SURVEY GUIDANCE AND FORMS

Similar documents
Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

SECTION SITE SURVEYS

STATE UNIVERSITY CONSTRUCTION FUND

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

Subdivision Application Checklist

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CHAPTER 11 SURVEY CADD

Porter County Plan Commission

Site Plan/Building Permit Review

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

City of Massillon Site Plan Checklist

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CHAPTER 11. Plan Standards

PART XII: TOPOGRAPHIC SURVEYS

Washington County Road Engineering Plan Submittal/Review Checklist

List of Figures. List of Forms

1.1 GENERAL RECORD DRAWING REQUIREMENTS

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

3. DESIGN SPECIFICATIONS

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

CITY OF MUSKEGO DRAFTING STANDARDS

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

Minor Site Plan Application and Checklist Land Disturbing Activities

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

PLANNING AND DEVELOPMENT

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

Chapter 13 Plan Submittals

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

Town of Westlake Construction Plans Review Checklist

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

MAJOR GRADING PLAN CHECKLIST

Clarifications in italics added July 2018

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

DRAFTING STANDARDS 9.00 DRAFTING STANDARDS

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

Application for Site Plan Review

B-PERMIT PLAN CHECK MANUAL

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

Project Name: County File No.: Checked by: For: Date:

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

Sewer Line Extension Permit Design Checklist

Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc.

PRELIMINARY PLAT CHECK LIST

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL

Record Drawing Standards for Projects Version 2.1

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS

APPENDIX D: DRAWING SUBMISSION STANDARDS

Appendix E-4. City of Fort Collins. Requirements for Utility Plans

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d

CONCEPT REVIEW GUIDELINES

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

10010 RECORD DRAWING INFORMATION

DEVELOPMENT PLAN CHECKLIST

Grease Interceptor Design Checklist

SECTION 6A ROADWAY PLAN PREPARATION

PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

Section 101. Street Design

SITE PLAN APPLICATION

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION

Suveying Lectures for CE 498

1. Land survey Work. 2. Civil and Structural engineering services.

CHECKLIST 8-O. Highlands County Engineering Department Improvement Plan Checklist

APPLICATION FOR SITE PREPARATION PERMIT

B17. Sewer Site Plans BULLETIN

Plan Submittal and Review Checklist

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

Town of Skowhegan Application For Development Review

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation

Town of Apex, North Carolina

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

Legal Description & Site Plan Requirements and Layouts

DIVISION A GENERAL AND DRAFTING ENGINEERING STANDARDS

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

5.7 Plan Documentation and Supporting Information.

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT

CITY OF MERCER ISLAND

Transcription:

Appendix H Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN SURVEY GUIDANCE AND FORMS Version 2.0 April 2014 1

Table of Contents Section 1 Survey and Mapping... 1 1.1 Introduction... 1 1.2 Property Owner Contact... 1 1.3 Property Owner Interaction... 1 1.4 Objections to Entry... 1 1.5 Safety... 1 Section 2 Topographic Surveys... 2 2.1 General Scope/Limits of Survey... 2 2.2 Existing Property Boundaries Representation... 2 2.3 Detailed Topographic Elements... 3 2.4 Field Codes... 6 Section 3 Survey Control... 7 3.1 Horizontal Control... 7 3.2 Vertical Control... 8 Section 4 Data Management... 9 Section 5 Sample Property Owner Notification Letter... 10 List of Figures Figure 5-1 Sample Property Owner Notification Letter... 10 List of Tables Table 4-1 CADD Deliverables... 9 1

