Richard T Crane Medical Preparatory HS

Similar documents
Marcus Moziah Garvey Elementary School

Amos Alonzo Stagg Elementary School

Wendell Smith Elementary School

Jackie Robinson Elementary School

Robert Fulton Elementary School

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

John Spry Elementary Community School

Alexander Graham Bell Elementary School

Philip Rogers Elementary School

John Milton Gregory Elementary School

Everett McKinley Dirksen Elementary School

Morton School of Excellence

EPIC Academy High School

Charles N Holden Elementary School

John Harvard Elementary School of Excellence

Daniel S Wentworth Elementary School

University of Chicago Charter - Carter G Woodson

Architecture, Construction, and Engineering Technical Charter

Rufus M Hitch Elementary School

Andrew Carnegie Elementary School

Cyrus H McCormick Elementary School

Richard J Oglesby Elementary School

KIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom

Disney II Magnet School

John Hancock College Preparatory High School

Jonathan Burr Elementary School

Brian Piccolo Elementary Specialty School

Arthur A Libby Elementary School

Langston Hughes Elementary School

William Penn Elementary School

University of Chicago Charter - NKO

North Lawndale College Prep Charter - Collins

George Washington Elementary School

Walt Disney Magnet Elementary School

George Washington High School

Theodore Roosevelt High School

Academy for Global Citizenship Elementary School

George W Tilton Elementary School

Disney II Magnet High School

Joseph E Gary Elementary School

Arthur E Canty Elementary School

Betty Shabazz Intl Charter - DuSable Leadership

John F Kennedy High School

Phoenix Military Academy High School

Urban Prep Academy for Young Men - West

Legacy Charter Elementary School

John L Marsh Elementary School

Amandla Charter High School

Multicultural Academy of Scholarship

Norman A Bridge Elementary School

William Howard Taft High School

Henry H Nash Elementary School

Bowen High School. Definitions EXTERIOR E 89th St Chicago, IL Co-locating on This Campus: Bowen HS and Noble St Chtr-Orange

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

Friedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

Emmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL

James Shields Middle School 2611 W 48th St Chicago, IL 60632

Hiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

Harriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

Franklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610

Joseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608

William H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609

Frederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622

Lorenz Brentano Math & Science Academy ES 2723 N Fairfield Ave Chicago, IL 60647

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645

John Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630

Ellen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

Manley Career Academy High School 2935 W Polk St Chicago, IL 60612

Joseph E Gary Elementary School 3740 W 31st St Chicago, IL 60623

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

James Otis Elementary School 525 N Armour St Chicago, IL 60642

John Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641

SITE $1,539,659. Item - Type Quantity Unit Rank Cost. Entrance Control - Audio and Video 2 EA Exterior Doors - Exterior Wood Door 2 EA

Perspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653

Wendell Phillips Academy High School 244 E Pershing Rd Chicago, IL 60653

Charles Allen Prosser Career Academy High School 2148 N Long Ave Chicago, IL 60639

James Monroe Elementary School 3651 W Schubert Ave Chicago, IL 60647

William J Onahan Elementary School 6634 W Raven St Chicago, IL 60631

William Howard Taft High School 6530 W Bryn Mawr Ave Chicago, IL 60631

Francis W Parker Elementary Community Academy 6800 S Stewart Ave Chicago, IL Co-locating on this campus are AMANDLA and PARKER

OCPS Submittal Register for Product Data and Shop Drawing Reviews

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

U of I Facilities Standards Updates for 2017

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

BUILDING DEPARTMENT CURRENT

BUILDING PLAN REVIEW REQUIREMENTS

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. : The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CHIMNEY Brick Chimney - Concrete/ Mortar Liner 1 6 7 0 65 75 150 LF $50,408 $50,408 CORNICE Cornice - Masonry Projecting/Limestone 1 6 7 GRE 7 1,500 1,500 LF Assessment Date: 1/8/2013 Page 1 of 20

