Specification For. Asset Information Pr8701

Similar documents
This specification describes the general requirements for Engineering Services provided to Vale.

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

CHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

VCE Systems Engineering: Administrative information for Schoolbased Assessment in 2019

DNVGL-CP-0212 Edition March 2016

Estates Development & Projects

CONSULTANT ACCREDITATION SCHEME WATER SUPPLY

This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements.

Design submission using DTC or Engineering Certified solution.

BIM/VDC on TAA Projects:

SECTION SUBMITTAL PROCEDURES

Drawing Management Standard

ASSET INFORMATION SPECIFICATION

Medical Devices Calibration, testing, service and repair

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

CONSULTANT ACCREDITATION SCHEME SEWER DESIGN

DESIGN STANDARD DS 30

3. How to prepare a successful proposal?

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

This document is a preview generated by EVS

WORKSHOP- 892 INNOVATIONS IN CIM FOR DIGITAL PROJECT DELIVERY TRB 96 th ANNUAL MEETING, JANUARY 2017, WASHINGTON, DC. BIM for Infrastructure

WELCOME TO CHEMIONIX. Chemionix e-solutions Pvt Ltd Mumbai India

TYPE APPROVAL PROCEDURE

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.

Workshop on Offshore Wind Energy Standards and Guidelines: Metocean Sensitive Aspects of Design and Operations in the United States July 17, 2014

Employability Enhancement Program for Engineers. Transformation of an engineering degree holder to a real Engineer, who can do more at work.

COST Open Call and COST New Action Proposal Submission, Evaluation, Selection and Approval Procedure

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

Understanding Computer Aided Drawing (CAD) Unit Level: Unit Credit Value: 7 GLH: 50 AIM Awards Unit Code: CQ8/2/EA/002 Unique Reference A/600/2374

Incentive Guidelines. Aid for Research and Development Projects (Tax Credit)

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

COST European Cooperation in Science and Technology

Table of Contents. Introduction... 1

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Offshore production installations Basic surface process safety systems

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah

Seychelles Civil Aviation Authority SAFETY NOTICE. Coding and registration of Seychelles 406 Mhz Emergency Locator Transmitters (ELTs)

THE ADVANCED MODELING SUBMITTAL REVIEW CHECKLIST (CHX)

Adoption of pipe systems by a GT management of UIP activities

39 Years of Learning the Hard Way. Mark A Etrheim, Mastercraft Homes Inc

IGEM/TD/101 Edition 2 Communication 1740 Adoption of pipe systems by a GT management of UIP activities

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Vanderbilt University Standard Specification Revised 2/6/08

Certificate of Appropriateness (CoA) Checklist

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

00-General Drawings. Doc. no.: NA-00-STS002

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

East Central College

BIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos

ISO INTERNATIONAL STANDARD. Ships and marine technology Launching appliances for davit-launched lifeboats

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Canadian Technology Accreditation Criteria (CTAC) MECHANICAL ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC)

COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING. July 31, :00 PM. Commissioners Chamber

DNVGL-CP-0338 Edition October 2015

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

Architectural Design Process

Controlling Changes Lessons Learned from Waste Management Facilities 8

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

Public Information and Disclosure RD/GD-99.3

Chemionix Solutions. Outsourcing. Engineering. Drafting

ELECTRONIC DRAFTING GUIDELINES

BIM. e Submission Guideline Structural. Annex 1a. Recommended Process Revit 2010

Guidance on design of work programmes for minerals prospecting, exploration and mining permits

Canadian Technology Accreditation Criteria (CTAC) ELECTROMECHANICAL ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC)

TECHNOLOGY QUALIFICATION MANAGEMENT

Implementing BIM for infrastructure: a guide to the essential steps

Summary of Relaying Reviews Reporting

Subject Document no. Page Drafting of P&IDs TBA 1 / 6. Group Issued (by / date) Revised (by / date) Rev. Instruction TSN 15.5.

