ETSI TR V1.1.1 ( )

Similar documents
ETSI TR V1.1.1 ( )

SOUTH AFRICAN NATIONAL STANDARD

ETSI ES V1.2.1 ( )

ETSI TS V1.1.1 ( )

ETSI ES V1.1.1 ( )

ETSI TS V1.5.1 ( ) Technical Specification

ETSI TS V1.4.1 ( ) Technical Specification

ETSI TR V1.2.2 ( )

Final draft ETSI ES V1.3.1 ( )

Final draft ETSI ES V1.3.1 ( )

ETSI EG V1.1.1 ( )

Draft ES V1.1.1 ( )

ETSI EN V1.2.1 ( )

Final draft ETSI ES V2.1.1 ( )

Final draft ETSI EN V1.1.1 ( )

ETSI ES V1.1.1 ( )

ETSI EN V2.1.1 ( )

ETSI EN V1.2.1 ( )

Final draft ETSI EN V2.1.1( )

ETSI ES V1.2.1 ( )

ETSI EN V1.2.1 ( )

ETSI EN V1.2.1 ( ) Harmonized European Standard (Telecommunications series)

ETSI TS V ( )

ETSI TS V1.1.1 ( )

ETSI EN V1.1.1 ( ) Harmonized European Standard (Telecommunications series)

ETSI EN V1.3.1 ( )

ETSI TS V1.1.2 ( )

ETSI ES V1.1.1 ( )

ETSI TS V ( )

Draft ETSI EN V1.3.1 ( )

ETSI EN V1.4.1 ( )

ETSI TS V8.1.0 ( ) Technical Specification

DraftETSI EN V1.2.1 ( )

Final draft ETSI EN V1.3.1 ( )

ETSI EN V1.2.1 ( )

ETSI EN V2.1.1 ( ) Harmonized European Standard (Telecommunications series)

ETSI EN V1.4.1 ( )

ETSI TR V1.1.1 ( )

Final draft ETSI EN V1.1.1 ( )

ETSI EN V1.2.1 ( )

ETSI EN V1.3.1 ( )

TR V1.1.1 ( )

ETSI ES V1.1.1 ( )

ETSI EN V1.2.3 ( ) Harmonized European Standard (Telecommunications series)

ETSI EN V2.1.1 ( )

ETSI EN V1.5.1 ( ) Harmonized European Standard (Telecommunications series)

ETSI TR V1.2.1 ( )

ETSI EN V1.1.1 ( )

ETSI EN V1.3.1 ( ) Harmonized European Standard (Telecommunications series)

ETSI TS V7.3.0 ( ) Technical Specification

SOUTH AFRICAN NATIONAL STANDARD

ETSI EN V1.2.1 ( )

ETSI TS V8.0.0 ( ) Technical Specification

DraftETSI EN V1.2.1 ( )

ETSI EN V1.3.2 ( ) Harmonized European Standard (Telecommunications series)

ETSI TS V5.4.0 ( )

Summary 18/03/ :27:42. Differences exist between documents. Old Document: en_ v010501p 17 pages (97 KB) 18/03/ :27:35

ETSI TR V1.2.1 ( )

Final draft ETSI EG V1.1.0 ( )

ETSI EN V1.1.2 ( ) Harmonized European Standard

ETSI EN V1.2.1 ( ) Harmonized European Standard

Final draft ETSI EN V1.1.1 ( )

ETSI TS V1.2.1 ( ) Technical Specification. Terrestrial Trunked Radio (TETRA); RF Sensitive Area Mode

Final draft ETSI EN V1.2.2 ( )

Final draft ETSI EN V1.2.0 ( )

ETSI EN V1.3.1 ( )

ETSI EN V1.1.1 ( )

ETSI TS V4.0.0 ( )

ETSI TS V8.0.0 ( ) Technical Specification

ETSI TR V5.0.1 ( )

ETSI TS V8.2.0 ( ) Technical Specification

ETSI TS V1.1.1 ( ) Technical Specification

ETSI EN V1.1.1 ( )

