TONOPAH AIRPORT RECONSTRUCT TAXIWAY A

Similar documents
TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By:

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

Appendix B. Airport Master Plan Update William R. Fairchild International Airport Port Angeles, Washington AIRPORT LAYOUT PLAN CHECKLIST

Chapter Four AIRPORT LAYOUT PLAN SET COMPONENTS

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

STANDARD BID ITEM NUMBERS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

NRE DESIGN PARK SITE DEVELOPMENT PLANS SECTION 3 TOWNSHIP 50 SOUTH, RANGE 25 EAST CITY OF NAPLES, COLLIER COUNTY, FLORIDA

ROWAN UNIVERSITY 201 MULLICA HILL ROAD GLASSBORO, NEW JERSEY 08028

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

2018 PARKING LOT MAINTENANCE & REPAIR

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.

X X X X X - Finalize drawing list X X B. Project Description

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

COLLIER COUNTY. Public Utilities Department Utility Deviation Approval Sheet. CC Resource Recovery Park DIW - FM separation from drainage structures

REPUBLIC OF CROATIA. Croatia Control Ltd. Aeronautical Information Service Rudolfa Fizira Velika Gorica, PO Box 103 Croatia

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Guidance Material for ILS requirements in RSA

SECTION 39 - MANHOLES TABLE OF CONTENTS

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

Jointed Precast Concrete Pavement

APPLICATION FOR SITE PREPARATION PERMIT

Lincoln County Public Works Water and Sewer Submittal Application

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum.

.1 Applicability: These criteria shall be applied as follows:

Page 1 of 10. Cuyahoga County Airport, Cleveland, Ohio. Airport Master Plan Update Draft Final Report and Draft Airport Layout Plan

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

CITY OF STOCKTON 2016 STANDARD PLANS AND SPECIFICATIONS PROPOSED REVISIONS

Date: 7/21/2014 Initiated by: AAS-100

FISCAL YEAR CAPITAL IMPROVEMENT PLAN AVIATION FACILITIES

2018 District 1 Highway Construction Program

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

Argos Ingegneria S.p.A. October 2009

Evaluation of In-Pavement Light Fixture Designs and Performance

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS FEBRUARY 2015

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

Airfield Obstruction and Navigational Aid Surveys

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

List of Figures. List of Forms

CITY OF MIAMI. CAPITAL IMPROVEMENTS PROGRAM Mark Spanioli, P.E., Director PRE-FAB/REMOVABLE SUPPORT FACILITY

Linear Airfield Lighting Evaluations: From the Laboratory to the Field

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

B-PERMIT PLAN CHECK MANUAL

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)

TO WHOM IT MAY CONCERN:

LIVELIFE.TRAVELWELL. DesignStandardsManual GeneralStandardsandCriteria DenverInterna onalairport AirportInfrastructureManagement

PILOT VISIBILITY STUDY

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022)

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS

Section 101. Street Design

TABLE OF CONTENTS 1200 PLAN PREPARATION

Washington County Road Engineering Plan Submittal/Review Checklist

Survey Data and TOPO Checklist

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

TOWN OF GARDEN CITY, UTAH GARDEN CITY PARK TRAIL

Facility Services Subgroup Preface for Divisions 21` through 28

CITY OF LAREDO 3MG SAN ISIDRO SUBDIVISION ELEVATED STORAGE TANK

REQUEST FOR PROPOSAL AERIAL PHOTOGRAPHY & DIGITAL MAPPING ROADS DEPARTMENT

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

MICRO MILLING. Applications and Advantages for Pavement Preservation

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

APPENDIX C VISUAL AND NAVIGATIONAL AIDS

CS2.0 COVER SHEET VOL. 2

Valley Road Main Replacement

Staff: Interim Executive Director. Business Development Director Environmental Programs Director. Planning and Development Director

CHAPTER 29 PROJECT COMPLETION DOCUMENTS

1.1 GENERAL RECORD DRAWING REQUIREMENTS

Precast Concrete. Installation Guide V GR-WI-599. Page 1

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

For crossing under a railroad, contact the specific railroad company's engineering department.

SIGN PERMIT APPLICATION

Miscellaneous. Demolition

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

Special Provision No. 999F29 March 2018 REQUIREMENTS FOR INSTALLATION OF METALLIC DOWELS INTO CONCRETE

CONCEPT REVIEW GUIDELINES

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

CONTRACT 1 DISTRICT G WATER STORAGE TANK EASTHAM, MASSACHUSETTS DECEMBER 2014 LIST OF DRAWINGS EASTHAM TOWN ADMINISTRATOR

Ecological Restoration Drafting & Design Guidelines

ADDENDUM #1. April 29, 2009

Plate 8132A - Preformed Rigid PVC Conduit Loop Detector, is a new plate requested by OTST.

