STOREFRONT General Notes 1. Check contract documents and shop drawings, and understand and clarify any Field Verify Notes, approvals of drawings, and products required to be familiar with the project. Installation instructions are intended to be a reasonable guideline for installation of a product based on testing and common conditions. Conditions on a project may vary and deviations or special instructions should be defined in the shop drawings. Shop Drawings should take precedence and define project-specific products and installation. 2. All materials need to be inventoried to be certain everything required for installation is accounted for. 3. Materials need to be installed plumb, level, and true. 4. Work from project-defined benchmarks like center column lines, finished floors, or mullion spacing as defined by the Architectural drawings and the General Contractor. 5. All sealants need to be compatible with all materials. The Glazing Contractor and/or General Contractor are responsible for supplying sealants, and submitting any sealant compatibility and performance documentation. 6. Isolation of dissimilar materials, like aluminum and uncured concrete, should be prepared for. 7. Use a heavy bituminous paint, zinc chromate coating, or approved equal to isolate incompatible materials. 8. Protection and cleaning of materials are the responsibility of the Glazing and General Contractors. (Reference AAMA documentation, care, and maintenance.) 9. Diversity of Federal State and Local Building Codes are the responsibility of the Architect, Owner, and Customer to interpret compliance for the fenestration products used on the project. Boyd Aluminum is only a material supplier. 10. Boyd Aluminum is the material supplier of the fenestration product defined in the drawings and contract documents. Only fasteners and accessories within the system are supplied. Anchors, sealants, and fasteners to the surrounding conditions should be defined on the shop drawings and are normally the responsibility of the Glazing Contractor. 11. Due to changing fenestration parameters and evolving product lines, Boyd Aluminum reserves the right to change detailing and documentation commensurately without notification. Page Number 205
BOYD ENTRANCES 1. Boyd Entrance Systems are designed to offer a wide range of installation options. Review the frames with your project hardware requirements to ensure the options are compatible. 2. The use of a Loctite type product is recommended for hardware installation. Some items may already be prepared with Loctite. 3. Installation instructions are based on stocked hardware options. Special hardware may require further review. 4. Boyd offers door frames and door blanks for customers to fabricate their own hardware options. 5. Boyd can fabricate to customer-supplied hardware if frames and stiles are compatible. Boyd will only fabricate to hardware supplied. Boyd will not replace or be responsible for missing pieces or fabrication incompatible for those pieces. 6. Boyd fabrication from templates may be done, but absolutely no guarantee is given that the fabrication will be compatible without physical hardware. Page Number 206
STOREFRONT ENTRANCE FRAMES Frame #1: Butt Hinge and Continuous Hinge Frame. Figure A (Frame Layouts) The butt hinge and continuous hinge frames without a transom use an open frame header that has a screw boss that may interfere with pivot installation. Figure A Butt Hinge / Continuous Hinge Frame NOT USED WITH PIVOT FIGURE A BUTT HINGE / CONTINUOUS HINGE FRAME Page Number 207
