Titan Install Guides http://www.troax.com/gb
Contents Titan Partitioning Pages 3-10 Titan King 1 Pages 11-17 Titan SSS Handle Pages 18 Page 2 http://www.troax.com/gb
Rev B 21/02/17 Titan Partition You will need: Drill with hammer action Metal Shears Mole Grips or Pliers Pop Rivet Gun Try Square Hacksaw Spirit Level Tape Measure Adjustable Spanner File Hammer Screwdriver Also: Tek Screw holder, Sockets, Drill Bit Set, Metric Tap Set, Chalk Line, Allen Keys Page 3 http://www.troax.com
Rev B 21/02/17 Beginning Installation Before you begin: Identify all of the components for your installation Choose a datum point from which to measure all positions of the panels Measure and mark up all positions of components allowing for the width of joints and posts. Assembling Mullions Mullion Pierced Uprights M8 x 70 Hex Bolts Hex Nuts Sealant Please note: Fix every mullions to floor before continuing with installation. Mullion to Floor M10 Countersunk Expansion Bolts Floor Channel to Floor Hammer Fixings Please note: These fixings are for concrete floors only. Page 4 http://www.troax.com
Rev B 21/02/17 Joining Panels 1. 2. 3. 5. 2438mm Panels - 5 H-cleats 2743mm Panels - 6 H-cleats 3048mm Panels - 6 H-cleats 3657mm Panels - 7 H-cleats 6. 2438mm Panels - 5 Spring Clips 2743mm Panels - 6 Spring Clips 3048mm Panels - 6 Spring Clips 3657mm Panels - 7 Spring Clips Please Note: All joint voids should be filled with mineral wool. 7. Page 5 http://www.troax.com
Rev B 21/02/17 1. Panel Junctions 2. 2438mm Panels - 5 H-cleats 2743mm Panels - 6 H-cleats 3048mm Panels - 6 H-cleats 3657mm Panels - 7 H-cleats 3. 4. 2438mm Panels - 5 Spring Clips 2743mm Panels - 6 Spring Clips 3048mm Panels - 6 Spring Clips 3657mm Panels - 7 Spring Clips 5. Page 6 http://www.troax.com
Rev B 21/02/17 Installing Fillers 1. Filler to Wall Hammer Fixings insert filler section 2. 3. Filler to Panel H cleats Spring Clips Cover Channels Installing Pre-formed Corners Please note: Panels fit to the pre-formed corners using the standard H-cleat and cover channel method shown previously. Page 7 http://www.troax.com
Rev B 21/02/17 Top Capping Installation Please note: There are two types of top capping. Ensure you are following the correct install instructions for the capping you have received. Joint Covers Skirt Screw Top Capping Push Fit Corner Covers Skirt Screw Page 8 http://www.troax.com
Rev B 21/02/17 Top Channel Installation Corner Covers Skirt Screws Top Channel Skirt Screws Please note: There are two types of top capping. Ensure you are following the correct install instructions for the capping you have received. Page 9 http://www.troax.com
Maintenance Information 1.0 General Cleaning 1.1 - Daily Cleaning is recommended for the removal of dust and dirt. 1.2 - Do not use abrasive cleaning solutions, abrasive papers or alkaline solutions. 1.3 - Wipe down only. Must not be washed down. 2.0 Laminated and Wooden Doors 2.1 - Wipe down periodically using a damp cloth and a mild detergent, drying with a clean cloth afterwards. 3.0 Sliding Doors 3.1 - Lightly oil trolley hangers every 3 to 5 months. 3.2 - Check the trolley alignment in the track every 3 to 5 months. 4.0 Locks and Hinges 4.1 - Duplicate keys can be ordered from Troax Lee Manufacturing Ltd. 4.2 - Lightly oil hinges every 3 to 5 months. 5.0 Bolted Fixings 5.1 - Check bolted fixings to ensure they are still tight every 6 to 12 months. 6.0 Glazing 6.1 - Clean glass when necessary using a suitable glass cleaner ONLY. 6.2 - Wipe down only. Must not be washed down. 7.0 Polycarbonate 7.1 - Cleaning must be carried out manually. Carefully brush with a very soft brush to remove any particles. Using a lint free cloth gently wipe (Do not rub) with lukewarm water mixed with a mild domestic soap like Fairy liquid. Rinse thoroughly with clean water and wipe dry with a very soft lint free cloth (Do not rub). 8.0 Door Closers 8.1 - To be maintianed as per the manufacturers recommendation 9.0 Damaged Items 9.1 Contact Troax Lee Manufacturing Ltd for a range of replacement doors, panels and glazing etc. Page 10 http://www.troax.com CLUK 014 ISS 7 August 2016
