Tools Required Page 1. KIT CONTENTS: Smoking Shelter Page 1-2 Smoking Shelter Optional Extras Page 3

Similar documents
MODUS 770 AND MODUS 1280 (FLAT PACK) OPERATIONAL, ASSEMBLY & FIXING INSTRUCTION LEAFLET

VISAGE SCREEN SYSTEM - FOUR SIDED (FLAT PACK) OPERATIONAL, ASSEMBLY & FIXING INSTRUCTION LEAFLET

INSTALLATION INSTRUCTIONS

RECYCLED MATERIAL PICNIC TABLE FLAT PACK ASSEMBLY INSTRUCTIONS

PEMBRIDGE PICNIC TABLE INSTRUCTIONS MANUAL

Assembly Instructions

Assembly Instructions

PFW 6851 Display Wall Mount, Turn & Tilt 80 kg INSTALLATION INSTRUCTIONS

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT

LOCKN LOAD FIRST TIME INSTALLATION

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Oxford Stalls Installation Instructions

Side Mount INSTRUCTION BOOKLET #C122 BED STYLE: PARK CITY

Triplex Instructions for Packing and Unpacking

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

LOCKN LOAD FIRST TIME INSTALLATION

Installation Instruction

Installation Instructions

Assembly Instructions 10 X 10 Aluminum Roof Support



RTS518 - Rhino Heavy Duty 2 & 3 Crossbar System Hyundai iload, imax, i800, H-1.

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

Pickup Box Utility Rack Package Installation (Instruction ID: )

Privacy Wall Glass Selections - Polished Edge Slider Door

Curium 19H Installation Instructions & Parts List

LOCKN LOAD FIRST TIME INSTALLATION

13MM FLAT WRENCH FOR LEVELING THE GLIDES OF STRUCTURE 6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME

Star Trac Turbo Trainer Assembly & Setup

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS



TIP FOR GETTING STARTED

INSTALLATION INSTRUCTIONS

REGENCY TIMBER BUILDINGS

Kawasaki Teryx 750 Cab Kit* Caution: Before using this product, read this manual and follow all Safety Instructions.

installation instructions WC Frame 1180mm with Dual Flush Cistern

INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE

S H E D A S S E M B L Y I N S T R U C T I O N S

INSTALLING YOUR NEW SPRING LIFT ARM KIT

v1.0 ASSEMBLY GUIDE Mia Wide Bookcase

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

WILDING WALLBEDS INSTALLATION INSTRUCTION Side Mount

This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently.

installation instructions

INSTALLATION INSTRUCTIONS Flat Panel Static Wall Mount Model: GSM-111

LOWLINE SINGLE FOLD DOWN WALL BEDS

ASSEMBLY INSTRUCTIONS FOR MAR-K BEDSIDES AND GM FLUSH TAILGATE WITH HANDLE

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

INSTALLATION GUIDE. 1. Overview. 2. Measuring. 3. Tools & fixings you will need B C. Opening Width. Opening Height

Installation Guide. Bi-fold Doors

Frameless Fixed Panel Slider

Ultra Fast Delivery SGL Toilet Cubicle Pack Fitting Instructions

ASSEMBLY GUIDE. Mia Narrow Bookcase

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

Qwik-Fence Installation Instructions

INSTALLATION INSTRUCTIONS

TOOLS REQUIRED FOR ASSEMBLY. Rubber Mallet or Plastic Tip Hammer PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER.

HONDA RIDGELINE (KIT #601) Installation Instructions (to be used in addition to owners manual)

Assembly Instructions

Installation Instructions

OWNER S MANUAL CONTENTS. The only table saw fence with Automatic Positioning Control TM

READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION

Installation Guide Contemporary Alfresco V1.3 LU

Installation Guide Simplicity Alfresco. V1.9 Lu070318

INSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

INSTRUCTIONS FOR ASSEMBLY 2355mm x 3125mm Workshop

Joiner Kit For Models N388, C450, E402B, E411T, E415H, E440T, E442B, E521T and E522B

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

RLT500 - Rhino Track Leg Kit

Installation Instructions

Warnings. Description. Prior to Installation Tools Needed

Installing Brackets to Minimize Distortion in Your SMART Board 685ix Interactive Whiteboard System s Projected Image

3/8 FRAMELESS BYPASS SLIDING SHOWER ENCLOSURE

INFINITE RANGE - HINGE DOOR

Stage 2: Preparing the door (read in conjunction with Hole Drilling Options on back of Template).