Frame #2: Offset Pivot Frame. Figure B Offset pivot frame uses a header that omits the screw boss that interferes with the pivot installation. Figure B Offset Pivot Frame NOT USED WITH PIVOT FIGURE B OFFSET PIVOT FRAME Page Number 208
Frame #3: Transom Frame. Figure C Transom Glazing Deducts Figures D-1 and D-2 Transom frame is compatible with multiple hinge options. Transom frame options can include 1/4" or 1" glazing options. Figure C 1" GLZ Transom Frame FIGURE C 1" GLZ TRANSOM FRAME Page Number 209
Figure D-1 1 3/4" Standard Frames 1/4" Glazing Transom Frame Optional 1/4" Glz Transom Frame Figure D-2 2.000" Standard Frames 1/4" Glazing Transom Frame Optional 1/4" Glz Transom Frame Page Number 210
Frame #4: Transom Tube Frame. Figure E Transom Glazing Deducts Figures F-1 and F-2 The transom tube is designed to be compatible with concealed overhead closures. The transom tube is assembled using shear block assembly at the tube location. Transom frame is compatible with multiple hinge options. Transom tube frame options can include 1/4" or 1" glazing options. Figure E 1" GLZ Tube Transom Frame FIGURE E 1" GLZ TUBE TRANSOM FRAME Page Number 211
Figure F-1 1 3/4" Standard Frames 1/4" Glazing Tube Header Frame Figure F-2 2.000" Standard Frames 1" Glazing Tube Header Frame 1/4" Glazing Transom Frame Optional 1" GLZ Transom Frame Page Number 212
Frame #5: Center Set Frame. Figure G The center set frame is designed to be used with the double-acting door option. Figure G Center Set Frame FIGURE G CENTER SET FRAME Page Number 213
Frame #6: Center Set Transom Frame. Figure H Transom Glazing Deducts Refer to Figures F-1 and F-2 Transom frame options can include 1/4" or 1" glazing options. Figure H Center Set Transom Frame FIGURE H CENTER SET TRANSOM FRAME Page Number 214
BUTT HINGE FRAME UNIT ASSEMBLY (Exploded Butt Hinge Frame) Figure J 1. Verify opening size. 2. Assemble head and door jambs with #10 screws as shown; butter the frame header edges with sealant. 3. Door stops must be removed/not installed prior to assembly. 4. Threshold clip sill into frame as shown with Loctite. 5. Install hinges with Loctite. 6. Set frame into opening plumb and square. Block and anchor entrance frame to prevent movement on hardware mullions. 7. Fill frame jambs with sealant to channel water out of stops, as shown in Figure K. 8. Anchor thresholds with 1/4" FH fasteners through holes provided set in sealant. 9. Block and anchor frame through stop pocket at 4" 6" from corners and 16" O.C. or, as superseded by drawings and/or calculations. If using filler fasteners; may offset. Figures L-1 and L-2. 10. Show attention to anchoring hardware points plumb. 11. Snap in vertical door stops, then horizontal with sealant in reglet. Seal corners. 12. Clean the frame. Page Number 215
Figure J Butt Hinge Frame (2) #10-12 1 1/4" (2) #10-12 X 1 1/4" PHL PH SMS PHL PH SMS (4) (4) #12-24 #12-24 PHL PHL FH MS FH MS UNDERCUT Undercut 4 41/2 1/2 BUTT Butt HINGE Hinge (4) #12-24 (4) #12-24 PHL FH PHL MS FH MS UNDERCUT Undercut (4) #12-24 (4) #12-24 PHL FH MS PHL FH MS UNDERCUT Undercut Butter w/ Sealant BUTTER W/ SEALANT Butter BUTTER w/ W/ Sealant SEALANT Snap-In SNAP-IN Door DOOR Stop STOP With WITH Weatherstrip WEATHERSTRIP (Not (NOT Shown SHOWN At Hinge AT HINGE Jamb JAMB For FOR Clarity) CLARITY) (2) #10-12 X 1 1/4" PHL PH SMS 4 1/2 4 1/2 BUTT Butt HINGE Hinge (4) (4)#12-24 PHL FH MS UNDERCUT Undercut Figure K (4) #12-24 PHL FH MS (4) #12-24 PHL Undercut FH MS UNDERCUT Backer Plate For BACKER PLATE FOR 4 1/2 Butt Hinge 4-1/2 BUTT HINGE (4) (4)#12-24 PHL FH MS UNDERCUT Undercut 4 1/2 4 1/2 BUTT Butt HINGE Hinge THRESHOLD Threshold CLIP Clip (2) #10-24(2)#10-24 PHL FH MS PHL Undercut FH MS UNDERCUT (2) #10-24 (2)#10-24 PHL FH FH MS MS UNDERCUT Undercut 1/4" PHL FH Seal SEAL And AND Tool TOOL At AT Threshold THRESHOLD FIGURE K (2)#10-24 PHL FH (2) MS #10-24 UNDERCUT PHL FH MS Undercut FIGURE J BUTT HINGE FRAME Threshold THRESHOLD Clip CLIP w/ W/ (2) (2)#10-24 PHL FH MS FH UNDERCUT MS Undercut Page Number 216