DOORS Exterior Steel Door Overhead Rolling / Garage Door Side Lite Transom Lite 1 6 GRE 6 67 7 GRE 6 4 3 GRE 6 6 GRE 6 62 67 EA $22,132 7 EA $6,161 6 EA $1,359 62 EA $17,555 $47,207 ENTRANCE Concrete Exterior Stairs Concrete Ramp Entrance Controls - Audio and Video Power Door Operator and Controls Ramp Handrails Stone Stairs 1 6 7 GRE 7 48 GRE 7 13 GRE 7 3 GRE 7 1 GRE 7 26 3 664 48 LF 13 LF 3 EA 1 EA 26 LF 677 LF $5,577 $5,577 FOUNDATION Concrete Foundation 1 6 7 GRE 7 1,544 1,544 LF LIGHTING Exterior Lights - Wall Mounted LINTELS 1 6 GRE 6 35 7 35 EA $7,508 $7,508 Lintels - Steel Lintels - Stone 1 6 7 GRE 7 1,560 GRE 7 1,152 1,560 LF 1,152 LF Assessment Date: 1/8/2013 Page 2 of 20

PARAPET Coping - Metal Coping - Stone Parapet < 16" Height Parapet > 30" Height Parapet 16" to 30" Height 1 6 7 GRE 7 1,154 GRE 7 2,377 GRE 7 55 GRE 7 1,005 GRE 7 1,340 1,154 LF 2,377 LF 55 LF 1,005 LF 1,340 LF ROOF SYSTEM Exterior Downspouts Interior Downspouts Metal Roof Modified Bitumen Roof Roof Structure: Steel with Clay Tile Arch Roof Structure: Steel/Metal Deck/Concrete Topping 1 6 7 GRE 7 40 50 1,156 GRE 6 3,300 00 500 112,500 GRE 7 85,900 GRE 7 30,000 40 LF 1,306 LF $74,003 3,300 SF $24,916 113,100 SF $8,258 85,900 SF 30,000 SF $107,177 SUPERSTRUCTURE Metal Deck/Concrete Topping Steel with Clay Tile Arch 1 6 7 GRE 7 47,900 GRE 6 200 371,700 47,900 SF 371,900 SF $7,550 $7,550 WALLS Brick Prefabricated Metal Panel Wall Stone - Cut 1 6 7 GRE 7 48,900 GRE 7 4,300 GRE 7 37,700 48,900 SF 4,300 SF 37,700 SF Assessment Date: 1/8/2013 Page 3 of 20

WINDOWS Window - Guards perforated Window - Guards wire guard Windows - Casement Aluminum Double-pane Windows - Casement Lexan Windows - Sash Aluminum Double-pane EXTERIOR 1 6 GRE 6 4,044 YEL 4 150 44 YEL 4 600 GRE 6 5,000 20,250 7 4,044 SF 150 SF $11,467 144 SF $824 600 SF $69,086 25,250 SF $346,418 $427,795 $653,221 ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Emergency generator 150 KW -200 KW natural gas - Outdoor Exit Signs - Auditorium Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - Intrusion detection 1 6 7 GRE 7 3 GRE 6 6,385 GRE 6 56,883 GRE 6 39,422 6,650 GRE 6 4 GRE 7 1 GRE 6 6 GRE 6 2 61 5 BLU 5 419,600 GRE 6 419,600 3 EA 6,385 SF $8,674 56,883 SF $24,403 39,422 SF $20,858 16,650 SF $7,143 4 EA $429 1 EA 6 EA $1,399 63 EA $16,077 15 EA $3,496 1 EA $1,430 419,600 SF $600,028 419,600 SF $390,018 $1,073,955 MAIN SERVICE 1 6 7 Main Electrical service - Live Front - 2000 to 3000 A 120/208/3PH YEL 4 2 2 EA $514,800 Assessment Date: 1/8/2013 Page 4 of 20