Installation Instructions

PFW Installation Guide Installationsanleitung, Guía de Instalacíon, Guida de Installazione, Guide d Installation, Installatie gids

INFINITE RANGE - CENTRE FOLDING DOOR

INSTRUCTIONS FOR ASSEMBLY 2355mm x 4665mm Workshop

Please read BOTH these Installation Instructions and the General Instructions before attempting to install or operate this equipment.

INSTALLATION INSTRUCTIONS

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS

Model 6100 Illustrated Installation Instructions Contractors Wardrobe

Custom Wood Frame Overlay for Glass Doors Installation Instructions

SINCE 1922 P UBLICATION N O

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

INSTALLATION INSTRUCTIONS

ASSEMBLY INSTRUCTIONS DIY WALL BED KIT QUEEN BI FOLD DOOR CABINET & MECHANISM. Tools Required For Assembly. 6.5mm Masonry Drill Bit

ROOFSAFE ANCHOR & CABLE

Bunk Pod Front Entry Assembly Instructions

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

STOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets

Installation for Full Size Polaris Ranger Crew Doors

Transcription:

TM MODUS SHELTER 770 AND 1280 FLAT PACK ASSEMBLY & FIXING INSTRUCTION LEAFLET NOTE: Ensure that all relevant personnel read the points listed below and that a copy is passed on to staff involved with the installation. Please also refer to the Manual Handling Operations Regulations 1992 during the handling of the product and materials used for installation. CONTENTS: Tools Required Page 1 KIT CONTENTS: Smoking Shelter Page 1-2 Smoking Shelter Optional Extras Page 3 Standard Shelter Page 4-5 Standard Shelter Optional Extras Page 6 Section 1 : ASSEMBLY OF SHELTER Page 7-10 Section 2 : ASSEMBLY OF SHELTER - OPTIONAL EXTRAS Page 10-15 Section 3 : UNPACKING THE SHELTER Page 16 Section 4 : INSTALLATION OF SHELTER Page 16-17 Section 5 : ADJUSTMENT OF LEGS Page 18

TOOLS REQUIRED: 13mm Spanner Hand Drill with Pozi Drive Drill Bit M6 Pin Torx Screwdriver Bit 19mm x 150mm Masonry Drill Bit Rubber Mallet Hammer Flat Head Screwdriver Pencil and Tape Measure 17mm Spanner / Socket x2 5mm Allen Key 6mm Allen Key 19mm Spanner / Socket 18mm Masonry Drill Bit Torque Wrench with 19mm Socket Heavy-Duty Electric Drill Scalpel or other sharp blade SMOKING SHELTER KIT CONTENTS: Modus 770 1280 Assembled Shelter (770) ITEM 1 770 Roof ITEM 2 1280 Roof ITEM 3 Front Left Corner Extrusion ITEM 4 Front Right Corner Extrusion ITEM 5 Rear Corner Extrusion x2 x2 ITEM 6 Spigot Leg x4 x4 ITEM 7 Top Glazing Support Side 770 x2 ITEM 8 Top Glazing Support Side 1280 x2 ITEM 9 Top Glazing Support Rear ITEM 10 PETG Glazing Side 770 x2 ITEM 11 PETG Glazing Side 1280 x2 ITEM 12 PETG Glazing Rear ITEM 13 Middle Support Extrusion Side 770 x2 ITEM 14 Middle Support Extrusion Side 1280 x2 ITEM 15 Middle Support Extrusion Rear ITEM 16 PETG Panel Clamp Extrusion x6 x6 ITEM 17 PETG Glazing Filler Strip Side 770 x2 ITEM 18 PETG Glazing Filler Strip Side 1280 x2 ITEM 19 PETG Glazing Filler Strip Rear ITEM 20 Ecoboard Panel Side 770 x2 ITEM 21 Ecoboard Panel Side 1280 x2 ITEM 22 Ecoboard Rear Panel ITEM 23 Bolt M8 x 20mm x8 x8 ITEM 24 Washer M8 x8 x8 ITEM 25 Security Screw M6 x 16mm x8 x8 ITEM 26 Roof Corner Bracket x2 x2 ITEM 27 Security Screw 20mm x24 x26 ITEM 28 Bolt M10 x 50mm x4 x4 ITEM 29 Nylon Spacer 20mm OD x4 x4 ITEM 30 Nylon Plug x5 x5 ITEM 31 M10 Nut x4 x4 ITEM 32 M12 Ground Fixing Anchor Bolt x4 x4 Assembled Shelter (1280) P. 1