Figure L-1 Anchor ANCHOR At AT Center CENTER Of Glass OF GLASS Pocket POCKET DOOR Anchor ANCHOR Threshold THRESHOLD At AT CENTER Center OF Of DOOR Door FIGURE L-1 Figure L-2 Offset Fasteners If Using Frame Filler Fasteners Will Offset IF USING FRAME FILLER FASTENERS WILL OFFSET DOOR Anchor ANCHOR Threshold THRESHOLD At AT Center CENTER Of OF DOOR Door FIGURE L-2 OFFSET FASTENERS Page Number 217
HANG DOOR Figure M 1. Check frame to be sure it is plumb and square. 2. Inspect door leaf for damages. 3. Glazing a door on a table is easier, but it can be done vertically as well. See Figures N and O for demonstration. 4. Attach the push bar so it is level and square. 5. Install the door snap in interior stop. Seal corners. See Figure P. 6. Ensure the jack screw is not screwed down too far. 7. Set glass. 8. Snap in exterior bead. Note that verticals run through, and may require a trim to miss welds, see Figure P. 9. Attach the handle. 10. Position the door and fasten the hinges using Loctite. 11. To adjust the jack screw, place a wedge under the door to relieve pressure. Snug the jack screw gently to avoid glass breakage. Snap on the jack screw hole plug. 12. Clean door and frame. Page Number 218
Figure M 1/4-20 PHL PH Jack Screw 1/4-20 PHL PH JACK SCREW 1/4-20 PHL FH 1/4-20 PHL FH DOUBLE Double Set Stud SET STUD Pull PULL Handle HANDLE 1/4-20 Allen Keyed 1/4-20 ALLEN Set Screw KEYED SET SCREW #12-24 PHL FH MS FH UNDERCUT MS Undercut 1/4-20 UNC Grip 1/4-20 Open UNC End GRIP Rivnut OPEN END RIVNUT 1/4-20 PHL FH MS 1/4-20 PHL FH MS PUSH Push Bar BAR #12-24 PHL FH #12-24 MS Undercut PHL FH MS UNDERCUT Snap SNAP In Interior IN INTERIOR Stop STOP TO ADJUST To Adjust JACK Jack SREW, Screw, Relieve Pressure By RELIEVE PRESSURE BY Using A Wedge USING A WEDGE #12-24 PHL #12-24 PHL FH MS FH MS Undercut UNDERCUT FIGURE M Page Number 219
Figure P Sealant SEALANT Figure N If Not Already Done, IF NOT ALREADY DONE, TRIM CORNER Trim Corner OFF TO Off To MISS Miss WELDS. Welds. FIGURE P Interior Glass INTERIOR Stops GLASS With Gaskets STOPS WITH GASKETS Setting Chairs SETTING CHAIRS 4" 4" FROM From STILE Stile Interior INTERIOR Glass GLASS STOPS Stops WITH With GASKETS Gaskets Jack JACK Screw SCREW 3/4" HOLE Hole PLUG Plug FIGURE N Page Number 220
Figure O 3/4" Hole Plug 3/4" HOLE PLUG Jack Screw JACK SCREW Interior Glass INTERIOR GLASS Stops With Gaskets STOPS WITH GASKETS Setting Chairs SETTING CHAIRS 4" From Stile 4" FROM STILE FIGURE O Interior Glass INTERIOR GLASS Stops With Gaskets STOPS WITH GASKETS Page Number 221
PIVOT HINGE FRAME UNIT ASSEMBLY (Exploded Pivot Frame) Figure Q 1. Verify the opening size. 2. Assemble head and door jambs with #10 screws as shown; butter the frame header edges with sealant. 3. Door stops must be removed/not installed prior to assembly. 4. Threshold clip sill into frame as shown with Loctite. Half of the base pivot may be the threshold clip on a pivot hinged frame. 5. Install header pivot with Loctite. 6. Set frame into the opening, plumb and square. Block and anchor the entrance frame to prevent movement on hardware mullions. 7. Block and anchor pivot and set threshold in sealant with 1/4" FH fastener through fastener holes provided. See Figures Q and R. 8. Fill frame jambs with sealant to channel water out of stops as shown. See Figure S. 9. Block and anchor frame through stop pocket at 4" 6" from corners and 16" O.C. or, as superseded by drawings and/or calculations. If using filler, fasteners may offset. See Figures R-1 and R-2. 10. Be sure anchoring hardware points plumb. 11. Snap in vertical then horizontal door stops with sealant in reglet. Seal corners. 12. Clean frame. Page Number 222
