLE OF CONTENTS. INTRODUCTION...2 General...2

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

Project Name: County File No.: Checked by: For: Date:

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

Washington County Road Engineering Plan Submittal/Review Checklist

CHAPTER 11. Plan Standards

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

Plan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA

RRR Design & Modeling with the FDOT Civil 3D State Kit

3. DESIGN SPECIFICATIONS

Revised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF MUSKEGO DRAFTING STANDARDS

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

CHAPTER 11 SURVEY CADD

TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 3

Clarifications in italics added July 2018

Chapter 13 Plan Submittals

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

PROJECT NAME: TRACT, PARCEL MAP PROJECT ID NO. PLAN CHECKED BY: 1ST CHECK 3RD CHECK 2ND CHECK COMMENTS FINAL MYLAR DATE CHECKED:

Automated Machine Guidance

Sewer Line Extension Permit Design Checklist

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

City of Massillon Site Plan Checklist

PRELIMINARY PLAT CHECK LIST

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Plan Preparation Guide. Chapter 18 QUALITY CONTROL / QUALITY ASSURANCE

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

580 - NOISE BARRIERS OPSS 580 INDEX

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices.

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL

Public Projects Plan Submittal Guidelines Revised August 4, 2017 Plan submittal Process: 10% Plans 25% Plans 30% Plans 60% Plans 90% Plans

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS

List of Figures. List of Forms

APPENDIX D: DRAWING SUBMISSION STANDARDS

SCOPE OF WORK AND DELIVERABLES T.H.

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia

SECTION 3 SUBMISSION REQUIREMENTS

Show all your work for full credit!! Reference ODOT

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

STATE UNIVERSITY CONSTRUCTION FUND

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST

10010 RECORD DRAWING INFORMATION

Update: July 20, 2012

1 MUNICIPAL INFRASTRUCTURE

Section 7 Notes and Annotations

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST

Detail Design for State Project

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

DRAFTING STANDARDS 9.00 DRAFTING STANDARDS

Subdivision Application Checklist

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS

Exhibit A Scope of Services and Deliverables West Swan River Bridge Approaches

LONGITUDINAL PROFILE COMPLETION

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

MnDOT Contract Exhibit A - Scope of Services

APPENDIX 4. Checklists. Township of King Design Criteria and Standard Detail Drawings

SITE PLAN APPLICATION

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Council Policy Engineering Drawing Submission Requirements

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

Survey Control Point Observations

TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2

Symmetrical Parabolic Curve In highway practice, abrupt change in the vertical direction of moving vehicles should be avoided. In order to provide

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

To apply proposed roadway data (vertical alignments, cross section template data, cut/fill slopes, etc.)

SECTION SITE SURVEYS

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

Transcription:

Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable Financial Project ID's (Federal Funds) notation if applicable Exceptions & Equations County Name State Road Number Approval Signature Lines Railroad Crossing (if applicable) Revision Box Governing Standards & Specifications Dates Department's Project Manager's Name (GEC and FTE) Begin and End Project Station, Begin and End Project TMP, & Begin Project CMP Begin and End Bridge Stations Consultants Name/Address/Contract Number/ Certificate of Authorization Number and Vendor Number (if applicable) Bench Mark Datum Note Index of Sheets No duplicate sheet numbers; unique sheet numbers only Contract Plans and Component Plan Lists (Roadway, S&PM, Signals, ITS, Lighting, Landscape, Structures, Tolls, etc.) Signature Sheet Section 303 Sections for each Professional of Record Index of Sheets for each Professional of Report Image of the seal(s) Appearance of the Digital Signature only to be applied in Phase IV Summary of Pay Items Section 304 Item Numbers with Descriptions, Units, and Quantities Typical Section Section 306 Mainline, Ramps and Cross Road Typicals Tolling Point Typicals R/W Lines Special Details (e.g., Bifurcated Sections, High Fills, Shoulders, Cross Slope Correction, etc.) Traffic Data Pavement Design Typical Section Notes