Main Electrical service - Live Front - above 3000 A 120/208/3PH YEL 4 1 1 EA $308,880 $823,680 POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels less than 400 amp ELECTRICAL 1 6 7 4 34 3 GRE 6 3 42 EA $51,480 3 EA $4,290 1 EA $1,216 $56,986 $1,954,621 FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System FIRE PROTECTION MECHANICAL AIR CONDITIONING Chillers - Water Cooled - Absorber greater than 300 tons Cooling Tower - Spray Type - greater than 300 tons Window A/C AIR HANDLING SYSTEMS 1 6 GRE 6 419,600 GRE 6 371,700 1 6 1 YEL 4 1 BLU 5 4 3 7 7 419,600 SF $150,007 371,700 SF $451,801 $601,808 $601,808 2 EA $167,310 1 EA $55,770 7 EA $9,224 $232,304 1 6 7 Air Handling Package - Single Zone - Steam 4,000 to 8,000 cfm BLU 5 3 3 EA $47,190 Air Handling Package - Single Zone - Steam 12,001 to 20,000 cfm BLU 5 5 5 EA $121,550 Assessment Date: 1/8/2013 Page 5 of 20

Air Handling Package - Single Zone - Steam 8,001 to 12,000 cfm Air Handling Package - Single Zone - Steam less than 4,000 cfm Air Intake - Built Up Air Handling Air intake for all Air Handling s except built up AHU Fan Coil - Hot Water-Heating Multi Zone Built Up Air Handling - Steam 25,001 to 35,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam 25,001 to 35,000 cfm Reheat Boxes With Hot Water Coils Reheat Boxes With Steam Coils Return Duct Work - Masonry and Ducts - Existing or Missing Exterior Shaft Return Fans - Indoor 10,001 to 20,000 CFM Return Fans - Indoor 5,000 to 10,000 CFM Return Fans - Indoor less than 5,000 CFM Return Fans - Outdoor greater than 20,000 CFM Single Zone Built Up Air Handling - Steam 25,001 to 35,000 cfm Single Zone Built Up Air Handling Auxiliaries- Steam 25,001 to 35,000 cfm BLU 5 1 BLU 5 1 GRE 6 3 0 GRE 6 5 BLU 5 4 YEL 4 4 YEL 4 73 YEL 4 79 GRE 6 300 GRE 6 3 3 2 BLU 5 1 GRE 6 4 BLU 5 1 YEL 4 1 1 EA $21,450 1 EA $10,010 3 EA $4,290 10 EA $14,300 5 EA $6,721 4 EA $171,600 4 EA $160,160 73 EA $720,291 79 EA $824,681 300 LF $18,876 6 EA $43,758 3 EA $9,152 1 EA $2,860 4 EA $17,160 1 EA $42,900 1 EA $24,310 $2,261,259 BOILER SYSTEMS Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler greater than 200 HP Boiler Auxiliary - Steam Boiler greater than 200 HP Chemical Feed System (Steam Boilers) Chemical Pot Feeder - Hot Water Combustion Dampers Feed Water Pumps and Tank - Steam Boilers HEAT EXCHANGERS 1 6 GRE 6 3 BLU 5 3 GRE 6 4 GRE 6 3 GRE 6 2 7 3 EA $89,661 3 EA $49,335 1 EA $2,145 4 EA $1,201 3 EA $858 2 EA $16,874 $160,074 1 6 7 Heat Exchanger - Steam to Hot Water Shell Type YEL 4 3 3 EA $63,492 $63,492 Assessment Date: 1/8/2013 Page 6 of 20