Figure R-1 Anchor At Center Of Glass Pocket ANCHOR AT CENTER OF GLASS POCKET DOOR Anchor ANCHOR Threshold THRESHOLD At AT CENTER OF DOOR Center Of Door FIGURE R-1 Figure R-2 Offset Fasteners If Using Frame Filler, Fasteners Will Offset IF USING FRAME FILLER FASTENERS WILL OFFSET DOOR Anchor ANCHOR Threshold THRESHOLD At AT CENTER OF DOOR Center Of Door FIGURE R-2 OFFSET FASTENERS Page Number 223
Figure Q Offset Pivot Hinge Frame (3) (3) #10-12 #10-12 PHL PHL PH PH SMS Butter BUTTER w/ W/ Sealant SEALANT Top Pivot TOP Frame PIVOT Part FRAME PART 1/4-20 PHL 1/4-20 FH MS PHL Undercut FH MS UNDERCUT BUTTER Butter w/ W/ Sealant SEALANT (3) #10-12 PHL PH SMS Snap-In SNAP-IN Door DOOR Stop STOP With Weatherstrip WITH WEATHERSTRIP (Not Shown At (NOT Hinge SHOWN Jamb AT For HINGE Clarity) JAMB FOR CLARITY) INTERMEDIATE Intermediate PIVOT Pivot FRAME Frame PART Part 1/4-20 PHL 1/4-20 FH MS PHL Undercut FH MS UNDERCUT Figure S BOTTOM Bottom PIVOT Pivot FRAME Frame PART Part SHIM Shim PIVOT Pivot IF If REQUIRED Required #10-24 #10-24 PHL PHL FH FH MS MS FUNDERCUT Fundercut Fasten Pivot To FASTEN PIVOT TO Finished Floor FINISHED FLOOR w/ (2) 1/4" PHL FH W/ (2) 1/4" PHL FH 1/4" PHL FH Seal SEAL And AND Tool TOOL At AT Threshold THRESHOLD FIGURE S FIGURE Q OFFSET PIVOT HINGE FRAME Threshold THRESHOLD Clip CLIP w/ W/ (2) (2)#10-24 PHL FH MS FH UNDERCUT MS Undercut Page Number 224
HANG DOOR Figure T 1. Check frame to be sure it is plumb and square. 2. Inspect door leaf for damages. 3. Glazing a door on a table is easier, but it can be done vertically as well. See Figures N and O. 4. Attach the push bar level and square. 5. Install the door snap-in interior stop. Seal corners. See Figure P. 6. Ensure the jack screw is not screwed down too far. 7. Set glass. 8. Snap in exterior bead. Note that verticals run through, and may require a trim to miss welds. See Figure P. 9. Attach the handle. 10. Install pivots using Loctite. 11. Depress head pin in upper pivot. See Figure U. 12. If the intermediate pivot is installed, you will need to remove the cover and retract it. See Figure V. 13. Position the door and adjust the lower pivot stud, then tighten the set screw. See Figure W. 14. Reposition the door and release the head pin on upper pivot. 15. If available, and an adjustment is needed, remove the cover on lower pivot for final adjustment. See Figure W. 16. Snug down the intermediate pivot and replace cover. 17. To adjust the jack screw, place a wedge under the door to relieve pressure. Snug the jack screw gently to avoid glass breakage. Snap on jack screw hole plug. 18. Clean door and frame. Page Number 225
Figure T 1/4-20 PHL PH Jack Screw 1/4-20 PHL PH JACK SCREW 1/4-20 PHL FH 1/4-20 Double Set PHL Stud FH DOUBLE SET STUD Pull Handle PULL HANDLE Top TOP Pivot PIVOT Door DOOR PartPART 1/4-20 Allen Keyed 1/4-20 Set ALLEN Screw KEYED SET SCREW 1/4-20 UNC Grip 1/4-20 Open UNC End GRIP Rivnut OPEN END RIVNUT 1/4-20 PHL FH MS PUSH Push BAR Bar Intermediate INTERMEDIATE PIVOT Pivot DOOR Door PART Part #12-24 #12-24 PHL PHL FH FH MS MS UNDERCUT Undercut Snap In Interior SNAP IN Stop INTERIOR STOP To Adjust Jack Screw, TO ADJUST Relieve JACK Pressure SCREW, By RELIEVE PRESSURE Using A Wedge BY USING A WEDGE To TO Adjust ADJUST Pivot PIVOT Relieve Pressure RELIEVE By Using PRESSURE A Wedge BY USING A WEDGE. PIVOT Pivot MAY May NEED Need TO To BE Be SHIMMED Shimmed & SHOULD & Should BE INSTALLED Be Installed PLUMB Plumb Bottom Pivot BOTTOM PIVOT Door Part DOOR PART FIGURE T Page Number 226
