Cressington 108 Auto/SE Sputter Coater Standard Operating Procedures (S.O.P)

Similar documents
Operating Checklist for using the Scanning Electron Microscope, JEOL JSM 6400.

Operating Checklist for using the Scanning Electron. Microscope, JEOL JSM 6400.

CHA ELECTRON BEAM EVAPORATOR SYSTEM OPERATING MANUAL Version: 2.0 August 2016

Standard Operating Manual

1.2. Make sure the viewing screen is covered (exposure to liquid N 2 may cause it to crack).

Basic Users Manual for Tecnai-F20 TEM

EXPERIMENT # 3: Oxidation and Etching Tuesday 2/3/98 and 2/5/98 Thursday 2/10/98 and 2/12/98

isel=vakuum UV exposure device

Thin Film Deposition

SEM Training Notebook

SOP for Hitachi S-2150 Scanning Electron Microscope For review purposes only

MSE 595T Transmission Electron Microscopy. Laboratory III TEM Imaging - I

EXPERIMENT # 3: Oxidation and Etching Week of 1/31/05 and 2/7/05

Title: Amray 1830 SEM#2 Semiconductor & Microsystems Fabrication Laboratory Revision: D Rev Date: 03/18/2016

Please follow these instructions for use of the Philips CM100 TEM. Adopted from website below.

First published : May 1997 Fourth edition : January No

Strata DB235 FESEM FIB

Operating the Hitachi 7100 Transmission Electron Microscope Electron Microscopy Core, University of Utah

Full-screen mode Popup controls. Overview of the microscope user interface, TEM User Interface and TIA on the left and EDS on the right

Thin Film Deposition

Standard Operating Procedure for the Amray 1810 Scanning Electron Microscope Version: 29 NOVEMBER 2014

1.3. Before loading the holder into the TEM, make sure the X tilt is set to zero and the goniometer locked in place (this will make loading easier).

University of Minnesota Nano Fabrication Center Standard Operating Procedure Equipment Name:

Scanning Electron Microscope FEI INSPECT F50. Step by step operation manual

7. Michelson Interferometer

SEM Training Notebook

FEI Tecnai G 2 F20 Operating Procedures

Setting up and Using Digital Micrometer Controlled Lapping Fixtures

Gencoa 3G Circular Magnetron

Niobium Coating of Copper Cavities by UHV Cathodic Arc: progress report

HEX02 EMBOSSING SYSTEM

FE-SEM SU-8020 Operating manual (Preliminary version)

Tinker Tuesday Project - Stainless Steel Tumblers

DELUXE AIR PRESSURE CASTING MACHINE MODEL # S

SEM OPERATION IN LOW VACUUM MODE

Model SU3500 Scanning Electron Microscope

Hydraulic Clamp Carrier. Installation & Operation Manual

1.1. Log on to the TUMI system (you cannot proceed further until this is done).

JEOL 6500 User Manual

Maintenance Information

Instructions for Tecnai a brief start up manual

EMO. Service Instruction. created by Frank Weithöner. Table of contents: Special Tools Assembling Mixing Chamber

2. OPERATING PROCEDURES 3. WARNING AND SAFETY HAZARDS 4. QUALITY CONTROL 5. MAINTENANCE 6. INSTALLATION 7. WARRANTY AND LIMITATIONS

JEOL 6700 User Manual 05/18/2009

UK10 UK11. First published: June No.KX03023

DISCO DICING SAW SOP. April 2014 INTRODUCTION

CLUSTERLINE RAD VERSATILE DYNAMIC SPUTTER SYSTEM OPTOELECTRONICS, MEMS, PHOTONICS, WIRELESS

This product is designed for a water supply pressure range of 20 psi (137kPa) minimum to 80psi (550 kpa) maximum.