HEATING DEVICES Cabinet Heaters With Steam Coils Fin Tube Hot Water Radiators - Steam Heater - Electric Heater - Hot Water 1 6 YEL 4 6 1 YEL 4 106 BLU 5 14 BLU 5 8 11 7 7 EA $31,389 106 LF $18,190 14 EA $9,209 1 EA $1,430 19 EA $72,930 $133,147 MECHANICAL PLUMBING Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Hydronic Supply and Return - Steel or Galvanized Piping - Steam - Steel or Galvanized Pumps - Chilled Water 21-50 HP Pumps - Condenser Water 21-50 HP Pumps - Hot Water 11 to 20 HP Pumps - Hot Water 5 to 10 HP TEMPERATURE CONTROL Direct Digital Control (DDC) System Thermostats - Direct Digital Control (DDC) VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm 1 6 GRE 6 2 4 BLU 5 2,800 BLU 5 5,000 500 BLU 5 2,500 300 1 GRE 6 2 YEL 4 2 YEL 4 1 1 BLU 5 419,600 6 64 1 6 BLU 5 2 1 GRE 6 4 GRE 6 5 7 7 7 6 EA $21,736 2,800 LF $91,091 5,500 LF $251,823 2,800 LF $126,355 2 EA $21,808 2 EA $11,440 2 EA $53,625 1 EA $17,160 $595,037 419,600 SF $2,100,098 164 EA $23,452 $2,123,550 3 EA $11,655 4 EA $1,716 5 EA $1,144 Assessment Date: 1/8/2013 Page 7 of 20

Exhaust Fans - Roof Mounted above 8,000 cfm Exhaust Fans - Roof mounted less than 500 CFM Lab Exhaust Hood Type I Exhaust Hood - Kitchen or Culinary Arts Type II Exhaust Hood - Warming Kitchen MECHANICAL GRE 6 9 GRE 6 2 BLU 5 2 1 GRE 6 2 9 EA $19,305 2 EA $315 3 EA $69,069 1 EA $1,716 2 EA $1,859 $106,778 $5,675,641 PLUMBING HOT WATER Hot Water Heater - Gas more than 300,000 BTU/HR Hot Water Heater - Steam Heat Exchanger PIPING Domestic Piping - Cold Water from Risers to Fixtures Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping 1 6 1 6 7 7 1 EA $6,721 1 EA $2,288 $9,009 419,600 SF $69,263 419,600 SF $129,787 419,600 SF $432,759 419,600 SF $87,264 419,600 SF $103,210 419,600 SF $340,509 419,600 SF $206,256 419,600 SF $209,516 419,600 SF $247,737 419,600 SF $185,680 419,600 SF $140,417 $2,152,400 Assessment Date: 1/8/2013 Page 8 of 20

POOL SYSTEMS Pool Drain Piping Pool Filtration System Pool Hot Water Heater - Steam Heat Exchanger Pool Supply and Return Piping 1 6 GRE 6 50 BLU 5 1 YEL 4 1 00 7 50 LF $858 1 EA $122,980 1 EA $13,013 100 LF $1,573 $138,424 PUMPS Domestic Booster Pump duplex Domestic Booster Pump simplex Ejector Pump Sump Pump PLUMBING INTERIOR ADMINISTRATIVE SUITES 1 6 YEL 4 1 7 1 EA $3,146 1 EA $17,160 1 EA $3,003 1 EA $1,359 $24,668 $2,324,501 Ceiling - Exposed Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Concrete Flooring - Tile/Sheet Lighting - Lay-In Lighting - Pendant/Surface Lighting - Wall Mounted Walls - Concrete Block Walls - Plaster/Drywall 1 6 GRE 6 241 7 GRE 6 608 1,206 8,557 10,243 GRE 6 498 1,904 GRE 6 418 2,858 3,616 594 GRE 6 20 GRE 6 348 1,068 5,401 8,934 92 196 GRE 6 34 15 GRE 6 8 GRE 6 721 1,863 GRE 6 3,533 23,908 18,004 241 SF $455 20,614 SF $30,922 2,402 SF $1,410 7,486 SF $19,728 20 SF $94 15,751 SF $18,698 388 SF $137 49 SF $24 8 EA $229 2,584 SF $2,062 45,445 SF $73,083 Assessment Date: 1/8/2013 Page 9 of 20