Depress Head Pin Before DEPRESS HEAD PIN BEFORE Positioning Door, Then Release POSITIONING After Door DOOR, Is Positioned THEN RELEASE AFTER DOOR IS POSITIONED Figure U Top Pivot Figure V Intermediate Pivot FIGURE U TOP PIVOT Remove Cover To Retract Pin REMOVE COVER TO RETRACT PIN FIGURE V INTERMEDIATE PIVOT Figure W Bottom Pivot If Available, Remove Cover For Adjustment IF AVAILABLE, REMOVE COVER FOR ADJUSTMENT SET SCREW Set Screw FIGURE W BOTTOM PIVOT Page Number 227
TRANSOM FRAME UNIT ASSEMBLY (Exploded Transom Frame) Figure X 1. Verify opening size. 2. Assemble head, horizontal, and door jambs with #10 screws as shown; butter the frame header edges with sealant. 3. Door stops must be removed/not installed prior to assembly. 4. Threshold clip sill into frame, as shown, with Loctite. Half of the base pivot may be the threshold clip on a pivot hinged frame. See Figure Y. 5. Install pivots or hinges with Loctite. 6. Set frame into opening plumb and square. Block and anchor entrance frame to prevent movement on hardware mullions. 7. Block and anchor pivot and set threshold in sealant with 1/4" FH fasteners through fastener holes provided. See Figure Z-1 and Z-2. 8. Fill frame jambs with sealant to channel water out of stops as shown. See Figure Y. 9. Block and anchor frame through stop pocket at 4" 6" from corners and 16" O.C. or as superseded by drawings and/or calculations. If using filler fasteners, may offset. See Figure Z-1 and Z-2. 10. Show attention to anchoring hardware points plumb. 11. Snap in vertical, then horizontal door stops with sealant in reglet. Seal the corners. 12. Install interior transom sash in thin sealant. 13. Seal corners and place transom setting blocks at 1/8" 1/4" point locations. See Figure AA. 14. Set glass in transom. Install glazing wedge. 15. Clean frame. 16. Install door. See Figure BB for installation, and Figures N and O for glazing. 17. Clean door and frame. Page Number 228
Figure X Transom Pivot Frame (2) #10-12 PHL PH SMS Butter w/ Sealant BUTTER W/ SEALANT Glazing GLAZING Wedge WEDGE Butter BUTTER w/ Sealant W/ SEALANT (2) #10-12 PHL PH SMS (2) #10-12 PHL PH SMS (3) #10-12 PHL PH SMS BUTTER Butter W/ w/ SEALANT Sealant Top Pivot TOP Frame PIVOT Part FRAME PART 1/4-20 PHL FH MS TRANSOM Transom SASH Sash Snap-In Door Stop w/ SNAP-IN Weatherstrip DOOR (Not STOP Shown W/ WEATHERSTRIP At Hinge Jamb For (NOT Clarity) SHOWN AT HINGE JAMB FOR CLARITY) Butter BUTTER w/ W/ Sealant SEALANT Intermediate Pivot Frame INTERMEDIATE PIVOT Part FRAME PART 1/4-20 PHL PHL FH FH MS MS Bottom BOTTOM Pivot Frame PIVOT Part FRAME PART SHIM PIVOT Shim Pivot IF REQUIRED If Required #10-24 PHL FH MS #10-24 PHL FH MS UNDERCUT Undercut Fasten Pivot To Finished Floor w/ (2) 1/4" PHL FASTEN FH PIVOT TO FINISHED FLOOR W/ (2) 1/4" PHL FH 1/4" PHL FH (3) #10-12 PHL PH SMS (3) #10-12 PHL PH SMS Figure Y FIGURE Y Seal And Tool SEAL AND TOOL At Threshold AT THRESHOLD FIGURE X TRANSOM PIVOT FRAME Threshold THRESHOLD Clip CLIP w/ W/ (2) (2) #10-24 PHL PHL FH FH MsMS Page Number 229
Figure Z-1 Anchor At Center Of Glass Pocket ANCHOR AT CENTER OF GLASS POCKET Anchor At Center ANCHOR AT CENTER Of Glass OF GLASS Pocket POCKET DOOR Anchor ANCHOR Threshold THRESHOLD At Center AT CENTER Of OF Door DOOR FIGURE Z-1 Figure Z-2 Offset Fasteners If Using Frame Filler, Fasteners Will Offset IF USING FRAME FILLER FASTENERS WILL OFFSET If IF Using USING FRAME Frame FILLER Filler, Fasteners FASTENERS WILL Will OFFSET Offset DOOR Anchor Threshold At Center Of Door ANCHOR THRESHOLD AT CENTER OF DOOR FIGURE Z-2 OFFSET FASTENERS Page Number 230