Summary of Quantities Section 307 Project Layout Section 309 Plan Profile Sheet Sequence (Mainline, Ramps, and Crossroads) Project Control Section 310 Benchmarks Reference Points Control Points General Notes Section 311 FDM & TDH Standard Notes (as applicable) Coodinate and Curve Data Section 312 All horizontal curve data per FDM Section 312 Northing/Easting for PC, PI, PT, and CC Design Speed Roadway Plan Profile Section 312 Plan: Baseline of Survey, Station Equations Existing Topography Including Utilities Existing & Proposed R/W Lines (If Available) Centerline of Construction (If Different From The Baseline Of Survey) Begin and End Stations: Project, Construction, Bridges, Bridge Culverts, Exceptions, Widening, Reconstruction, and Milling & Resurfacing Reference Points (If Project Layout Sheet Not Included In Plans Set) Curb Return numbers; station ties and elevations Prop Drainage structure with structure no. Proposed R/W lines Proposed Side Drain Pipe Requirements (including size) for access and intersections Final Geometrics; Including Radii, Station Pluses, Offsets, Widths Taper/Transition Lengths, Curve Data General Notes (If General Notes Sheet Not Included) Flood Data if not shown elsewhere Limit of Wetlands

Profile: Appropriate Bench Mark Info Equations Existing Ground Line With Elevations At End Of Each Sheet Begin and End Stations: Project, Construction, Bridges, Bridge Culverts, Exceptions, Widening, Reconstruction, and Milling & Resurfacing Final Profile Grades and Vertical Curve Data Mainline Storm Drain Pipes Proposed Special Ditches Ditch Gradient w/ DPI Sta and Elev Non Standard superelevation transition details High Water Elev Mainline Drainage Structure with structure numbers Cross Drain; Structure No, Size and Flow Line Elev Special Profile Section 313 Ramp Profile Worksheet Including Nose Sections Existing Ground Line Of Intersections Final intersection profile grades Final curb return profiles (if applicable) Superelevation diagrams as required Final ramp profile grades including nose sections Preliminary access and frontage road profiles (may contain one or more types of special profiles.) Back of Sidewalk Profile Section 313 Begin And End Project Stations Begin And End Sidewalk Stations Cross Street Locations And Elevations Drainage Flow Direction Arrows Mainline Equations Existing Driveway Locations And Details Superelevation Details Back Of Sidewalk Profile Grades And Vertical Curve Information Building Floor Elevations With Offset Distance Left And Right Gradeline Notation: Specifically The Numeric Difference Relative To Roadway Profile Gradeline

Interchange Layout/Details Section 314 Schematic Of Traffic Flow And Volumes Proposed Bridge Limits R/W Lines Prelim Configuration and Geometrics Quadrant Identification Ramp Labels Curve Data Including Superelevation and Design Speed Coordinate Data, Sta and Ties Access and Frontage Roads, With Dimensions and R/W Fence Location Ramp Identification Ramp Terminal Details Section 314 Radii, Transition and Taper Length Ramp Identification Intersection Layout/Details Section 314 Existing Topography (If Applicable) Proposed R/W Limits Length Of Turn Lanes Taper Lengths Geometric Dimensions(Radii, Offsets, Widths) Limit of Proposed Construction on Side Roads Applicable Notes Cross Drains With Structure Numbers and Pipe Sizes Storm Drain Pipes Including Sizes Final Geometrics Including Dimensions, Radii, Offsets, Station Pluses and Taper/Transition Lengths Cross Section Pattern Sheet Section 314 Interchange Layout Access and Frontage Roads Mainline and Ramp Stationing Begin and End Bridge Sta Cross Section Location Lines Ramp Baselines with Nomenclature and Stations Roadway Soil Survey Section 318 Soil data Project Specific

Cross Sections Section 319 Existing Ground Line Existing Survey Baseline Elevations Station Numbers Baseline Of Survey Labeled Proposed Template With Profile Grade Elevations Along mainline And Cross Streets R/W Special Ditch Bottom Elev Equivalent Stations for Ramps and Mainline Mainline Equation Stations Soil Borings Water Table (Check Base Clearance) Extent of Unsuitable Material Proposed Template and Profile Grade Elevation Earthwork Columns Begin and End Stations for Project, Construction, Earthwork, Bridges and Bridge Culvert affected by template and where unsuitable materials are present Temporary Traffic Control Plans Section 321 Project Specific Other Worksheets As Necessary To Convey Concept And Scope Pay Items with descriptions, units, and quantities