$146,843 AUDITORIUM - DEDICATED Main Floor Seating Sound System Stage Curtains Stage Lighting System CHORAL ROOM 1 BLU 5 672 BLU 5 1 6 GRE 6 2 7 672 EA $81,624 1 EA $92,950 2 EA $22,651 1 EA $114,400 $311,625 Risers 1 6 7 GRE 6 38 50 88 LF $807 $807 CLINIC Health Clinic 1 6 7 GRE 7 1,464 1,464 SF CORRIDOR Stair Handrails Stairs - Asphalt DOORS 1 6 GRE 6 63 BLU 5 48 7 63 LF 48 LF $2,402 $2,402 Interior Steel Doors incl hw Interior Wood Doors incl hw Store Front Door 1 6 7 7 28 25 6 103 178 23 GRE 6 43 70 EA $15,950 320 EA $150,347 43 EA $10,146 $176,443 Assessment Date: 1/8/2013 Page 10 of 20

GYMNASIUM / AUDITORIUM Bleacher Seating Ceiling - Plaster/Drywall Ceiling - Splined Flooring - Wood Lighting - Metal Halide/Sodium Vapor Lighting - Pendant/Surface Scoreboards Walls - Concrete Block Walls - Plaster/Drywall Walls - Structural Glazed Tile 1 6 BLU 5 560 504 GRE 6 4,622 0,032 11,737 7,981 11,737 9,892 20 GRE 7 19 2 2,496 GRE 6 8,432 GRE 6 3,880 1,064 EA $54,462 4,622 SF $39,525 21,769 SF $228,165 23,610 SF $120,403 120 EA $21,450 19 EA 3 EA $2,076 12,496 SF $107,216 8,432 SF $72,347 3,880 SF $27,742 $673,386 KITCHEN Ceiling - Splined Flooring - Concrete Lighting - Pendant/Surface Wall - Plaster/Drywall Wall - Structural Glazed Tile 1 6 GRE 6 2,268 GRE 6 684 7 GRE 7 36 GRE 6 2,129 GRE 7 1,330 2,268 SF $6,486 684 SF $3,228 36 SF 2,129 SF $5,023 1,330 SF $14,738 LIBRARY Casework Flooring Carpet Lighting - Lay-In 1 6 7 GRE 7 358 BLU 5 3,985 GRE 6 62 358 LF 3,985 SF $14,246 62 SF $44 $14,291 Assessment Date: 1/8/2013 Page 11 of 20

LOCKER/SHOWER ROOM Benches Lockers Showers 1 6 14 222 7 BLU 5 1,192 102 52 GRE 6 23 44 336 LF $6,976 1,346 EA $198,064 67 EA $38,653 $243,693 LUNCHROOM Ceiling - Lay-In Flooring - Tile/Sheet Lighting - Lay-In Serving Line Wall - Plaster/Drywall 1 6 7 GRE 6 270 12,553 GRE 6 270 12,523 73 4 GRE 6 40 120 GRE 6 477 675 6,980 12,823 SF $579 12,793 SF $386 177 SF $124 160 LF $95,753 8,132 SF $3,844 $100,685 MDF/IDF Finishes Ventilation and Cooling 1 6 GRE 6 303 7 GRE 7 1 303 SF $1,031 1 EA $1,031 MECHANICAL/SERVICE ROOMS Mechanical/Service Rooms Storage Room 1 6 BLU 5 6,185 4,792 7 GRE 6 4,371 3,190 10,977 SF $92,662 7,561 SF $20,627 $113,289 STAFF RESTROOM Accessories Ceiling - Lay-In 1 6 7 GRE 6 2,396 6,055 1,099 GRE 7 164 9,550 SF $107,813 164 SF Assessment Date: 1/8/2013 Page 12 of 20