Figure AA Install INSTALL Interior INTERIOR Transom Sash In Thin Sealant TRANSOM SASH IN THIN SEALANT Seal SEAL Corners CORNERS Place 2 Setting PLACE 2 Blocks SETTING at 1/8" BLOCKS Or 1/4" @ 1/8 OR Point 1/4 Locations POINT LOCATIONS FIGURE AA Page Number 231
Figure BB 1/4-20 1/4-20 PHL PHL PH JACK Jack SCREW Screw Top TOP Pivot PIVOT Door DOOR Part PART 1/4-20 Allen 1/4-20 Keyed ALLEN Set KEYED SET SCREW Screw 1/4-20 PHL FH 1/4-20 Double PHL Set Stud FH DOUBLE SET STUD Pull PULL Handle HANDLE #12-24 PHL FH MS Undercut UNDERCUT 1/4-20 1/4-20 UNC UNC GRIP Grip OPEN Open END End RIVNUT Rivnut 1/4-20 PHL FH MS PUSH Push BAR Bar Intermediate INTERMEDIATE Pivot PIVOT Door DOOR Part PART #12-24 #12-24 PHL PHL FH FH MS MS UNDERCUT Undercut SNAP Snap IN In INTERIOR Interior Stop STOP TO ADJUST To Adjust JACK Jack SCREW, Screw, Relieve RELIEVE Pressure PRESSURE By Using BY A USING A WEDGE. Wedge BOTTOM Bottom Pivot PIVOT DOOR Door Part PART To TO Adjust ADJUST Pivot, PIVOT Relieve RELIEVE Pressure PRESSURE BY USING By Using A WEDGE A Wedge PIVOT Pivot May MAY Need NEED To TO Be BE Shimmed SHIMMED And AND SHOULD Should BE INSTALLED Be Installed PLUMB Plumb FIGURE BB Page Number 232
TRANSOM TUBE FRAME UNIT ASSEMBLY (Exploded Transom Tube Frame) Figure CC 1. Verify opening size. 2. Assemble head, horizontal with Shear Blocks, and door jambs with #10 screws, as shown. Butter the frame header edges with sealant. If using offset pivot, shear block will need to be field modified. See Figure DD. 3. Door stops must be removed/not installed prior to assembly. 4. Threshold clip sill into frame as shown with Loctite. Half of the base pivot may be the threshold clip on a pivot hinged frame. 5. Install pivots or hinges with Loctite. 6. Set frame into the opening plumb and square. Block and anchor entrance frame to prevent movement on hardware mullions. 7. Block and anchor pivot and set threshold in sealant anchor with 1/4" FH fasteners through fastener holes provided. See Figures EE-1 and EE-2. 8. Fill frame jambs with sealant to channel water out stops as shown. See Figure FF. 9. Block and anchor frame through stop pocket at 4" 6" from corners and 16" O.C. or as superseded by drawings and/or calculations. If using filler fasteners, may offset. See Figures EE-1 and EE-2. 10. Show attention to anchoring hardware points plumb. 11. Do not install door stops at this point. 12. Install interior transom sash in thin sealant. See Figure EE-1. 13. Seal corners and place transom setting blocks at 1/8" 1/4" point locations. See Figure AA. 14. Set glass in transom. Install glazing wedge. 15. Clean frame. 16. Install concealed overhead closure. Refer to manufacturer s hardware instructions. 17. 105 degree pivot. See Figure GG. 18. 105 degree butt hinge. See Butt Hinge Frame, Figure J. 19. Install arm cover. See Figure GG. 20. Trim and install vertical door stops. 21. Install door. See Figure GG for installation, and Figures N and O for glazing. 22. Attach arm and adjust, per hardware instructions. See Figure GG. 23. Clean door and frame. WHEN When USING Using OFFSET Offset PIVOT Pivot Front FRONT Leg LEG Of Shear OF SHEAR Block BLOCK Will WILL Need NEED To TO Be BE Removed REMOVED Figure DD FIGURE DD Page Number 233
