PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: EL PASO COUNTY, TEXAS

Similar documents
FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr

Charlton/Oxford Route 20 Reconstruction Project

Updated: April 7, 2016

FM 691 CORRIDOR STUDY

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median

The Shoppes at Forney Crossings

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Purple Line Extension Section 3 Pre-Construction Community Meeting June 21, 2018

CONCEPT REVIEW GUIDELINES

DIVISION PAVEMENT MARKINGS AND MARKERS

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Locate Request Information

Update on Traffic Results and Findings

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

August 21, Luis E. Ramírez Thomas, President, RAI-N. June Activity Report

CLINTON CLOSURE DETOURS

Purple Line Extension Section 3 Pre-Construction Community Meeting March 22, 2018

Study Description. November 29, Overpass Road Alternatives Public Workshop

State Road A1A North Bridge over ICWW Bridge

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

Agenda Item No. August 28, Honorable Mayor and City Council Attention: David Van Kirk, City Manager. Dale I. Pfeiffer, Director of Public Works

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County

APPLICATION FOR SITE PREPARATION PERMIT

Minutes of the Planning & Projects Committee Meeting - Gulf Coast Freight Rail District March 3, 2009

2.8 NOISE. Chapter IX 2. Comments and Responses CONSTRUCTION NOISE. Comment

PHASE II FOR LEASE PROJECT FEATURES. Phase I - 100% Leased to FedEx Ground

WHEREAS, the Board has given consideration to the public comment entered into the public record upon said project; and

TYPICAL SECTION OF IMPROVEMENT

there are no known Critical Environmental Area(s) on the site which will be impaired as the result of the proposed Actions; and

Operating Standards Attachment to Development Application

Cotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

TRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey

King Mill Lambert DRI# 2035 Henry County, Georgia

MnDOT Contract Exhibit A- Scope of Services. Project Information -

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation

CHAPTER 26 SITE PLAN REVIEW

DESIGN PUBLIC HEARING

BOARD OF DIRECTORS MEETING MINUTES

THE PLANNING BOARD OF EFFINGHAM COUNTY, GA May 22, 2017

ATTENDING THE MEETING Robert Balogh, Chairman Marcus Staley, Vice-Chairman Bob Ross, Supervisor Harold Close, Supervisor Neil Kelly, Supervisor

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Exit 61 I-90 Interchange Modification Justification Study

Pacificans for Highway 1 Alternatives c/o Hal Bohner

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

Rail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets

Item 2. September 28, 2017

MINUTES OF REGULAR MEETING OF THE CITY PLANNING AND ZONING COMMISSION OF THE CITY OF LUFKIN, TEXAS, HELD ON THE 10TH DAY OF AUGUST, 1981, AT 5:00 P.M.

Increasing Pace of Utility Accommodations

Welcome Public Open House

B-PERMIT PLAN CHECK MANUAL

9-11 Commission to Address Emergency Preparedness

EAST BRANDYWINE TOWNSHIP PLANNING COMMISSION REGULAR SESSION Wednesday, December 6, 2017

Memorandum. Dear Ms. Allen,

SDSU NEW STUDENT HOUSING PROJECT ENVIRONMENTAL IMPACT REPORT Final EIR Comments and Responses

MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

Site Plan/Building Permit Review

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

[LLUTC L ER0000-LVRWJ10J4080; UTU ] Notice of Intent to Prepare an Environmental Assessment for the Proposed

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

Town of Greenport Planning Board Meeting Minutes for September 26, 2017

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

November 6, The Board of Public Works and Safety met in regular session in the Council Chambers on Tuesday November 6, 2018 at 9:00am.

Columbus Board of Education October 1, 2013

IOWA ORNITHOLOGISTS' UNION - Birding Sites in Story County

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

Technical Memorandum ECO-7

Appendix G. Visual Simulations and Illustrations

Summerland Planning Advisory Committee. SunPAC Meeting #31 April 28, 2011

Article 4.0 Measurements and Exceptions

DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3

ZONING BOARD OF APPEALS VILLAGE OF ROSEMONT AGENDA FEBRUARY 6, 2018 MEETING 3:00 P.M DEVON AVENUE, 2 ND FLOOR ROSEMONT, IL

ACEC OC February 22, 2017

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

MARCH 7, The invocation was given by Reverend Leland Nelson from Calvary Baptist Church.