Section 1 Survey and Mapping 1.1 Introduction The following section provides specific guidance for survey and mapping for the Clean Water Nashville Overflow Abatement Program (Program). This guidance establishes standard Program methodologies and protocols in the pursuit of standard final survey products. The Designer and its sub-consultants shall adhere to this guidance unless a deviation is specifically requested in writing and approved by the Project Manager. 1.2 Property Owner Contact Unless otherwise instructed by the Project Manager, the initial survey step is to contact property owners and obvious tenants within the survey project limits to inform about the surveyor s presence and obtain information such as private underground improvements, underground tanks, etc. For each owner and tenant within the survey limits, the surveyor shall prepare individual Property Owner Contact letters (see attached sample in Section 5). Each letter must be submitted through the Designer to the Project Manager for approval prior to mailing or delivering it to property owners. After the Project Manager approves the letter, it shall be mailed or hand delivered to the property owner(s) before commencing the survey. If the letter is mailed, it shall be sent at least five business days but not more than 20 business days prior to commencing the survey. 1.3 Property Owner Interaction Promoting good relations with property owners is vital to MWS public relations. Because the surveyor is often the initial contact person with the property owner and tenant, establishing good relations through courteous discussions is essential when describing survey work in the name of MWS. 1.4 Objections to Entry No entry shall be made on improved property unless direct contact is made with the owner or tenant and the response is positive. If a property owner or tenant objects to entry onto his/her property, the surveyor should not enter. If the survey is already in progress when the owner objects, the surveyor should leave immediately. When an objection to entry occurs, the surveyor will contact the Project Manager for guidance. 1.5 Safety The Designer and its survey sub-contractors shall perform all field activities in a safe manner. The Designer and/or its survey sub-consultant shall prepare a site-specific Health and Safety Plan prior to commencing field services and shall perform and document safety inspections and briefings for the duration of the design field services. These documents should be maintained in the Surveyor s files and provided to the Designer or the Program upon request. 1

Section 2 Topographic Surveys 2.1 General Scope/Limits of Survey The topographic survey shall be conducted via the following parameters: Extend an appropriate distance on each side of the preliminary horizontal alignment. Include all adjacent roadways and railroads including utilities and drainage features. For gravity drained utility lines, include location and invert data for the first manhole extending beyond the project/survey limits (upstream and downstream) even when they extend beyond such project/survey limits. All survey data shall be scaled to ground coordinates using a common data adjustment factor for the project. Include the preparation of property exhibits for parcels requiring easements or fee simple acquisitions. 2.2 Existing Property Boundaries Representation The existing property boundaries shall be established via the following parameters: The existing right-of-way and property boundary shall be based on prior survey, plat, or deed. Delineation of mathematical dimensions and directions including curve data (arc length, delta, radius, chord length and chord bearing) The survey shall include record information for each parcel. - Current owner and mailing address - Recorded information - book, page or instrument number, and date When a minimum of two controlling monuments are not found along the property boundary, topographic data will be correlated/tied to controlling physical monuments along the boundary or to monuments on or beyond the surveyed premises that establish the surveyed premises boundary. Specific boundaries shall be determined for right-of-way or easement exhibits. 2

Version 2.0 Appendix H Survey Guidance and Forms 2.3 Detailed Topographic Elements Unless otherwise specified in the specific project Scope of Work, the topographic survey shall provide the following. Contours at 1-foot intervals with the following exceptions: - Areas where the slope is greater than 2:1 - Areas where contours can be shown at 2-foot intervals with contour errors not exceeding one-half the contour intervals Spot elevations on paving, structures, and other hard surfaces to the nearest 0.05 foot Spot elevations on other surfaces to the nearest 0.15 foot Spot elevations covering the entire survey limits incorporating: - High points - Low points - Grade changes - Sufficient intervals to represent the terrain s general character including, but not limited to, the following locations: o Along all grade break points and lines o In areas where the slope is less than 5:1 on a 50-foot square grid o On the top (at back) and bottom (at face/gutter) of curbs o On both sides of sidewalks at 50-foot intervals o Appropriately at breaks in grade o On roadways and driveways at the crown o At other cross-slope grade breaks at 50-foot intervals o On railroads at 100-foot intervals at the track s centerline, at top of rail, and at appropriate grade breaks Actual elevations of contours and spot elevations. Appropriately sized and oriented spot elevations and points for legibility on a printed survey Structures and slab locations and all corners including: - Retaining walls - Bridges - Culverts - Ramps - Street or road paving - Guardrails - Entrance drive openings - Miscellaneous structures - Tanks - Driveways - Septic tank drain fields - Sidewalks - Fences - Other obstructions Elevations for each floor and at each structure s entrance and at slab corners Mean elevation and extent of water in excavations, wells, and water bodies 3