Titan Sliding Door (King 1) 07/03/17 Rev D You will need: Drill with hammer action Metal Shears Mole Grips or Pliers Pop Rivet Gun Try Square Hacksaw Spirit Level Tape Measure Adjustable Spanner File Hammer Screwdriver Also: Tek Screw holder, Sockets, Drill Bit Set, Metric Tap Set, Chalk Line, Allen Keys Page 11 http://www.troax.com/gb
07/03/17 Rev D Over Panel Installation Lintel to Mullions M8 x 25 or M10 x 20 CSK BOLTS RHS SUPPORT POST RHS LINTEL (SIZE AS LAYOUT DRG) ANGLE BRACKET WELDED TO SUPPORT POST Over Panel Mullion to Floor Countersunk Expansion Bolts Page 12 http://www.troax.com/gb
07/03/17 Rev D Ltd s ers ee H-Cleats and Spring Clips H Cleat Rotation e Spring Clip to Cover Channel See layout drawing for o/all width See layout drawing for panel width Blank end post See layout drawing for panel width 96 Lock Box Please Note: Place the H Cleat between the lock box and slide down as shown. Then begin to rotate to the H Cleat until horizontal and locked into place. Repeat this process. 2438mm Panel - Use 5 H-Cleats 2743mm Panel - Use 6 H-Cleats 3048mm Panel - Use 6 H-Cleats 3657mm Panel - Use 7 H-Cleats Please Note: Fit the cover channel on both sides of the joint. Space the spring clips equal along each channel. 2438mm Panel - Use 5 H-Cleats 2743mm Panel - Use 6 H-Cleats 3048mm Panel - Use 6 H-Cleats 3657mm Panel - Use 7 H-Cleats Page 13 http://www.troax.com/gb
End Bracket 07/03/17 Rev D King 1 Bracket and Track Installastion Track Brackets to Track Angle M10 x 25 Countersunk Bolts and Nuts 75mmx50mm Track Angle Track to Post M10x25mm Bolt (Posts are drilled and Tapped to suit) Page 14 http://www.troax.com/gb
07/03/17 Rev D Trolley Assembly Trolley Assembly and Installation Trolley to Door Capping M8x25mm Bolts M8 Nuts Please Note: After attaching the trolley brackets, place the U Channel over the top of the door skins and fix it into place using pop rivets. Page 15 http://www.troax.com/gb
07/03/17 Rev D Bottom Capping and Floor Guide Installation Please Note: Screw Floor guides to the floor with a 65mm Woodscrew and Rawl. The floor guide should be placed so that it is flush with post as shown by the dashed line below (after te post). Floor Guide Top and Bottom Capping Fixings Pop Rivets Please Note: This Bottom Track (51 x54mm U Channel) spot welded to a 54x25mm U Channel. Page 16 http://www.troax.com/gb
Maintenance Information 1.0 General Cleaning 1.1 - Daily Cleaning is recommended for the removal of dust and dirt. 1.2 - Do not use abrasive cleaning solutions, abrasive papers or alkaline solutions. 1.3 - Wipe down only. Must not be washed down. 2.0 Laminated and Wooden Doors 2.1 - Wipe down periodically using a damp cloth and a mild detergent, drying with a clean cloth afterwards. 3.0 Sliding Doors 3.1 - Lightly oil trolley hangers every 3 to 5 months. 3.2 - Check the trolley alignment in the track every 3 to 5 months. 4.0 Locks and Hinges 4.1 - Duplicate keys can be ordered from Troax Lee Manufacturing Ltd. 4.2 - Lightly oil hinges every 3 to 5 months. 5.0 Bolted Fixings 5.1 - Check bolted fixings to ensure they are still tight every 6 to 12 months. 6.0 Glazing 6.1 - Clean glass when necessary using a suitable glass cleaner ONLY. 6.2 - Wipe down only. Must not be washed down. 7.0 Polycarbonate 7.1 - Cleaning must be carried out manually. Carefully brush with a very soft brush to remove any particles. Using a lint free cloth gently wipe (Do not rub) with lukewarm water mixed with a mild domestic soap like Fairy liquid. Rinse thoroughly with clean water and wipe dry with a very soft lint free cloth (Do not rub). 8.0 Door Closers 8.1 - To be maintianed as per the manufacturers recommendation 9.0 Damaged Items 9.1 Contact Troax Lee Manufacturing Ltd for a range of replacement doors, panels and glazing etc. Page 17 http://www.troax.com CLUK 014 ISS 7 August 2016