RS 34 / 36 Squeeze Roller assembly instructions

Similar documents
Rotary Mower L47, M47, N47, RM44YR Parts Catalog

25-200H. 12 Planer / Jointer. with Helical Cutterhead. Parts List.

Removing the Z-Axis lead screw

M2 Assembly. M2 Sub-Assemblies mm Belt Sub-Assembly mm Belt Sub-Assembly Spider Sub-Assembly... 4

RYOBI 10 IN (254 MM) TABLE SAW MODEL NO. BT REPAIR SHEET

HYDRAULIC CONTROL DETAILS PARTS LIST

RTI TECHNOLOGIES, INC.

INSTRUCTIONS AND PARTS LIST POWER HAMMER

RYOBI 10 in. (254 mm) TABLE SAW MODEL NO. BT3100 REPAIR SHEET

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.

ABM International, Inc. Navigator Assembly Manual

SUPER PRO GUN & SUPER PRO GUN II

Parts Manual. Models 521 SSE (621502X37NA) 521 SSR (621503X37NA) &


RYOBI 10 in. TABLE SAW - MODEL NO. BT3000

w w w. h d o n l i n e s h o p. d e AUTOMATIC COMPRESSION RELEASE TOOL GENERAL INSTALLATION -J04654 REV Kit Number Models

MODEL NO.: MI PARTS BREAKDOWN

REPAIR INSTRUCTIONS. Cat. No Cat. No MILWAUKEE ELECTRIC TOOL CORPORATION. SDS Max Demolition Hammer. SDS Max Rotary Hammer

Deck Mount Installation with Bench

Operating Instructions

Parts Sheet. RSX096 High Force, Rod Style Actuator EXPLODED VIEW - RSX _00_RSX09. * Specify stroke length when ordering A/R = As Required

Section D ACCELERATOR


TorqueMaster Replacement Spring

ATTACHMENT APPLICATION CHART

Click Here to Go Back

Removing Right-Side. Components. Right-Side. Components. Click Here to Go Back AT THIS POINT

Ford Pick Up Rear leaf Spring Kit Installation Instructions

TO OPERATE AUTO-GUIDE POWER. 24 Gauge Pittsburgh Operating Instructions FLANGING ATTACHMENT

ITEM NO. PART NO DESCRIPTION QTY.

Parts Manual. English

SWAG AIR-HYDRO RAM MOUNT ASSEMBLY INSTRUCTIONS

ELECTRIC TOOL CORPORATION

MODEL H " BYRD SHELIX CUTTERHEAD INSTRUCTIONS

PARTS LIST. Clarke CDP350V 16mm DRILL PRESS Part Number:

Singer From the library of: Superior Sewing Machine & Supply LLC

w w w. h d o n l i n e s h o p. d e TIMKEN BEARING CONVERSION TOOL GENERAL INSTALLATION -J04672 REV Kit Number Models

LORON SERVICE MANUAL / PARTS LIST SINGLE DOUBLE PALLET HANDLER CONTENTS: PAGE 1 Lift Truck Requirements General Installation Procedures

3000, 4000, 4100, 7500, 7700

CNC Router Parts. Standard Rack & Pinion Drive Assembly Instructions

INSTRUCTION MANUAL AND PARTS LIST MODEL 14-10

Tire Chain Kit. Replacing Shear Pins. Weight Kits. Drift Cutter

DO35 MAINTENANCE INSTRUCTIONS

EllisSaw.com. EllisSaw.com P.O. Box Verona, WI

Page 1. SureMotion Quick-Start Guide: LARSACC_QS 1st Edition - Revision A 03/15/16. Standard Steel Bolt/Screw Torque Specifications

HYDRAULIC MOWER AHRM4H, HRM48H Parts Catalog INDEX HOME TRACTOR ATTACHMENTS APPLICATION CHART

Model No: TC10. Parts Information: Tyre Changer - Automatic

Section D ACCELERATOR

3000, 4000, 4100, 7500, 7700 Drum & Disc Brake Lathes

Code Product Qty 1 Top Vertex 3 2 Hot End Housing 1 3 Bottom Vertex 3 4 Print Platform Lock 3 5 End Stop Holder 3 6 Filament Feeder Motor Bracket 1 7

Main Drive Components

FM2113PC/FM2114PC SBC Top Mount Alt, w/ A/C & Power Steering

3200 Series Modular Belt Straight Conveyors

EEBR312A Brake Lathes Parts Identification

SECTION 9: PARTS. Table Breakdown REF PART # DESCRIPTION REF PART # DESCRIPTION

FM2113PC/FM2114PC SBC Top Mount Alt, w/ A/C & Power Steering

Exploded View Saw Base - Model 7060 Semi-Automatic Cut-Off Band Saw

Parts Catalog Collector 34 Model Gasoline

ABM International, Inc.

