HIDEAWAY SERIES POCKET DOOR SYSTEM ASSEMBLY INSTRUCTIONS

Similar documents
INSTALLATION INSTRUCTIONS

1 PREPARE HEADER AND ROUGH OPENING

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Pre-Hanging Information

For doors up to and including standard door sizes

Box Track INSTALLATION INSTRUCTIONS

TOYOTA MOTOR EUROPE CA Products Division Tel : Fax :

Cellar Hanger ASSEMBLY INSTRUCTIONS

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions

Top Mount Ultra Modern Hanger

Industrial Hanger ASSEMBLY INSTRUCTIONS

Contour Hanger ASSEMBLY INSTRUCTIONS

Sliding Pocket Door Systems

Installation Instructions

Heavy Duty I-Beam Trolley

Assembly Instructions 10 X 10 Aluminum Roof Support

Pillar Hanger ASSEMBLY INSTRUCTIONS

TWIG Hanger ASSEMBLY INSTRUCTIONS

Loft Hanger ASSEMBLY INSTRUCTIONS

Coburn Straightaway Door Gear

Stag Hanger ASSEMBLY INSTRUCTIONS

VERDERA T01-A INSTALLATION INSTRUCTIONS MIRRORED CABINET K-99003T-R/K-99003T-L K-99005T-R/K-99005T-L K-99009T

Versatrac Bypass Door Units, Conventional and Top Track, 300 and 400 Series

Assembly Instructions

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

Ripple Hanger ASSEMBLY INSTRUCTIONS

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

Assembly Instructions 10 X 10 Aluminum Frame Building

western window systems westernwindowsystems.com installation instructions non-pocket 2-1/4 panels

Joiner Kit For Models N388, C450, E402B, E411T, E415H, E440T, E442B, E521T and E522B

Coburn Interior Sliding Systems. Coburn COBURN SLIDING SYSTEMS

Vinyl Sliding Glass Door Assembly Instructions

INSTALLATION GUIDE. 1. Overview. 2. Measuring. 3. Tools & fixings you will need B C. Opening Width. Opening Height

RLP Flat Track Hardware sliding door hardware/ barn door track

SINGLE TRACK BYPASS (patent pending) barn door hardware

Chapter 18. Interior Doors

Single. HowTO install this. READ this HowTO CAREFULLY! sliding door unit. (It could save you lots of work!) Before you start:

Privacy Wall Glass Selections - Polished Edge Slider Door

Installation Instruction

Installation Instruction

IDP Entry-Fit Steel Door Frames. Installation Instructions K2A and NK2A Series Frames

Assembly Instructions Please keep for future reference Inspire 40

Spoked GARRICK HANGER

Stage 2: Preparing the door (read in conjunction with Hole Drilling Options on back of Template).

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

How To Measure Your Finished Opening

COBURN SLIDING SYSTEMS

(2) Plastic Plugs (2) Frame Bracket. Spacers. License Plate Bracket. (2) 12mm Single Bolt Plates. (2) 12mm Double Bolt Plates

340 & 350 SERIES DELUXE FRAMELESS BYPASS

Assembly Instructions

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

Oxford Stalls Installation Instructions

Installation Instructions

READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION

INS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER

Rockwell 4-in-1 Sliding Door

Sliding Glass Door Assembly and Installation Guide

Best Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

WAREHOUSE HANGER INSTALLATION INSTRUCTIONS R H INS T A L L A TIO N INS T R U C TIO N S

SIDE FOLDING POST ADJUSTMENTS

Trim type: Shadow gap. Fire rating: FD30. Enigma. Pocket sliding door systems. Installation instructions FD30 S

Triple Bypass System

INSTALLATION INSTRUCTIONS DANUBE ACRYLIC NEO ANGLE

S H E D A S S E M B L Y I N S T R U C T I O N S

Vanity Installation Instructions

9/16" (14mm) 1/2" (12mm)

Installation Instructions

SYSTEM 42 SCREEN CASSETTE WITH 30mm SIDE RAIL

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

Installation Instructions

S H E D A S S E M B L Y I N S T R U C T I O N S

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

Installation Instructions

A POCKET GUIDE TO POCKET DOORS

Vanity Installation Instructions

ATLANTIS RAIL Contact Information

#916 CLASSIC 16 GUN CABINET ASSEMBLY INSTRUCTIONS

Installation Instructions

ROCKWELL 4-IN-1 DOOR. Two Panel Door. Half X Door. Z Combination Door. Double X Door