Version 2.0 Appendix H Survey Guidance and Forms Lakes, rivers, streams, drainage courses, and legal or regulated drains on or near the surveyed alignment Actual water levels surveyed indicating the survey shot date Waterway and environmental buffer zones of record and per zoning ordinances For the surveyed corridor if applicable, the location and elevation for the 100-year floodplain and floodway based on the most recent available mapping from the Federal Emergency Management Agency (FEMA) or modeling from Metro or an appropriate agency. - Digital FEMA Flood Insurance Rate Maps can be found at https://msc.fema.gov/. - The elevation component for this item is not applicable for areas without a mapped flood elevation. - The floodplain source and floodway boundaries will be clearly indicated on the survey. Locations, elevations, and area limits of swamps and wetlands based on available mapping or if determined by others. - The U.S. Fish and Wildlife National Wetland Inventory maps are located at http://www.fws.gov/wetlands/. - The surveyor/designer must also coordinate with the local Tennessee Department of Environment and Conservation field office and U.S. Army Corps of Engineers District office to identify other potential known wetland areas. Test boring locations, horizontal direct drilling, and/or monitoring wells, and the elevation at the top of the holes/wells shall be shown. All miscellaneous features including signs, lights, parking lot striping, benches, waste receptacles, bicycle racks, etc. Visible rock formations locations. Perimeter outlines for woods and thickly vegetated areas For trees greater than 4-inch caliper or over 10 feet tall, tree caliper in inches and common tree species name. Descriptions of any natural features and the ground cover/vegetation type within the survey s extent. Depictions of railroads including: - Rail data (raised lettering on the side of the rail) for the entire topographic survey limits - Distance to the nearest milepost and distance to any switches and frogs for permit references 4

Version 2.0 Appendix H Survey Guidance and Forms Street names and highway crossings or adjoining project corridor including jurisdiction, width, pavement type, and address numbers assigned to the parcel, as applicable. Widths for known or recorded rights-of-way (if variable, indicate as variable and provide appropriate dimensions to define it) along with source of information Utility information including locations and elevations for overhead and underground utilities based on record utility information and survey measurements for accessible utility appurtenances. - The surveyor shall contact Tennessee One-Call for pre-design locations and include the dig ticket number and date on the survey. - If the utility company is not part of the state underground utility locating service, the surveyor will contact the utility company directly and obtain all relevant mapping and markings including those which may be within adjoining public rights-of-way. - Available utility maps and utilities shown on a local geographic information system (GIS) shall also be included with appropriate notes or indications as to the information s source. - The extent of the Sub-surface Utility Engineering, if any, will be clearly identified in the Designer survey scope of services. - Locations, descriptions, elevations, sizes, materials, and flow directions for sanitary sewers, storm sewers, combined sewers, storm drains, culverts, and their appurtenances such as sanitary cleanouts including: o o o o Manholes and other structures such as culverts, headwalls, catch basins, and clean-outs. Rim and bottom/invert elevations for each catch basin and manhole including the bottom of sumped structures and the invert elevation for each pipe. Notations regarding inaccessible inverts, i.e., hooded, and water level in the structure. Precise locations of all underground structure measurements utilizing aids such as Pipe Mic and/or rod-mounted clinometers to ensure all vertical measurements are orthometric to the elevation basis. - Locations, descriptions, elevations, and characteristics for power, communication, cable television, lighting, petroleum, and traffic control, and their appurtenances including: o Power poles o Telephone poles o Guy wires o Manholes o Anchors o Boxes o Vaults o Transformers o Lamp poles o Light boxes o Etc. - Operating authority name, contact person, and phone number. - Lines connecting all structures and markers for each utility indicated above. 5

Version 2.0 Appendix H Survey Guidance and Forms 2.4 Field Codes Field codes/descriptors for survey point data and line coding operators shall conform to the field code/operator library. The most current version of this information can be accessed at http://cleanwaternashville.com/survey/ or provided electronically at the design kick-off meeting. While the coding operators (begin line, end line, PC, POC, PT, etc.) presented are preferred and encouraged, limitations in certain software may make the specified use impossible. Regardless, field codes provided in the Design Management Manual shall be used unless otherwise approved by the Project Manager. 6

