CFDTT-01. Control Joint Study (General)

Similar documents
Pebbletex Adhered Mat Design. Typical Details

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

Flashing Materials. Rough Opening Preparation

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

How To Install Windows: Nail-Fin Application

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

Eagle clad double-hung window installation instructions

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

DW HORIZONTAL INSTALLATION

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

Tools required by installer: Materials required by installer:

Pocket Door Installation Instructions

Installation of Fiberglass Windows

DW VERTICAL INSTALLATION

900 SERIES WALL PANELS

All Window Installation Instruction

Adorn Mortarless Stone Veneer Installation Natural Concrete Products

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

Shapes Siding. Perfection Shingles. Chalk Line

DIVISION 6 WOOD AND PLASTICS

Building Wrap and Flashing

400 SERIES VERTICAL INSTALLATION

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

Keeping Water Out of. Stucco Walls. by Gene Summy. Assume that the cladding will leak, but make sure the envelope is watertight

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Picture Frame Method Revised 10/24/2016

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

Building Wrap and Flashing

Installation Instructions

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016

Acrowall-CP Cement-Plaster Stucco

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

Installation Recommendations for Finless Frame Doors

Installation Guide - Evolution Series Wood Siding

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

Sun Windows General Information New Construction Hinged Door Installation Instructions

UNIT 5: EXTERIOR DOORS AND WINDOWS

3M Air and Vapour Barrier 3015 Technical guide

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

HydroGap Drainable Housewrap: Installation Instructions

SECTION SHEET METAL FLASHING AND TRIM

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

Integrity Polygon and Round Top Installation and Finishing Instructions

Installation Manual SOLID CORE SIDING

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

KuraStone TM Installation Guide

PRIMED STRAND REVERSIBLE SHAKE

AIA Specification. Section Slate Shingles PART 1 GENERAL

KS SERIES - VERTICAL INSTALLATION

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

The better way to build TM. Installation Manual ROOF SIPs

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

Slate Shingle Specifications

TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system.

In the 30-plus years that I ve been a remodeling contractor, I ve

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Dura-Lock Roof System

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS

Curtain Wall Installation Guide

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

Self-Adhering Reflective Sheet Membrane

DESIGNER SERIES GUTTER SYSTEM INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

Before installation, check your local and state requirements for this type of install.

ForceField Air & Water Barrier System. installation instructions

I n s t a l l a t i o n I n s t r u c t i o n s

REGAL. Installation Manual

Installation Instructions

TABLE OF CONTENTS A. PBR

application instructions

GLOSSARY OF TERMS SECTION 8

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nail Fin (JII025) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

Integrate the Window and WRB (1/2)

SECTION SHEET METAL FLASHING AND TRIM

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

WindowSeal. Installation Instructions. Prep & General Conditions

PANELTEK ENGINEERED SIDING/PANELLING INSTRUCTIONS

DuPont Flashing Systems Installation Guidelines. Integral Flanged Door Before water-resistive. Version 2

VINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS

SECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories.

Ekoroof LiteTile Dimensions

Transcription:

Trim Method Classic Method Notes: Control joints are required and should be located by the designer at the following locations on the construction documents: 144 sf (13.4 sm) is the maximum overall area One dimension shall not exceed 2-1/2 times the other dimension At all dissimilar substrate/sheathing transitions. Possibly off corners of windows/doors. Increase control joint requirements where thicker stucco or special structural conditions exist. CFDTT-01 Control Joint Study (General)

Trim Method Notes If trim is planned it s usually best to avoid running the control joints through them. Evaluate floor line conditions and place either a control or expansion joint. If large foam trims are used, plan on adding an expansion joint in the trim if the control joint continues behind it. Use Striplath reinforcement at corners. CFDTT-02 Control Joint Study (Trim Method)

Classic Method Notes The classic method uses the window and door openings as part of the control joint process Evaluate floor line conditions and place either a control or expansion joint if needed, otherwise follow the general guidelines. Generally foam trims aren t used with this aesthetic condition. Do not use butterfly lath reinforcement at corners. CFDTT-03 Control Joint Study (Classic Method)

Approved Substrate Structa Wire Twin Trac 316 Lath 1/2 Cemplaster Fiberstucco Primecoat Primer Superior Finish CFDTT-04 Cross-Section

Lap onto Spline Lap onto window flashing Spline Lap felt 2 (50 mm) min. horizontally, 6 (152 mm) vertically Hint: mark framing locations when installing felt 2-water barriers required, second is protective overlay Lap felt spline as noted. If using peel and stick follow manufacturer s instructions. Always follow window manufacturer s instructions Verify detailing with asphalt felt manufacturer Lap corners 12 (305 mm) each side Minimum requirements: Grade D or ASTM D226, Type I CFDTT-05 Water Barrier Design Notes Lap water barriers onto weep screed (shown) or solid metal casing bead with weep holes. Place WRB behind expanded metal casing bead. Lap accessories 1 (25 mm) min. onto foundation and keep 4 (102 mm) above grade