BHJ Products, Inc. Parts List & Instructions

3850, Drum & Disc Brake Lathes. Parts Identification

Coolant Tank Screen Leg Idle End Lockwasher 64 B-015B Leg Drive End Machine Screw 1/4-20 x 3/4 Round Head

OPERATIONS MANUAL. Port-O-Slitter

CATALOG OF REPLACEMENT PARTS

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

Fairlane Front Suspension Install Sheet

EXCERPT FROM THE Jobsite saw OWNERS MANUAL

Side Winder R o u t e r L i f t.

SERVICE PARTS LIST. M18 FUEL SAWZALL Reciprocating Saw F56A BULLETIN NO CATALOG NO

1 of 12 5/24/2015 9:43 AM

SECTION 9: PARTS Main

Parts Catalog Admiral 28 Cylindrical Scrubber

DRIVE COMPONENTS REMOVAL. 9. FXCW/C: see Figure Remove bolt (9), sprocket retainer (8), and thrust washer (7). NOTE PRIMARY DRIVE LOCKING TOOL

3000, 4000, 4100, 7500, 7700

12. Wings, Flaps, Ailerons and Struts

Inspection. Assembly Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent.

SPARE PARTS LIST MODEL NO. LB1200F PAGE 1 ITEM PART NO. DESCRIPTION QTY NOTE

Door window. Front door window, assembly overview

535A. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A.

AX1001. Smith/Functional training Combo-free weight ASSEMBLY INSTRUCTIONS

OPERATOR S MANUAL MAINTENANCE MANUAL PARTS LIST TURFCO. 60 Inch Seeder. Product Number Starting Serial Number H00801 PATENT PENDING

Brother Industries, Ltd. Nagoya, Japan

`48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line:

Parts List for Type 1

OPERATIONS MANUAL. Port-O-Slitter

Repair Parts List DRYER MODEL NUMBER MDG30PNVWW. When requesting service or ordering parts, always provide the following information:

SERIES I MILLING MACHINES

FRAME. Pull Type Rigid Frame, Lift Rotate INNER HITCH

12. Mechanical Drawings & Parts Breakdown List

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

USE THE PARTS LIST BELOW TO MAKE SURE YOUR KIT IS COMPLETE BEFORE INSTALLATION. IF ANY PIECES ARE MISSING, PLEASE CONTACT:

SatNOGS. SatNOGS Rotator v3 Mechanical Assembly. This is the assembly guide for the third version of the SatNOGS Rotator.

INDEX. 52SD Mower Deck Shell, Pulley Covers, Gauge Wheels and Attaching Parts Pulleys, Blades, Belts, Spindles and Attaching Parts...

Parts Manual SPEEDZTR 42 / SPEEDZTR 42BF / SPEEDZTR 46BF / SPEEDZTR 48BF / SPEEDZTR 54BF /

APS Small Seeds Box Assembly Instructions

SECTION 7 - SUSPENSION

Parts Catalog. S-Series Slicer Manual Frozen Option S13. Model:

Astro-Physics Inc. 400QMD Lubrication/Maintenance Guide

NEWLONG. r PORTABLE FILLED BAG CLOSING MACHINE NEWLONG MACHINE WORKS, LTD.


Transcription:

RS 34 / 36 Squeeze Roller assembly instructions 83 259 Step 1. Assemble new bearing Make sure the tapper is going the correct direction Use fixture to press bearings into upper and lower rollers Press bearings into roller. Press bearing from the outside race only. (Press till bearing bottoms).

Use fixture to setup upper roller (upper roller needs spacer washer to align Rod 36 332 for marking of rod and bearings) Place roller in fixture with belt drive side away from fixture then install rod 36 332332 into roller. Mark klocation of bearings then remove rod for dimpling.

Tack weld dimple on both sides of the rod. Top rod 36 332. Left side tack 3 1/8 from left end, Right side 2 3/4 from right end. tightening check shaft to roller spacing Bottom rod 56 117 Left Lftid side tack k3 1/8 from lft left end, Right side 1 3/4 from right ihtend. with jig. (Dimples are to keep rod from (Make sure dimples from tack weld are in align to each other) rotating during torque). Dimples should be.06 +.01 in height. Marked line on Jig is for upper roller Edge on Jig is for Lower roller

Check spacing of right side rod to roller 68mm. Place roller in fixture and clamp rod then torque to (min 43 Nm max 45 Nm) or 380 inch lbs to 400 inch lbs max.