Ceiling - Plaster/Drywall Floor Drain Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Wall - Structural Glazed Tile Wall - Tile Ceramic/ Porcelain Water Closet GRE 6 4,926 7,205 4,773 GRE 6 3 50 13 GRE 6 8,183 3,002 GRE 6 6,108 GRE 6 26 29 0 22 34 GRE 6 6 47 53 GRE 6 5 9 194 8 95 29 1 6 33 GRE 6 8,092 3,315 GRE 6 897 2,820 560 GRE 7 11,448 GRE 7 1,488 13 77 19 16,904 SF $48,295 66 EA $19,520 11,185 SF $20,829 6,108 SF $8,734 55 EA $5,644 66 EA $26,770 106 SF $55 208 SF $28 142 EA $27,332 50 EA $22,680 11,407 SF $23,143 4,277 SF $10,887 11,448 SF 1,488 SF 110 EA $56,514 $378,242 SWIMMING POOL Accessories Bleacher Seating/Plank seating Floor Tile Lighting - Pendant/ Surface Paint Pool Basin Pool Deck Pool deck drains Splined Ceiling including access Structural Glazed Tile Wall Tile 1 6 GRE 6 3,885 17,165 GRE 6 26 7 GRE 7 150,440,181 GRE 6 5 GRE 6 3,885 GRE 7 364 GRE 6 3,144 3,885 SF $30,000 117 EA $1,656 1,165 SF $3,965 26 SF $28 150 SF 1,440 SF $40,772 1,181 SF $7,802 5 EA $1,859 3,885 SF $41,667 364 SF 3,144 SF $9,486 $137,236 Assessment Date: 1/8/2013 Page 13 of 20

THEATER Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Concrete Lighting - Lay-In Lighting - Pendant/ Surface Stage Wall - Plaster/Drywall 1 6 7 GRE 7 7,122 YEL 4 2,720 BLU 5 3,312 GRE 7 82 2 BLU 5 1,100 GRE 7 5,038 7,122 SF 2,720 SF $28,238 3,312 SF $15,629 82 SF 12 SF $20 1,100 SF $30,831 5,038 SF $74,718 VERTICAL CONVEYANCE Elevator - Roped Holeless Hydraulic Stage Lift 1 6 7 1 1 2 EA $56,628 2 EA $3,737 $60,365 VOCATIONAL SHOP Work Sink INTERIOR 1 6 7 GRE 6 2 42 25 16 85 EA $98,456 $98,456 $2,548,252 ROOM ADMIN_WALL Administrative Office Walls 1 6 7 GRE 7 1,429 1,429 SF Assessment Date: 1/8/2013 Page 14 of 20

CASEWORK Casework 1 6 7 GRE 6 3 114 429 87 633 LF $37,109 $37,109 CEILING Exposed Ceiling Lay-In/Drop Plaster/Drywall 1 6 7 GRE 6 2,183 1,714 5,052 GRE 6 23,029 40,425 GRE 7 3,848 8,949 SF $7,356 63,454 SF $49,397 3,848 SF $56,753 CHALK BOARD 1 6 7 Chalk Board YEL 4 207 207 LF $25,161 $25,161 CLASSROOM Eye Wash Station Science Lab Elements Science Lab Shower 1 6 7 BLU 5 2 2 1 GRE 6 3 2 2 2 5 EA $29,315 3 SF $69 7 EA $46,475 $75,859 CORRIDORS Carpet Ceiling Concrete Block Concrete Epoxy/Painted Drop/Lay-In Floors 1 BLU 5 88 6 GRE 6 720 7 GRE 7 13,338 GRE 6 374,055 300 28,831 29,527 GRE 7 7,310 88 SF $315 720 SF $2,039 13,338 SF 374 SF $1,765 59,713 SF $73,498 7,310 SF Assessment Date: 1/8/2013 Page 15 of 20

Lay-In Pendant/Surface Plaster/Drywall Single Water Cooler Stair Handrails Stairs Student Lockers Terrazzo Tile Ceramic/Porcelain Tile/Sheet Flooring Walls 5,546 41,969,445 6,824 GRE 6 2,294 72,785 22,070 4 11 GRE 6 939 1,812 GRE 6 3 167 726,149 697 7,294 16,180 GRE 6 57 GRE 6 4,754 20,609 GRE 7 1,010 57,515 EA $11,115 8,269 EA $1,033 97,149 SF $182,562 25 EA $43,043 2,751 LF 896 EA $1,344 1,846 EA $164,307 33,474 SF $97,932 57 SF $145 25,363 SF $6,798 1,010 SF $585,897 CORRIDORS CEILING Plaster/Drywall 1 6 7 GRE 6 566 7,399 7,965 SF $1,603 $1,603 FLOOR Carpet Concrete Floor Tile/Sheet 1 YEL 4 844 508 6 GRE 6 7,079 7 GRE 7 1,057 GRE 6 896 9,735 56,132 1,352 SF $10,578 7,079 SF $33,406 1,057 SF 66,763 SF $18,995 $62,979 GYM_FLOOR Gymnasia Floor 1 6 26 3,434 7 3,560 SF $27,950 $27,950 Assessment Date: 1/8/2013 Page 16 of 20

