STATE OF OHIO DEPARTMENT OF TRANSPORTATION. SUPPLEMENTAL SPECIFICATION 817 SPRAY THERMOPLASTIC PAVEMENT MARKING April 15, 2011

Similar documents
ITEM 644 THERMOPLASTIC PAVEMENT MARKING

Appendix D Answers To Chapter Review Questions

C. For cold-applied tape, the pavement temperature shall be at least 70 F.

SPECIAL PROVISION TO SPECIAL SPECIFICATION Reflectorized Pavement Markings with Retroreflective Requirements

SUPPLEMENTAL SPECIFICATION. PROFILE ROAD MARKING SYSTEM South Carolina Department of Transportation

DIVISION PAVEMENT MARKINGS AND MARKERS

CHAPTER 5 PREFORMED THERMOPLASTIC

SPECIAL SPECIFICATION 8582 All Weather Thermoplastic Pavement Markings

Opening date has been changes from October 29, 2014 to November 3, 2014.

Item P-620 Runway and Taxiway Marking

Date: October 17, To: All Prospective Bidders. Re: Addendum No 3. Questions and Answers and Construction Document Changes

SUPPLEMENTAL SPECIFICATION SINGLE COMPONENT HYBRIDIZED POLYMER PAVEMENT MARKINGS

Section 7 Specification 7.2 Painted Roadway Lines TABLE OF CONTENTS

DMS-8220, Hot Applied Thermoplastic

3 All Weather Paint. Product Bulletin January Second Drop Glass Beads

Item P-620 Runway and Taxiway Marking

Product Bulletin July 2011

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

J O I N T I N D U S T R Y S T A N D A R D. Requirements for Soldering Pastes J Standard 005A. December 2011

Application Guidelines for Pavement Markings in Grooved Pavement Surfaces

OPERATING PAVEMENT PROFILOGRAPH AND EVALUATING PROFILES

Retroreflective Road Markings

Traffic Line Painting and Other Pavement Markings

INDEX TO CLAUSES PART 1 - GENERAL

ENGINEERING DIRECTIVE

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

CHAPTER 4 LIQUID THERMOPLASTIC

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction

DMS-8290, Glass Traffic Beads

CHAPTER TWO Fire Lanes & Fire Access

METRIC TT-B-1325C June 1, 1993 SUPERSEDING TT-B-1325B April 25, 1978 FEDERAL SPECIFICATION BEADS (GLASS SPHERES) RETRO-REFLECTIVE

Stamark Pavement Marking Tape and Liquid Pavement Markings Application Guidelines for Pavement Markings in Grooved Pavement Surfaces

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

A. Section includes surface preparation and the application of paint systems on the following exterior substrates: 1. Steel and iron.

BUREAU OF INDIAN STANDARDS. Draft Indian Standard TWO COMPONENTS HIGH BUILD EPOXY MICACIOUS IRON OXIDE (MIO) PIGMENTED INTERMEDIATE COAT SPECIFICATION

SPECIFICATION FOR WATERBORNE TRAFFIC LINE PAINT

INSTALLATION INSTRUCTIONS FOR #101NS & #101QR FIXED BASE

Working Methods TOTAL JOINERY REPAIR SOLUTIONS

Portable retroreflectometers and structured pavement markings

Evaluation of Durable Lane Delineation Materials

SUPPLEMENT 1127 PAY FACTORS DETERMINATION FOR PAVEMENT AND STRUCTURE CONCRETE

Marine. Paint Specification: November ::Fiberglass Substrate:: PAINT that OUTLASTS & OUTPERFORMS

Working Methods TOTAL JOINERY REPAIR SOLUTIONS

Guide Sign Policy for Secondary State Highways Edition

PILOT VISIBILITY STUDY

REQUEST FOR PROPOSALS

SURFACE FINISH. A galvanized finish is MnDOT s standard on new traffic control signal poles, mast arms, transformer bases, and luminaire extensions.