CITY OF MUSKEGO DRAFTING STANDARDS

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

580 - NOISE BARRIERS OPSS 580 INDEX

Transcription:

RECONSTRUCT TAXIWAY A AIP NO. 3-32-0019-15 PWP-NY-2018-137 NYE COUNTY BID NUMBER 2018-01 NYE COUNTY, NEVADA MARCH 16, 2018 376 Coaldale 265 Silver Peak 6 95 Tonopah TONOPAH AIRPORT Goldfield Warm Springs 6 E to ly Oasis Nevada California 266 Lida 95 L to as Vegas VICINITY MAP N.T.S. C:\pw_work\atknanv01\fitz1543\dms41919\G-100 to 101.dwg Mar 14, 2018-12:58pm LOCATION MAP N.T.S. COUNTY COMMISSIONERS CHAIRPERMAN JOHN KOENIG VICE CHAIRMAN DAN SCHINHOFEN COMMISSIONER ANDREW BORASKY COMMISSIONER DONNA COX COMMISSIONER LORINDA WICHMAN PUBLIC WORKS ACTING DIRECTOR TIM DAHL 10509 Professional Circle, Suite 102 Reno, Nevada 89521-8991

SAFETY NOTES GENERAL NOTES EXISTING PROPOSED G-101 GENERAL NOTES AND LEGEND

PHASING NOTES 1) THE CONTRACTOR SHALL COORDINATE WORK ON THE AIRPORT AND INTERRUPTIONS OF AIRPORT OPERATIONS WITH THE ENGINEER. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM OWNER/ENGINEER A MINIMUM OF 48 HOURS PRIOR TO ANY WORK WITHIN RESTRICTED AREAS. 2) THE CONTRACTOR SHALL PLACE LOW PROFILE BARRICADES ACROSS THE TAXIWAY CONNECTORS TO PREVENT AIRCRAFT FROM ENTERING THE WORK ZONE AS SHOWN IN THE PLANS. IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE AND TO MAINTAIN THE BARRICADES AND THE RED LIGHTS FOR THE DURATION OF THE PROJECT. ANY DAMAGE TO THE BARRICADES OR LIGHTS SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE. AT THE END OF THE PROJECT, ALL BARRICADES WILL BE RETURNED TO THE COUNTY IN GOOD WORKING CONDITION. 3) IF TEMPORARY RUNWAY DISPLACEMENTS ARE NECESSARY, THEY SHALL BE ASSEMBLED AS SHOWN IN THE PLANS. IT IS THE CONTRACTORS RESPONSIBILITY TO MAINTAIN THESE DISPLACEMENTS FOR THE DURATION OF THE PROJECT. THIS INCLUDES PROVIDING SET UP, DAILY INSPECTION, AND TEAR DOWN AS NECESSARY TO MAINTAIN FUNCTIONALITY. 4) THE CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE & ELECTRICAL FACILITIES WITHIN THE CONSTRUCTION AREA UNTIL THE PROJECT IS COMPLETE. 5) WORK WITHIN THE RUNWAY OBSTACLE FREE ZONE () AND THE RUNWAY OBJECT FREE AREA () SHALL BE PERFORMED WITH THE SUPERINTENDENT MONITORING THE UNICOM FREQUENCY OF 123.00 FOR AIRCRAFT ACTIVITY. IF NECESSARY, ALL MEN AND EQUIPMENT SHALL VACATE THE UNTIL THE AIRCRAFT OPERATION HAS BEEN COMPLETED. 6) ALL EQUIPMENT SHALL BE RETURNED TO THE STAGING AREA AT THE END OF THE WORK DAY. NO EQUIPMENT OR STOCKPILES SHALL REMAIN IN THE OVERNIGHT. 7) ALL WORK EXCEPT FOR THE SECOND COAT OF PAINT MUST BE COMPLETED IN PHASE 1 BEFORE WORK IN PHASE 2 CAN BEGIN. THE SECOND COAT OF PAINT FOR PHASE 1 SHALL BE APPLIED AT THE SAME TIME AS THE SECOND COAT OF PAINT ON PHASE 2. PHASE (Calendar Days) CONSTRAINED START PHASE 1 - TAXIWAY A NORTH 21 Initial Notice to Proceed PHASE 2 - TAXIWAY A SOUTH, TAXIWAY A2 50 Phase 1 is Completed TOTAL TIME 77 CONTROL POINTS CONTROL POINT NORTHING EASTING ELEVATION Panel Point 10 20891072.734 1517975.245 5419.79' Panel Point 11 20888917.28 1518606.405 5409.22' BASIS OF BEARINGS, NEVADA COORDINATE SYSTEM, CENTRAL ZONE, VALUES BASED ON THE NORTH AMERICAN DATUM OF 1983, THE BASIS OF ELEVATION FOR THIS SITE IS NAVD88 AND PP#11 IS REFERENCED AS THE PRIMARY X,Y,Z VALUES. 8) SEQUENCE OF CONSTRUCTION EVENTS SUBJECT TO CHANGE: MOBILIZATION, PULVERIZING PAVEMENT & DEMOLITION, EARTHWORK & ELECTRICAL IMPROVEMENTS, AGGREGATE BASE, ASPHALT CONCRETE PAVING, SAWCUTS, CRACK SEAL, FOG SEAL, STRIPE, OPEN FOR USE, DEMOBILIZATION. OVERALL SITE, SAFETY & PHASING PLAN CS-101