KITCHEN_FLOOR Kitchen Floor 1 6,584 7 1,584 SF $5,459 $5,459 LIBRARY_CEILING Drop/Lay-In LIBRARY_WALL 1 6 GRE 6 3,985 7 3,985 SF $8,548 $8,548 Plaster/Drywall GRE 6 2,944 2,944 $6,946 LIGHTING 1 6 7 $6,946 Lay-In Pendant/Surface 1 6 7 2 422 733 6 96 75 1,167 EA $31,889 187 EA $13,156 $45,045 MARKER BOARD Marker Board 1 6 7 2 1,170 1,182 LF $1,459 $1,459 RESTROOM_LIGHT Restroom Lighting 1 6 7 GRE 7 16 16 EA Assessment Date: 1/8/2013 Page 17 of 20

RESTROOM_WALL Restroom Walls 1 6 7,845 1,304 3,149 SF $4,696 $4,696 STAIRS Terrazzo Tile THEATER_WALL 1 6 GRE 6 32 BLU 5 3 7 32 SF $362 3 SF $57 $419 1 6 7 Auditorium Walls BLU 5 922 922 SF $5,221 $5,221 WALL Concrete Block Metal/Folding Panel Plaster/Drywall Wall ROOM 1 6 7 GRE 6 9,075 8,361 GRE 6 450 GRE 6 720 21,067 68,551 BLU 5 4,441 17,436 SF $25,955 450 SF $1,062 90,338 SF $53,105 4,441 SF $20,957 $101,079 $1,052,181 SITE ATHLETIC Football/Soccer - Natural Running Track Asphalt 1 6 00 51,000 BLU 5 33,360 7 51,100 SF $29,387 33,360 SF $110,198 $139,585 Assessment Date: 1/8/2013 Page 18 of 20

CIVIL/DRAINAGE Catch Basin Site Manhole 1 6 7 7 GRE 7 38 8 EA $1,216 38 EA $1,216 FENCING Chain Link Ornamental Iron 1 6 7,534 60 GRE 6 52 597 1,594 LF $22,002 649 LF $14,508 $36,510 LANDSCAPE Asphalt Play Area/Hardscape Benches Grass Hardscape - Concrete Irrigation Parkway trees Walking Path - Crushed Stone 1 BLU 5 2,910 6 GRE 6 6 7 GRE 7 31,962 45 9,737 GRE 6 51,000 41 GRE 6 20 2,910 SF $8,239 6 EA $1,416 31,962 SF 9,882 SF $2,737 51,000 SF $29,172 42 EA $2,454 20 SF $44,018 PARKING LOT Asphalt Concrete Curbs Parking lot interior plantings Trash Compactor Trash Enclosure 1 6 GRE 6 30,335 7 GRE 6 75 1,039 GRE 7 8 GRE 7 1 GRE 7 216 30,335 SF $26,027 1,114 LF $3,681 8 LF 1 EA 216 SF $29,708 Assessment Date: 1/8/2013 Page 19 of 20

SIDEWALKS Perimeter Sidewalks 1 6 7,092 21,730 22,822 SF $20,613 $20,613 SIGNAGE Flag Pole Marquee - Free Standing Back Lighted SITE Campus Need ² ³ 1 6 7 GRE 7 1 GRE 7 1 1 EA 1 EA $271,649 $15,081,874 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 1/8/2013 Page 20 of 20