DOT N LINE EQUIPMENT

CITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves.

Application Brief TROXLER MODEL 3450

COMMERCIAL ITEM DESCRIPTION FASTENER TAPES, HOOK AND LOOP, SYNTHETIC

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION

A. Section includes surface preparation and the application of paint systems on exterior substrates.

ermseal is ColorPoint s main supplier and has been

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 39 - MANHOLES TABLE OF CONTENTS

Dowel Bar Alignment and Location for Placement by Mechanical Dowel Bar Insertion

Liquid Pavement Marking Series 1200

Section 914. JOINT AND WATERPROOFING MATERIALS

SPECIAL SPECIFICATION 7368 High Build Paint

Union County Vocational - Technical Schools Scotch Plains, New Jersey

COMMERCIAL ITEM DESCRIPTION INK, MARKING, EPOXY BASE

SPECIAL SPECIFICATION 7415 All Weather Paint

TT-P (COM-NBS) September 18, 1975 INTERIM FEDERAL SPECIFICATION PRIMER COATING, LATEX BASE, EXTERIOR, (UNDERCOAT FOR WOOD), WHITE AND TINTS

Sketchpaint. Ideal for turning any smooth surface into a whiteboard. Ready to use in 5 days

1. ASME A Scheme for the Identification of Piping Systems.

Special Provision No. 999S29 May 2010

EXTERIOR PAINTING

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 BID INVITATION NO EIGHT (8) EACH UTILITY BODY AND POWER LIFTGATE

INCH-POUND TT-B-1325D 06 August 2007 SUPERSEDING TT-B-1325C June 1, 1993 FEDERAL SPECIFICATION BEADS (GLASS SPHERES) RETRO-REFLECTIVE

#85-2-5A: PAINT STRIPPING AND FINISH ANALYSIS AND CORRECTION - (Aug 7, 1985)

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

APPLICATION NOTE - SR001. Cold Weather Application

SSPC-PA 2 Procedure for Determining Conformance to Dry Coating Thickness Requirements

Technical Data Sheet ACRYLIC FILLER 4:1 Acrylic filler with anti-corrosion additives RELATED PRODUCTS. Acrylic and polyurethane thinner

RESIDENTIAL ROOFS ADDENDUM NUMBER ONE. August 28, 2017

SECTION MANHOLES

Seal Coats and Surface Treatments Fred J. Benson, Dean of Engineering A. and M. College of Texas College Station, Texas The construction, as here


MIL-STD-1580B REQUIREMENT 11 DETAILED REQUIREMENTS FOR CONNECTORS

Engineered Hardwood Flooring Installation Instructions

Southeast Toyota Tacoma 4-Door Roof Rack DEALER INSTALLED

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

Technical Data February, 2016

Magnetpaint & Sketchpaint

Introduction...2 Product Application Requirements...3 Adhesive Series of Stamark Tapes...3 Hot Inlay Application of Long Lines...

SECTION PRE-MANUFACTURED CABINETS

2013 SKILLS CANADA NATIONAL COMPETITION

JOINT INDUSTRY STANDARD. Requirements for Soldering Pastes J Standard 005A. June 2011 Final Draft for Industry Comment

Waterborne Paint with Rohm and Haas Rhoplex HD-21 Binder. Interstates 1-89 and 1-91, Vermont. June2002 Reporting on Work Plan 2000-R-7 Final Report

Primer / Primer Surfacer

PREMIUM CONCRETE COUNTERTOP MIX INSTALLATION INSTRUCTIONS

For crossing under a railroad, contact the specific railroad company's engineering department.

CHAPTER 2 REFLECTIVE GLASS BEADS

GEOTEXTILE INS TALL ATION GUIDE

STRUCTURED PAVEMENT MARKINGS 90 TH ANNUAL TRANSPORTATION SHORT COURSE TRAFFIC OPERATIONS SESSION I PRESENTED BY HERBERT BICKLEY, P.E.