City of Surrey Adaptive Signal Control Pilot Project

Adopt-A-Trail Project FAQs

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

Oil Spill Funds and the Opportunities they Present for Galveston Bay

Straight Line Diagram. Lawrence 37. January 2010

APC REGULATORY UPDATE NOVEMBER 16, PennDOT AND

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

Alameda Corridor-East Construction Authority THE ACE REPORT. ACE Board Chair s Message. Dear Friends:

SCOPE OF WORK AND DELIVERABLES T.H.

LCRA TRANSMISSION SERVICES CORPORATION

Town of Rotterdam Office of the Planning Commission

Abilene District Traffic Signal Timing and Capacity Analysis

Precast Concrete Pavement Background Concepts. Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001

Public School Facilities Element

MINUTES OF THE SPECIAL MEETING OF THE PLANNING BOARD HELD ON WEDNESDAY, NOVEMBER 12, 2014

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS PRINCESS PALM AVENUE, SUITE 120 TAMPA, FLORIDA

San Antonio Wrong Way Driver Initiative

Transcription:

PUBLIC HEARING LOOP 375 FRONTAGE ROADS RECONFIGURATION FROM FM 76 (NORTH LOOP DRIVE) TO ZARAGOZA PORT OF ENTRY CSJ: 2552-03-058 EL PASO COUNTY, TEXAS Del Valle High School July 25, 2018

Hearing Information Purpose of the Public Hearing: to solicit feedback from the community regarding proposed enhancements to Loop 375 from North Loop Drive to Zaragoza Port of Entry (POE) Options for Commenting: 1) Verbal comments for the official record will commence after the presentation 2) Written comments can be placed in the comment box 3) E-mail comments to: kjohnson@blantonassociates.com 4) Mail comments to: Blanton & Associates Attn: Loop 375 Frontage Roads 5 Lakeway Centre Court, Suite 200 Austin, TX 78734 Deadline for Comments: Thursday, August 9, 2018 ** Public Hearing Report will be posted at https://www.txdot.gov/inside-txdot/getinvolved/about/hearings-meetings/el-paso/072518.html when analysis is complete. 2

Public Hearing Notice 3

Introductions Elected Officials Project Team Members 4

Agenda for Tonight s Public Hearing Welcome Project Overview Environmental Overview Intermission Public Comments Adjourn Public Hearing 5

Project Location Map 6

Purpose and Need Project Purpose The purpose of the project is to improve mobility and reduce congestion on Loop 375 by extending frontage roads across the Union Pacific railroad and reconfiguring ramps. Need The project is needed to address increased traffic congestion from current and anticipated growth in the project area. 7

Project Description Extend frontage roads over the Union Pacific railroad just north of SH 20 (Alameda Avenue) and Loop 375 intersection Reconfigure ramps in both the north and southbound directions Project Length: 2.4 miles Permanent Drainage Easements: 6.03 acres Temporary Construction Easements: 2.51 acres No displacements or relocations 8

Ramp Layouts Ramps between S. Americas Avenue and Pan American Drive Replace northbound entrance ramp from S. Americas Avenue with a new entrance ramp from S. Americas Avenue braided with an exit ramp to Pan American Drive Replace southbound exit ramp to S. Americas Avenue with a new exit ramp from S. Americas Ave braided with an entrance ramp from Pan American Drive 9

Ramp Layouts Ramps between Pan American Drive and Socorro Road Remove northbound exit ramp to Socorro Road and place a new entrance ramp from Pan American Drive Remove southbound entrance ramp from Socorro Road and place a new exit ramp to Pan American Drive 10

Ramp Layouts Ramps between Alameda Avenue and North Loop Drive Replace northbound entrance ramp from Alameda Avenue and exit ramp to North Loop Drive with ramps from the frontage road extension Replace southbound exit ramp to Alameda Avenue with a ramp from the frontage road extension 11

Existing Typical Sections Loop 375 frontage roads from North Loop to Zaragoza POE Each frontage road consists of three travel lanes with two 14-foot-wide lanes and a 12-foot-wide lane 12

Proposed Typical Section near Pan American Drive Loop 375 frontage roads and ramps near Pan American Drive Each frontage road consists of three travel lanes with two 14-foot-wide lanes and a 12-foot-wide lane Ramps would consist of a 14-foot-wide travel lane with 4-foot-wide inside shoulders and 6-foot-wide outside shoulders 13

Proposed Typical Section at Union Pacific Railroad Loop 375 frontage roads at the Union Pacific Railroad Southbound: one 12-foot-wide travel lane, one 14-foot-wide shared lane, and a 5-footwide sidewalk Northbound: one 12-foot-wide auxiliary lane, one 12-foot-wide travel lane, one 14- foot-wide shared lane, and a 5-foot-wide sidewalk 14