Text Comparison. Documents Compared en_ v010301p.pdf. en_ v010501p.pdf

ETSI TS V8.1.0 ( ) Technical Specification

ETSI EN V1.1.1 ( )

ETSI EN V1.2.1 ( )

ETSI TS V1.2.1 ( ) Technical Specification

ETSI TS V8.7.0 ( ) Technical Specification

ETSI EN V7.0.1 ( )

ETSI TR V1.3.1 ( )

ETSI TS V1.1.2 ( )

ETSI EN V1.1.1 ( )

ETSI EN V1.4.1 ( ) Harmonized European Standard (Telecommunications series)

Draft ETSI EN V1.1.1 ( )

Draft ETSI EN V2.1.0 ( )

ETSI EN V1.2.1 ( )

ETSI TS V ( )

Draft EN V1.1.1 ( )

ETSI TS V9.3.0 ( ) Technical Specification

ETSI EN V1.1.1 ( )

ETSI EN V1.5.1 ( ) Harmonized European Standard (Telecommunications series)

ETSI EN V1.1.1 ( )

ETSI TS V1.1.1 ( )

ETSI EN V1.1.1 ( )

ETSI EN V1.1.1 ( )

ETSI TR V1.4.1 ( )

ETSI TS V9.0.0 ( ) Technical Specification

ETSI TS V ( )

ETSI EN V1.1.1 ( )

Transcription:

TR 101 953-2-2 V1.1.1 (2004-07) Technical Re Access network xdsl transmission filters; Part 2: VDSL splitters for European deployment; Sub-part 2: Specification of Testing methods for high pass part of VDSL/POTS splitters

2 TR 101 953-2-2 V1.1.1 (2004-07) Reference DTR/TM-06027-2-2 Keywords ADSL, ISDN, splitter, testing, POTS, VDSL, xdsl 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C Association à but non lucratif enregistrée à la Sous-Préfecture de Grasse (06) N 7803/88 Imant notice Individual copies of the present document can be downloaded from: http://www.etsi.org The present document may be made available in more than one electronic version or in print. In any case of existing or perceived difference in contents between such versions, the reference version is the Portable Document Format (PDF). In case of dispute, the reference shall be the printing on printers of the PDF version kept on a specific network drive within Secretariat. Users of the present document should be aware that the document may be subject to revision or change of status. Information on the current status of this and other documents is available at http://al.etsi.org/tb/status/status.asp If you find errors in the present document, send your comment to: editor@etsi.org Copyright Notification No part may be reproduced except as authorized by written permission. The copyright and the foregoing restriction extend to reproduction in all media. European Telecommunications Standards Institute 2004. All rights reserved. DECT TM, PLUGTESTS TM and UMTS TM are Trade Marks of registered for the benefit of its Members. TIPHON TM and the TIPHON logo are Trade Marks currently being registered by for the benefit of its Members. 3GPP TM is a Trade Mark of registered for the benefit of its Members and of the 3GPP Organizational Partners.

3 TR 101 953-2-2 V1.1.1 (2004-07) Contents Intellectual Property Rights...4 Foreword...4 1 Scope...5 2 References...5 3 Definitions and abbreviations...6 3.1 Definitions...6 3.2 Abbreviations...6 4 Introduction...6 5 Test conditions and general notes...7 6 List of test cases for the low pass part of the VDSL over POTS splitter...8 6.1 Insertion Loss Requirements for Options A, B and C...8 6.2 Unbalance about earth requirements for options B and C...12 6.2.1 Unbalance about earth requirements for options B and C without DC feeding...12 6.2.2 Unbalance about earth requirements for options B and C with DC feeding...13 History...14

