SPS Crab Cavity Validation Run ( )

Similar documents
Motivation: ERL based e linac for LHeC

2008 JINST 3 S The RF systems and beam feedback. Chapter Introduction

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7

Superconducting RF System. Heung-Sik Kang

(fb) Nevent/year for 50fb -1. s (GeV) ~ ~ qq q=t. ZZ cos <0.8 W + W tt 175GeV 500,00 5,000. Zh 120GeV. 230GeV. HA 400GeV 220GeV 410GeV

Hardware Commissioning

The impedance budget of the CERN Proton Synchrotron (PS)

Crab Cavities for FCC

R.Bachimanchi, IPAC, May 2015, Richmond, VA

FAST RF KICKER DESIGN

THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING CAVITY

ESS RF Development at Uppsala University. Roger Ruber for the FREIA team Uppsala University

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint

FREIA Facility for Research Instrumentation and Accelerator Development Infrastructure and Control Architecture

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008

FLASH. FLASH Training: RF Gun. FLASH: the first soft X-ray FEL operating two undulator beamlines simultaneously. Siegfried Schreiber, DESY

Status and Future Perspective of the HIE-ISOLDE Project

Current Industrial SRF Capabilities and Future Plans

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension

Main Injector Cavity Simulation and Optimization for Project X

LARGE SCALE TESTING OF SRF CAVITIES AND MODULES

LHC. LHC Crab-cavity Aspects & Strategy. LHC Upgrade & Crab Crossing. New Road Map. SPS, a first validation step

INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE

Third Harmonic Superconducting passive cavities in ELETTRA and SLS

R. Assmann, CERN/AB. for the Collimation Project 7/12/2007 LHC MAC RWA, LHC MAC 12/07

Packaging of Cryogenic Components

To produce more powerful and high-efficiency particle accelerator, efforts have

DEVELOPMENT OF A BETA 0.12, 88 MHZ, QUARTER WAVE RESONATOR AND ITS CRYOMODULE FOR THE SPIRAL2 PROJECT

A Synchrotron Phase Detector for the Fermilab Booster

HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK

SRF in Storage Rings. Michael Pekeler ACCEL Instruments GmbH Bergisch Gladbach Germany

Tests of the Spoke Cavity RF Source and Cryomodules in Uppsala

CEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute

Couplers for Project X. S. Kazakov, T. Khabiboulline

Position of the LHC luminous region

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY

CEBAF Overview June 4, 2010

SRF EXPERIENCE WITH THE CORNELL HIGH-CURRENT ERL INJECTOR PROTOTYPE

Cryogenics for Large Accelerators

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY

Crab Cavity Systems for Future Colliders. Silvia Verdú-Andrés, Ilan Ben-Zvi, Qiong Wu (Brookhaven National Lab), Rama Calaga (CERN)

3.9 GHz System (AH1) XFEL WP46

Project of RF System for 2.2 GeV Electron Storage Ring Zelenograd SR Source.

SLHiPP-2, Catania, Italy. A cryogenic system for the MYRRHA linac. Nicolas Chevalier, Tomas Junquera

Project X Cavity RF and mechanical design. T. Khabiboulline, FNAL/TD/SRF

LHC TRANSVERSE FEEDBACK SYSTEM: FIRST RESULTS OF COMMISSIONING. V.M. Zhabitsky XXI Russian Particle Accelerator Conference

An Overview of MAX IV Insertion Devices & Magnetic Measurement System. Hamed Tarawneh On behalf of Insertion Devices Team

Linear Particle Accelerator Control Performance

Installation! of! E (g 2p ) & E (G Ep /G Mp )! in Hall A! during the 6MSD!!"#$%&'(#

FLASH II: an Overview

EMMA the World's First Non-Scaling FFAG Accelerator

Circumference 187 m (bending radius = 8.66 m)

RF System Models and Longitudinal Beam Dynamics

RF Design of Normal Conducting Deflecting Cavity

FLASH: Status and upgrade

ABSTRACT 1 CEBAF UPGRADE CAVITY/CRYOMODULE

Physical Design of Superconducting Magnet for ADS Injection I

Digital LLRF Test on the Renascence Cryomodule

ALMA Interferometer and Band 7 Cartridge

BCS UPDATE. j. welch 2/9/17

FAST KICKERS LNF-INFN

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory

3.9 GHz Deflecting Mode Cavity

Detailed Design Report

Philippe Lebrun & Laurent Tavian, CERN

Automatic phase calibration for RF cavities using beam-loading signals. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 18 Oct 2017

