Assembly instructions

Similar documents
Assembly instructions

Assembly instructions

PROFESSIONAL FLARING TOOL 001ERL 37 & ERL 37

Operating Manual Riveting Tool R1. For installing blind rivet nuts

Operator's manual. TruTool N 200 (1A1) english

INSTRUCTION MANUAL Q-HYDRAULIC

HMZ Locknuts simple and reliable locking devices

ADDUCO Hydraulic Clamping Nut

CLAMPEX KTR 401 Operating/Assembly instructions. 1 Technical data 2

Hydraulic Adapters (080201/ MS# 51820) (080202/ MS# 51815) (071502) (081602) (080203/MS# 51813)

MSR/MSB Mechanical Setting Tool

HDL(M)6 Nut/Screw Assembly

HBS-AP ASSEMBLING INSTRUCTIONS

Specification Tapped holes f. coupl Scope Allocation of the JED Numbers General...

VERSAtoolTM SAE J533 & SAE J1453. Safety and Operating Manual

IX. FLARED JOINTS IX. FLARED JOINTS

Installation and Operational Instructions for ROBA -DX Couplings Type 931.3

KBS 40 Locking Device is a frictionally engaged detachable shaft-hub connection for cylindrical shafts and bores without keyway.

Operating Manual. for CUTTING, PERFORATING, BENDING SLB120

RIVETING Rivet types Solid rivets Solid rivets are used less and less. They have been replaced in many cases by welding or bonding.

REPUTE tube fittings are manufactured to stringent quality control program and internal standards which

HC Hydraulic Expansion Chucks

REP Design LLC. 193 Winding Ridge Rd, Southington, CT INSTALLATION INSTRUCTIONS:

Maintenance Information

REPAIR INSTRUCTIONS. Cat. No Cat. No MILWAUKEE ELECTRIC TOOL CORPORATION. SDS Max Demolition Hammer. SDS Max Rotary Hammer

Specification

Operator's manual. TruTool N 1000 (1B1) english

Technical Manual. ETP-CLASSIC incl type R. Content

Installation and Operating Instructions for Shrink Discs RLK 608 and RLK 608 E E e

Operating manual. TruTool N 500 (1A1) english

SPIETH Locknuts. Series MSW. Works Standard SN 04.03

HMP-200 BENDER INSTRUCTION SET

E.C. HOPKINS LTD PGO4 PEANUT GRINDER OPERATORS MANUAL AND PARTS LIST

DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks

linear/swivel clamp CLR Operating instructions e [ ]

INSTRUCTIONS FOR USE LA, MAMMUT & STR KNURLING TOOLS

OTECO INC. MODEL ,000 PSI 4-1/16 PORT DM GATE VALVE MAINTENANCE MANUAL

MSR/MSB Mechanical Setting Tool

CONNEX-Junction. for subsequent lateral connections to thin-walled drainage and sewer pipes. adjustable durable leakproof

All American Mower Blade Sharpener Mulching Blade Model Patent Pending

RoAd And MineRAl technologies

The object of these Operating Instructions is to assist you in the correct safe and economical use of the TORSIOMAX torque screwdriver.

Tools for Plumbing. Introduction

Rigid Fluid Lines Tubing Materials Material Identification 7-1

52/8 04/2005 UNIVERSAL. Narrow Stitching Head. Operating-Instructions Spare parts list

Alpha + On-Roof System Installation manual

Page 1. SureMotion Quick-Start Guide: LARSACC_QS 1st Edition - Revision A 03/15/16. Standard Steel Bolt/Screw Torque Specifications

STAUFF. Stauff-Connect Machinery & Services. Local Solutions for Individual Customers Worldwide

Hydrajaws Safety Lifeline Tester

SAFETY PRECAUTIONS GENERAL INFORMATION

Installation and operating instructions for Brake disc with clamping element RLK 608 E Schaberweg Telefon

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

Clamping bolts Eccentrical cams clamping units

OPERATING INSTRUCTIONS MODULGRAV. Tel. +49 (0) Fax +49 (0) homepage:

PF 3000 Face Milling Cutter

RING CUTTING SYSTEM OPERATOR S MANUAL

Thread and End Connection

TOOLS AND INSTALLATION

MB-105 BENDER INSTRUCTION SET PRO-TOOLS 7616 INDUSTRIAL LANE TAMPA, FLORIDA PHONE FAX

Chapter 6 Frame And Lens Repairs

w w w. h d o n l i n e s h o p. d e TIMKEN BEARING CONVERSION TOOL GENERAL INSTALLATION -J04672 REV Kit Number Models

c. Pins, bolts, and retaining rings b. Washers, locking nuts, and rivets

1904, 1904Pg, 1904PgSB, and 1906SB High Capacity Ratchet Knockout Drivers

INSTRUCTIONS FOR USE B2 FORM KNURLING TOOL

FITTINGS & GAUGES 20,000 PSI

peat sampler All it takes for environmental research operating instructions Table of contents