CP-101 PHASE 1 SITE, SAFETY & PHASING PLAN

CP-102 PHASE 2 SITE, SAFETY & PHASING PLAN

A1 RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RPZ RPZ RSA RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ A1 11-29 15-33 A1 CD-101 TAXIWAY A DEMOLITION PLAN STATION 0+00 TO 18+20

T TAXIWAY A DEMOLITION PLAN STATION 18+20 TO 39+80 CD-102

TAXIWAY A DEMOLITION PLAN STATION 39+80 TO 61+40 CD-103

A3 33 A3 () () () RPZ RPZ RPZ RSA RSA RSA RSA CD-104 TAXIWAY A DEMOLITION PLAN STATION 61+40 TO 80+00

A A2 15-33 A2 FA A2 RSA RSA RSA RSA RSA RSA RSA A2 RSA RSA RSA RSA RSA RSA CD-105 TAXIWAY A2 DEMOLITION PLAN STATION 0+00 TO 8+50

A1 RSA RSA RSA RSA RSA OFZ 29 RSA RSA RSA RSA RSA RSA 15-33 RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ RPZ C-101 PLAN & PROFILE TW A STATION 0+00 TO 5+40

C-102 PLAN & PROFILE TW A STATION 5+40 TO 8+90

C-103 PLAN & PROFILE TW A STATION 8+90 TO 14+30

FA TOF C-104 PLAN & PROFILE APRON STATION 0+00 TO 4+00

C-105 PLAN & PROFILE TW A STATION 14+30 TO 19+70

TO TS C-106 PLAN & PROFILE TW A STATION 19+70 TO 25+10

TS TS FA C-107 PLAN & PROFILE TW A STATION 25+10 TO 30+50

C-108 PLAN & PROFILE TW A STATION 30+50 TO 35+90

A A2 A2 A A A2 C-109 PLAN & PROFILE TW A STATION 35+90 TO 41+30

A A2 A A A2 SA A2 A2 15-33 C-110 PLAN & PROFILE TW A2 STATION 1+00 TO 6+00

TS C-111 PLAN & PROFILE TW A STATION 41+30 TO 46+70

A TS T C-112 PLAN & PROFILE TW A STATION 46+70 TO 52+10

TS A C-113 PLAN & PROFILE TW A STATION 52+10 TO 57+50

C-114 PLAN & PROFILE TW A STATION 57+50 TO 62+90

TO TOF C-115 PLAN & PROFILE TW A STATION 62+90 TO 68+30

C-116 PLAN & PROFILE TW A STATION 68+30 TO 73+70

C-117 PLAN & PROFILE TW A STATION 73+70 TO 78+50

C-118 TYPICAL PAVEMENT SECTION DETAILS AND NOTES

CM-101 SAWCUT PLAN

CM-102 TAXIWAY A STRIPING PLAN STATION 0+00 TO 15+50

CM-103 RUNWAY 15-33 STRIPING PLAN STATION 29+60 TO 51+20

CM-104 RUNWAY 15-33 STRIPING PLAN STATION 29+60 TO 51+20

CM-105 RUNWAY 15-33 STRIPING PLAN STATION 72+80 TO 83+60

" " " " E-100 ELECTRICAL LEGEND AND NOTES

A A2 A2 15-33 A2 A2 A A A2 A A A2 E-101 TAXIWAY A AND TAXIWAY A2 ELECTRICAL LAYOUT AND CIRCUITING PLAN

E-102 APRON CONNECTOR ELECTRICAL LAYOUT AND CIRCUITING PLAN

E-401 ELECTRICAL DETAILS TAXIWAY EDGE LIGHTING DETAILS

E-402 ELECTRICAL CABLE CONNECTION DETAILS

E-403 ELECTRICAL CONDUIT DUCT BANK DETAILS

X AIRFIELD LIGHTING A A 8 - E-404 ELECTRICAL HANDHOLE DETAILS

E-405 ELECTRICAL DETAILS - TEMPORARY RELOCATED THRESHOLD DETAILS

E-406 ELECTRICAL SIGN DETAILS - 1

E-407 ELECTRICAL SIGN DETAILS - 3

E-408 ELECTRICAL VAULT DETAILS