MuCool Test Area Experimental Program Summary

Construction Status of SuperKEKB Vacuum System

System Integration of the TPS. J.R. Chen NSRRC, Hsinchu

1.8 MW Upgrade of the PSI Proton Accelerator Facility

5.5 SNS Superconducting Linac

HOM COUPLER ALTERATIONS FOR THE LHC DQW CRAB CAVITY

SRF FOR FUTURE CIRCULAR COLLIDERS

Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs. Josef Frisch Pohang, March 14, 2011

INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM

3.9 GHz work at Fermilab

Proposal of test setup

ANALYSIS OF 3RD OCTAVE BAND GROUND MOTIONS TRANSMISSION IN SYNCHROTRON RADIATION FACILITY SOLARIS Daniel Ziemianski, Marek Kozien

THE CRYOGENIC SYSTEM OF TESLA

SRF Advances for ATLAS and Other β<1 Applications

Short-Pulse X-ray at the Advanced Photon Source Overview

Using Higher Order Modes in the Superconducting TESLA Cavities for Diagnostics at DESY

S. Ghosh On behalf of Linac, IFR, Cryogenics, RF and beam transport group members. Inter University Accelerator Centre New Delhi India

Acceleration of High-Intensity Protons in the J-PARC Synchrotrons. KEK/J-PARC M. Yoshii

Mechanical study of the «Saclay piezo tuner» PTS (Piezo Tuning System) P. Bosland, Bo Wu DAPNIA - CEA Saclay. Abstract

Dark Current Kicker Studies at FLASH

Cornell ERL s Main Linac Cavities

Normal-conducting high-gradient rf systems

New Tracking Gantry-Synchrotron Idea. G H Rees, ASTeC, RAL, U.K,

Superconducting RF cavities activities for the MAX project

BEPCII-THE SECOND PHASE CONSTRUCTION OF BEIJING ELECTRON POSITRON COLLIDER

RF System LSD Work. William Merz

Summary of CARE-HHH Mini-Workshop on LHC Crab Cavity Validation, 21 August 2008

The HL-LHC Machine *

Beam Loss monitoring R&D. Arden Warner Fermilab MPS2014 Workshop March 5-6, 2014

DQW HOM Coupler for LHC

LHC. Crab Cavities from virtual reality to real reality. R. Calaga, BE-RF, LHC-PW, Chamonix On behalf of the LHC-CC collaboration

Status of Proton Beam Commissioning at MedAustron Ion Beam Therapy Center

Transcription:

SPS Crab Cavity Validation Run (2017-2018) Alick Macpherson BE-RF-SRF Acknowledgments Marton Ady, Vincent Baglin, Philippe Baudrenghien, Krzyzstof Brodzinski, Rama Calaga, Ofelia Capatina, Frederic Galleazzi, Erk Jensen, Antoine Kosmicki, Phoevos Kardasopoulos, Pierre Maesen, Eric Montesinos, Ghislain Roy, Benoit Salvant, Rogelio Tomas, Giovanna Vandoni. 1

Overview The SPS Installation and Integration Issues Beam Issues, and Beam time requests Schedule and planning 2

Overview The SPS Installation and Integration Issues Beam Issues, and Beam time requests Schedule and planning Purpose of the SPS crab cavity validation program Validate Crab cavity design for proton beams Validate Crab cavity invisibility to proton beams when not on resonance Validate operational functionality & Machine protection mechanisms Overall goal => set inputs for final design 2

General Overview Baseline parameters Voltage = 3 MV/cavity Frequency = 400.079 MHz Cavity aperture: 84 mm diameter Operating Temperature= 2K QL = 5x10 5 (Assuming R/Q=400) RF power = 40kW tetrode/cavity 3

General Overview Baseline parameters Voltage = 3 MV/cavity Operating Temperature= 2K Frequency = 400.079 MHz QL = 5x10 5 (Assuming R/Q=400) Cavity aperture: 84 mm diameter RF power = 40kW tetrode/cavity Crab cavity prototypes 3 designs being taken forward to the SPS test SPS Crab Cavity Cryomodule (CCM) 2 cavities installed in 1 cryomodule cavities of same type 3 different cryomodules should be interchangeable 3

