Workshop. Debbie Lilu, CTMA Director Bill Chenevert, Senior Program Manager Marc Sharp, Project Manager

Similar documents
Module 1 - Lesson 102 RDT&E Activities

Other Transaction Authority (OTA)

Technology Roadmapping. Lesson 3

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 5 R-1 Line #102

2017 AIR FORCE CORROSION CONFERENCE Corrosion Policy, Oversight, & Processes

Integrated Transition Solutions

The Role of the Communities of Interest (COIs) March 25, Dr. John Stubstad Director, Space & Sensor Systems, OASD (Research & Engineering)

Realizing Fleet Savings Through SBIR/STTR 23 August 2017

Federal Partnership for Interoperable Communications

UNCLASSIFIED R-1 Shopping List Item No. 127 Page 1 of 1

Stakeholder and process alignment in Navy installation technology transitions

Other Transactions (OTs) for Prototypes and the Information Warfare Research Project (IWRP) Consortium OT

Dedicated Technology Transition Programs Accelerate Technology Adoption. Brad Pantuck

A Translation of the Contracting Alphabet: From BAAs to OTAs

Manufacturing Readiness Assessment Overview

Office of Small and Medium Enterprises (OSME) Bureau des petites et moyennes entreprises (BPME)

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Cross-Service Collaboration Yields Management Efficiencies for Diminishing Resources

RAPID FIELDING A Path for Emerging Concept and Capability Prototyping

Aberdeen Proving Ground Advanced Planning Briefing to Industry

Lesson 17: Science and Technology in the Acquisition Process

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or

Foundations Required for Novel Compute (FRANC) BAA Frequently Asked Questions (FAQ) Updated: October 24, 2017

The 2019 Biometric Technology Rally

DoD Research and Engineering

The Naval Undersea Warfare Center Division Newport

Autonomy Test & Evaluation Verification & Validation (ATEVV) Challenge Area

Defense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Organizational Perspective and Technical Requirements

Prototyping: Accelerating the Adoption of Transformative Capabilities

International Partnership for Nuclear Disarmament Verification Phase II

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO

Comments of Shared Spectrum Company

GREEN MINING INNOVATION I Q A L U I T, N U N A V U T

Department of Energy s Legacy Management Program Development

SUBJECT: Army Directive (Acquisition Reform Initiative #3: Improving the Integration and Synchronization of Science and Technology)

CRS Report for Congress

8(A) CONTRACTING, MENTOR-PROTÉGÉ PROGRAM, & JOINT VENTURES. March 9, 2010 William T. Welch

Management of Toxic Materials in DoD: The Emerging Contaminants Program

Additive Manufacturing is making headway at NAVAIR Lakehurst

DoD Research and Engineering Enterprise

Embraer: Brazil s pioneering aviation giant

Manufacturing Readiness Levels (MRLs) and Manufacturing Readiness Assessments (MRAs)

ESA EO Programmes for CM16. Introduction to proposed programmes. Industry Consultation Workshop ESRIN, Frascati, 7 June 2016

Policy Perspective: The Current and Proposed Security Framework

The Logista. Letter. from the President CONTENTS. Volume 7, Issue 1 March 2017

Advancing the Use of the Digital System Model Taxonomy

ARPA-E Technology to Market: Changing What s Possible

Digital Engineering. Phoenix Integration Conference Ms. Philomena Zimmerman. Deputy Director, Engineering Tools and Environments.

Moving from R&D to Manufacture

Module 2 Lesson 201 Project Coordinator (PC) Duties


COT&S Extension Process for Rail Transit Friction Brake Systems. Charles Turner STV Incorporated Engineering Specialist Philadelphia, PA

Dutch Underwater Knowledge Centre (DUKC)

Digital Engineering Support to Mission Engineering

AASHTO IDRRIM meeting

Follow the Yellow Brick Road

Technology & Manufacturing Readiness RMS

SPACE EXPLORATION AS A DRIVER FOR GROWTH ESA INITIATIVE TO PARTNER WITH PRIVATE SECTOR

Wave Energy Scotland Lessons Learnt

NACE International Standards & DoD Corrosion Prevention/Control Effort

DoD Research and Engineering Enterprise

ICT strategy and solutions for upstream oil and gas. Supporting exploration and production globally