Zero Point Clamping System. ZERO lock BALL lock

H6400, H6400C1 & VSD6400 REVERSIBLE DRILLS

A SRF/SERF A SRF/SERF

EZ-Lock Assembly Manual

25 TONNE HYDRAULIC PRESS MODEL NO: AHP 26

Late Spiders - Forming Bubble Flares on Brake Lines

HEICO FASTENING SYSTEMS. Simple Fast Reliable HEICO-TEC TENSION NUT

Removing Right-Side. Components. Right-Side. Components. Click Here to Go Back AT THIS POINT

Installation and Operational Instructions for ROBA -DS couplings Type 95. _ (disk pack HF) Sizes

I-W07/W77. Couplings DETAIL A WARNING. Photo Showing Pipe with Weld Seam Ground 6 inches/152 mm Back from Pipe End and an AGS Groove

Elcometer Conical Mandrel Bend Tester

Design Guide. Original version of the design guide

Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher

CENTAFLEX-A Assembly and operating instructions 008A N/S.. M EN Rev. 2

Assembly and Adjusting Instructions for Modules 6x6 and 4x4 Alignment Adapter

Polygonal Clamping System Clamping device SVP-2

LX1 Maintenance Manual for Model LX1B. Table of Contents 1. GENERAL DISASSEMBLY, ASSEMBLY AND ADJUSTMENT COMPONENTS...

SR-1.0 Manual, a.doc 11/14/2006 Page 1 of 17

Technical features. Positive Taper Lock System for manual tool clamping. Technical features:

Sport-Thieme. Handball Goal. Assembly instruction. 3x2 m, Free-standing with Fixed Net Brackets

CENTAFLEX-A Assembly and operating instructions 008A GN, -GZ, -GB.. M EN Rev. 7

Operating Instructions K-POWERgrip EWL Always on the safe site.

Assembly Instructions. Original version of assembly instructions

General Safety and Maintenance Manual

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extention Sections. Reliable Connections

TYPE 3740XL EXTRA LARGE WET RUNNING CARTRIDGE SPLIT SEAL

The Virgo/Libra Steam Engine

Repair manual. Fifth-wheel coupling JSK 38/50

Pipe wrenches Tube cutters Bench yoke vices. Three stands Other plumbing tools Sets of pipe wrenches. Ergonomic shape

PURESTREAM SYSTEM - ASSEMBLY GUIDE

STAMPING TECHNOLOGY - CLAMPING RAW PARTS

Fifth-wheel coupling JSK 38/50

Installation Tools. Pipe Cutters for steel and cast iron pipes 598. Deburring Reamer / for stainless steel pipes 600. for copper pipes 602

A cut above the rest The VOSSRingM cutting ring system

Transcription:

Assembly instructions

Important notes on VOSS assembly instructions In order to ensure maximum performance and functional reliability of VOSS products, the respective assembly instructions, operating conditions and tube recommendations have to be adhered to. We recommend that you use VOSS pre-assembly devices at all times. It is absolutely essential to follow the operating instructions for the respective pre-assembly device used. Do not start with assembly until you are absolutely sure that you have understood the operating and assembly instructions for each VOSS pre-assembly device or machine, tool and product. Incorrect handling leads to risks regarding safety and leak-tightness and can result in failure of the entire connection. It is impossible for the manufacturer to monitor whether the user is adhering to the operating and assembly instructions for individual pre-assembly devices or machines, tools and products, as well as what conditions prevail and what methods are used for installation, operation, application and maintenance of the individual products. Improper workmanship can lead to material damage, which in turn may pose a danger to life and limb. This means that VOSS Fluid GmbH can accept no responsibility or liability for loss, damage or costs incurred due to faulty installation, improper operation or incorrect application and maintenance or from any related issue. Failure to heed this warning will lead to loss of guarantee. VOSS Fluid GmbH reserves the right to make changes or additions to the information provided without prior notification. Customers can obtain the latest version of the operating and assembly instructions upon request, or from our download area at: www.voss.net

General notes on VOSS assembly instructions Make sure that all components, including the tubes, are clean before assembly is started and that they remain clean during the entire assembly process. Soiled components may lead to failure of the system. Before starting assembly, make sure that you have carried out all preparatory work in accordance with the respective instructions. Specifications concerning permissible steel tubes: seamless, cold-drawn and normalized precision steel tubes as specified in DIN EN 10305-4, material E235+N, mat. no. 1.0308+N or E355, mat. no. 1.0580. The tubes must be ordered by specifying the outer diameter and the inner diameter. Specifications concerning permissible stainless steel tubes: seamless, cold-drawn and solution-annealed, scale-free stainless steel tubes in CFA or CFD delivery condition of dimensions and tolerances according to DIN EN 10305-1 and all other delivery conditions as specified in DIN EN 10216-5, material X6CrNiMoTi17-12-2, mat. no. 1.4571. The tubes must be ordered by specifying the outer diameter and the inner diameter. The tubes should be prepared with the same thoroughness as preassembly and final assembly of the connection. Especially when using long tubes, check the end sections for damage or distortion. We recommend that pre-assembled tubes which are not to be finally assembled yet should be fitted with protective caps. Marking a stroke on the union nut and the tube makes it easier to achieve the correct number of turns when tightening the coupling. Before starting to assemble VOSS components with elastomer seals, always check that: the nut and the seal surfaces are clean and undamaged and/or the elastomer sealing is clean and undamaged Determining the tightening torque for screw couplings The tightening torques specified in the catalogue apply under the following conditions: steel fittings with VOSS coat surface coating the specified nominal pressure ranges assume that the mating material has a tensile strength of 600 N/mm² our recommendations on lubrication of the threaded studs are observed If other values for strength, modulus of elasticity and friction-surface combinations are used, the user has to adapt the tightening torque empirically. The recommended tightening torques have to be adhered to if the pressure range is to be fully utilized and the appropriate safety level is to be maintained. The recommended tightening torques for the threads are given in the tables for the respective type of thread. Explanation of symbols and other notes Visual inspection Turn until hand-tight or carry out another manual activity Use the tool to tighten the coupling according to the instructions Oil and lubricate at the point marked with an arrow All dimensions in millimetres [mm]

