LHC TRANSVERSE FEEDBACK SYSTEM: FIRST RESULTS OF COMMISSIONING. V.M. Zhabitsky XXI Russian Particle Accelerator Conference

Similar documents
2008 JINST 3 S The RF systems and beam feedback. Chapter Introduction

Nominal LHC parameters

Accelerator Complex U70 of IHEP-Protvino: Status and Upgrade Plans

FAST RF KICKER DESIGN

Main Injector Cavity Simulation and Optimization for Project X

RF test benches for electron cloud studies

R. Assmann, CERN/AB. for the Collimation Project 7/12/2007 LHC MAC RWA, LHC MAC 12/07

Betatron tune Measurement

Lawrence Berkeley Laboratory UNIVERSITY OF CALIFORNIA

Predictions of LER-HER limits

1997 Particle Accelerator Conference, Vancouver, B.C., Canada, May 12-16, 1997 BNL

Re-commissioning the Recycler Storage Ring at Fermilab

APAC 2007, Raja Ramanna Centre for Advanced Technology(RRCAT), Indore, India LHC STATUS. Lyndon Evans, CERN, Geneva, Switzerland

Crab Cavities for FCC

Acceleration of High-Intensity Protons in the J-PARC Synchrotrons. KEK/J-PARC M. Yoshii

Third Harmonic Superconducting passive cavities in ELETTRA and SLS

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY

Maurizio Vretenar Linac4 Project Leader EuCARD-2 Coordinator

Digital Signal processing in Beam Diagnostics Lecture 2

The impedance budget of the CERN Proton Synchrotron (PS)

RF System Models and Longitudinal Beam Dynamics

Roman Pots. Marco Oriunno SLAC, PPA. M.Oriunno, SLAC

Low Level RF. Part 2: Cavity Controller, Problems and Cures CAS RF. P. Baudrenghien CERN-BE-RF. 3. What will go wrong? 4. Power amplifier limits

Bunch-by-bunch studies at DELTA

Design and performance of LLRF system for CSNS/RCS *

Engineering Challenges and Solutions for MeRHIC. Andrew Burrill for the MeRHIC Team

Slide Title. Bulleted Text

VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian

Electromagnetic characterization of materials for the CLIC Damping Rings and high frequency issues

Tutorial on Design of RF system for Indus Accelerator. Maherdra Lad Head, Radio Frequency Systems Division RRCAT, Indore

LHC: CONSTRUCTION AND COMMISSIONING STATUS

Bunch-by-Bunch Broadband Feedback for the ESRF

Measurement Setup for Bunched Beam Echoes in the HERA Proton Storage Ring

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction

BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER

THE ORION PHOTOINJECTOR: STATUS and RESULTS

CHAPTER 13 BEAM INSTRUMENTATION

Superconducting RF System. Heung-Sik Kang

REVIEW OF FAST BEAM CHOPPING F. Caspers CERN AB-RF-FB

The HL-LHC Machine *

Longitudinal bunch shape Overview of processing electronics for Beam Position Monitor (BPM) Measurements:

rf amplitude modulation to suppress longitudinal coupled bunch instabilities in the CERN Super Proton Synchrotron

Fast Kickers at DESY

Plan for Accelerator Beam Study Towards J-PARC Muon Project. Koji YOSHIMURA (KEK) for KEK Muon Working Group at NuFACT08 July 2nd, 2008

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY

MEASURES TO REDUCE THE IMPEDANCE OF PARASITIC RESONANT MODES IN THE DAΦNE VACUUM CHAMBER

LHC. LHC Crab-cavity Aspects & Strategy. LHC Upgrade & Crab Crossing. New Road Map. SPS, a first validation step

National Accelerator Laboratory

DEVELOPMENT OF CAPACITIVE LINEAR-CUT BEAM POSITION MONITOR FOR HEAVY-ION SYNCHROTRON OF KHIMA PROJECT

Non-invasive Beam Profile Measurements using an Electron-Beam Scanner

EuroTeV High Bandwidth Wall Current Monitor. Alessandro D Elia AB-BI-PI 1-1 -

Beam Loss Monitoring (BLM) System for ESS

Dark Current Kicker Studies at FLASH

Position of the LHC luminous region

Influence of Distributed Ion Pump Voltage on the Anomalous Instability in CESR D.L. Hartill, T. Holmquist, J.T. Rogers, and D.C.