(2) #10-12 PHL PH SMS (2) #10-12 PHL PH SMS Figure CC Transom Tube Frame Butter w/ Sealant BUTTER W/ SEALANT ANCHOR Anchor CLIP Clip W/ w/ (3) #10 PHL FH SMS (3) #10 PHL FH SMS (Requires Field ( REQUIRES FIELD Modification To Allow For MODIFICATION TO Top Pivot Frame Part) ALLOW FOR TOP PIVOT FRAME PART) #10 PHL FH SMS Undercut UNDERCUT TRANSOM Transom SASH Sash Butter BUTTER w/ Sealant W/ SEALANT (2) #10-12 PHL PHL PH PH SMS SMS Coc Anchor Bracket w/ #10-32 COC ANCHOR PHL BRACKET FH MS UC W/ #10-32 PHL FH MS UC TOP PIVOT Top Pivot FRAME Frame PART Part 1/4-20 1/4-20 PHL PHL FH FH MS MS Coc Angle COC Bracket ANGLE w/ BRACKET (2) 1/4-20 W/ Hex (2) Head 1/4-20 & (2) HEX Lock HEAD Washers & (2) LOCK WASHERS 1/4-20 1/4-20 PHL PHL FH FH MS MS Intermediate Pivot INTERMEDIATE PIVOT Frame Part FRAME PART 1/4-20 PHL FH MS Bottom Pivot BOTTOM PIVOT FRAME Frame PARTPart SHIM PIVOT Shim Pivot IF REQUIRED If Required #10-24 #10-24 PHL PHL FH FH MS MS UNDERCUT Undercut #10 PHL #10 FH PHL SMS FH SMS UNDERCUT Undercut #10 PHL FH SMS Fasten Pivot To Finished Floor FASTEN w/ (2) PIVOT 1/4" PHL TO FH FINISHED FLOOR W/ (2) 1/4" PHL FH 1/4" PHL FH Set SET In IN Sealant SEALANT Anchor ANCHOR Clip CLIP w/ (4) W/ #10 (4) PHL FH SMS #10 PHL FH SMS Snap-In SNAP-IN Door DOOR Stop STOP w/ Weatherstrip W/ WEATHERSTRIP (Not Shown At Hinge (NOT Jamb SHOWN For Clarity) AT HINGE JAMB FOR CLARITY) Figure FF Seal And Tool SEAL AND TOOL At Threshold AT THRESHOLD FIGURE CC TRANSOM TUBE FRAME FIGURE FF Threshold THRESHOLD Clip CLIP w/ W/ (2) (2) #10-24 #10-24 PHL PHL FH FH MS MS Page Number 234
Use FH Fasteners To Avoid Interference w/ Concealed USE FH FASTENERS TO AVOID INTERFERENCE W/ CONCEALED Overhead OVERHEAD Closer CLOSER Figure EE-1 Anchor At Center Of Glass Pocket ANCHOR AT CENTER OF GLASS POCKET Set In Sealant SET IN SEALANT Field Trim This Leg Off When Using Offset Pivot FIELD TRIM THIS LEG OFF WHEN USING OFFSET PIVOT Anchor At Center Of Glass Pocket ANCHOR AT CENTER OF GLASS POCKET DOOR Anchor Threshold At Center Of Door ANCHOR THRESHOLD AT CENTER OF DOOR FIGURE EE-1 Page Number 235
Use FH Fasteners To Avoid Interference w/ Concealed USE FH FASTENERS TO AVOID INTERFERENCE W/ Overhead CONCEALED OVERHEAD Closer CLOSER Figure EE-2 Offset Fasteners If Using Frame Filler, Fasteners Will Offset IF USING FRAME FILLER FASTENERS WILL OFFSET SET IN SEALANT Set In Sealant Field Trim This Leg Off When FIELD TRIM THIS LEG OFF WHEN Using USING Offset OFFSET PIVOT Pivot If Using Frame Filler, Fasteners Will Offset IF USING FRAME FILLER FASTENERS WILL OFFSET DOOR Anchor Threshold At ANCHOR THRESHOLD Center AT CENTER Of OF Door DOOR FIGURE EE-2 OFFSET FASTENERS Page Number 236
Figure GG #12-24 PHL FH #12-24 PHL FH MS MS Undercut UNDERCUT 1/4-20 1/4-20 PHL PHL PH JACK PH Jack SCREW Screw 1/4-20 Allen Keyed Set Screw 1/4-20 ALLEN KEYED SET SCREW 1/4-20 PHL 1/4-20 FH Double PHL FH Set DOUBLE SET STUD Stud 1/4-20 1/4-20 UNC Grip UNC Open GRIP End OPEN END RIVNUT Rivnut Pull PULL Handle HANDLE Top TOP Pivot PIVOT Door DOOR Part PART Attach ATTACH To TO PIN Pin ON On SLIDE Slide Arm Cover ARM COVER #10 #10 PHL FH FH SMS 1/4-20 PHL FH MS PUSH Push BAR Bar Intermediate INTERMEDIATE Pivot PIVOT Door DOOR Part PART #12-24 Phl PHL Fh FH MS Ms UNDERCUT Undercut SNAP Snap IN In INTERIOR Interior Stop STOP To Adjust Jack Screw, TO ADJUST Relieve JACK Pressure SCREW, By RELIEVE PRESSURE Using A Wedge BY USING A WEDGE To Adjust Pivot, Relieve TO ADJUST Pressure PIVOT By Using RELIEVE A Wedge PRESSURE BY USING A WEDGE PIVOT MAY Pivot NEED May Need TO BE To SHIMMED Be Shimmed & Should Be Installed Plumb & SHOULD BE INSTALLED PLUMB Bottom BOTTOM Pivot PIVOT Door DOOR PartPART FIGURE GG Page Number 237