Section 3 Survey Control All survey projects produced under the Program will be tied to specific horizontal and vertical datum planes. Over the Program s life, these datum planes may be amended to reflect later geodetic adjustments. However, the datum established for use by the Design Management Manual shall be used regardless of whether or not the datum has been superseded by adjustments (from the National Geodetic Survey, etc.). For this reason, it is important to use the latest Design Management Manual in effect on the date the project commences. No survey is to be based on assumed datum. All vertical and horizontal survey control monuments shall be set by methods for which a relative precision can be computed and certified compared to the reference datum (i.e., closed traverse or multiple independent GPS-derived vectors). 3.1 Horizontal Control Horizontal data shall be referenced to the North American Datum of 1983, Adjustment of 1995, Tennessee Zone (4100) State Plane (grid) Coordinates, abbreviated as SPCS 83 (1995). The measurement unit shall be U.S. Survey Feet. Horizontal control may be established by direct traverse or static, RTK GPS observations, or other methods as deemed appropriate by the responsible surveyor or engineer but must meet Second Order Class II (1:20,000) referenced to the Tennessee Geodetic Reference Network (TGRN). Horizontal control point monuments shall be a semi-permanent nature. The use of #5 (5/8-inch diameter) capped deformed rebar 18 inches in length is acceptable; however, concrete monuments/disks and other generally used monumentation techniques may also be employed at the surveyor s discretion. Control monumentation should be installed outside the anticipated construction envelope to maximize the likelihood of its availability for future use after construction. Horizontal control shall be placed no greater than every 800 feet. Monumentation type and offset distances to two adjacent landmarks shall be included within the survey drawing. Project control for route or site surveys where the longest side of the survey area exceeds 1/4 mile (0.25 mile) shall be scaled to ground/project coordinates using a datum adjustment factor (DAF). For the Program, unless otherwise directed, a common DAF of 1.00006 shall be used as follows: DAF x SPC Northing = Project Ground Northing DAF x SPC Easting = Project Ground Easting All coordinate and drawing files shall be delivered in project ground coordinates. Orthometric elevations shall not be scaled. The survey drawings and file deliverables must designate, The ground coordinates for this project have been tied to the TGRN SPCS 83 (1995) and datum adjusted using a datum adjustment factor of 1.00006. 7

Version 2.0 Appendix H Survey Guidance and Forms 3.2 Vertical Control Vertical data (orthometric elevations) shall be referenced to the North American Vertical Datum of 1988 (NAVD88). Measurement unit shall be U.S. Survey Feet. Vertical control may be established by differential or trigonometric leveling or GPS methods and shall meet Second Order, Class II, as defined by NGS and referenced to the Tennessee Geodetic Reference Network (TGRN). Vertical benchmark monumentation shall be of a semi-permanent nature. The use of #5 (5/8-inch diameter) capped deformed rebar 18 inches in length is preferable; however, fire hydrant tag bolts, or railroad spikes may also be employed at the surveyor s discretion. All horizontal control points shall also be made vertical benchmarks. Vertical Control monumentation should be installed outside the anticipated construction envelope to maximize the likelihood it is available for future use after construction. Vertical control shall be placed no greater than every 500 feet. Monumentation type and offset distances to two adjacent landmarks shall be included within the survey drawing. 8

Section 4 Data Management In addition to CADD drawing files, the following data records shall be delivered to Metro: Table 4-1 CADD Deliverables Deliverable Description File Format Naming Convention Survey Drawing AutoCAD.DWG See CADD Standards of this Document 2007 or greater and.pdf Raw Data for Total Station ASCII/.TXT [PROJECT_NUMBER]_X_RD.TXT and GPS observations Example: (multiple files okay) 12-SC-123_X_RD.TXT Coordinate file for all ground coordinates in P, N, E, Z, format (one file) ASCII/.TXT [PROJECT_NUMBER]_X_GC.TXT Example: 12-SC-123_X_GC.TXT All field notes (one file).designerf [PROJECT_NUMBER]_X_FN.DESIGNERF Example: 12-SC-123_X_FN.DESIGNERF Copies of all reference deeds and/or plats (one file per deed/plat) labeled by Tract number.designerf [PROJECT_NUMBER]_ INSTRUMENTNO]_X_DP.DESIGNERF Example: 12-SC-123_20120101160254_X_DP.DESIGNERF 9

Section 5 Sample Property Owner Notification Letter The Word template for this document will be provided electronically at the design kick-off meeting. Figure 5-1 Sample Property Owner Notification Letter 10