4 TR 101 953-2-2 V1.1.1 (2004-07) Intellectual Property Rights IPRs essential or potentially essential to the present document may have been declared to. The information pertaining to these essential IPRs, if any, is publicly available for members and non-members, and can be found in SR 000 314: "Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to in respect of standards", which is available from the Secretariat. Latest updates are available on the Web server (http://webapp.etsi.org/ipr/home.asp). Pursuant to the IPR Policy, no investigation, including IPR searches, has been carried out by. No guarantee can be given as to the existence of other IPRs not referenced in SR 000 314 (or the updates on the Web server) which are, or may be, or may become, essential to the present document. Foreword This Technical Re (TR) has been produced by Technical Committee Transmission and Multiplexing (TM) as collaboration between: AT Analogue of Technical Committee Access and Terminals (AT); and TM6 of Technical Committee Transmission and Multiplexing (TM). The present document is part 2, sub-part 2 of a multi-part deliverable suping different aspects of European Specific DSL splitters, as identified below: Part 1: Part 2: "ADSL splitters for European deployment"; "VDSL splitters for European deployment": Sub-part 1: Sub-part 2: Sub-part 3: "Specification of Testing methods for the low pass part of VDSL/POTS splitters"; "Specification of Testing methods for high pass part of VDSL/POTS splitter"; "Specification of Testing methods for VDSL/ISDN splitters". NOTE: The choice of a multi-part format for this deliverable is to facilitate maintenance and future enhancements.

5 TR 101 953-2-2 V1.1.1 (2004-07) 1 Scope The present document describes test methods for the high pass section of VDSL/POTS splitters. These splitters are intended to be installed at the Local Exchange side of the local loop and at the user side near the NTP. In the case of splitters at the user side, the present document describes test methods for the master splitter that is intended for use at the demarcation point of the customer premises. Distributed filters are outside the scope of the present document. NOTE 1: At some locations in the present document impedances values are listed. These values might differ from the values listed in the requirement specifications TS 101 952-2-2 [2]. If the values differ the values of TS 101 952-2-2 [2] have to be used. NOTE 2: At some locations in the present document measurements are only shown for splitters at the user side. E.g. this is the case in figure 3. When measuring a splitter at the Local Exchange side the position of the Feeding bridge and the Holding Circuit have to be exchanged. NOTE 3: Remark, that in the present state of TS 101 270 [1] the use of distributed filters is not applicable for VDSL-over-POTS. 2 References For the purposes of this Technical Re (TR) the following references apply: [1] TS 101 270 (all parts): "Transmission and Multiplexing (TM); Access transmission systems on metallic access cables; Very high speed Digital Subscriber Line (VDSL)". [2] TS 101 952-2-2: "Access network xdsl transmission filters; Part 2: VDSL splitters for European deployment; Sub-part 2: Specification of the high pass part of VDSL/POTS splitters for use at the Local Exchange (LE) and the user side near the Network Termination Point (NTP)". [3] TS 101 952-2-1: "Access network xdsl transmission filters; Part 2: VDSL splitters for European deployment; Sub-part 1: Specification of the low pass part of VDSL/POTS splitters". [4] TR 101 953-2-1: "Access network xdsl transmission filters; Part 2: VDSL splitters for European deployment; Sub-part 1: Specification of Testing methods for low pass part of VDSL/POTS splitters". [5] ITU-T Recommendation O.9: "Measuring arrangements to assess the degree of unbalance about earth". [6] ITU-T Recommendation O.42: "Equipment to measure non-linear distortion using the 4-tone intermodulation method". [7] TBR 038: "Public Switched Telephone Network (PSTN); Attachment requirements for a terminal equipment incorporating an analogue handset function capable of suping the justified case service when connected to the analogue interface of the PSTN in Europe". [8] TBR 021: "Terminal Equipment (TE); Attachment requirements for pan-european approval for connection to the analogue Public Switched Telephone Networks (PSTNs) of TE (excluding TE suping the voice telephony service) in which network addressing, if provided, is by means of Dual Tone Multi Frequency (DTMF) signalling". [9] EG 201 120: "Public Switched Telephone Network (PSTN); Method of rating terminal equipment so that it can be connected in series and/or in parallel to a Network Termination Point (NTP)".