The European Spallation Source. Dave McGinnis Chief Engineer ESS\Accelerator Division IVEC 2013

DESIGN OF THE INJECTION KICKER MAGNET SYSTEM FOR CERN's 14TeV PROTON COLLIDER LHC

version 7.6 RF separator

Attosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors

MAX II RF system 100 MHz technology Lars Malmgren 10th ESLS RF Meeting Dortmund September 27-28, 2006

Status of Proton Beam Commissioning at MedAustron Ion Beam Therapy Center

FAST KICKERS LNF-INFN

DQW HOM Coupler for LHC

PINGER MAGNET SYSTEM FOR THE ALBA SYNCHROTRON LIGHT SOURCE

Draft of Conceptual Phase 2 Collimation System Design. Phase 2 Specification and Implementation Meeting R. Assmann

The TESLA Linear Collider. Winfried Decking (DESY) for the TESLA Collaboration

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY

CEBAF Overview June 4, 2010

Illinois. I Physics. Fourier engineering: progress on alternative TESLA kickers

STABILITY CONSIDERATIONS

The Commissioning of the ATLAS Pixel Detector

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7

Thermionic Bunched Electron Sources for High-Energy Electron Cooling

Light Source Diagnostics. Hywel Owen ASTEC Daresbury Laboratory

Crab Cavity Systems for Future Colliders. Silvia Verdú-Andrés, Ilan Ben-Zvi, Qiong Wu (Brookhaven National Lab), Rama Calaga (CERN)

HOM COUPLER ALTERATIONS FOR THE LHC DQW CRAB CAVITY

A HIGH EFFICIENCY 17GHz TW CHOPPERTRON

HOM Based Diagnostics at the TTF

SRF FOR FUTURE CIRCULAR COLLIDERS

SURVEY AND ALIGNMENT FOR THE SWISS LIGHT SOURCE

1.5 GHz Cavity design for the Clic Damping Ring and as Active Third Harmonic cavity for ALBA.

Project X Cavity RF and mechanical design. T. Khabiboulline, FNAL/TD/SRF

Project of RF System for 2.2 GeV Electron Storage Ring Zelenograd SR Source.

THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING CAVITY

CTPPS Detector Performance

Specification of the kicker Measurement of the magnetic field inside the kicker Optimisation of the kicker impedance to 50 Status and picture of the

Diamond sensors as beam conditions monitors in CMS and LHC

Linear Particle Accelerator Control Performance

THz Pump Beam for LCLS. Henrik Loos. LCLS Hard X-Ray Upgrade Workshop July 29-31, 2009

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008

Recent studies of the electron cloud-induced beam instability at the Los Alamos PSR

Nonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs

Emilia Cruz. September 21, 2015

ANALYSIS OF 3RD OCTAVE BAND GROUND MOTIONS TRANSMISSION IN SYNCHROTRON RADIATION FACILITY SOLARIS Daniel Ziemianski, Marek Kozien

queensgate a brand of Elektron Technology

EMMA the World's First Non-Scaling FFAG Accelerator

New apparatus for precise synchronous phase shift measurements in storage rings 1

ERL Prototype at BNL. Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.

CHAPTER 6 BOOSTER RF SYSTEMS

Multi-bunch feedback systems

Transcription:

LHC TRANSVERSE FEEDBACK SYSTEM: FIRST RESULTS OF COMMISSIONING V.M. Zhabitsky XXI Russian Particle Accelerator Conference 28.09-03.10.2008, Zvenigorod

LHC Transverse Feedback System: First Results of Commissioning CERN W.Hofle, E.Montesinos, P.Baudrenghien, F.Killing, I.Kojevnikov, G.Kotzian, R.Louw uwerse, V.Rossi, M.Schokker,, E.Thepenier Thepenier, D.Valuch JINR LHC Damper V.M.Zhabitsky, N.I.Lebedev, E.V.Gorbachev, N.V.Pilyar, S.V. V.Rabtsun, A.A.Makarov, R.A.Smolkov 30.09.2008 RuPAC 2008 2

