Remote Maintenance Box, RMB

Similar documents
DEIF A/S. Application note. Generators parallel with mains Multi-line 2 version 2. Application description. Power import control. Power export control

Generator Paralleling Controller, GPC-3 TCM-2 replacement Paralleling and Protection Unit, PPU-3

Multi Differential Relay, MDR-2 DESCRIPTION OF OPTIONS

DEIF A/S. Application Notes. MDR-2 test procedures. Test of current measurement. Test of differential current measurement.

DEIF A/S. Description of options. Option H3 Serial communication Profibus DP Multi-line 2 version 2. Description of option. Functional description

PARAMETER LIST PARAMETER LIST

Option D1 Voltage/var/cos phi control Description of option Functional description

DEIF A/S. Description of options. Option H1, CAN open communication Basic Gen-set Controller. Description of option. Functional description

DEIF A/S. Description of options. Option H1 Serial communication CAN open. Description of options. Functional description. Tables.

Option H2, Modbus communication Automatic Gen-set Controller H SW version 2.33.X

DEIF A/S. Application Notes. Basic Gen-set Controller. Single generator set. Automatic mains failure. Parallel with mains (grid)

DESIGNER S REFERENCE HANDBOOK

Installation Instructions and Reference Handbook. Installation instructions

Designer s Reference Handbook. Paralleling and Protection Unit/GS Multi-line I SW version 2.4X.X. Display unit and menu structure

Option T2 Digital AVR: DEIF DVC Leroy Somer D510C Description of option Functional description

DEIF A/S. User s manual. Read synchroscope type RSQ-3. Precision LED synchronoscope. High immunity to harmonic distortion F (UK)

MS8268 HANDHELD DIGITAL MULTIMETER OPERATOR S INSTRUCTION MANUAL

JBus/Modbus Communication Card

SMART TOILET CONTROL

Electronically Commutated (EC) Motor Control with Solo, Select and Sync PWM Boards

2011 / Circuit Tracer

1 SAFETY INSTALLATION OPERATION COMPONENTS FAULT DIAGNOSTICS FUNCTIONS TECHNICAL SPECIFICATIONS...

ADC5000 SERIES. AC/DC Switch Mode Power Supplies and Rectifiers for Industrial and Telecom Applications. 60W, 125W and 250 W

MBus Interface for Energy and Power meters AEM and APM

Tablet Oscilloscope Safety Information

Tesla K20 GPGPU Card Installation Guide

GFL-1000 User Manual Ground Fault Locator

USER S MANUAL Multi-instrument, MIQ96-3

Installation and start up instructions. Detection of vector shift. Detection of over- and underfrequency. Generator disconnection on mains failure

2015 RIGOL TECHNOLOGIES, INC.

Automatic synchronising relay

Agilent U1253B True RMS OLED Multimeter. Quick Start Guide

IO-DIM4 4-Channel, Digital to Analogue Converters

Installation and start up instructions. Paralleling relay type HAS-111DG uni-line G (UK) Synchronisation of generator to busbar

Series 70 Servo NXT - Modulating Controller Installation, Operation and Maintenance Manual

Power Meter. Measurement Guide. for Anritsu RF and Microwave Handheld Instruments BTS Master Site Master Spectrum Master Cell Master

Installation & Operation Manual SAGA1-K Series Industrial Radio Remote Control

Agilent G1888 Network Headspace Sampler

Portable Appliance Testers. OmegaPAT MI 2140 BetaPAT MI 2141 User Manual Ver Code No

VOLTAGE REGULATOR R 449. Installation and maintenance. This manual must be sent to the end user R 449 X2 Z1 X1 Z2 E+ E- (12V - 10A)

Nash Chandelier Assembly and Installation Instructions

SERIES 70. R SERVO PRO Version 3.0 OPERATION AND MAINTENANCE MANUAL. The High Performance Company

Installation and start up instructions. Synchroniser type FAS-115DG uni-line H (UK) Synchronisation of generator to busbar

Programmable Process Temperature Controller

POWER TRACE TM TASCO, INC.

ELECTRICIAN S THEORY EXAMINATION 17 November 2012 QUESTION AND ANSWER BOOKLET

ModieLoad. Static capacitive load unit 9.8A 240vac single phase. CAUTION: Ensure only Phase to Neutral connection CAT IV 300V

PRODUCT SAFETY SOLUTIONS MODEL HWI-01. Model HWI-01 Serial Number:

MADELINE METAL CHANDELIER

Installation and start up instructions. Synchroniser type FAS-113DG uni-line F (UK) Synchronisation of generator to busbar

Woven Leather Chandelier Large Assembly and Installation Instructions

NRU Diode Replacement

Your Global Flow Control Partner. Series 70 SERVO PRO Version 3.0 Operation and Maintenance Manual

Operating Instructions PROFITEST H+E TECH. Diagnostics Unit for Electric Charging Stations (Type 2 Connector Socket and Plug) /3.