SMOKING SHELTER 1 7 8 9 2 3 4 5 10 11 12 13 14 15 16 6 17 18 19 23 24 25 20 21 22 26 27 28 770 SIZE 1280 SIZE 29 30 31 32 P. 2

SMOKING SHELTER OPTIONAL EXTRAS: (please refer to your order) 33 34 Full Rear Ecoboard Panel Kit Modus 770 1280 ITEM 33 Pozi Pan Screw 60mm x2 x2 ITEM 34 Washer M5 x 25mm OD x2 x2 ITEM 35 Ecoboard Panel Rear Top As well as the above additions, the following item QTY s are affected: 35 ITEM 9 Top Glazing Support Rear Removed from kit ITEM 12 PETG Glazing Rear Removed from kit ITEM 16 PETG Panel Clamp Extrusion x4 x4 ITEM 19 PETG Glazing Filler Strip Rear Removed from kit Please see page 10 for fitting instructions Ashmount SG 37 ITEM 36 Ashmount SG ITEM 37 No. 10 (Ø4.8 x 32mm) Pozi Screw x4 ITEM 38 Washer x4 ITEM 39 Nylon Spacer (Lift-off mounting) x4 38 Please see page 12-13 for fitting instructions 36 39 Ashmount (various sizes) ITEM 40 Ashmount ITEM 37 No. 10 (Ø4.8 x 32mm) Pozi Screw x4 40 Please see page 13 for fitting instructions 37 P. 3

STANDARD SHELTER KIT CONTENTS: Modus 770 1280 Assembled Shelter (770) ITEM 1 770 Roof ITEM 2 1280 Roof ITEM 3 Front Left Corner Extrusion ITEM 4 Front Right Corner Extrusion ITEM 5 Rear Corner Extrusion x2 x2 ITEM 6 Spigot Leg x4 x4 ITEM 7 Top Glazing Support Side 770 x2 ITEM 8 Top Glazing Support Side 1280 x2 ITEM 9 Top Glazing Support Rear ITEM 10 PETG Glazing Side 770 x2 ITEM 11 PETG Glazing Side 1280 x2 ITEM 12 PETG Glazing Rear ITEM 13 Middle Support Extrusion Side 770 x2 ITEM 14 Middle Support Extrusion Side 1280 x2 ITEM 15 Middle Support Extrusion Rear ITEM 16 PETG Panel Clamp Extrusion x6 x6 ITEM 17 PETG Glazing Filler Strip Side 770 x2 ITEM 18 PETG Glazing Filler Strip Side 1280 x2 ITEM 19 PETG Glazing Filler Strip Rear ITEM 20 Ecoboard Panel Side 770 x2 ITEM 21 Ecoboard Panel Side 1280 x2 ITEM 22 Ecoboard Rear Panel ITEM 23 Bolt M8 x 20mm x8 x8 ITEM 24 Washer M8 x8 x8 ITEM 25 Security Screw M6 x 16mm x8 x8 ITEM 26 Roof Corner Bracket x2 x2 ITEM 27 Security Screw 20mm x24 x26 ITEM 28 Bolt M10 x 50mm x4 x4 ITEM 29 Nylon Spacer 20mm OD x4 x4 ITEM 30 Nylon Plug x5 x5 ITEM 31 M10 Nut x4 x4 ITEM 32 M12 Ground Fixing Anchor Bolt x4 x4 Assembled Shelter (1280) P. 4

STANDARD SHELTER 1 2 7 8 9 3 4 5 10 11 12 13 14 15 16 6 17 18 19 23 24 25 26 27 28 20 21 22 770 SIZE 1280 SIZE 29 30 31 32 P. 5