JEOL JEM-1400 Transmission Electron Microscope Operating Instructions

1. Specimen Holder Removal, Loading, and Insertion

Syncore Analyst Technical data sheet

Adjustable Center Crossheads Operations Manual

FBX1104P FBX1104 FBX1106P FBX1106

Tinker Tuesday Project - Drinking Glasses

2. Raise HT to 200kVby following the procedure explained in 1.6.

Band-Master ATS Nano Pneumatic Banding Tool Operating Instructions

Bodyspray INSTALLATION INSTRUCTIONS

SCREEN PRINTING V0.3 DRAFT. Not for Release STANDARD OPERATING PROCEDURE

1 Placing particles on the slide

2 How to operate the microscope/obtain an image

plasmonic nanoblock pair

INSTRUCTION BX1425P,PSM,PTV BX1433P,PSM,PTV BX1025P,PSM BX1033P,PSM. No First published : November 1997

1. Preliminary sample preparation

QUICK PROGRAMMING FOR THERMO SUNIS INDOOR WIREFREE SENSOR

RAISING THE BAR ON REACTIVE DEPOSITION SPUTTER RATES Douglas R. Pelleymounter

Week IX: INTERFEROMETER EXPERIMENTS

AZ 1512 RESIST PHOTOLITHOGRAPHY

RG REPAIR GUIDELINE 10/23/2015. Repair Description: Tools Required: Step List: Approximate time: minutes

Standard Operating Manual

IL550 & IL560 Series Optical Monitors for The ULTIMATE in Thin Film Coating Precision, Accuracy & Control

Z 406 Bench work Manual

System Options. Magnetic Property Measurement System. AC Susceptibility. AC Susceptibility Specifications

Owner s Manual. PhotoSharp E. Southern Avenue, Phoenix, AZ USA Workhorseproducts.com 1

Automatic Film Applicator BEVS 1811/2 User Manual

MDX DC 1 kw & 1.5 kw Series. Tight regulation Superior arc control Low stored output energy

High Rise Sit-Stand Desk Converter

Advanced Plasma Technology. High precision film thickness trimming for the TFH industry. Roth & Rau AG September 2009

AUTOMATION OF THIN FILM DEPOSITION PROCESS BASED ON MAGNETRON SPUTTERING 1. INTRODUCTION

Voltage Control for Reactive Sputtering: Improving Typical Sputter Rate while Dramatically Reducing Input Power Requirements

JEOL JEM 2010 TRAINING TRANSMISSION ELECTRON MICROSCOPE USER MANUAL

King Cloud III. Warning. Obstruction Detection. Instructions for Reclining Sofas

OPERATION OF THE HITACHI S-450 SCANNING ELECTRON MICROSCOPE. by Doug Bray Department of Biological Sciences University of Lethbridge

User Operation of JEOL 1200 EX II

MOTOR REPLACEMENT : STEP BY STEP.

UFNF YES Image Reversal & HMDS Oven Revision 6.0 1/22/2014 Page 1 of 5. YES Image Reversal and HMDS Oven SOP

CNC Using the FlexiCam CNC and HMI Software. Guldbergsgade 29N, P0 E: T:

INSTRUCTION. Industrial Sewing Machines V7100/D,DE,F,ML W8100/D,DE,F,C W8042 W V7002-1S W8103-1S. No Third edition : March 2001

Basic Operating Instructions for Strata Dual Beam 235 FIB/SEM

Optical spray painting practice and training system

Standard Operating Procedure for Cutting Stainless Steel on the Rofin Laser Machining Station

Introduction of New Products

VS7550 VUV/UV Mini Spectrograph Operating Manual

OPERATING INSTRUCTIONS FOR MODEL SPR-25 Manual Stencil Printer

Fabrication of narrow bandpass filters for wavelength division multiplexing applications A feasibility study

* * APPLICABLE MODELS: 2014 > MAZDA 3

JSM 6060 LV SCANNING ELECTRON MICROSCOPE STANDARD OPERATING PROCEDURES

1 Connector X14270, 47-pin 2 Plug connector to distribution box X4010, 23-pin. 3 Connector X14271, 54-pin 4 Connector X14272, 54-pin

Installation and Operating Instructions Desk top Laser

OPERATION AND MAINTENANCE INSTRUCTIONS AVK UNDERGROUND FIRE HYDRANT

Micro Automation Programmable Dicing Saw, Model 1006

Transcription:

Cressington 108 Auto/SE Sputter Coater Standard Operating Procedures (S.O.P) The Cressington sputter system is designed for only one purpose which is the deposition of gold onto a sample to reduce charging when analyzed in the SEM. This system is only available for reservation through a NanoFab Staff member. NanoFab staff will make the reservation and operate the system for the intended user. Here is a brief summary about film thickness from the Cressington Operations Manual. The thickness of film required to prevent charging is very dependent on the sample and the operating voltage in the SEM. A thickness of between 3nm 5nm will usually prevent charging. The film needs to be thin enough not to obscure fine detail, but thick enough to prevent charging. Operating the system: 1