Assembly instructions for BV-10 flared couplings 1 Notes Before starting the assembly work, read and observe the general notes in the up-to-date VOSS catalogue and check that your assembly instructions are up to date. These assembly instructions describe pre-assembly and final assembly of BV-10 flared couplings. Various VOSS pre-assembly devices are available for pre-assembly of the flared cone. The specifications in the respective operating instructions apply to the assembly procedures here. 2 Tube preparation 2.1 Determine the tubing dimensions using the following table of dimensions. L1 L2 Series Tube OD[mm] t5 [mm] x approx. [mm] L1 approx. [mm] L 6 7 0.8 7.8 55 L 8 7 1.1 8.1 55 L 10 7 0.5 7.5 60 L 12 7 0.5 7.5 62 L 15 7 0.5 7.5 62 L 187.5 1.5 9 63 L 227.5 1.5 9 65 L 287.5 1.5 9 72 L 3510.5 2.8 13.3 75 L 42 11 3 14 75 S 8 7 2.4 9.4 55 S 107.5 2.4 9.9 60 S 127.5 2.4 9.9 60 S 14 8 3.4 11.4 65 S 168.5 2.5 11 65 S 2010.5 3.5 14 70 S 25 12 3.5 15.5 75 S 3013.5 4.5 18 75 S 38 16 5 21 78 L2 approx. [mm] t5 x 2.2 Cut tubes at right angles. An angle tolerance of ±1 is permissible. Do not use tube cutters or angle grinders to cut tubes. Slightly deburr tube end inside and outside. Clean the tube. 0,2 max. ±1

BV-10 3 Flared cone pre-assembly 3.1 Push the BV-10 union nut and the clamping ring onto the tube as shown in the diagram. 3.2 Pre-assembly principle Only use a VOSS pre-assembly device for this process. During the pre-assembly the BV-10 flared cone is pressed into the tube. Set up the pre-assembly device and tools as described in the corresponding operating instructions. The outer diameter and wall thickness of the tube must be observed when choosing which tools to use. Pre-assemble the coupling as described in the operating instructions. 3.3 Apply a light film of lubricant (e.g. mineral-oil based hydraulic fluid HLP32) to toothed section and the cylindrical collar of the BV-10 flared cone and then push this onto the assembly mandrel.

BV-10 3.4 Push the tube, with the BV-10 union nut and clamping ring on it, from the outside into the hole of the clamping jaws until it is centred on the BV-10 flared cone. The BV-10 union nut and clamping ring must remain outside of the assembly area. Make sure the correct clamping jaw pressure is set. The tube must not be able to slip when the assembly process is started. Follow the relevant sections of the operating instructions for the respective pre-assembly device. 3.5 Press the BV-10 flared cone into the tube. The optimum flared-cone assembly position is achieved when the remaining gap is 0.5 mm but not more than 1 mm. The BV-10 flared cone must not touch the flat surfaces of the tube end. Gap of 0.5 up to max. 1 mm required 3.6 Check that the flared cone fits squarely. 90 ± 1

BV-10 4 Final assembly 4.1 Push the O-ring on and check that it is bedded in the groove of the flared cone without being twisted. Lubricate the threads, the taper surface and the BV-10 union nut lightly (e.g. using mineral-oil based hydraulic fluid HLP32). 4.2 Insert the pre-assembled tube end into the cone of the coupling connecting piece at a straight angle. Make sure the O-ring is not damaged. Ensure a tensionfree connection of the pre-assembled tube and the coupling connecting piece. wrong correct 4.3 Turn the BV-10 union nut until it is hand-tight.

BV-10 4.4 Tighten up the coupling by turning the BV-10 union nut by approx. 3/4 1 full turns. If the coupling is being installed on an already-installed tubing system, hold the coupling connecting piece with a spanner when tightening the coupling. approx. 3/4 1 turns 5 Re-assembly Each time the BV-10 flared cone is unscrewed, the O-ring must be checked for damage and replaced if necessary. For the second and all ensuing re-assembly processes, the BV-10 union nut must be tightened by only 1/4 1/2 turns after it has been hand-tightened. approx. 1/4 1/2 turns