STANDARD SHELTER OPTIONAL EXTRAS: Please refer to your order 33 34 Full Rear Ecoboard Panel Kit Modus 770 1280 ITEM 33 Pozi Pan Screw 60mm x2 x2 ITEM 34 Washer M5 x 25mm OD x2 x2 ITEM 35 Ecoboard Panel Rear Top 35 As well as the above additions, the following item QTY s are affected: ITEM 9 Top Glazing Support Rear Removed from kit ITEM 12 PETG Glazing Rear Removed from kit ITEM 16 PETG Panel Clamp Extrusion x4 x4 ITEM 19 PETG Glazing Filler Strip Rear Removed from kit Please see page 10 for fitting instructions 41 42 43 44 Perch Seat 1200 QTY:1 ITEM 41 Perch Seat 1200 ITEM 42 M10 Coach Bolt x4 ITEM 43 M10 Nut x4 Please see page 11 for fitting instructions Perch Seat 600 QTY:2 QTY:1 ITEM 42 M10 Coach Bolt x8 x4 ITEM 43 M10 Nut x8 x4 ITEM 44 Perch Seat 600 x2 Please see page 12 for fitting instructions 45 Blank Signage Panel ITEM 45 Blank Signage Panel ITEM 46 5.5 x 50mm Security Screw x6 ITEM 47 Washer M5 x 25mm x6 ITEM 48 Nylon Spacer x6 46 47 Please see page 14 for fitting instructions 48 49 Polycarbonate Graphic To fit to: Blank Signage Panel (see above) ITEM 49 Polycarbonate Signage Panel ITEM 50 4.5 x 20mm Security Screw 6 ITEM 51 Hinged White Cover Cap 6 50 51 Please see page 15 for fitting instructions P. 6

Section 1: Assembly of Shelter 1 2 3 5 3 23 24 22 745mm 6 5 Slide all 4 Spigot Legs (ITEM 6 s) into the bottom of each of the Corner Extrusions (3-5). The holes in the Spigot Legs will align with the diagonally spaced holes in the Extrusions. Secure the Spigot Legs in place using the M8 fixings (23-24) with the 13mm spanner. 4 Take the Rear Panel (22) and slide it into the right hand slot in one of the Rear Corner Extrusions (5) as above. For the Smoking Shelter, ensure the cut edge of the panel faces upwards. 5 Measure from the top of the Extrusion and mark in pencil a distance of 745mm. Align the top of the Ecoboard Panel with this mark and ensure the Panel is located inside the channel in the Extrusion so that it sits flush with the back of the channel. 6 27 Using the hand drill and security bit, fix the Panel into the Extrusion using a Security Screw (27) through the upper fixing hole. Using rubber mallet, tap the side at the bottom of the Extrusion to ensure that the Panel is pushed fully into the Extrusion. 7 8 21 9 3 20 5 Using the hand drill and security bit, fix the Panel into the Extrusion using another Screw (27) through the lower fixing hole (see above). 21 20 5 4 Repeat STEPS 2-6 to fix the remaining Rear Corner Extrusion (5) to the other end of the Panel. Repeat the process to fix a Side Panel (20 or 21) to the Corner Extrusion (5). Attach a Front Left Corner Extrusion (3) to the opposite end of the Panel. P. 7 Fix the remaining Side Panel (20 or 21) to the vacant slot in the Rear Corner Extrusion (5). Attach the Front Right Corner Extrusion (4) to the Panel.

10 15 11 12 16 22 Push the Middle Support Exrusion (15) onto the top edge of the Panel (22). Ensure the side with the two notches meets with the Panel. Repeat this for the Side Panels using the Extrusions (13 or 14.) 13 14 Slide the 3 x PETG Panels (12 and 10 or 11) into the slots in the Corner Extrusions from the top. Ensure the sides of the PETG with the printed protective sheets on face outwards. Peel back (but do not remove) this outer sheet from all the edges. Insert the Panel Clamp (16) into the channel of the Extrusion from the inside of the shelter with the teeth touching the PETG sheet. 15 19 Push it in by hand, aligning the top of the Clamp with the Extrusion. Using the rubber mallet and a piece of timber* (not supplied) gently tap the Panel Clamp into the channel part way. *30-50cm softwood baton. 16 Use the timber to tap the Panel Clamp level with the top of the Corner Extrusion. Once aligned, hammer the Panel Clamp fully into the channel using the timber until it locks into place. Repeat for the Middle Support Extrusions (13 or 14). 17 8 7 Using a sharp blade, run the knife down the edge of the Panel Clamps to carefully cut the clear protective films on the inside of the PETG sheets and remove. Insert the Rear Glazing Filler Strip (19) in the channel into the Extrusion (15). 18 31 Use the rubber mallet and timber to Slide the Top Glazing Supports (9 secure the Glazing Strip fully within and 7 or 8) over the top of the PETG the channel along its entire length. Panels. Ensure the deeper face of the Repeat for Side Filler Strips (17 or 18). Top Glazing Support faces outwards. Check there is a Nut in each of the moulded legs. If not, place one of the Nuts (31) into each of the four hexagonal shaped recesses. P. 8

