HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

Similar documents
APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

Site Plan/Building Permit Review

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Porter County Plan Commission

TOWN OF NORTH BRANFORD

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

OVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION

Town of Skowhegan Application For Development Review

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

Subdivision Application Checklist

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Minor Site Plan Review Process

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

PLANNING AND DEVELOPMENT

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

5.7 Plan Documentation and Supporting Information.

CONCEPT REVIEW GUIDELINES

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW

Application for Site Plan Review

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

b. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade).

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

ADMINISTRATIVE DESIGN REVIEW Information

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

Application Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

SITE PLAN APPLICATION

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

Last Name: First Name: M.I:

APPLICATION FOR SITE PREPARATION PERMIT

List of Figures. List of Forms

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

Rezoning Application for Planning Commission

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

City of Whitefish Planning & Building Department PO Box E 2 nd Street Whitefish, MT Phone: Fax:

City of Whitefish 418 E 2 nd St PO Box 158 Whitefish, MT Phone: Fax:

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

Town of Apex, North Carolina

Permit Application. General Information

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

City of Massillon Site Plan Checklist

Procedure to Petition for Plat Review and Site Plan Review

SITE PLAN REVIEW GUIDELINES Rev. 2016

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

Mussey Township Building Department. 135 N. Main, P.O. Box 118 Capac, MI Phone: Fax:

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

PLANNED SIGN PROGRAM SUBMITTAL REQUIREMENTS

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

PRELIMINARY PLAT CHECK LIST

SUBDIVISION PLAT APPLICATION

MINOR SITE PLAN APPLICATION COVER SHEET

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)

Major Site Plan Application

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)

MASTER PLAN PHASE: MINOR SUBDIVISION APPLICATION COVER SHEET

FREMONT COUNTY. APPLICATION FOR ZONE CHANGE #2 USE DESIGNATION PLAN (Requires Subsequent Approval of ZC #2 Final Designation Plan) 1.

Checklist for Tentative Subdivision Map

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

CHAPTER 26 SITE PLAN REVIEW

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION

CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS

TOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw

Essential Skills: Reading and Interpreting Maps and Plans

NON-RESIDENTIAL DEVELOPMENT

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

SECTION SITE SURVEYS

City of Palmetto Florida

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $

SITE PLAN APPLICATION - PLANNING COMMISSION

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

City of Del Mar Planning Department Submittal Checklist ADR ADMINISTRATIVE DESIGN REVIEW PERMIT

Minor Site Plan Application

Clear Creek County Site Development

REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation)

Development Application

APPLICATION FOR SITE PLAN REVIEW

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016

DESIGN REVIEW PROCESS AND APPLICATION

Minor Site Plan Application and Checklist Land Disturbing Activities

Example Plans: Business Signs (Not For Construction)

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

NEW SINGLE FAMILY HOMES

Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014

Transcription:

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use. It is understood and agreed by the applicant, that all sections of Hamilton Township Zoning Code section 3.4 are met and included with the filing of this site plan review application and subsequent zoning permit application. Knowing that the lack of any required information from this application are grounds for denial of application. A complete copy of section 3.4 of the Hamilton Township Zoning Code can be found at www.hamilton-township.org or can be requested from Township staff. Application must be submitted no less than 15 working days prior to the meeting where approval is sought. Attach five (5) detailed site plan copies of the property and any existing buildings and proposed construction. Also include a detailed elevation drawing of the structure to be built. Fill in all dimensions showing all front, side and rear yard clearances, frontage, building line, acreage, easements, any existing or proposed roadways and all adjoining properties and/or all properties that are within 200 feet of the proposed construction site property line. All site plans shall include a parking plan, landscaping plan, lighting plan, signage plan, elevation plans, a north point and be at a scale no more than 50:1. All site plans shall include the names, addresses, phone numbers, and email addresses of applicants, owners, developers, and designers. Applicant Name: Address: Land Owner Name: Address: Location Address: Subdivision: Class of Work: New: Telephone: Telephone: Lot Number: Addition: Size in square feet, restrooms and utility areas excluded: Number of Stories: First Floor sq. Second Floor sq. Existing Building Use: Proposed Building Use: Building Height: Acres: Parcel Number: Military Survey Number: Applicant Signature:

****************************************************************************** For Use of the Zoning Inspector: Zoning District: R-1 R-2 R-3 R-4 PUD B-1 B-2 M-1 M-2 Other: Main Road Frontage: Front Yard Setback: Side yard clearance: Rear Yard Setback: Right: Left: Total: Building Line: Dimensions of Building: Length: Width: Remarks: Date Filed: Date of Trustee Hearing: Date Approved: Date Disapproved: Approval Sent to Applicant: Third Party Engineering review: Date sent to TPE: Action of TPE: Fee from TPE: Impact Fee: Reviewed By: Hamilton Township Zoning Inspector Property Owners (Within 200 feet, Adjoining or Across the Street or Road From)