What is BIM and why should construction lawyers care about it? Dr. Carrie Sturts Dossick, P.E. Bita Astaneh Asl

1 Higher National Unit credit at SCQF level 7: (8 SCQF credit points at SCQF level 7)

ISO INTERNATIONAL STANDARD

UNIT Computer Aided Draughting (CAD) for Engineers (SCQF level 5)

Kinyun Australia KP : Procedure for Control of Engineering Drawings PROCEDURE FOR CONTROL OF ENGINEERING DRAWINGS

Air Monitoring Directive Chapter 9: Reporting

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

DRAFT ASSEMBLY RESOLUTION A. (26)

Technical Description. Mechanical Engineering Design - CAD

Maximo Oil and Gas Maximo HSE Manager Application Overview Standard Actions Standard Action Groups

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP)

FIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

DEPARTMENT OF COMMUNICATIONS. No April 2013 MINISTER OF COMMUNICATIONS OUTLINE OF THE ICT POLICY REVIEW PROCESS, 2013

Public and Aboriginal engagement Public Information and Disclosure REGDOC-3.2.1

Pohlcla Coslelanos Anthony Plrozzl, Jr. Edward R. Renwick. Vice President

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

EDS GRID AND PRIMARY SUBSTATION CIVIL DESIGN STANDARDS

Turning the wheels of your success

VCE Product Design and Technology: Administrative information for Schoolbased Assessment in 2018

Public and Aboriginal Engagement Public Information and Disclosure REGDOC-3.2.1

ISO INTERNATIONAL STANDARD

ADDENDUM #2 September 12, 2018

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

City of Santa Paula Planning Department

G17 Dam Safety Processes

Delivery of Developer Funded Infrastructure A New Model

RELEVANT ELECTRICAL STANDARDS

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

Transcription:

Specification For Asset Pr8701

Written Direction Control Document Sponsor Document Owner Subject Matter Expert References Infrastructure Technical Standards Committee Manager, Capital Delivery, SIS Network Projects Manager, Capital Delivery, SIS Page ii

Contents 1. Introduction... 4 2. Scope... 4 2.1 Responsibilities... 4 2.2 Applicable Sections... 4 3. Design Documentation... 5 3.1 Design Report... 5 3.2 Design Report Attachments... 5 3.3 Design Report Calculations... 5 3.4 Design Drawings... 5 3.5 Digital Engineering (2D or 3D Models)... 5 3.6 Operational (Asset) Contingency Plans... 6 4. As Built Documentation... 6 4.1 Drawings... 6 4.2 Digital Engineering Models... 6 4.3 Active & Decommissioned Assets... 7 4.4 Manuals... 7 4.5 Commissioning... 7 4.6 Warranties... 8 4.7 Media... 8 4.8 Certificates of Registration... 8 4.9 Control Systems... 8 4.10 Operational Contingency... 8 Page iii

1. Introduction 1.0.1 The purpose of this Specification is to define Unitywater s requirements for the asset information documentation that is to be provided to Unitywater upon completion of construction and commissioning of projects undertaken for and on behalf of Unitywater. 2. Scope 2.0.1 Asset information comprises a suite of design, construction, commissioning, operating and maintenance documentation related to an asset or assets presented in a specified format. 2.0.2 In addition to providing information on operation and maintenance of an asset, the asset information provides a reference inventory for any future augmentations, operational modifications and assets that have been decommissioned. 2.0.3 Asset consist of two parts: Design Documentation As Built Documentation 2.1 Responsibilities 2.1.1 Design Documentation shall be developed by the designer during the design phase of a project. 2.1.2 As Built Documentation shall be developed by the Constructor during the construction phase and finalised upon completion of commissioning. 2.1.3 Practical Completion will not be granted to the Constructor until all As Built documentation has been submitted to the satisfaction of Unitywater. 2.2 Applicable Sections 2.2.1 There are two Project Deliverable Checklists, one specifying the requirements for design documentation and the other the requirements for As Built documentation. 2.2.2 Unitywater will provide a completed checklist which is unique to each project and identifies all asset information required including the form of submission. 2.2.3 If any of the sections or subsections have been identified as Not Applicable in the Project Deliverables Checklist, then there is no requirement to provide Asset related to that section or subsection. 2.2.4 The Project Deliverables Checklist will nominate whether a new document is required or updating of an existing document 2.2.5 Where new CAD drawings are required Unitywater will provide a CAD template file, Unitywater drawing number and any process tag numbers. Page 4