19 1 2 20 21 28 29 26 Lift the Roof (1 or 2) above the shelter and drop the Roof legs into the Extrusions (3-5) in the four corners of the Frame. This may require two people. Slide the Roof Corner Brackets (26) Use the M10 Fixings (28-29) to into the largest cavity in the Front secure the Roof to the Corner Corner Extrusions with the part of the Extrusion through the central hole, Bracket with the hole pointing in tighten using your fingers. Repeat towards the entrance to the shelter. this for the other three Extrusions. 22 23 24 27 24 25 Using the drill fix the M6 Security Screws (24-25) into the two remaining holes in each of the four Corner Extrusions (3-5). Using a 17mm spanner, carefully tighten the M10 Fixings from STEP 21 until you feel resistance. DO NOT OVERTIGHTEN. Using the drill and security drill bit secure the 2x Brackets (26) to the underside of the Roof (1 or 2) using Security Screws (27). 25 27 Using the drill fix the top glazing supports into the roof using the remaining Securit Screws (27). Fix through all four holes in each Top Glazing Support Extrusion. Finally, remove all the protective film from the outside of the Glazing Panels. The shelter is now assembled and ready for installation. P. 9

Section 2: Assembly of Shelter - OPTIONAL EXTRAS Move straight onto SECTION 3 if your shelter does not include any of these features: 1. FULL REAR BACK PANEL SEE STEPS 26-29 2. PERCH SEAT 1200 SEE STEPS 30-37 3. PERCH SEAT(S) 600 SEE STEPS 38-39 4. ASHMOUNT SG SEE STEPS 40-45 5. ASHMOUNT SEE STEPS 46-48 6. BLANK SIGNAGE PANEL SEE STEPS 49-53 7. POLYCARBONATE SIGNAGE SEE STEPS 54-58 1. FULL REAR BACK PANEL 26 27 28 35 9 12 Follow STEPS 1-10. At STEP 11, rather than fitting Glazing (12) in the rear of the shelter, instead substitute with an Ecoboard Rear Top Panel (35). Slot the Panel down the channel from the top. A rubber mallet may be required to push the Panel down the channel as the fit is quite tight. Tap the top of the Panel until it is level with the top of the Extrusions as shown. 29 16 19 Follow STEPS 12-24, with the exception of fitting the Glazing fixing components to the rear of the shelter (i.e. do not fit 9,12, 16 and 19). 33 34 Secure the hood to the panels using the drill to fix the Screw and Washer (33 and 34) though the Roof Tabs and through into the Panelling. In order to minimise any gaps between the Roof and Panels you may require somebody to apply force to the Roof from the outside whilst the Fixings are installed from the inside. P. 10

2. PERCH SEAT 1200 30 31 32 Hold the Seat (41) where you want it to be positioned on the Rear Panel (ensure the top of the Seat is at a height of 750mm). Mark the position of the four fixing keyhole slots onto the Rear Panel. 33 From inside the shelter, drill the upper left fixing keyhole through the Panel using a 12mm drill bit and hand drill. 34 From outside the shelter fit one of the Coach Bolts (42) through the drilled hole. 35 42 Slot the upper left fixing keyhole of the Seat over the Bolt from inside the shelter. Hand tighten a Nut (43) onto the thread. Pivot the Seat up at the opposite end, ensuring it is level by using a spirit level. Mark the hole positions. 36 38 Slot the key holes over the Bolts and push down to locate them. Screw on the Nuts (38) until finger tight. Check the marks align with the keyslots in the seat. If not, remark their positions. Remove the Nut and then whole Seat and set aside. Follow STEPS 31-32 for the remaining fixing points. 37 P. 11 Lift the Seat up so that the key holes line up with the protruding Bolts that are now sticking through the Panel on the inside of the shelter. Using the 17mm socket or spanner, tighten the fixings until the head of the Coach Bolt compresses against the outside face of the Ecoboard Panel with the fixing no longer turning. Take care that the head of the Coach Bolt does not pull against the Ecoboard such that the Panel is dented or dished. This indicates that the fixing is overtightened. Repeat until all four fixings are secured.