Instructions for Lighting an S Scale Caboose

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

Installation And Care Instructions. Vertical Honeycomb Shades

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

R Form No MILLENNIUM GONDOLA / WALLCASE ASSEMBLY

Straight Stringer Installation Instructions

Installation and Assembly: Flat Video Wall Mount For 40" to 65" Flat Panel Displays

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit

ASSEMBLY INSTRUCTIONS DIY WALL BED KIT QUEEN BI FOLD DOOR CABINET & MECHANISM. Tools Required For Assembly. 6.5mm Masonry Drill Bit

Installation Instructions. Single. READ these Installation Instructions CAREFULLY! sliding door unit. Before you start: WHAT YOU NEED TO KNOW FIRST.

x2 1/4 (6mm) Floor Anchor

RLP Mini Low Profile V Track Hardware sliding door hardware/ barn door track

ProBuilder Series CoolSmart TV (42PB - sku# )(54PB - sku# )(72PB - sku# )

Installing flat panels on the MPL15 wall mount

Transcription:

HIDEAWAY SERIES POCKET DOOR SYSTEM ASSEMBLY INSTRUCTIONS Part No. PRODUCT RANGE (UK IMPERIAL SIZES) MADE FOR 50mm X 100mm STUD WALLS Item Code Available Sets Maximum Door Width Maximum Door Height Coburn Sliding Systems Limited, Unit1, Cardinal West, Godmanchester PE292XN Tel: +44 (0)208545 6720, E-mail: sales@coburn.co.uk www.coburn.co.uk Maximum Door Weight 61730 H30* 762mm 2032mm 56kg 61736 H36* 915mm 2032mm 56kg 61742 H42* 1067mm 2032mm 90kg 61842 H42A 1067mm 2743mm 90kg 61848 H48A 1219mm 2743mm 90kg 61854 H54 1371mm 2743mm 90kg 61860 H60A 1524mm 2743mm 90kg IMPORTANT! Before proceeding with the assembly carefully inspect the packaging to make sure the components have not been damaged during transit. IMPORTANT! Opening height must be measured from finished floor level (taking account of any flooring) Opening must be square, plumb with studs and level. Door meeting require 2 kits and the 61600 jointing kit Note! Instructions are for a 2032mm door, if door is shorter, lower header and cut bottom ends of Split Studs. All purpose frames, marked to cut to shorter length PART No. 06426.47

CONTENTS 61730/736/742/842/848/854/860 POCKET DOOR KIT ACCESSORIES 61601 CAVITY WIDENING KIT (UP TO 50mm THICK DOORS) 61602 CAVITY WIDENING PLATES, (UP TO 50mm THICK DOORS) 61700 COMPONENT KIT 61900 ADAPTOR KIT (UP TO 44mm THICK DOORS) 61600 JOINTING KIT

ACCESSORIES (CONTINUED) 61604 HANGER, 56kg 61607 HANGER, 90kg 61606 DOOR STOPS (5pcs), DOOR MOUNTED 61611 DOOR STOP, TRACK MOUNTED 61910 BOTTOM GUIDE 95604 POCKET DOOR HOLD OPEN PISTON 30620 SOFT CLOSER KIT, 90KG 30621 SOFT CLOSER KIT, 60KG 61421 SIMULTANEOUS OPERATOR KIT 1000mmX1000mm

Step 1 Opening preparation NAIL ON CENTER NAIL NAIL ROUGH OPENING HEIGHT DOOR HEIGHT + 114mm SET NAIL AT DOOR HEIGHT + 19mm to 38mm CHALK LINE ROUGH OPENING WIDTH 2 X DOOR WIDTH + 25mm CONSTRUCT A ROUGH OPENING. The Header must be square and plumb with studs and LEVEL. Minimum height is 2140mm, width is 2 x Door Width + 25mm. NB: Instructions are for 2032mm high doors. MEASURE up from the finished floor 2051mm or from the sub-floor 2070mm. This will give 19mm to 38mm clearance under the door. Mark each rough stud and drive a flat head nail in the centre, leaving 3mm protruding. (Frame header end brackets will rest on these nails). Step 2 Prepare track / header a. Take the track/header and place it on a flat surface with the wooden head facing down; a. b. A B b. Remove end bracket and turn the header over; c. Cut the wood header ONLY, at desired door size, use markings. DO NOT CUT THE TRACK; A B 2/8 = 810mm (32 ) 2/6 = 760mm (30 ) 2/4 = 710mm (28 ) 2/0 = 610mm (24 ) c. d. d. Turn the assembly with the wood head facing down and cut the aluminium track 35mm shorter than the wooden header; e. Turn header on the side and cut the trim board ONLY, on each side at door size, use markings; e. f. f. Put back the end bracket at the end of the wooden head. 4