Crab Cavities in the SPS SPS ECA4 ECA4 Cryogenics Infrastructure: Only SPS Pt 4 is feasible LLRF ~35m away: Experimental cavern (ECA4) accessible with beam Location Availability: Space is not free end of 2015 Limited access to SPS zone after SPS long shutdown (2013-2014) Features: Location just upstream of SPS Extraction pt for LHC beam 2 4

LSS4: Simplified View Cryo RF Power CCM LLRF ECA4( 35m) TCF20 N 2 5

SPS LSS4: As it is now 6

SPS LSS4: Crab Integration Crab Cavities cannot be installed until COLDEX Installation removed COLDEX must be de-installed by end of 2015 LSS4 Alcove: This is now (again) a cryogenic installation. 7

SPS Integration Issues SPS operation must be independent of crab operational availability Crab Cavity module switchable from in-beam to out-of-beam position Need to increase opening angle of Y-chamber =>New Y-chamber design 16 o 3000 mm Dummy LHC Beam Pipe 510 mm SPS Bypass CM Movement: In out of beam line Cryomodule: moved with cavities cold and helium tanks full Duration: less than 20 mins. Acceleration: less than 0.2g Safety requirement: Movement is a remote operation 8

Y-Chamber redesign Model Z Zx (kohms/ Zy (kohms/ Baseline 12 Degree (mohms) 2.8 0.33 m) 0.31 m) 16 Degree 3.73 0.27 1.67 16 Degree Undulations 3.69 0.41 0.53 Ellipsoid 1.65 0.25 0.85 Proposed 0.43 0.21 0.85 9

Y- Chamber: Changes in shunt impedance Simulations: Phoevos Kardasopoulos Propagating modes 10

Y- Chamber: Changes in shunt impedance Simulations: Phoevos Kardasopoulos Propagating modes 10

Y- Chamber: Changes in shunt impedance Simulations: Phoevos Kardasopoulos Propagating modes No significant impedances below beam frequency Propagating modes do not reach cavity due to aperture reduction Propagating modes into SPS reduced wrt existing design Design endorsed by Impedance Working Group 10

Integration Space Vertical constraints: 700mm (max) between beam axis and top of table Magnet Busbar + shielding + support Table Out of Beam Top Front: Installation In Beam 1250 mm 1200 mm 500 mm Integration constraints: https://edms.cern.ch/document/1360083 11

Integration Space Vertical constraints: 700mm (max) between beam axis and top of table Magnet Busbar + shielding + support Table Out of Beam Top Front In Beam 1178 mm 1200 mm 500 mm Integration constraints: https://edms.cern.ch/document/1360083 12

Integration: Cryo Module Interfaces 3 different cryomodule: Evolving toward consistent interfaces Designs not finalised yet, but should be harmonised and made consistent Simplifies support table design, cryomodule exchange, alignment steps Example: Cryomodule designs as of week 18 2014 Cryomodule Relative Position of power coupler wrt crab cavity reference position Longitudinal Distance Between Couplers Transverse offset wrt beam axis Height (beam axis to centre of waveguide) BNL 900 mm 0 mm 960.45 mm ODU 1050 mm -113 mm 944.94 mm UK 890.4 mm 25 mm 939.85 mm Support Table functionality becoming more complex Once cryo module design is frozen, support table design can be finalised 13

SPS Ambient Magnetic Field Initial 2D simulation results consider only main magnet busbars use worst case scenario: Identify most critical position. Pt A: Outer surface of cryomodule Pt B: Outer surface of He Vessel Cavity specifications require a ambient magnetic field < 1 ut With busbar shield, cryomodule shield factor = 200 (achievable) 10mm busbar shielding to be installed (2015) In-Beam Stray field [mt] Out-of-Beam Stray field [mt] Busbar shielding Pt A Pt B Pt A Pt B Stainless steel (or no cover) 0.4 0.2 0.6 0.3 Constructional steel, 2 mm thick 0.3 0.2 0.4 0.2 Constructional steel, 10 mm thick 0.1 0.1 0.2 0.1 Details: https://edms.cern.ch/document/1377806 A B To be confirmed by measurement in August 2014 14

Beam Line Around the Cryomodule Vacuum Conditions: Required case operational conditions = 10-10 mbar Present SPS vacuum conditions: ~ 10-9 - 10-8 mbar Crab Cavity cryo module should not cryo pump the SPS beam line Vacuum infrastructure + Standard RF warm-cold transition at CM Require: NEG Coating or cold trap or baked acarbon on each side of CM Differential pumping: Implemented at beam pipe transition diameter With some beam line modification PCavity <10-10 mbar is achievable 15