3. Design Documentation Design Documentation may comprise some or all of the following depending on the complexity of the project scope: 3.1 Design Report Unitywater will provide a copy of the design report template (F8586 Design Report) to be completed by the Designer. The report shall contain, but be not limited to, the design criteria, land tenure, location, environmental issues, consultation with external parties, construction / operational issues, commissioning, safety in design and constraints that are relevant to the design. The report is to be RPEQ certified. 3.2 Design Report Attachments includes all associated reports used to support the design report. 3.3 Design Report Calculations includes all calculations used to support and validate the design. 3.4 Design Drawings F10435 Project Deliverables Checklist Design Documentation will specify the level of design (concept or detailed) required and whether an update to existing drawings or creation of new drawings is required Design drawings shall be completed and approved by Unitywater in accordance with: o o o SEQ Asset Specification; Pr8843 Drawing and Equipment Tag numbering and; Pr9080 CAD BIM Drafting Modelling Standards. Where Unitywater provide drawings of existing infrastructure in a standard other than those mentioned above the Designer shall, during the course of design, amended such that they comply with the current standards. 3.5 Digital Engineering (2D or 3D Models) 2D CAD models are historically the accepted standard for submission of a digital design. Building Modelling (BIM) or other 3D graphic models are a relatively new method of digital design. Where BIM is nominated as the preferred method design, Page 5

Unitywater will specify the associated Level of Detail (LOD). BIM Models shall be prepared and submitted in accordance with Pr10360 Employer Requirements. 3.6 Operational (Asset) Contingency Plans Unitywater has operational contingency plans for critical assets which provides guidance on how to operate the network in the event of the asset failing. For existing critical assets the Designer will be required to update the existing asset contingency plan. Where new critical assets are being created the Designer will be provided with a template to develop a new asset contingency plan. 4. As Built Documentation As Built Documentation asset information may comprise any of the following: 4.1 Drawings Drawing Register Civil Electrical Mechanical Structural Building Process & Instrumentation (P&ID s) Process Flow Hydraulic Grade Mass Balance Hazardous Area Site Plans The form of documentation will vary according to the complexity of the works. Where both CAD and PDF s are specified for the same deliverable the PDF shall be in the format of a Smart PDF derived from the CAD file. 4.2 Digital Engineering Models Page 6

This is a relatively new method of capturing asset information and includes Building Modelling (BIM) or other 3D graphic models. Where BIM is nominated as the preferred method of asset capture, Unitywater will specify the associated Level of Detail (LOD). BIM Models shall be prepared and submitted in accordance with Pr10360 (Employer Requirements) 4.3 Active & Decommissioned Assets 4.4 Manuals Generally, Unitywater will provide an Excel template to be populated with Active asset information. This template is configured to allow asset information to be directly imported into Unitywater s Asset Management System (Maximo). This also includes identifying any assets that may have been decommissioned during the project. Standard Operating Procedures (STP s only) Unit Process Guidelines (STP s only) Operations Manual Maintenance Routines (active assets only) Operations Manual shall be site specific and include sufficient information for the operation of the asset in its entirety. The information to be supplied shall include, but not be limited to, the following (where applicable): i. Site Specific Asset Operating Procedures a step-by-step procedure detailing: o HMI / SCADA Operation; o Checks before Starting; o Starting; o Continuous Operation; o Stopping; o Emergency Stopping; o Isolating of Asset Components; o Abnormal Operation as applicable; ii. Acceptable ranges for operational control; iii. Equipment settings: o Final commissioned settings. Maintenance Routines comprise the list of vendor recommended maintenance routines for each active asset. These will be submitted on the same template as Active & Decommissioned Assets (see 4.3 above) 4.5 Commissioning Page 7

ITP s Process Performance Test Reports Commissioning Report Training Records Training Material 4.6 Warranties Warranty Register 4.7 Media CCTV Footage Photo s 4.8 Certificates of Registration Lifting Equipment, Davits & Fall Arrest Points Pressure Vessels Dangerous Goods / Materials Electrical Fire Backflow Prevention (RPZ s) Cathodic Protection 4.9 Control Systems Functional Description; Functional Specification 4.10 Operational Contingency Asset Contingency Plan Page 8