Lap corners per manufacturer s instructions Lap and seal according to manufacturer s instructions Hint: mark framing locations when installing or align framing marks on wrap Install following wrap manufacturer s instructions. Always follow window manufacturer s instructions 2-water barriers required, second is protective overlay of asphalt felt Lap felt 2 (50 mm) min. horizontally, 6 (152 mm) vertically Verify detailing with profiled drainage wrap manufacturer Minimum requirements: Code Recognized profiled wrap equivalent to Grade D or ASTM D226, Type I Lap water barriers onto weep screed (shown) or solid metal casing bead with weep holes. Place WRB behind expanded metal casing bead. Lap accessories 1 (25 mm) min. onto foundation and keep 4 (102 mm) above grade CFDTT-06 Water Barrier Design Notes

Follow Rollershield LAB Detail instructions Seal seams and lap onto stucco weep screed or track with Rollershield Flashing Tape Install following Rollershield LAB details. Always follow window manufacturer s instructions Rollershield 2-water barriers required, second is protective overlay of asphalt felt Lap felt 2 (50 mm) min. horizontally, 6 (152 mm) vertically. Hint: mark framing locations when installing felt Minimum requirements: ASTM D226, Type I Lap water barriers onto weep screed (shown) or solid metal casing bead with weep holes. Place WRB behind expanded metal casing bead. Lap accessories 1 (25 mm) min. onto foundation and keep 4 (102 mm) above grade CFDTT-07 Water Barrier Design Notes

Follow Rollershield LAB Detail instructions Detail masonry control joints with Rollershield Flashing Tape Install following Rollershield LAB details. Always follow window manufacturer s instructions Rollershield Slip sheet required Lap felt 2 (50 mm) min. horizontally, 6 (152 mm) vertically Hint: mark framing locations when installing felt Minimum requirements: Code Recognized asphalt felt Lap water barriers onto weep screed (shown) or solid metal casing bead with weep holes. Place WRB behind expanded metal casing bead. Lap accessories 1 (25 mm) min. onto foundation and keep 4 (102 mm) above grade CFDTT-08 Water Barrier Design Notes

Insulation Code-recognized as a water barrier Insulation not recognized as a water barrier Rollershield Shown Secondary Water Barrier added Install and seal per manufacturer s requirements Support Plates For Continuous Insulation (CI) thicknesses of 1.5 (38 mm) or greater use an approved accessory plate. Wind-Lock Lath Lock or ULP 302, Demand DP300, Buildex Gridmate or Master Wall approved equal. Attach insulation board at framing locations, midpoint of board Keep insulation board 6 (152 mm) above grade. CFDTT-09 Optional Continuous Insulation Design Notes

Interlock inside and outside corners Provide a closure strip to protect insulation board from exterior exposure CFDTT-09 Optional Continuous Insulation Detail Notes

With water barrier installed over weep screed: 1. Attach casing Beads 2. Tack Control Joints 3. Install Structa Lath Twin Trac 4. Set Corner Beads 2 4 3 CFDTT-10 Lath Notes 1 Structalath Twin Trac Installation a. Determine starting point and plan comfortable working length for each lath section. b. The lath can be unrolled on the ground and pre-cut, or the lath can be unrolled against the wall and then cut. If unrolled on the ground, minimize any undue distortions or stepping on the lath. c. Ensure when installing that furring points are oriented against the wall. d. Position the starting end of the lath at the appropriate height. Drive a roofing nail into one of the starting ears, against a vertical wire. e. Unroll the lath or place lath on the wall taking care it lays flat on the wall surface. f. Every 6-8 feet drive another roofing nail loosely to position the mesh at the right height. This nail should be between vertical wires. Continue to end of desired lath section. g. Cut the lath as needed at accessory locations. h. Pull any slack from the lath and nail the top loosely. Fasten the lath vertically at mid point of the section and fasten the lath vertically every 6 inches (152 mm) or at every pair of Twin Trac wires. At either end of the lath section, pull the lath tight either by hand, or by driving nails at an angle and nail off vertically. Once lath is tightened at each end, complete fastening at each stud location. i Lap Structalath Twin Trac one mesh width, this is approximately 1½ inches (38 mm). Lap End laps approximately 1½ inches (38 mm). Vertical laps must occur over a framing member. j. Fastener types and sizes must be in accordance with ASTM 1063 or in accordance with local building codes or in accordance with engineering drawings and specifications for the project. If staples are being utilized, they should be oriented parallel to the framing member to minimize risk of missing the framing, and puncturing the WRB.