LHC Transverse Feedback System The LHC will provide high intensity proton and lead ion beams. The ultimate intensities after injection into the LHC will be about 4.8 10 14 particles for the proton beam with an energy of 450 GeV, 4.1 10 10 ions for the 208 Pb 82+ beam with an energy of 177 GeV/u. These intensities can lead to coherent transverse instabilities. The theoretical prediction for the instability rise time τ inst, dominated by the resistive wall effect, is about 18.5 ms or 208 turns at injection energy, and a significant contribution of the LHC collimators at collision energy to τ inst is also predicted. will stabilize the beam against coupled bunch instabilities as well as damp the transverse oscillations of the beam originating from steering errors and kicker ripple. It will also be used for the purposes of tune measurement and for abort gap cleaning. 30.09.2008 RuPAC 2008 3

The LHC Transverse Feedback System DK BPM Amplifier Delay Digital Signal Processor Front Electronics 30.09.2008 RuPAC 2008 4

Synchrophasotron (operated in 1957-2002) 7TeV 8.33T, 15 m 11850A 7MJ LHC: C : C 0 = 26658.883 m 1232 main dipole 392 main quadrupole magnets 30.09.2008 RuPAC 2008 5

Livingston type plot: Energy stored in the beam (and magnets) 10000.00 LHC energy in magnets Energy stored in the beam [MJ] 1000.00 100.00 10.00 1.00 0.10 ISR SNS LEP2 LHC injection (12 SPS batches) SPS fixed target SPS batch to LHC RHIC proton LHC top energy SPS ppbar HERA TEVATRON Factor ~200 0.01 1 10 100 1000 10000 Momentum [GeV/c] inspired by R.Assmann. Chamonix XIV, 2005 30.09.2008 RuPAC 2008 6

=> 30.09.2008 RuPAC 2008 7

Performance specification Electro-static kickers base-band Integrated transverse electric field E ds (for 450 GeV/c) 900 kv per turn Aperture of kickers 52 mm Number of kickers per beam and plane 4 Length electrodes in kicker 1.5 m Nominal voltage up to 1 MHz (at β = 100 m) ±7.5 kv Kick per turn at 450 GeV/c (at β = 100 m) 2 µrad (0.2 σ) Rise-time 10-90%, V max = ±7.5 kv 350 ns Rise-time 1-99%, V max = ±7.5 kv 720 ns *) Frequency range for gain 1 khz 1 (20) MHz *) Rise time fast enough for gap of 38 missing bunches (900 ns for rise time (0.5 %-99.5% %) in the LHC injection kicker ) All LHC Damper systems must operate on day ONE! 30.09.2008 RuPAC 2008 8

Installation and Physical layout in Point 4 underground LHC ADT (4 modules) left of IP4 + space for 2 more modules (upgrade) ADT (4 modules) right of IP4 + space for 2 more modules (upgrade) 30.09.2008 RuPAC 2008 9

Layout of the LHC Damper (four independent systems, one per plane (H/V) and beam) and block-diagram of the transverse feedback system for vertical oscillations. The feedback loop contains all functionalities for transverse damping and controlled bunch excitation as well as many built-in features allowing the user full remote operation and diagnostics. 30.09.2008 RuPAC 2008 10

7/8 inch coaxial cable (coaxial lines of 570-650 m) Beam Position Monitor in Cryomodule 30.09.2008 RuPAC 2008 11

Pick-up Signal Processor Crate 30.09.2008 RuPAC 2008 12

D.Valuch. Beam Position Unit 30.09.2008 RuPAC 2008 13

V.Rossi Digital Signal Processor Unit 30.09.2008 RuPAC 2008 14

Front view The Thales Communications (Belgium) Rear view 200 W solid state driver amplifier: 43 db gain, very flat, 3 khz 20 MHz. 30.09.2008 RuPAC 2008 15

CERN. 21 December 2006. Electrostatic Kickers and Wideband Power Amplifiers in the LHC tunnel 30.09.2008 RuPAC 2008 16

A fragment of an assembly drawing of a vertical kicker: 1 - vacuum tank (wall thickness: δ = 14 mm), 2 - electrodes, 3 - input of a signal, 4 coupler, 5 feedthrough for coupler, 6 - device of fixing of the electrode module. Electron cloud's problem: F. Ruggiero (CERN). Chamonix XI, 15 19 January 2001 S.Rabtsun.. Leading Designer. 30.09.2008 RuPAC 2008 17