Beam Line Around the Cryomodule Vacuum Conditions: Required case operational conditions = 10-10 mbar Present SPS vacuum conditions: ~ 10-9 - 10-8 mbar Crab Cavity cryo module should not cryo pump the SPS beam line Vacuum infrastructure + Standard RF warm-cold transition at CM Require: NEG Coating or cold trap or baked acarbon on each side of CM Differential pumping: Implemented at beam pipe transition diameter With some beam line modification PCavity <10-10 mbar is achievable Example: Cryo Trap Cryo trap: Transmission ra9o No cryotrap 0.5m cryotrap 1.0m cryotrap No pump 100% 1% 0.55% With pump 10% 0.55% 0.2% Pressure [Pa] Pressure drop: 2 orders Cryotrap 15

Vacuum Considerations Sector 431 V2 DCUM 41737 OUT COLDEX Vacuum gauge V3 DCUM 41753 Circulating beam V1 DCUM 41731 Vacuum gauge IN Sector 430 Vacuum gauge V4 DCUM 41757 16

Vacuum Considerations Sector 431 V2 DCUM 41737 OUT COLDEX Vacuum gauge V3 DCUM 41753 Circulating beam V1 DCUM 41731 Vacuum gauge IN Sector 430 Vacuum gauge V4 DCUM 41757 Isolated beam pipe zone NEG or cold trap or acarbon Differential pumping Sector 431 Vacuum gauge OUT Vacuum gauge CRAB Circulating beam V1 DCUM 41731 Vacuum gauge IN Sector 430 Vacuum gauge V4 DCUM 41757 16

Rf Power and Orbit Drifts Beam position in Cavity: Tetrode Power vs Beam offset 17

Rf Power and Orbit Drifts Beam position in Cavity: Tetrode Power vs Beam offset Crab Tetrode Should provide 40 to 50 kw (to be tested) Power constraints => beam must stay centred SPS closed orbit drift in ramp up to 6mm Correctors at SPS Pt 4 in interlock chain complicates orbit centering Slow orbit drift to be countered by support table adjustment, driven by LLRF Support Table no longer simple 17

SPS Validation Program: 5 Steps 1. Cavity setup, conditioning, beam injection and initial cavity operation 2. Long Term Effects: Coasting Beam [120-270 GeV]. Low Intensity 1. Single + multi-bunch + trains: Emittance growth, Dispersion etc 3. Short Term Effects: Cycling Beam: [26-450 GeV]. Low intensity 1. Direct crabbing measurements: Head tail monitor 2. Global and Local Crabbing schemes 4. Machine Protection Issues and Quench studies 5. High Intensity Studies Impedance Studies and Invisibility of detuned cavities Cavity operation with beam: Cryo limit of 8-12 hrs operation 18

SPS Validation Program: 5 Steps 1. Cavity setup, conditioning, beam injection and initial cavity operation 2. Long Term Effects: Coasting Beam [120-270 GeV]. Low Intensity 1. Single + multi-bunch + trains: Emittance growth, Dispersion etc 3. Short Term Effects: Cycling Beam: [26-450 GeV]. Low intensity 1. Direct crabbing measurements: Head tail monitor 2. Global and Local Crabbing schemes 4. Machine Protection Issues and Quench studies 5. High Intensity Studies Impedance Studies and Invisibility of detuned cavities Cavity operation with beam: Cryo limit of 8-12 hrs operation Each MD step: 3 slots of 8hrs of beam => 24 hours of beam per cavity Test of 2 cavities: 10 days of dedicated MD time spread over 2 years This is ~1/3 of allocated SPS MD beam time 18

SPS Beam Crab cavities is need dedicated MD time LHC beams: cannot be in when LHC beam extracted SPS Fixed Target: large beams at injection & slow extraction Coasting Beam: Crab dispersion and long term emittance growth Beam Energy > 120GeV to distinguish from natural emittance growth 6σ LHC Beam Energy [GeV] SPS Natural Emittance Growth Measurements Intensity [x 10 Tunes Qx/Qy RF Voltage [MV] dεx/dt [%/hr] dεy/dt [%/hr] 55 1 0.13/0.18 3 140-370% 57% 120 0.5 (12b) 0.13/0.18 2.0-4.0 100-300% 40-90% 120 0.1 0.13-0.33 2.0-4.0 18% 17% 270 0.4 0.13/0.18 3 20-23% 14-24% What s changed after LS1? => participate in MDs in 2015 19