JOINT CTF-SCF/TFC.15/3 November 2, Joint Meeting of the CTF and SCF Trust Fund Committees Washington, D.C. Monday, November 9, 2015

Committee on Development and Intellectual Property (CDIP)

JOCOTAS. Strategic Alliances: Government & Industry. Amy Soo Lagoon. JOCOTAS Chairman, Shelter Technology. Laura Biszko. Engineer

Air Force Small Business Innovation Research (SBIR) Program

Venture Capital Technology Panel (VCRAC) Presentation to John Young Assistant Secretary of the Navy (Research, Development, and Acquisition)

NRC Aerospace Institute for Aerospace Research. NRC-IAGT Collaborative Forum on Future Gas Turbine Challenges and Opportunities

Information Warfare Research Project

Challenges and Innovations in Digital Systems Engineering

Engineering Autonomy

DoD Engineering and Better Buying Power 3.0

The Hybrid Space Program: A Commercial Strategy for NASA s Constellation Program

EDUCATION AND TRAINING

inemi Project on Metals Recycling

IDEaS INNOVATION FOR DEFENCE EXCELLENCE AND SECURITY PROTECTION SECURITE ENGAGEMENT STRONG SECURE ENGAGED

Arshad Mansoor, Sr. Vice President, Research & Development INNOVATION SCOUTS: EXPANDING EPRI S TECHNOLOGY INNOVATION NETWORK

Communications Interoperability- Current Status

NAVY OPERATING CONCEPT (CURRENT & FUTURE READINESS)

Bridge Condition Assessment Using Remote Sensors

Other Transaction Agreements. Chemical Biological Defense Acquisition Initiatives Forum

Attachment C to Modification # 6 to VA HSMM. Schedule of Fees

How to Establish and Manage a Technology Transfer Office

Interagency Collaboration: Barriers / Solutions

A State Toolkit for Adopting IPAWS

Establishment of a Center for Defense Robotics

Click to edit Master Intro Title

DRAFT FOUR-YEAR ROLLING OPERATIONAL PLAN FOR THE RADIOCOMMUNICATION SECTOR FOR

MBtechnology: University of Michigan Transportation Institute

EXECUTIVE SUMMARY. St. Louis Region Emerging Transportation Technology Strategic Plan. June East-West Gateway Council of Governments ICF

WFEO STANDING COMMITTEE ON ENGINEERING FOR INNOVATIVE TECHNOLOGY (WFEO-CEIT) STRATEGIC PLAN ( )

Riser Lifecycle Monitoring System (RLMS) for Integrity Management

Our Acquisition Challenges Moving Forward

November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS

Ms. Lisa Sanders Director

Human Spaceflight: The Ultimate Team Activity

Human Systems COI 3/23/2018. Dr. Kevin T. Geiss Director Airman Systems Directorate 711th Human Performance Wing Air Force Research Laboratory

BY ORDER OF THE COMMANDER USTRANSCOM INSTRUCTION 61-1 UNITED STATES TRANSPORTATION COMMAND 5 JULY 2017 COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

New Approaches to Manufacturing Innovation in DOE

The Sustainable Tourism Programme of the 10-Year Framework of Programmes on Sustainable Consumption and Production

Transcription:

Workshop Debbie Lilu, CTMA Director Bill Chenevert, Senior Program Manager Marc Sharp, Project Manager

Workshop Outline Introduction Essentials of a Good CTMA Project The Concept Paper MIPR Process/Requirements Project Execution Technology Transition 2

Introduction CTMA -- the perfect vehicle to accelerate innovation at DOD maintenance and sustainment facilities Understanding key CTMA elements impacting rapid deployment of new innovation is critical to success A highly interactive Workshop is planned to help Ask questions, interrupt speakers If you don t, I will come to you. Watch out!! 3

CTMA Program -- Maintenance and Sustainment at Best Cost Unique joint NCMS/DoD partnership since 1998 Focused on DoD Maintenance and Sustainability Fosters true collaboration between DoD and industry partners, both small and large Demonstrate/pilot advanced technologies/process capabilities/asset sustainment Allows DoD to Try it before you buy It A Joint NCMS/DoD Partnership 4