CENTER SET AND CENTER SET TRANSOM FRAME UNIT ASSEMBLY (Exploded Center-Set Frame) Figure HH 1. Verify opening size. 2. Assemble head, horizontal with Shear Blocks, and door jambs with #10 screws, as shown. Butter the frame header edges with sealant. 3. Threshold clip sill into frame as shown with Loctite. 4. Install threshold or floor pivot with Loctite. 5. Set frame into opening plumb and square. Block and anchor entrance frame to prevent movement on hardware mullions. 6. Block and anchor pivot and set threshold in sealant anchor with 1/4" FH fasteners through fastener holes provided. See Figure JJ-1 and JJ-2. 7. Block and anchor frame through center at 4" 6" from corners and 16" O.C. or as superseded by drawings and/or calculations. If using filler fasteners, may offset. See Figures JJ-1 and JJ-2. 8. Show attention to anchoring hardware jambs and points plumb. 9. Install interior transom sash in thin sealant. 10. Seal corners and place transom setting blocks at 1/8" 1/4" point locations. See Figure AA. 11. Set glass in transom. Install glazing wedge. 12. Clean frame. 13. Install concealed overhead closure. Refer to manufacturer s hardware instructions. 14. Install door. See Figure KK. 15. Attach arm and adjust, per hardware instructions. 16. Clean door and frame. Page Number 238
Figure HH Center Set Frame 1/4" 1/4" Shim SHIM (For ( Use FOR w/ USE 2" WITH 2" HEADER) Header) COC COC JAMB Jamb BRACKET Bracket #10 #10 PH PH SELF-THREADING Self-Threading BUTTER Butter W/ w/ SEALANT Sealant Concealed Overhead Closer CONCEALED OVERHEAD CLOSER COC Angle Bracket COC ANGLE BRACKET 1/4-20 1/4-20 HEX Hex HEAD Head MS MS w/ Washer W/ WASHER COC Cover Plate COC COVER PLATE #10-24 FH MS #10-24 FH MS Butter w/ Sealant BUTTER W/ SEALANT Threshold Clip THRESHOLD CLIP (2) #10-24 PHL FH MS (2) #10-24 Undercut PHL FH MS UNDERCUT Pivot PIVOT Stud STUD & & Bearing BEARING Hex HEX Lock LOCK Nut NUT Threshold THRESHOLD Adapter ADAPTER Nut NUT Hex Jamb Nut HEX JAM NUT 1/4" PHL FH PIVOT Pivot STUD Stud & & BEARING Bearing HEX Hex LOCK Lock NUT Nut FLOOR Floor MOUNTED Mounted PIVOT Pivot BASE Base (2)#10-24 PHL FH FH MS MS UNDERCUT Undercut Threshold THRESHOLD Clip CLIP w/ (2) #10-24 PHL W/ (2) FH #10-24 MS Undercut PHL FH MS FIGURE HH UNDERCUT CENTER SET FRAME Page Number 239
Figure JJ-1 Anchor Through Center ANCHOR THROUGH CENTER DOOR Anchor Threshold At ANCHOR THRESHOLD AT Center CENTER Of OF DOOR Door FIGURE JJ-1 Figure JJ-2 Offset Fasteners If Using Frame Filler, Fasteners Will Be Offset IF USING FRAME FILLER FASTENERS WILL BE OFFSET DOOR Anchor Threshold At Center Of Door ANCHOR THRESHOLD AT CENTER OF DOOR FIGURE JJ-2 OFFSET FASTENERS Page Number 240
Figure KK 1/4-20 PHL 1/4-20 PH Jack PHL Screw PH JACK SCREW 1/4-20 PHL FH MS 1/4-20 PHL FH MS 1/4-20 Allen Keyed 1/4-20 Set ALLEN Screw KEYED SET SCREW 1/4-20 UNC Grip Open End Rivet 1/4-20 UNC GRIP OPEN END RIVET 1/4-20 PHL FH 1/4-20 Double PHL Set Stud FH DOUBLE SET STUD Push PUSH Bar BAR FIGURE KK Page Number 241
1231 1231 BAM-10104 Storefront SUBSILL SIDELITE TO DOOR FRAME Figure LL 1. Set subsill in sealant adjacent jamb. 2. Back seal subsill and filler up approximately 6". 3. Fill glazing cavity with sealant above subsill and tool to shed water into subsill. 4. See Storefront to complete. Set Subsill And Seal To Mull Fill Cavity SET SUBSILL AND SEAL TO MUL FILL CAVITY TO To SUBSILL Subsill HEIGHT Height SO So WATER Water IS Is FORCED Forced TO To EVACUATE Evacuate THROUGH Through SUBSILL Subsill Figure LL Seal SEAL Up UP FILLER Filler Full FULL Length LENGTH Both BOTH Sides SIDES Set SET Frame FRAME In IN Sealant SEALANT Fill FILL Pocket POCKET Here HERE To TO Threshold THRESHOLD Height HEIGHT 1221 BAM-10100 BAM-10128 FIGURE LL Page Number 242