3. PERCH SEAT 600 38 39 21 20 For the Perch Seat 600 these are fitted on the interior Side Panels (see above). The installation is very similar to the Perch Seat 1200 so follow the same procedures as STEPS 30 to 37. The seat can be placed centrally or to either side of the the Side Panels. However, please ensure the top of the seat is installed at a height of 750mm. 4. ASHMOUNT SG PERMANENT MOUNTING ADDITIONAL TOOLS REQUIRED: 3mm Drill Bit 40 41 42 36 38 37 Open the Ashmount SG (36) and remove the liner. Pop out the four holes as illustrated above (we recommend a screwdriver for this). Place the unit in the desired position on the Ecoboard Panel and mark through the four hole positions using a scribe or pen. Remove the unit and drill four pilot holes using a 3mm drill bit. Drill to a depth of 10mm. Use a piece of masking tape wrapped onto the drillbit as a guide. (CAUTION - DO NOT DRILL ALL THE WAY THROUGH THE PANEL!) Attach the unit to the panel using Screws and Washers provided (37 and 38) and tighten using the hand drill. P. 12

4. ASHMOUNT SG LIFT OFF MOUNTING 43 44 45 37 Open the Ashmount SG and remove the liner. Pop out the four L shapes as illustrated above. Place the unit in the desired position on the Ecoboard Panel. Mark the four hole centres (see above) using a scribe or pen onto the Panel. 5. ASHMOUNT 46 39 Drill four pilot holes using a 3mm drill bit (CAUTION - DO NOT DRILL ALL THE WAY THROUGH THE PANEL!) - see STEP 41. Fix the Screw and Washer (37 and 39) into the Panel so that the screw heads stick out enough to allow the unit to be fitted (approx. 5-10mm). If the unit does not fit then adjust the depth of the Screws until it does so. 47 Open the unit and line up the bulbous ends of the L shaped slots with the screw heads sticking out from the Panel. Slot the unit over the screw heads and slide the Ashmount SG to the right and downwards to engage the Fixing in the top of the L shaped slot. The unit can be removed when required. 48 37 3mm 40 Remove the Liner from inside the Ashmount (40). Hold the Ashmount in position on the Panel where you want it to be sited. Mark the hole centres through the keyhole slot in the unit (see above) using a pen or scribe. Ensure the unit is level with the top of the Panel either by measuring the same distances from the top of the Panel to the hole centres or by using a spirit level. Drill a small pilot hole using the 3mm drill bit from inside the shelter into the positions just marked using the hand drill (CAUTION - DO NOT DRILL ALL THE WAY THROUGH THE PANEL!). Fix the Screws (37) into the Panel. Leave the screw heads proud of the Panel by approx. 3mm to allow the screw head to slot into the keyhole slot in the rear of the unit. Attach the unit to the Panel. The depth of the Screws may need to be adjusted to ensure the keyhole slots in the unit are securely engaged with the screw heads. With the unit in this position fix the Screws (37) into the two smaller holes to complete the installation. NOTE: Follow these same steps for all sizes of Ashmount (1.5L, 3L or 12L). The number of fixings for the 12L Ashmount increase to six, however the procedures are the same. P. 13

6. BLANK SIGNAGE PANEL ADDITIONAL TOOLS REQUIRED: 3mm Drill Bit 49 45 50 51 5mm Position the Signage Panel (45) in the sign recess in the Roof at the front of the shelter. The Panel is dual-sided so it does not matter which way it faces. You will need to ask someone to hold the sign in place from the outside whilst the Sign is secured inside the shelter. 52 Ensure the Panel is correctly positioned. Looking from the outside, check there is an even gap all around the sign of approx. 5mm between the sign recess in the Roof and the Sign itself. 53 From inside the shelter, drill the Signage Panel through the two outermost holes in the Roof panel recess using a 3mm drill bit. Be careful not to drill right through the Panel. Use a collar on the drill bit or mark the bit with tape to a depth of 40mm. Once the tape is reached, stop drilling. (CAUTION - DO NOT DRILL ALL THE WAY THROUGH THE PANEL!) 46 47 48 Fix the Signage Panel in place with the hand drill through the two outer holes drilled in STEP 51 using the Security Screws, Washer and Spacer (46, 47 and 48) as shown. Drill the remaining four holes and fix the Panel into place using the remaining Fixings as shown in STEP 52. P. 14