6 TR 101 953-2-2 V1.1.1 (2004-07) 3 Definitions and abbreviations 3.1 Definitions For the purposes of the present document, the following terms and definitions apply: A-wire and B-wire: wires in the 2-wire local loop connection provided from the exchange to the NTP on-hook: state of the POTS equipment at either end of a POTS loop connection when the NTP terminal equipment is in the quiescent state NOTE: In the case where there are multiple TE present at the customer end of the loop, then only when all of these are on-hook should the CPE be considered to be on hook from the perspective of testing the splitter. off-hook: state of the POTS equipment at either end of a loop connection when the NTP terminal equipment is in the steady loop state 3.2 Abbreviations For the purposes of the present document, the following abbreviations apply: ADSL Asymmetric Digital Subscriber Line CPE Customer Premises Equipment DC Direct Current DSL Digital Subscriber Line dbm Absolute power level expressed in decibels relative to 1 mw DUT Device Under Test ISDN Integrated Services Digital Network ITU International Telecommunication Union LE Local Exchange (Central Office) NF Narrow-band Frequency NTP Network Termination Point OP Operational Amplifier POTS Plain Old Telephone Service STF Specialist Task Force TE Terminal Equipment (e.g. Telephone, Fax, voice band modem etc.) VDSL Very high speed Digital Subscriber Line Z RHF Reference Termination Impedance for high frequencies (refer to TS 101 952-2-2 [2]) 4 Introduction The present document is part 2, sub-part 2 of a multi-part deliverable suping different aspects of European Specific DSL splitters. It has been produced based on the activities of STF 248. The present document describes test methods for the high pass part of VDSL/POTS splitters. The test methods of the present document are based on requirements of the following document: TS 101 952-2-2 [2]: "Specification of the high pass part of VDSL/POTS splitters for use at the Local Exchange (LE) and the user side near the Network Termination Point (NTP)". Furthermore certain aspects of the following documents have been considered as to provide a document which is consistent with the specifications of the other sub-parts of TR 101 953: TS 101 952-2-1 [3]: "Specification of the low pass part of VDSL/POTS Splitters"; TR 101 953-2-1 [4]: "Specification of Testing methods for the low pass part of VDSL/POTS splitters".

7 TR 101 953-2-2 V1.1.1 (2004-07) For each test, the document describes: Title of the test. Purpose of the test. Requirement in reference to the specifications. Test configuration. Test set up. Test parameters. Test results matrix. Measuring notes. 5 Test conditions and general notes For some tests feeding bridges and holding circuits are foreseen. For all of these tests, feeding bridge and holding circuit must comply with the requirements as specified in TBR 038 [7] with respect to the low frequency range. Similar performance is required for the high frequency range (up to 12 MHz). An equivalent accuracy may be obtained by calibrating the feeding bridge and holding circuit across the relevant frequency range. Signal injection a Feeding Bridge a Test connection b DC feeding b U F R F A I F Figure 1: External circuitry for feeding bridge a Holding Circuit a b DC b R DC Figure 2: External circuitry for holding circuit General notes: Polarity of the feeding voltage and with this the direction of the feeding current may impact the additional insertion loss caused by the feeding bridge and holding circuit. A calibration/normalization measurement need to be taken before each single measurement step.

8 TR 101 953-2-2 V1.1.1 (2004-07) For active splitters the connection of the DC feeding is essential i.e. for LE splitters the feeding bridge should be connected to the POTS and the holding circuit should be connected to the LINE. For TE splitters the feeding bridge should be connected to the LINE and the holding circuit should be connected to the POTS. Test set-ups as given in the present document show TE test set-ups unless stated otherwise. Tests for LE splitter evaluation should be set up considering the aforementioned. The inaccuracy of the measurement resulting from tolerances in the test set-up and its containing equipment should be carefully considered. When giving a verdict on the test results with respect to the requirement in the related standard this tolerance in the test results need to be taken into account. Before splitters are tested the class of splitter should be categorized. A basis for this could be the schematic of the splitter or a statement of the manufacturer. The following classes have been identified so far in the course of this project: passive: splitters which do exclusively contain passive components; passive with current/voltage detection: splitters which perform NF filtering using passive components, which are enhanced by detection circuits based on the DC voltage and/or the DC current; active: splitters which contain active components (like OP) to perform the NF filtering. NOTE: The splitters that have been evaluated during the validation of the test methods described herein are to be classified in cluster "passive". Although the STF 248 has not had a splitter classified in cluster "passive with current/voltage detection" at hand for the validation, the experience from STF 215 allowed to assess the test methods for that type, too. No "active" splitters could be made available for evaluation. The results of the STF 248 work could be validated for the first two classes, for the third class (active splitters) theoretical test case validations have been discussed. 6 List of test cases for the low pass part of the VDSL over POTS splitter 6.1 Insertion Loss Requirements for Options A, B and C Table 1 Test case name: Insertion Loss in the Pass Band (VDSL) Reference: TS 101 952-2-2 [2], clause 7.1 Test purpose: To evaluate the Insertion Loss in the Pass Band (VDSL) in when tested with the test parameters as given in the related standards Test configuration: See Test Set-up; DUT not configured