Pavement Markings Under Wet Night Road Conditions. A Comparison of 2 Beads in Grooved High Build Waterborne on I-215I

RAPTOR EPOXY PRIMER RAPTOR 4:1 ANTI-CORROSIVE EPOXY PRIMER DESCRIPTION

SUNBELT transformer WIDTFA3501 PAINTING TRANSFORMERS WITH WATERBORNE PAINT SYSTEMS INTERNAL USE ONLY DOCUMENT HISTORY

Lesson 6 ~ Write and Solve Proportions

Transcription:

817.01 Description 817.02 Materials 817.03 Equipment 817.04 Surface Preparation 817.05 Application 817.06 Basis of Payment STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 817 SPRAY THERMOPLASTIC PAVEMENT MARKING April 15, 2011 817.01 Description. This work consists of furnishing and applying spray thermoplastic pavement markings according to Item 641, 740.01, 740.09, 917.10, and the additional requirements specified below. 817.02 Materials. Furnish materials from the Department s Approved List conforming to: Spray Thermoplastic Pavement Marking... 917.01 Glass beads, Type C...740.09 The Engineer may obtain random samples from the application equipment. Furnish the manufacturer s identification information for the sampled materials. The Department will test the quality assurance sample for conformance to the manufacturer s production ranges. Samples not meeting the manufacturer s production ranges will require the Contractor to re-apply, at his expense, any markings using that sample. All other untested batches will become not approved materials and will either require testing or re-application. Do not apply material that has exceeded the manufacturer s shelf life. Do not use glass beads that are wet. 817.03 Equipment. Equip all spray thermoplastic pavement marking trucks for center line, lane line and edge line markings with a computerized Data Logging System (DLS), including a cab mounted display which shows the actual bead application rate. For center line, lane line and edge line markings applied with truck-mounted equipment, when the length of marking exceeds 0.5 miles (0.8 km) of continuous line equivalent, document the following with the DLS: 1. Measure and record application vehicle speed to the nearest 0.1 mph (0.16 km/h). 2. Measure and record pavement surface temperature. 3. Measure and record air temperature. 4. Measure and record spray thermoplastic temperature in the kettle and at the point of application.

Record as a separate DLS report line entry the above information for each route section painted, when the length of marking exceeds 0.5 miles (0.8 km) of continuous line equivalent. A route section is defined as one direction of a contiguous section of highway (without breaks) with the same route number designation. If the DLS equipment fails, finish that day s work only and resume when the DLS equipment is working. The Department will provide a standard DLS spreadsheet, which prescribes the correct DLS report format and content prior to beginning of work. Each DLS shall have an annual calibration of all mechanical and electrical components and its software function and output confirmed by the DLS manufacturer or their designated representative. Evidence of the annual calibration is shown by carrying a signed and dated stamp or seal affixed to the inside of the driver s door of each striper. Use application equipment that includes a kettle for melting the spray thermoplastic and maintaining it at the proper temperature. Equip the kettle with a thermostat to control the temperature of the melted spray thermoplastic and to prevent overheating. Use equipment that continuously mixes and agitates the molten spray thermoplastic. Ensure that the parts of the equipment that convey the spray thermoplastic from the kettle to the application point maintains it at the required temperature. Attach an automatic bead dispenser to the equipment so that the beads are immediately and uniformly dispensed over the marking surface. Equip the bead dispenser with an automatic cutoff control synchronized with the cut-off of the spray thermoplastic material. Ensure that the application equipment applies lines with a square end and can apply broken lines. Furnish application equipment for applying spray thermoplastic markings that produces different widths of lines. Use equipment that ensures uniformity in the thickness and width of lines. Use equipment that forms lines 8 inches (200 mm) wide or less by one application pass. 817.04 Surface Preparation. Before applying spray thermoplastic the pavement surfaces must be clean, dust free, and completely dry. Test for moisture using the following test procedures, if needed as directed by the Engineer: Moisture Test 1. Tape a 12 inch (300 mm) square sheet of thin plastic to the road surface, sealing all edges. 2. After 15 minutes examine the side of the sheet facing the road surface. 3. If more than a sparse amount of moisture is present, do not apply spray thermoplastic. Apply spray thermoplastic to new pavement, over existing thermoplastic, or over one application of paint. Do not apply spray thermoplastic over epoxy, polyester, or preformed markings. Remove poorly adhering, flaking and loose markings and curing compounds. Use an