AcuteB Head. User s Guide

EurotestEASI MI 3100 SE MI 3100 s Instruction manual Version 1.1, Code no

ALPTEC POWER FACTOR CONTROLLER

4S, 5S, 5A, 6S, 6A, 8S, 9S, 10S, 10A, 26S, 29S, 35S, 35A, 36S,

Utility Interconnection and System Protection

APS M1P Single-phase Micro-inverter Installation and User Manual

Radio Control Installation and Operating Instructions System 4

Circuit Breaker Finder

Please note that Robots can move without warning, wear eye protection at all times and never touch a powered robot!

WATERFLUX 3000 Quick Start

Electrical Safety Tester

PPS MFS series - Installation Guide. Power Protector Stabilizer V 3.8 1

AM-510 Commercial / Residential Multimeter. AM-510-EUR Digital Multimeter. Users Manual

QL55 Series Luminescence Sensor

USER MANUAL KADABXXTBLA

WRM-10 TM TRANSFORMER WINDING RESISTANCE METER

Model 4210-MMPC-L. Multi-measurement Prober Cable Kit. Overview. Quick start guide topics. Related documents

TUCANA-02 P PORTABLE END MILLING MACHINE USER S MANUAL

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :

4. CONNECTIONS. Make sure all connections to and in your Universal Rectifier are tight.

PT-2000series AC/DCcurrentprobe PT-2710 PT-2720 PT-2740 PT-2770 MANUAL INSTRUCTION

R180. AVRs. Installation and maintenance

3B SCIENTIFIC PHYSICS

USER'S MANUAL DMR-2400

Industrial motor controller for brushed DC motors 24 VDC

FLUSH CONTROL Installation, Operation and Maintenance Instructions Part# STCBL

MINI PARALLEL REMOVER. Instruction Manual

CHAINSAW SHARPENER MODEL: ECSS-1

APS M1P Single-phase Micro-inverter Installation and User Manual

Installation Instructions

1000 SERIES INSTALLATION SUPPLEMENT Rev. 7/1/10

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS

Grid Radar Installation Manual

SMART TOILET CONTROL

User s Manual. MiniTec TM Series. Model MN26 (Model MN26T includes temperature probe) Mini Autoranging MultiMeter

OPERATION & SERVICE MANUAL FOR FC 110 AC POWER SOURCE

HAWK5000 Operators Manual

1000 SERIES INSTALLATION SUPPLEMENT Rev

Description of CERTO controller Standard

WATERFLUX 3000 Quick Start

EM420A/420B DIGITAL MULTIMETER OWNERS MANUAL Read this owners manual thoroughly before use

Electronic Circuit Breaker BASIC SMART. - Number of available output channels: 2 / 4 / 8

- Wiring Brochure Universal Reset Module 423e

ELECTRICAL MAINTENANCE SKILLS

Figure 1. Why is iron a suitable material for the core of a transformer?

DVM98. True RMS Digital Multimeter. 1 Safety information. 1.1 Preliminary. 1.2 During use

Transcription:

OPERATOR S MANUAL Remote Maintenance Box, RMB Warnings and legal information Operating procedure Voltage measurement Document no.: 4189340730B SW version AGC 3.40.0 or later and AGC 4.00.0 or later

Table of contents 1. WARNINGS AND LEGAL INFORMATION... 3 LEGAL INFORMATION AND RESPONSIBILITY... 3 ELECTROSTATIC DISCHARGE AWARENESS... 3 SAFETY ISSUES... 3 DEFINITIONS... 3 2. RMB OPERATING PROCEDURE... 4 OFF... 4 START GENERATOR... 5 GENERATOR SYNCHRONISATION... 5 DELOAD MAINS... 7 ISLAND... 7 SYNCHRONISATION TO MAINS... 9 DELOAD GENERATOR... 9 STOP... 10 DEIF A/S Page 2 of 10

1. Warnings and legal information This chapter includes important information about general legal issues relevant in the handling of DEIF products. Furthermore, some overall safety precautions will be introduced and recommended. Finally, the highlighted notes and warnings, which will be used throughout this handbook, are presented. Legal information and responsibility DEIF takes no responsibility for installation or operation of the generator set or the remote maintenance box. If there is any doubt about how to install or operate the generator set controlled by the unit, the company responsible for the installation or the operation of the set must be contacted. The units are not to be opened by unauthorised personnel. If opened anyway, the warranty will be lost. Electrostatic discharge awareness Sufficient care must be taken to protect the terminals against static discharges during the installation. Once the unit is installed and connected, these precautions are no longer necessary. Safety issues Installing and operating the unit implies work with dangerous currents and voltages. Therefore, the installation should only be carried out by authorised personnel who understand the risks involved in working with live electrical equipment. Be aware of the hazardous live currents and voltages. Do not touch any AC measurement inputs as this could lead to injury or death. Definitions Throughout this document, a number of notes and warnings will be presented. To ensure that these are noticed, they will be highlighted in order to separate them from the general text. Notes The notes provide general information which will be helpful for the reader to bear in mind. Warnings The warnings indicate a potentially dangerous situation which could result in death, personal injury or damaged equipment, if certain guidelines are not followed. DEIF A/S Page 3 of 10