1) Verify that the system is powered OFF (Fig. 1). (Fig. 1) 2) Open the UPPER LID (Fig. 2a) of the chamber, if the upper lid will not lift up easily then the chamber may not be fully vented; in this case you must press and hold the RED VENT BUTTON (Fig. 2b) located on the left side of the table until the chamber lid will lift up. (Fig. 2a) (Fig. 2b) 3) Remove the UPPER GLASS CHAMBER and the ADAPTER RING (Fig. 3) that is located underneath it and sit them off to the side. This allows for easy access to the sample table. 2

(Fig. 3) 4) Sit the sample to be coated onto the center of the SAMPLE TABLE (Fig. 3a) facing upwards. The table can be tilted if better side coverage is needed on the sample. This is done by rotating the LARGE BLACK KNOB (Fig. 3b) at the rear of the chamber. (Fig. 3a) (Fig. 3b) 5) Ensure that the CRYSTAL HOLDER (Fig. 4) is facing upwards towards the target. 3

(Fig. 4) 6) Reinstall the GLASS UPPER CHAMBER and ADAPTER RING and lower the UPPER LID (See Fig. 2a & 3). 7) Turn on the MAIN POWER SWITCH (Fig. 5). The mechanical pump will start and the chamber will begin pumping down. Within a minute the front panel gauge should begin to show a drop in vacuum pressure. (Fig. 5) 4

8) Let the system pump down to <.04 mbar as measured by the lower range of the FRONT PANEL GAUGE (Fig. 6). This should typically occur within 10 minutes of turning the system on. (Fig. 6) 9) Press the AUTO - MANUAL (FIG. 7) button to illuminate the MANUAL LED located directly above the button. (Fig. 7) 5

10) The DEPOSITION TIME is displayed in the TIMER section of the front panel. The deposition rate of this system is approximately.33 Å per second. To set the timer for the deposition thickness desired press and hold the PAUSE/TEST button (Fig. 8) and use the UP/DOWN buttons to the right of the TIME DISPLAY to adjust the deposition time. (Fig. 8) 11) Turn ON the Thickness monitor power, wait a few seconds for it to initialize and then momentarily press the ZERO button (Fig. 9). (Fig. 9) 6

12) Press the LEAK button (Fig. 10) and give the system a minute for the pressure to stabilize. Ensure that the SPUTTERING PRESSURE is set for.07 mbar -.08 mbar on the front panel gauge (See Fig. 6). If the pressure is incorrect then it will have to be adjusted, this is performed by turning the needle valve located on the back of the system (Contact NanoFab Staff for this). LEAK button (Fig. 10) 13) Now press the AUTO/MANUAL button again (See Fig. 7), the AUTO LED should now be illuminated. 14) If you need a highly uniform film on the surface of the sample then turn ON the sample table rotation by turning the SPEED SELECTION KNOB (Fig. 11) clockwise, there are 5 different rotation speeds that can be selected. (Fig. 11) 7

15) Open the shutter by turning the SHUTTER ACTUATION KNOB (Fig. 12) clockwise until it stops rotating. (Fig. 12) 16) Press the CYCLE button (Fig. 13) to start the automatic deposition cycle. Once this has been started the system will run a number of purge cycles before beginning deposition. A glow will be evident from the plasma and the timer will begin counting down once the deposition has started. The timer will reset to your preset amount when the deposition has completed. (Fig. 13) 17) Once the deposition has completed you may turn OFF the rotation (See Fig. 11). Then turn OFF both the system power (See Fig. 1) and the deposition monitor power (See Fig. 9). 18) Rotate the SHUTTER ACTUATION KNOB (See Fig. 12) counterclockwise approximately ¼ turn, back to the point it covers the target. 8

19) To vent the system you must press and hold the RED VENT BUTTON (See Fig. 2b) located to the left of the system. Once the lid lifts easily by hand you can release the RED VENT BUTTON. 20) Remove the UPPER GLASS CHAMBER and the ADAPTER RING (See Fig. 3) that is located underneath it and sit them off to the side. 21) Remove your sample and then reinstall the UPPER GLASS CHAMBER and the ADAPTER RING, then lower the UPPER LID. Leave the system in its powered down state when you are finished. 9