9 TR 101 953-2-2 V1.1.1 (2004-07) Test Set-Up for Measuring Direction LINE to VDSL: Z Source Us Feeding Bridge LINE POTS Holding Circuit Z open Signal source U F A I F 60 nf VDSL 60 nf R DC (see note) R F 634,5 µh Z VDSL - M Z Load V U1 Le vel meter NOTE: When the calibration measurement is done according to the figure above the influence of the Holding Circuit is not entirely taken into account as is left open. The Holding Circuit should be checked separately on the influence to Z RHF by measuring Z RHF over the entire frequency band both with and without the Holding Circuit inserted in the measurement. The influence of the Holding Circuit should not lead to a deviation of > 0,2 db which means the Holding Circuit shall have a return loss better than 16 db in the entire frequency band. Figure 3: Test set up for calibration LINE to VDSL Insertion Loss testing on a splitter Z Source Us Feeding Bridge LINE Splitter (DUT) POTS Holding Circuit Signal source U F A I F VDSL R DC R F 634,5 µh Z VDSL-M Z Load V U2 Level meter Figure 4: Test set up for LINE to VDSL Insertion Loss testing on a splitter

10 TR 101 953-2-2 V1.1.1 (2004-07) Test Set-Up for Measuring Direction VDSL to LINE: U1 V Z Load Feeding Bridge LINE POTS Holding Circuit Z open Level meter U F A I F VDSL R DC R F 60 nf 60 nf 634,5 µh Z VDSL-M Z Source Us Signal source Figure 5: Test set up for calibration VDSL to LINE Insertion Loss testing on a splitter U2 V Z Load Feeding Bridge LINE Splitter (DUT) POTS Holding Circuit Level meter U F A I F VDSL R DC R F 60 nf 60 nf 634,5 µh Z VDSL-M Z Source Us Signal source Figure 6: Test set up for VDSL to LINE Insertion Loss testing on a splitter NOTE: Even though there would not be any component in the high pass part, when there is no 120 nf blocking capacitor included (Option A Splitter), the measurement must be performed. This is required, as the low pass part of the splitter acts as a parallel load to the VDSL link which might harm the VDSL performance. Alternative splitter requirements (such as specifying a minimal input impedance of the low pass) and the related test methods are for further study.