Name: Mailing Address:

COMMERCIAL AND INDUSTRIAL USES The attached site plan review application is necessary for the construction, addition or significant renovation of all commercial and industrial buildings or uses within Hamilton Township. The Hamilton Township Planning and Zoning Staff strongly requires a least one pre-submission meeting with the applicant before an application is formally submitted for review. These meetings are constructive, set in a friendly environment and are designed to save the applicant both time and money by addressing issues which can delay the approval of the zoning certificate. In order for the Staff of the Hamilton Township Planning and Zoning Department to review an application, the following information will be necessary: Site Plan Submission: 1. Prior to the submission of a site plan any owner, builder or developer shall first consult with the Zoning Inspector. 2. All site plans shall be submitted to the Hamilton Township Zoning Inspector. 3. The submission of a site plan shall occur at least fifteen (15) working days prior to the meeting where approval is sought. The site plan may be reviewed at an earlier meeting. The site plan shall be complete and be accompanied by a completed application form, all required fees and data. 4. Five (5) identical copies of the site plan shall be submitted. Additional copies may be requested by the Zoning Inspector. 5. All site plans shall be drawn at a scale of not more than fifty (50) feet to the inch. 6. Site plans shall be on one or more sheets which are clearly and legibly drawn. 7. A filing fee shall be established by the Hamilton Township Trustees. This fee shall be paid upon the submission of a site plan. Site Plan Contents: 1. Every site plan application shall be signed by the owner(s) of the land to which the site plan applies; if a corporation, by a duly authorized officer of the corporation; or by an authorized agent on behalf of the owner(s) or corporate officer. 2. Every site plan shall include the following: (a) The names, addresses and telephone numbers and email addresses of the owner, developer and designers.

(b) (c) (d) (e) (g) (h) Location of the property by Military Survey Number or by Section, Town, Range, Township, County and State. A vicinity map showing the boundary lines of the property including bearings and dimensions and the surrounding roadway system. The scale of the site plan, a north point and a date and a title. The zoning classification of the property included in the site plan and all adjoining properties. The names of all subdivisions and property owners and the location of all property lines within two hundred (200) feet of the property included in the site plan. Locations, widths and names of all existing streets, railroad rights-of-way, easements, permanent buildings, and corporation, township and county lines within two-hundred (200) feet of the property included in the site plan. (i) Existing grades, drainage systems and structures with topographic contours at intervals not exceeding two (2) feet for 6% to 18% slopes within fifty (50) feet of the site. (j) Proposed grades, drainage systems and structures with topographic contours at intervals not exceeding two (2) feet for 6% to 18% slopes within fifty (50) feet of the site. (k) (l) (m) (n) (o) Natural features such as wooded lots, streams, lakes, ponds, marshes, wetlands and an indication as to whether they are to be retained, removed or altered. The types of soils found on the site. All flood prone areas using the Federal Emergency Management Agency (FEMA) onehundred (100) and five-hundred (500) year flood plain as a standard. The existing and proposed uses of the property and all structures thereon. The shape, size, location, height and floor area of all proposed structures on the property with their final ground floor elevations and an indication as to whether a structure is to be retained, removed or altered.

(p) (q) (r) (s) Front, side and rear elevations of all proposed or altered structures. The location and associated dimensions of all proposed streets, driveways, parking areas and sidewalks with directional indications for oneway streets and driveways. The location and size of all existing and proposed public and private utilities such as sewer, water, cable, gas and electric facilities with an indication as to whether they will be retained, removed or altered. The locations, dimensions and other relevant data for all proposed landscaping, fences, walls or similar structures. (t) The location, dimensions, lighting and description of all signs. (u) (v) (w) (x) (y) The location, intensity (in foot-candles) and orientation of all exterior lighting including cut sheets. A plan which illustrates the manner in which surface drainage will be accommodated. This plan shall include any temporary erosion and sediment control measures to be employed during on-site construction. All drainage areas influencing or influenced by the site shall be identified. A general time schedule which indicates the anticipated starting and completion dates for construction. If the development is to be staged, indication shall be made as to how the staging is to proceed. Any additional information that may be deemed necessary for proper and complete review when a proposed development presents difficult or unusual problems. A Traffic Impact Study (TIS) shall be required for all uses creating more than ten (10) vehicular traffic trips during the peak traffic hour. Additional information including a sight distance analysis may be required by Hamilton Township or Warren County Engineer s Office as warranted.