air blast, or manual or mechanical broom to prepare surfaces. When more effort is needed to obtain a surface free from adhering, flaking and loose markings and curing compounds, use water blasting or mechanical removal. 817.05 Application. If applying spray thermoplastic to pavements that are less than six months old, ensure that both the pavement surface and the ambient air temperature at the time of application are not less than 50 F (10 C) and rising. However, if applying thermoplastic to pavements that are older than a year, ensure that both the pavement surface and the ambient air temperature at the time of application are not less than 70 F (21 C) and rising. Ensure that the temperature of spray thermoplastic at the point of application is at least 375 F (191 C) and not more than 425 F (218 C). Apply spray thermoplastic at a thickness of 45 mil (1.15 mm) at the following rates: 45Mil Thickness Line Width (inch) 4 6 8 Pounds per Mile of Line Solid Line 762-886 1143-1329 1524-1772 Broken or Dotted Line 191-222 286-332 381-443 1.15 mm Thickness Line Width (mm) 100 150 200 Kilogram per Kilometer of Line Solid Line 209-242 313-364 417-485 Broken or Dotted Line 52-61 79-92 104-121 Mechanically apply glass beads to the wet spray thermoplastic surface so that the beads are embedded and retained and provide uniform retroreflectivity in the surface. Apply beads at a minimum rate of 10 pounds per 100 square feet (4.9 kg per 10 m²) of spray thermoplastic surface area. Use primer when required by the manufacturer. Apply primer according to the manufacturer s recommendations. For each route section on the DLS report, the Engineer will compute the amount of spray thermoplastic marking material and glass beads applied. The Department will reduce the contract price in direct proportion to the percent of deficiency of spray thermoplastic marking material or glass beads as specified in 817.05, up to 20 percent for each material deficiency. The Department will only use the greater deficiency of marking material or glass beads to compute the deduction. If the deficiency of spray thermoplastic marking material or glass beads is 20 percent or more, the Department will consider the work unsatisfactory. In addition, the Engineer will consider as unsatisfactory materials applied outside the temperature or application requirements in 817.05

without written approval of the Engineer. Replace spray thermoplastic markings and glass beads in all sections determined to be unsatisfactory by entirely removing the unsatisfactory spray thermoplastic material by grinding as per 641.10 and then reapplying at the full thickness specified in 817.05. Furnish the Engineer daily, biweekly and final DLS reports conforming to 817.03, and additional reports indicating material type and quantities in pounds (kilograms) of spray thermoplastic materials used, as per 641.04. 817.06 Basis of Payment. The Department will not pay for any spray thermoplastic lines that do not meet the required thickness. The Department will pay for accepted quantities at the contract prices, or prices adjusted according to 817.05, measured according to 641.12, with the provisions specified in 641.13, and as follows: Item Unit Description 817 Mile (Kilometer) Edge Line 817 Mile (Kilometer) Lane Line 817 Mile (Kilometer) Center Line 817 Foot (Meter) Channelizing Line 817 Foot (Meter) Dotted Line, inch ( mm) 817 Foot or Square Foot Removal of Pavement Marking (Meter or Square Meter), or Each 817 Lump Sum Two-Way Radio Equipment

Designer Note: For use in accordance with the 2010 C&MS on all projects using spray thermoplastic pavement marking material