Step 3 Mark the floor Make a straight chalk line on each side of the side studs to help define the pocket edges. Step 4 Position the track / header C D C D Insert the track into the opening over the nails. After ensuring the track is levelled secure the end brackets with screws. NB: If opted for a simultaneous operator please refer to the instructions provided with it. 5

Step 5 Prepare split studs IMPORTANT! Before proceeding with step 5, ensure the studs are straight. i.e. no damage has occurred during transit. E E1 E2 Cut the split stud at the overall height (H), DO NOT USE PLASTIC SPACERS. For doors over 38mm up to 44mm install the plastic spacers, supplied in a plastic bag. Insert the pins from the plastic spacer into slots located on the split studs on the metal side, as shown above (E2). NB: If opted for a cavity widening kit please refer to the instructions provided with it. Place a split stud on the track and butt it up to the head, pre-drill and countersink holes for fixing screws, in the wood header NOT THE TRACK. Repeat the step for all the split studs. NB: If using adaptor kit place nylon spacers before placing stud Step 6 Installing split studs overview If kit supplied has 4 split studs, the first set of 2 will be placed on the track and butted up to the head. The remaining set will be placed on the track and equally spaced between the first set and the side stud. NB: The face with the timber exposed MUST be facing out. If kit supplied has 6 split studs, the first set of 2 will be placed on the track and butted up to the head. The remaining 2 sets will be placed on the track and equally spaced between each other, the first set (already installed) and the side stud. NB: The face with the timber exposed MUST be facing out. 6

Step 7 Fixing split studs into floor plate NB: For doors up to 38mm use the plates that are inside the box and not sealed in the plastic bag NB: For doors over 38mm up to 44mm use the plates from the plastic bag, for wider doors a widening kit MUST be used. Slip floor plate fingers into split studs. DO NOT FIX THE PLATE TO THE FLOOR. NB: If opted for a widening kit please refer to the instructions provided with it. Step 8 Fixing split studs onto track Fix the first set of split studs by butting them to the header and the track, make sure they are in a levelled position, and fix them with screws. Fix the second pair of studs by butting them to the track equally spaced between the first set and the side stud, make sure they are in a levelled position and fix them with screws. 7

Step 9 Fixing floor plates to floor Ensure studs are straight (on the front and on the side). To double check if everything is straight the floor plate must be located in the middle of the chalk lines. Secure the floor plate with screws. Step 10 Door preparation: installing hanger plates 50 50 Attach the door plates on the top of the door at 50mm from the edges. NB: The lock tabs MUST be on the same side If opted for a soft closer or a simultaneous operator please refer to the instructions provided with it. 8

Step 11 Door preparation: rear bumber 1000 Attach bumper at the back of the door at 1000mm from the bottom. If opted for a holdback piston please refer to the instructions provided with it. Step 12 Insert hangers into track Wheel alternation Insert hangers into track alternating wheel positioning for even weight distribution 9

Step 13 Door installation Mount the hanger closer to the pocket first. Insert the hanger pin into door plate slot. Step 14 Door installation continued. Slide the door inside the pocket to ease mounting the second door plate. Insert hanger pin into the second door plate slot. 10

Step 15 Secure hanger pins After pins are fully inserted into door plates secure them by rotating the lock tab into locked position. After securing the pins adjust the height of the door, using the special spanner supplied, by rotating left and right the hanger bolt Step 16 Install bottom guides Apply desired wall material. Wall material is brought clear to edge of opening. WARNING: Use screws no longer than necessary. Screws must not protrude into pocket or door will be damaged. To provide a firm nailing surface, slip a 54mm wide board between split studs temporarily. After installing the architrave (NOT SUPPLIED BY COBURN), install the bottom guides. Adjust height to ensure door is central in pocket. NB: If opted for a different guide please refer to the instructions provided with it. 11

HIDEAWAY SERIES Fitting instructions Coburn Sliding Systems Limited Unit 1, Cardinal West, Godmanchester, PE29 2XN, United Kingdom Phone: +44 (0)20 8545 6680 Fax: +44 (0)20 8545 6720 E-mail: sales@coburn.co.uk www.coburn.co.uk