11 TR 101 953-2-2 V1.1.1 (2004-07) Test Parameters: Parameter Measurement Direction Table 2 Value VDSL LINE LINE VDSL -10 dbm 32 khz to 12 MHz combination 1: Z source = 135 Ω, Z load = 135 Ω Level of the test signal Us Frequency Range Combination of Source and Load Impedances Termination at POTS for calibration Z open = open circuit only, Z open Termination at POTS: = short circuit (R < 0,01 Ω) = open circuit = Z RHF Level of feeding voltage +50 V DC -50 V DC Load resistance R DC 470 Ω DC feeding current I F 0 ma to 80 ma Test Matrix: Table 3 TS 101 952-2-2 [2] Essential Tests Direction: VDSL - LINE Direction: LINE - VDSL Level of the test signal - 10 dbm Frequency Range 32 khz to 12 MHz Source/load combination 1 = short circuit = open circuit = Z RHF Level of feeding voltage +50 V DC Level of feeding voltage -50 V DC Value of feeding current 0 ma Value of feeding current 13 ma Value of feeding current 80 ma Optional Tests Number of tests 18 tests 18 tests 0 tests Test procedure notes: NOTE 1: The source impedance Z SOURCE shall be implemented in a symmetrical way. NOTE 2: During the STF 248 validation work the following spurious effects were observed: When capacitors were connected externally for the testing (in this case in form of the capacitors contained in Z VDSL-M ) this lead to resonance effects with components of the low pass branch. As a result dips occurred at single frequencies above 1 MHz exceeding the specified insertion loss limits. If such behaviour is seen, a re-test with slightly changed external capacitors is recommended. It was observed that a variation in the range of +10 % was sufficient. Test results: Test Result shall be recorded in db, where: I L = 20 lg (U2/U1), where U2 is the voltage observed when the splitter is connected as in Test Set-Up (see figures 4 and 6) and where U1 is the voltage observed when the splitter is replaced by a direct wire connection of less than 0,01 Ω (see figures 3 and 5).

12 TR 101 953-2-2 V1.1.1 (2004-07) Measuring notes: Please refer to the general notes given in clause 5. 6.2 Unbalance about earth requirements for options B and C 6.2.1 Unbalance about earth requirements for options B and C without DC feeding Table 4 Test case name: Unbalance about Earth Reference: TS 101 952-2-2 [2], clause 7.2 Test purpose: To evaluate the symmetry (unbalance) of the splitter about earth when tested with the test parameters as given in the related standards Test configuration: See Test Set-up; DUT not configured Test set-up: 150Ω R S1 R earth terminal (if available at DUT) a UT VDSL b DUT a POTS a Line b b ~ Uo S2 600 Ω R R connection to plate (if no earth connection at DUT) Earth Point conducting earth plate sufficient size (if no connection available DUT) Figure 7: Test set up for Unbalance about Earth Measurements at the VDSL NOTE: When measuring at the Line, source and load of the test set-up have to be reversed accordingly. Test Parameters: Parameter Level of the test signal Uo Frequency of the test signal Uo Combination of Source and Load Impedances Splitter Option Status of S1 Status of S2 Table 5-10 dbm frequency range 1: 50 Hz to 4 khz frequency range 2: 4 khz to 12 MHz combination 1: R = 600 Ω/2 = 300 Ω combination 2: R = 68 Ω Option B Option C open closed open closed Value

13 TR 101 953-2-2 V1.1.1 (2004-07) Test Matrix: Table 6 TS 101 952-2-2 [2] Essential Tests Level of the test signal -10 dbm Splitter Option B Splitter Option C Frequency Range 1 (50 Hz to 4 khz) Frequency Range 2 (4 khz to 12 MHz) Impedance combination 1 Impedance combination 2 Status of S1 = closed Status of S1 = open Measured at VDSL ; S2 = open Measured at VDSL ; S2 = closed Measured at LINE ; S2 = open Measured at LINE ; S2 = closed = 600 Ω Optional Tests number of tests 8 tests 8 tests 0 tests Test procedure notes: NOTE: At the frequencies as used in this specific test wiring gets imant. Special care shall be taken with respect to a wiring that does not unnecessarily impact the test result. Furthermore, the selection of termination components need to be performed carefully taking into account the test frequencies. Before performing the measurements as described in this clause a reference measurement should be done, testing the test set-up without the splitter (splitter replaced by a short). Test results: Test Result shall be recorded in db, where: unbalance = 20 log10 (Uo/U T ), where Uo is the longitudinal voltage fed in by the generator and where U T is the differential voltage observed at the input of the SUT. Measuring notes: Please refer to the general notes given in clause 5. 6.2.2 Unbalance about earth requirements for options B and C with DC feeding This is for further study.

14 TR 101 953-2-2 V1.1.1 (2004-07) History Document history V1.1.1 July 2004 Publication