LLRF Operation Operation: RF is ON Strong RF feedback + tune controls Cavities are on-tune at all time. Filling, ramping or operation with transparent crab cavities Cavities kept on-tune with small voltage (0.5MV?) + active tuning system Effect on beam nullified by counter-phasing the cavities RF feedback is used with on-tune cavity to provide stability and keep the beam induced voltage zero if the beam is off-centered. When crabbing is required (at flat top) Drive counter-phasing to zero. Phase PU Cavity Controller Degree of local crabbing controlled by synchronously changing voltage or phase in both cavities. TX 400MHz Global feedback Cavity Controller TX 20

Machine Protection Closed Orbit with global deflection LHC beam: 450 GeV, Cavity Voltage: 3 MV Worst Case: Global scheme in deflecting mode Closed orbit at 90 o phase advance: ~1mm offset, no amplitude growth. Interlock Strategy: Hardwired Interlocks: Inputs into BIS Interlock on vacuum Valves Software interlocks: Inputs into SIS Table Position (In/Out of beam positions) Power load on tetrodes LLRF Mitigations and Interlocks LLRF FB loop: Timescale of O(10us) => Time for quench mitigation actions SPS test to validate cavity mitigation schemes for failures/quenches TX fault: machine operation can continue if cavity detuned above RF freq. 21

Schedule Issues SPS Crab Validation Run: 2017 and 2018 SPS Crab schedule: Available Online Please see http://kiwi.web.cern.ch/kiwi/crab_sps/index.html 22

Schedule: Cavity + CryoModule TimeLine 23

Schedule: Cavity + CryoModule TimeLine 23

Schedule: SM18 + SPS SM18: CavityTesting, Cryo Module assembly and testing, Infrastructure validation SPS Preparation of Infrastructure, Validation of Services, Operations Interface SM18 Activities SPS Activities Cryo Semi-Rigid transfer line movement validation - 4.5K Sep Oct 2015 Cold Test of Cavity MFA at SM18 Oct Dec 2015 Cryomodule: RF conditioning- SM18 Jul Oct 2016 Proof-of principle Cavity tests in SM18 Apr Dec 2014 SM18 Quench studies (Proof of principle cavities) Jul 2014 Jan 2015 SPS Support Infrastructure Validation Oct 2014 Oct 2015 Transmitter noise tests Oct 2014 Jan 2015 Coldex Removal Dec 2015 Support Table Installation Dec 2015 Jan 2016 RF Power Installation Jan Feb 2016 SM18 Test of LLRF (High Q + Low Power) Jan Apr 2016 Installation - SPS - 2K equipment Dec 2016 Cryo Module Installation Dec 2016 Jan 2017 Y-Chamber Installation Jan 2017 SPS Operation Jan Nov 2017 Cryo 4.5 K Infrastructure Jan Jul 2014 Support Table Validation Apr Aug 2015 Cryomodule validation tests - SM18 Apr Jul 2016 RF Conditioning Mar Apr 2017 Magnetic Field Mapping of SPS Y-Chamber Translation Validation SM18 Test of SPS LLRF with cryomodule Measurement Program Jun Jul 2014 Apr Jul 2015 Apr Oct 2016 Apr Nov 2017 Jan 2014 Apr 2014 Jul 2014 Oct 2014 Jan 2015 Apr 2015 Jul 2015 Oct 2015 Jan 2016 Apr 2016 Jul 2016 Oct 2016 Jan 2017 Apr 2017 Jul 2017 Oct 2017 Jan 2018 24

SM18 RF Test facility M9 Bunker: Horizontal Tests LHC cryomodule HIE-ISOLDE cryomodule And later: FCC 400 MHz project M7 Bunker: Horizontal Tests CRAB cryomodule SPL half cryomodule And later: 800 MHz project M7 V3 V4 SM18 RF Area 25

Summary Comments Integration Integration of Crab infrastructure ongoing. Alcove space fully used 2015 Xmas stop must be used to remove COLDEX SPS Beam Time Crab Cavity Validation needs dedicated SPS MD time Initial estimates of MD time request: 5 x 24hrs per cavity MD program must include: Crab functionality, cavity invisibility, LLRF op, failure mitigation LLRF conceptual design now advancing Planning and schedule 2015 Xmas stop: installation of crab infrastructure in SPS 1st Crab Cryomodule installed 2016 Xmas stop 2 Cryomodule Installation periods (Xmas stops): can t hot swap modules Use 2016 for cryomodule sector test in SM18 26