The CTMA Cooperative Agreement Between OSD and NCMS; Contracting Agency Washington Headquarters Services (WHS) Effective through 2020 Project requirements to qualify: Can not be used for asset acquisition RDT&E and O&M Federal funds can be applied to the CA Focus on public good first, DoD second Must satisfy a Maintenance and Sustainment need Industry Cost Share required Multiple project partners (industry, academia, DoD Services) Project partners chosen based on best value, best cost criteria 5

Essentials of a Good CTMA Project Must satisfy a Maintenance and Sustainment*need Must have a defined public good (plus DoD) Innovative technology or process -- nearly ready for primetime Test, prove-out, demonstration, pilot, not full acquisition Meets a DoD requirement (current or future) Applicable across Joint Services preferred Funding source identified One or more partners preferred (gov t, industry, academia) Clear technology transition path identified * Defined as actions/activities that ensure longevity of valuable assets through their useful lifecycle (and beyond) think B-52 6

Essentials of a Good CTMA Project Workshop Exercise #1 7

CTMA Project Proposal 1 Protection of Historical Military Assets for Public Viewing Phase II Our military history is a very important portion of our country s historical record. Military artifacts, relics, displays commemorate the many the historical military events that shaped our history for over two centuries. Currently, a coordinated program does not exist for military as well as other historical artifacts that assures the public s best interests for an HSE perspective are fully met. A Phase I was recently completed by the Naval History and Heritage Command (NHHC). A new innovative process was developed to train inspectors, report results remotely and to identify and track mitigation actions needed to assure public safety. The process was validated through a pilot program that was launched in the state of Florida where over 200 aircraft were inspected. The team would like to launch a Phase II to complete the inspection of 1,200 aircraft and artifacts spread across the country as well as perform the needed mitigation on deficient aircraft. An estimated $2.1 M is needed to complete this phase. 8

CTMA Project Proposal 2 Research for Li-ion Battery Safety at Depot Maintenance Facilities DoD maintenance facilities continue to upgrade their fleet of maintenance vehicles and related equipment moving from lead-acid batteries to Lithium-ion. With more and more reports of fires and explosions, consideration of the safety aspects Li-ion batteries needs to be addressed. Safety features typically built into Li-ion cells (e.g., circuit interrupt device, pressure vent, and/or shutdown separator) to mitigate issues. Potential abuse issues such as thermal runaway caused by extended operation, abuse or other factors still exist. Intended to address Li-ion battery safety at a military maintenance facility related to thermal runaway, electrical failures, and mechanical abuse. The DoD maintenance depot chosen is expected to be a surrogate for commercial manufacturing facilities with similar issues. Industry (battery manufacturer and consultants), academia (research university), and the government will be members of the project team. Total project value is $675,000 with industry providing $125,00 of in-kind support. 9

Essentials of a Good CTMA Project Must satisfy a Maintenance and Sustainment*need Must have a defined public good (plus DoD) Innovative technology or process -- nearly ready for primetime Test, prove-out, demonstration, pilot, not full acquisition Meets a DoD requirement (current or future) Applicable across Joint Services preferred Funding source identified One or more partners preferred (gov t, industry, academia) Clear technology transition path identified * Defined as actions/activities that ensure longevity of valuable assets through their useful lifecycle (and beyond) think B-52 10

Formation Collaborative Project Process Define Need Define Concept ID Potential Technologies Qualify Potential Technology Providers Approval Prepare Documentation Submit for Approval Notify Project Participants Initiate Sub-Awardee Agreements Execution Kickoff Meeting Finalize Tasks, Deliverables Track Progress, Resolve Issues Monthly, Quarterly Reporting Closeout Assure Deliverables Met Quantify Benefits, Transition Plan Prepare, Issue Final Report Closeout Sub-Awardee Contracts Transition Release Report Showcase Technology Develop Requirements Document Promote Benefits across DoD 11

The Concept Paper What is it? What it isn t? Why is it needed? What must be included? Who writes it? Who approves it? Project Formation 12