2. RMB operating procedure To make sure that the operator understands the different functions and situations, this document gives a step-by-step description of the operation of the generator and the use of the remote maintenance box. A picture of the function selector switch s position together with a simple diagram of the application will be given for each step. Before operating the RMB or using this document, it is recommended to have read the Designers Reference Handbook. DEIF recommends that the operator always uses this manual for reference when operating the RMB if questions should arise. OFF Before the genset is started: Manually connect the cables from the generator to the busbar or transformer. Connect the two cables (voltage measurement and data cable) from the RMB to the generator s connections plug and socket. Select Remote maintenance at parameter; Genset Mode menu 6070. Make sure that the cable between the genset and busbar or transformer is correctly mounted and properly tightened. DEIF A/S Page 4 of 10

Start generator Start the generator by turning the function selector to Start generator. Phase sequence A check of the phase sequence (rotation) is especially required when connecting equipment to a new voltage source, therefore it is strongly recommended that the phase rotation is checked, this can for instance be checked with a DEIF phase sequence relay type RMT-111Q96. When all three phases are used to measure the voltage, the AGC-3 and AGC-4 will automatically run a phase sequence check. When measurement is carried out with one phase and neutral only, phase sequence check is not possible at the AGC-3 or AGC-4. DEIF A/S Page 5 of 10

Generator synchronisation When the generator is running (is shown on the display), the operator has to: Make sure that the voltage and frequency is OK. This is indicated by a LED on the display. Turn the function selector to Generator synchronisation. This will force the generator to make a dynamic synchronisation to the mains and close the generator breaker. The synchronisation will be shown on the display. The generator will run with a minimum of load until the next step is activated. Minimum load is adjusted in parameter 7023, and the default value is 5% of the nominal power. DEIF A/S Page 6 of 10

Deload mains Deload mains (load takeover) is done by: Adjusting the control settings for the power factor; this is done in parameter 7050. Turning the function selector to Deload mains. The operator can now adjust the generator power by means of the power switch. The operator can measure the current flow by means of a hand-held ammeter, this is done at the mains side cable, and when the mains is deloaded, the mains breaker can be opened or the fuses can be removed. When controlling the generator power via the power switch, it is recommended to have both actual and current power reference in the display view. It is described in the Installation Instructions and Reference Handbook of the RMB how to programme this, and it applies to both AGC-3 and AGC-4. When deloading the mains, a short activation, up to 1 sec., of the power switch will change the setpoint with 1 kw. If the power switch is activated for more than 1 sec., it will add 5 kw to the setpoint, and if it is activated for more than 3 sec., it will add 10 kw to the offset. When the fuses are removed, the generator will still be in fixed power mode, so to force the generator to switch from power regulation to frequency regulation, the operator has to turn the function selector to Island as quickly as possible. Be aware that in some cases a second source may provide power to the busbar without the operator s knowledge (ring coupling or wrapped busbar). DEIF A/S Page 7 of 10

Island When the load is taken by the generator and the mains is disconnected: Turn the function selector to Island, and the generator will now run in a normal island operation with frequency regulation. When the genset is running in island, it is possible to disconnect the Remote Maintenance Box without stopping the genset. The generator will continue running in island mode. Reconnection of the RMB is easily done via the data cable, and the communication is automatically started. DEIF A/S Page 8 of 10

Synchronisation to mains The synchronisation to mains is done by: Connecting the voltage measurement line between the voltage mains connection points on the box and the mains connection point (fuses/breaker). Check the phase rotation Switching the function selector to Synchronisation to mains. The generator will now make a static synchronisation, and when the synchroscope in the display is stable at 12 o clock, a lamp will come on and a buzzer will be activated to give a clear signal to the operator. Closing the mains breaker or connecting the fuses. Three-phase measurement All three phases are connected on the Remote Maintenance Box. When using three-phase measurement, it is not necessary to connect the neutral, as it is calculated internally by the AGC-3 and AGC-4 controllers. One-phase measurement Only one phase (L1) and neutral are connected on the Remote Maintenance Box. This can only be done if the neutral of the generator and the transformer are correctly connected, so the common measurement point is the same. It is the operator s responsibility to make sure that the voltage reference line is connected correctly and the phase sequence is OK, before closing the breaker or connecting the fuses. DEIF A/S Page 9 of 10

Deload generator The mains is now reconnected and the generator can be deloaded: Turn the function selector to Deload generator, and the generator will automatically deload and open the generator breaker. Stop The generator can now be disconnected: The operator can stop the generator by turning the function selector to Stop. After a cooling down time, set by the operator, the generator will stop automatically. Now the generator has fulfilled a maintenance job, and it can be moved to another job. DEIF A/S reserves the right to change any of the above. DEIF A/S Page 10 of 10