Casing Bead and Expansion Joint Installation Install casing beads at stucco terminations doors, windows and other through wall penetrations. Install expansion joints (or backto-back casing beads) at building expansion joints, where the stucco is to be installed over dissimilar construction or substrates, at changes in building height, at floor lines, columns, and cantilevered areas. Install full accessory pieces where possible and avoid small pieces. Seal adjoining pieces by embedding ends in sealant. Abut horizontal into vertical joint accessories. Attach at 6-inch (152 mm) centers into framing with appropriate fasteners. Control Joint Installation Install control joints every 144 ft2 (13.4 m2) for walls and 100 ft2 (9.3 m2) maximum (as indicated on the construction documents). Tack in place as insure proper alignment during the application of the Twin Trac. Wire tie control joints to Twin Trac at 6 inches (152 mm) on center if framing members aren t present under the accessory. Seal any exposed ends and edges preferably by setting them in sealant during installation to prevent water entry. Install peel and stick flashing tape under wall control joint locations if specified. <not a requirement, edit> CFDTT-11 Accessory Installation Notes

Inside and Outside Corners Install corner lath at inside corners and corner bead at outside corners over lath. Attach through lath into framing at 6 inches (152 mm) on center with appropriate fasteners. Diagonal Reinforcement Apply Striplath, minimum 4 x 12 (102 mm x 305 mm), in type and weights of selected lath at casing bead corners. CFDTT-12 Accessory Installation Notes

Cemplaster Fiberstucco Primecoat Primer Sanded Primecoat Primer CFDTT-13 Prime01 Primecoat Primer

Perfect Cemplaster Fiberstucco Desert Sand Spray Superior Finish R-Coarse Refinish CFDTT-14 Finish Application

Superior Finish over Primecoat Primer, 1/2 Cemplaster Fiberstucco and Structa Wire Twin Trac 316 lath Framing, Sheathing & 2- Water Barriers Casing Bead place about 1/8 (3 mm) above flashing Sealant Window installed per manufacturer s instructions Window Head Flashing with turned up ends as required by window manufacturer or building code CFDTT-15 Window Head with Nailing Fin

Superior Finish over Primecoat Primer, 1/2 Cemplaster Fiberstucco and Structa Wire Twin Trac 316 lath Framing, Sheathing & 2- Water Barriers Sealant sized for anticipated movement, 3/8 (9.5 mm) min Window installed per manufacturer s instructions CFDTT-16 Window Jamb with Nailing Fin Casing Bead

Superior Finish over Primecoat Primer, 1/2 Cemplaster Fiberstucco and Structa Wire Twin Trac 316 lath Sealant sized for anticipated movement, 3/8 (9.5 mm) min Window installed per manufacturer s instructions Casing Bead Framing, Sheathing & 2- Water Barriers CFDTT-17 Window Sill with Nailing Fin

Superior Finish over Primecoat Primer, 1/2 Cemplaster Fiberstucco and Structa Wire Twin Trac 316 lath Framing, Sheathing & 2- Water Barriers Casing Bead place about 1/8 (3 mm) above flashing Storefront Window installed per manufacturer s instructions Window Head Flashing with turned up ends as required by window manufacturer or building code Sealant CFDTT-18 Storefront Window Head

Casing Bead Sealant sized for anticipated movement, 3/8 (9.5 mm) min Window installed per manufacturer s instructions Superior Finish over Primecoat Primer, 1/2 Cemplaster Fiberstucco and Structa Wire Twin Trac 316 lath Framing, Sheathing & 2- Water Barriers CFDTT-19 Storefront Window Jamb

Window installed per manufacturer s instructions Pan Flashing (shown) if required by design or window manufacturer. Extend 2 min. over stucco, seal lower edge and sides. If not required use sealant sized for anticipated movement, 3/8 (9.5 mm) min. Superior Finish over Primecoat Primer, 1/2 Cemplaster Fiberstucco and Structa Wire Twin Trac 316 lath Casing Bead Framing, Sheathing & 2- Water Barriers CFDTT-20 Storefront Window Sill

Cemplaster Fiberstucco Downspout Fastener and Strap set in Sealant Predrill hole, fill with sealant, snug tighten only into structural framing CFDTT-21 Downspout Attachment Notes

Superior Finish over Primecoat Primer, 1/2 Cemplaster Fiberstucco and Structa Wire Twin Trac 316 lath Sealant sized for anticipated movement, 3/4 (19 mm) min. Framing, Sheathing & 2-Water Barriers Casing Bead 2x Dimensional Floor Framing Lumber (may not be needed with engineered lumber verify with manufacturer) ¾ (19 mm) gap for crossgrain shrinkage CFDTT-22 Floor Line Expansion Joint Note: Peel & Stick tapes could be used at floor lines for additional protection