Concept Paper The Essentials Follows a specific format established by WHS (approving agency) Strong focus on satisfying a public problem/need first followed by industry and DoD last Clearly articulate the benefits to the DoD and general public DoD facility/activity identified as a testbed/demonstration/pilot Must address a maintenance and sustainment need High level view of project not a statement of work Industry cost share identified Project Formation 13

Concept Paper Template 1. Overview/Background 2. Problem/Proposed Solution 3. Objective 4. Scope/Solution Approach 5. Tasks (optional -- 5,000 foot view) 6. Deliverables 7. Overall Project Costs 8. Benefits to the General Public 9. Benefits to DoD 10. Project Participants 11. Period of Performance 12. Security Requirements Project Formation 13. CTMA Program Activities (Transition Plan) 14

Concept Paper Format Font 10 point Times Roman, 1 inch margins Sections must follow Concept Paper Template (previous slide) Limited to 5-7 pages, do not include page numbers Pictures/graphics must be JPEG or PNG, not layered Project Formation 15

Sample Concept Paper Content (See handout for complete Concept Paper) 13. CTMA Program Activities In addition to its financial and programmatic management of this project, NCMS will perform technology transition efforts to disseminate the results of this initiative as appropriate across the full spectrum of DoD and most importantly to commercial sustainment activities, from field to depot maintenance and logistics. These activities are important as they allow NCMS to build strong relationships with commercial and government partners to provide a thorough understanding of the supply and maintenance needs of the industry. Project Formation 16

Key Elements - Concept Paper Addresses Maintenance and Sustainment Focuses on a Public Need/Problem Public Good Benefits Highlighted DoD Benefits Secondary Cost Share Included Program Activities (Outreach/Transition) Included High Level View of Initiative (not in the weeds) Project Formation 17

The Concept Paper Workshop Exercise #2 Project Formation 18

Key Elements - Concept Paper Addresses Maintenance and Sustainment Focuses on a Public Need/Problem Public Good Benefits Highlighted DoD Benefits Secondary Cost Share Included Program Activities (Outreach/Transition) Included High Level View of Initiative (not in the weeds) Project Formation 19

The MIPR Process/Requirements To apply funds to the CTMA CA a MIPR (Military Interdepartmental Purchase Request) is typically used The MIPR is completed by the Government Sponsor for the initiative CTMA CA accepts RDT&E, O&M and Procurement funds Research Development Test & Evaluation Funds (RDT&E) RDT&E funds must be obligated to a contract within 2 years RDT&E funds are preferred for CTMA Operations & Maintenance Funds (O&M) O&M funds must be obligated to contract within 1 year Procurement Procurement funds must be obligated to contract within 3 years Project Approval 20

CTMA CA Mod Approval Request submitted to OSD/WHS Concept Paper SF424 and SF424A MIPR & MIPR Acceptance WHS can typically process a contract modification within 30 to 45 days CTMA CA Modification approval received Project Approval 21

NCMS TEAM ROLES Project management, contract/legal & accounting administration, quarterly and Final reporting OSD, communication and outreach Government Actively participate teleconferences; engaged with and monitors tasks and deliverables Industry/Academia Actively involved with communication, cost and schedule Detailed monthly status reports/invoice Project Execution 22

TRANSITION Activities Develop project success story and announce completion of project (with abstract) in CTMA Connector Release Final Report to public, industry (based on terms of agreement with project participants and NCMS policy) Showcase Technology Brief at CTMA Partners Meeting DoD Maintenance Symposium JTEG, Joint Technology Enterprise Group Initiate Requirements Document, BCA (Government Sponsor) Promote benefits across DoD and public sector Project Transition 23

Project Transition Workshop Exercise #3 Project Examples Roadblocks that may prevent or make transition difficult Application/Demonstration to Acquisition Project Transition 24

Q&A 25

THANK YOU 26

Reference Documents Workshop Exercise #1 CTMA Project Proposals and Essentials of a Good CTMA Project for Evaluation Cost Share Sample MIPR 27

Cost Share Cost Sharing, often referred to as In-kind or Matching refers to the portion of project costs not borne by the Federal Government. There are numerous ways for project participants to provide cost share The CTMA program is a very unique program, cost share is required for all initiatives. CTMA offers the opportunity to the Government to leverage their initial investment MORE FOR THE MONEY! 28