Parameter Surface smoothness (L K =1.6 m; Ø100 mm) Required Achieved 1.6 μm 0.4 μm The obtained pressure limits of outgassing (stainless steel 304L) were from 2.0 10-10 Torr to 1.7 10-9 Torr. All data (blue lines) are better than the expected limit of 2 10-9 Torr (red line: bake-out 200 o C, 24 h, surface ougassing rate 4 10-12 mbar l/s/cm 2, S=2 10 4 cm 2, P=30 l/s for hydrogen). NEG pumps around the kickers are used in the LHC tunnel. During hardware and beam commissioning the vacuum at the kickers was better than 10-11 mbar. 30.09.2008 RuPAC 2008 18

A.A.Makarov, Leading designer. N.I.Lebedev, Leading engineer. E.V.Gorbachev, Leading engineer. R.A.Smolkov, Leading engineer. N.V.Pilyar, Leading engineer. Push-pull wideband power amplifier: Class of operation: AB Input amplitude: ±150 V Output amplitude: ±7500 V Bandwidth: 1 khz 1 (20) MHz Power elements: two 30 kw Thales RS 2048-CJC tetrodes 30.09.2008 RuPAC 2008 19

Parameter Required Achieved Lowest frequency 1kHz 1kHz Highest frequency 20 MHz 20 MHz Nominal - 3dB bandwidth 3 khz 1 MHz 2 khz - 0.95 MHz Nominal voltage up to 1 MHz ±7.5 kv ±7.8 kv Gain, db 34 34.3 Gain ripple ±0.7 db ±0.5 db Rise-time 10-90%, V max = 7.5 kv 350 ns 410 ns Rise-time 1-99%, V max = 7.5 kv 720 ns 760 ns The measured characteristics of the amplifier in the frequency range from 1 khz to 30 MHz correspond globally to the design specifications. An amplitude of ±7.8 kv was obtained on the deflector which is higher the required magnitude of ±7.5 kv. 30.09.2008 RuPAC 2008 20

Beam stability is achieved for a damping rate where g(ω) and φ(ω) are gain and phase transfer characteristics of the feedback loop. Due to the LHC specifications, the gain transfer function of the feedback loop is constant starting from 1 khz and decreases by 3 db at 1 MHz. Frequency characteristics for kicker voltage measured via the HOM port and recalculated from high pass with a cut-off of f HP = 500 MHz (blue, solid) and tetrode anode voltage (green, dashed) 30.09.2008 RuPAC 2008 21

The 16 amplifiers were tested at full DC anode voltage of 12kV, 7A of DC current per amplifier and with 0dBm signal source. Input circuit, amplitude and phase characteristics of all 16 amplifiers were stored in pictures and data files. 30.09.2008 RuPAC 2008 22

Hardware commissioning: all extensive tests required were completed in full volume and in time; the design specifications have all been met, the available peak voltage 11kV V at up to 100kHz has exceeded the design value 10.5kV at kickers. Beam commissioning: 16 kickers (JINR) and front-electronics (CERN) were successfully checked for first beams in the LHC. Signals from the LHC Damper pick-up for the first shot of beam 1. 7 September 2008. Signals from the LHC Damper pick-up for the first shot of beam 2. 10 September 2008. 30.09.2008 RuPAC 2008 23

& Tune Measurements Tune measurements were the first operational option for the LHC Damper when itwasusedasexciterafter obtaining the circulating beam 2 on 22:23, 11 September 2008. Beam was scanned by sweeping-frequency generator as external signal source in the feedback loop at half the level of the maximum power of the wideband power amplifiers. A Tune Measurement using Chirp Excitation (courtesy AB/BI). The bottom trace shows the vertical beam response; the top trace is the spectrum of the signal with the vertical tune peak. 30.09.2008 RuPAC 2008 24

commissioning plans low-level damper hardware deployed to be ready to close the loops on all dampers; transverse position measurement checked getting ready to close the loops. 40 MHz sampling clock adjustment started on beam 2 damper pick-ups shortly after first beam capture Vertical oscillations on beam 2, @Q7, seen by damper pick-up signal processing 30.09.2008 RuPAC 2008 25

30.09.2008 RuPAC 2008 26