7. POLYCARBONATE SIGNAGE 54 55 56 Position the Polycarbonate Signage Panel (49) in to the desired position on the Blank Signage Panel (45). Leave an equal gap of approx. 10mm around the edge so the Sign is fitted equally. 57 Using a 3mm drill bit drill three small pilot holes through the three holes shown above. Be careful not to drill all the way through the Blank Signage Panel. 58 Fix the Panel through the three fixing holes drilled with the hand drill using the Fixings (50 and 51). Once the three initial Fixings are in place the remaining thirteen holes can be drilled in the same manner as STEP 55. Then fix the Panel in place using the remaining Fixings in the same way as STEP 56. Once all the fixings have been tightened fold over the tops of the Cover Caps (51) to shield the Fixings from view. P. 15

Section 3: Unpacking the Shelter (when supplied pre-assembled) 59 Position the shelter close to the intended site using a pallet truck or forklift. Unfasten the screws holding the shelter to the pallet using the hand drill with pozi drill bit attached. PLEASE NOTE: A pre-laid concrete foundation should be prepared prior to installation. Please refer to Section 4 for guidelines on dimensions. CAUTION: To remove the shelter from the transportation pallet requires a minimum of three people. Once the fixings are removed the shelter should be carefully lifted so that the rear legs of the shelter are clear of the pallet. The rear legs should be lowered to the ground so that the shelter is tilted back at an angle with the front legs raised off the pallet. At this point, with the weight borne by the rear legs, the pallet can be pulled out from the front of the shelter by a third person. The shelter should then be tipped back level so that all four legs are back on the ground. Section 4: Installation of Shelter 60 61 62 Using a 18mm masonry drill bit, drill through the hole in the Spigot Leg down into the concrete approximately 105mm deep. Place the M12 Ground Fixing (32) through the Spigot Leg and down into the drilled hole. Using a hammer, tap the Fixing Bolt until it hits the top of the Spigot Leg Plate. Tighten the Bolts using a 19mm spanner. A torque setting of 80Nm is recommended. P. 16

CONCRETE BASE - RECOMMENDED MINIMUM DIMENSIONS.!!IMPORTANT!! MODUS SHELTER 770 1900 1200 200 MODUS SHELTER 1280 1900 1550 200 P. 17

Section 5: Adjustment of Spigot Legs when sited on uneven ground 63 64 65 Using a 13mm spanner/socket unscrew the two Bolts (23) with Washers on the inside at the bottom of the Extrusions and remove. Lift the Extrusion upwards and pull the Spigot Leg down to a more appropriate height ensuring that the shelter is now level. Replace the Bolts and Washers into the new holes within the Spigot Leg and tighten with a spanner or socket. Repeat STEPS 53-55 on the other Legs that need adjusting. P. 18

Should you require any further assistance please contact us on tel: 01253 600410, fax: 01253 792558 or email: sales@glasdon-uk.co.uk In accordance with our policy of continuous development and improvement, we reserve the right to make changes in design and specification without notice. Glasdon UK Limited products are manufactured under license worldwide and various components of the models are patented and design registered. AND MODUS ARE TRADEMARKS OF G LASDON GROUP AND I TS SUBSIDIARIES IN THE U.K. AND OTHER COUNTRIE S. Replacement components a re available di rect from GLASDON. GLASDON cannot be held responsible f or claims arising from incor rect insta llation, unautho rised modifications or mi suse of the p roduct. Glasdon U.K. Limited Preston New Road BLACKPOOL Lancashire FY4 4UL Tel: (01253) 600410 Fax: (01253) 792558 e-mail: sales@glasdon-uk.co.uk www.glasdon.com Issue 1 July 2012 C000/1009 Co pyright 2012