Project Planning and Funding Total Estimated Construction Cost: approximately $31.1 Million Funding Source: Federal and State funds 15

Environmental Overview The project was processed as a categorical exclusion (CE) Technical reports evaluated impacts to the human and natural environment Potential habitat for one state-threatened species and three species of greatest conservation need - Coordination with TPWD for New Mexico garter snake No anticipated impacts to archeological resources, community features, traffic noise, or water resources Access would be maintained to adjacent businesses throughout the project area 16

Section 4(f) and Chapter 26 Drainage easements and work adjacent to and above NRHPlisted Franklin Canal and other contributing features of the El Paso County Water Improvement District #1 (Water District) De minimis 4(f): project activities would not adversely affect the activities, features, or attributes that make the properties eligible for Section 4(f) of the DOT Act Project would comply with Chapter 26 of the Texas Parks and Wildlife Code No adverse effects to historic properties are anticipated 17

Air Quality Project located in a PM 10 air quality non-attainment area Air quality conformity consultation process was conducted On June 11, 2018, the Consultation Partners determined that the project is not of local air quality concern in accordance with 40 CFR 93.116(a) 18

Reviewing Project Information Project plans and the environmental documents are available for viewing tonight These documents can also be viewed at the TxDOT El Paso District Office at 13301 Gateway West, El Paso, TX 79928 until Thursday, August 9, 2018 19

Next Steps Review and consider public hearing comments Finalize design Anticipated environmental clearance Summer 2018 Easement agreements Anticipated construction start 2019 20

Intermission Intermission: A 15-minute intermission will begin Options for Commenting: 1) Verbal comments for the official record will commence after the presentation 2) Written comments can be placed in the comment box 3) E-mail comments to: kjohnson@blantonassociates.com 4) Mail comments to: Blanton & Associates Attn: Loop 375 Frontage Roads 5 Lakeway Centre Court, Suite 200 Austin, TX 78734 Deadline for Comments: Thursday, August 9, 2018 ** Public Hearing Report will be posted at https://www.txdot.gov/inside-txdot/getinvolved/about/hearings-meetings/el-paso/072518.html when analysis is complete. 21

Verbal Comments 22

3:00 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52 2:51 2:50 2:49 2:48 2:47 2:46 2:45 2:44 2:43 2:42 2:41 2:40 2:39 2:38 2:37 2:36 2:35 2:34 2:33 2:32 2:31 2:30 2:29 2:28 2:27 2:26 2:25 2:24 2:23 2:22 2:21 2:20 2:19 2:18 2:17 2:16 2:15 2:14 2:13 2:12 2:11 2:10 2:09 2:08 2:07 2:06 2:05 2:04 2:03 2:02 2:01 2:00 1:59 1:58 1:57 1:56 1:55 1:54 1:53 1:52 1:51 1:50 1:49 1:48 1:47 1:46 1:45 1:44 1:43 1:42 1:41 1:40 1:39 1:38 1:37 1:36 1:35 1:34 1:33 1:32 1:31 1:30 1:29 1:28 1:27 1:26 1:25 1:24 1:23 1:22 1:21 1:20 1:19 1:18 1:17 1:16 1:15 1:14 1:13 1:12 1:11 1:10 1:09 1:08 1:07 1:06 1:05 1:04 1:03 1:02 1:01 1:00 0:59 0:58 0:57 0:56 0:55 0:54 0:53 0:52 0:51 0:50 0:49 0:48 0:47 0:46 0:45 0:44 0:43 0:42 0:41 0:40 0:39 0:38 0:37 0:36 0:35 0:34 0:33 0:32 0:31 0:30 0:29 0:28 0:27 0:26 0:25 0:24 0:23 0:22 0:21 0:20 0:19 0:18 0:17 0:16 0:15 0:14 0:13 0:12 0:11 0:10 0:09 0:08 0:07 0:06 0:05 0:04 0:03 0:02 0:01 0:00

Thank You for Attending Options for Commenting: 1) Verbal comments for the official record will commence after the presentation 2) Written comments can be placed in the comment box 3) E-mail comments to: kjohnson@blantonassociates.com 4) Mail comments to: Blanton & Associates Attn: Loop 375 Frontage Roads 5 Lakeway Centre Court, Suite 200 Austin, TX 78734 Deadline for Comments: Thursday, August 9, 2018 24