Space Sheathing for anticipated movement Track Provide support strapping spaced on 8 centers, fastened top only if slab is offset from framing Slip Track, anticipated movement occurs here Sealant sized for anticipated movement, 3/8 (9.5 mm) min. Superior Finish over Primecoat Primer, 1/2 Cemplaster Fiberstucco and Structa Wire Twin Trac 316 lath Casing Bead, place about 1/8 (3 mm) above flashing Framing, Sheathing & 2-Water Barriers Flashing Note: Peel & Stick tapes could be used at floor lines for additional protection CFDTT-23 Floor Line Expansion Joint with Drainage Provision

Superior Finish over Primecoat Primer, 1/2 Cemplaster Fiberstucco and Structa Wire Twin Trac 316 lath Sealant sized for anticipated movement, 3/8 (9.5 mm) min. Seal Water Barrier to Pipe Framing, Sheathing & 2-Water Barriers Pipe Penetration, secured and sealed with foam seal or equivalent Note: If pipe penetration is large provide casing bead and sealant joint around the pipe CFDTT-24 Pipe Penetration

Sealant sized for anticipated movement, 3/8 (9.5 mm) min. Soffit Superior Finish over Primecoat Primer, 1/2 Cemplaster Fiberstucco and Structa Wire Twin Trac 316 lath CFDTT-25 Soffit Detail Casing bead, hold back about 1/8 (3 mm) from framing Framing, Sheathing & 2- Water Barriers

Superior Finish over Primecoat Primer, 1/2 Cemplaster Fiberstucco and Structa Wire Twin Trac 316 lath Sealant sized for anticipated movement, 3/8 (9.5 mm) min. Seal Water Barrier to Box Light Fixture Cover Framing, Sheathing & 2-Water Barriers Waterproof box sized to stucco thickness, secured with wires sealed with foam seal or equivalent CFDTT-26 Light Fixture Detail Note: If light fixture penetration is large provide casing bead and sealant joint around the box

Superior Finish over Primecoat Primer, 1/2 Cemplaster Fiberstucco and Structa Wire Twin Trac 316 lath Sealant sized for anticipated movement, 3/8 (9.5 mm) min. Seal Water Barrier Vent Duct Framing, Sheathing & 2-Water Barriers Fastener Pre-drill hole, fill with sealant, snug tighten only Duct Penetration, secured and sealed with foam seal or equivalent. Use approved heat resistant sealers if required Note: If duct penetration is large provide casing bead and sealant joint around the duct CFDTT-27 Vent Detail

Superior Finish over Primecoat Primer, 1/2 Cemplaster Fiberstucco and Structa Wire Twin Trac 316 lath Lap WRB over stucco weep screed Framing, Sheathing & 2-Water Barriers Keep siding at least 4 (102 mm) above grade Stucco Weep Screed Accessory place 1 (25 mm) min. over foundation, use extended leg version if sheathing is proud if wall surface CFDTT-28 Detail at Grade

Roof Coping Cap with secondary weather protection and continuous cleat over treated nailer. Extend cap 2 (50 mm) min. over stucco and seal lower edge. Allow for drainage provisions behind deck Casing Bead set about 1/8 (3 mm) under nailer Superior Finish over Primecoat Primer, 1/2 Cemplaster Fiberstucco and Structa Wire Twin Trac 316 lath Framing, Sheathing & 2-Water Barriers CFDTT-29 Detail at Roof Cap

See Foam Shape Data Sheet for Specifics Backwrap Method Mesh Transition Method Superior Finish Master Wall Base Coat Master Wall Mesh Foam Shape Wrap Mesh 2-/2 (55 mm) Master Wall Adhesive Superior Finish Master Wall Base Coat Wrap Mesh 2-/2 (55 mm) Master Wall Mesh Foam Shape Master Wall Adhesive Primecoat Primer The foam shape is adhered to the wall surface using either a full layer of Master Wall adhesive (preferred) or notched trowel adhesive. Shape is backwrapped or pre-wrapped with mesh embedded in Master Wall base coat. Once cured, a Superior Finish is applied to the shape. The foam shape is adhered to the wall surface using either a full layer of Master Wall adhesive (preferred) or notched trowel adhesive. Mesh is embedded in Master Wall base coat and run onto the wall surface. Once cured, Superior Finish is applied to the shape. Prime the stucco wall with Primecoat Primer before finishing with Superior Finishes to minimize finish absorption variations. CFDTT-30 Foam Shape Detail

Install roofing felt 4 (10 cm) up roof, set roof step flashing and roofing. Set casing bead or weep screed 1-2 (25-50 cm) above roof line. Superior Finish over Primecoat Primer, 1/2 Cemplaster Fiberstucco and Structa Wire Twin Trac 316 lath Framing, Sheathing & 2-Water Barriers Set Kick Out flashing before roofing and set in sealant. Seal where stucco meets flashing. Casing Bead CFDTT-31 Roof Flashing Detail