Loosen fixture and tap rod with soft face hammer then re torque bearings to previous torque settings. Check bearing linear play (min.2mm to max.65mm) / (min.005 max.015 inch) Rotate Rod for 5 revolutions to check bearings. (If tight check with Supervisor) Place roller on cart. Lower Roller assembly Repeat step 1. then Place on fixture. Flip indexing spacer for lower roller assembly.

Install motor plate 36 181 with ribbed washers and A6 20 socket head screws. Clean shaft and lube with rust inhibitor before installing pulley 36 331 When installing pulley 36 331 use a 10mm spacer then secure pulley with 4pc F8 10 set screws (2pc to tighten and 2pc to lock set screws).

Install Bearing 19 194 flush into pulley 60 750. (Picture below is for Duel squeeze roller#36 331) Install Bearing 19 126 flush into Brkt 36 412 Install Bearing 19 126 onto arbor 29 132M then press into arm Install pulley onto arm with A10 45 socket head lock washer and nut.

Spring #36 204 2pc K120 washers 1.5 of 1 inch double side tape Press into Holder #29 133M Pressbushing #28 633 into (Be sure to press bushings correct configuration). Bracket #36 475 Bracket #36 474 Left Clamp #36 478 2pc A M08 40 & L08 1pc A M08 30, L08 Rib Right Clamp #36 477 1pc 36 354 Bearing sleeve 2pc A M08 40 & L08 1pc A M08 30, L08 Rib Tap in plug provided with Bearing, Cam follower #19 299. Press zurt fitting half way, turn 90 degree and finish pressing.

Lightly ygrease then press Dowel Pin K 220 from the outside of the plates using below fixture. Install plates in Jig Install cam followers. (Torque 45NM) Install Rod end 29 199 with J M10 001 and LM10. Use jig to set throw of compression cylinder and snug Jam nut. Install 4mm clear blue air lines. Left cylinder top=40 bottom=36 Right cylinder top=32bottom=10 Check finished length 3.3 to center of Rod eye

2 3 1. Install Lower roller assy with 2pc A10 30 socket screw and L10 lock washers. 48Nm 2. Install Tube MTG 36 214 with Rod MTG 36 217 using 4pc A8 40 screw with L210 Lock washers. 25Nm 3. Put drive belt 36 175 around idler pulley 36 194 and install idler with A6 35 screws with lock washers. 9Nm 1 Install right clamp onto Rod of the upper roller. Then install right bracket onto Cam follower bearing.

Hold ldroller in position and install lllftb Left bracket on left cam follower bearing. Torque brackets to 25Nm or 220 inch pounds (make sure rollers are perpendicular to each other).

Top View of left cylinder. Install 1pc K220 washer on dowel and 1 pc on Rod end then fasten with 4pc M08 45 with rib washers. 25Nm Right cylinder needs Spacer 29 138 to go on rod end before fastening to right bracket then 4pc M08 45 with rib washers.

T connection for bottom cylinder connections. Inside view of left side. Run both lines inside tube. Bottom line goes to T on right side to tie the right bottom connection. Both top lines go to control box Lines are from top connections of cylinders that go to control box regulator (2) port

Install Delrin wedge between upper and lower rollers theninstalladjusters. adjusters. (remember to adjust them evenly). Left Right Light amount of black graphite grease Block 36 486 Right side Top screw M08 50, LM08 Lower screw M08 45, LM08 Block 36 473 Block spindle 36 482 Block 36 472 Block spindle 36 479 Lftid Left side Top screw M08 45, LM08 Lower screw M08 45, LM08

Install Right block 36 474 and left block 36 473 with 2ps M06 25 and L06. 9Nm Put belt 36 130 on Shaft 36 193 and install with AM06 35 with L6 9Nm (wipe bear metal rollers with Jo Guard) Install spring and block then Belt idler with M08 25 25Nm Route bltbf belt before mounting motor Put belt on pulley and fasten motor with 4pc spacers 56 138 and AM08 110 with L08. 25Nm

Install Right and Left guards 56 135 with AM05 12 and L05. Put idler assy 76 759 with 1pc AM06 20 with L06 (snug tight)