THE INSTLLING INSTRUCTION FOR CONCELED TNK Important remind: FFL ccessories List:. Please read through this Instructions carefully prior to installation, and our company shall not be responsible for any loss caused by not installating accrding with this Instructions. There are lubricants in production for toilet bowl installation.. Please confirm the FFL according to the overall indoor fitment method. Line out the FFL on the wall and always regard FFL as datum line of 0 height. 3.Please confirm the thickness of the floor exceed 80mm and it can bear more than 300kgf strength when the strength act on the front of toilet bowl. Note:.Please install the frame before paving the tiles. The dimensional unit is millimeter..please subject to the object as right if it is not in conformity with the components in picture. FFL of finish face, all dimension is millimeter 300kgf 9 8. 8.3 8. 8 7. 7. 7. Straight flush pipe of some products are offered with two kinds of seal gaskets. which can be selected according to toilet bowl type during installation. 0 FFL NO. NME QTY FUNCTION Expansion bolt components 4 To fix frame Protection frame For space reservation of push button plate when building the wall 3 Protection cover To prevent sundries falling into the tank when fitment 4 5 6 7. 7. 8. 8. 8.3 Clamp Drainage pipe Flush pipe Drainage straight pipe components Flush straight pipe components Long bolt Transparent long bolt shield Long bolt components To fix drainage pipe To drain To supply water to flush To connect the bended pipes to toilet bowl To fix toilet bowl To shield long bolt To fix toilet bowl 9 Plug To reserve space for straight pipes when laying bricks 0 ngle valve On-off For Filling Water 563307 4-.0
. Dimensions and Supply Pipe-laying Top inlet 500 46 000 G/ 40 095 35 30 80 0 400-0 40(40~40) 00 30 FFL 0 0~00 35 ack inlet 500 46 000 G/ 05.5 0 400-0 40 FFL 0 0~00 360 85
.Drainage Pipe Installation W 60~80 Remind: The function of drainage would be worse when the installation angle of drainage pipe exceed 45 PositionW=40~60 PositionW=60~80 Install drainage pipe clamp. 45(W=60~80) When excretory tube lean 45 it can only be fixed in Position (W=60~80). If necessary, adjust the clamp and drainage pipe location according to the bowl dimension. (Keep this clamp tightened to professionals!)
3.Drill on the floor. 0X50 0XDrill50.. 3. 0mm 50mm 85 360 0 4. 5. 6. 0X50mm 360 85.0X50. 3. 4. 5. s shown on picture:.drill 0*50. Insert expansion bolt 3. Tighten nut to strain bolt; 4. Unscrew nut; 5.Hold screw and washer for later use. 4. djust floor-fixing bracket : Floor-fixing bracket
5. djust horizontally and vertically, and tighten bolt: 3 9 Supply pipe ngle valve Please pre-tighten bolt, and tighten after bracket adjustment. Flexible hose connecting inlet valve Install angle valve, connect it to inlet valve with hose. D E C F Click Click
6.Install Plug: Click 30 80 For the fixing of the long screw, there are two groups of screw holes on the bracket which are of different distance. Please choose the right position according to the size of the toilet bowl. Sketch of installed frame Important remind: When the concealed tank fixed completely, it is important to test leaking with water upon hours before fixing wall. 0~60mm 7.The thickness of fixed wall is 0~60mm (measured from the front of frame to the finished tile surface) 0~60
8.Install toilet bowl.. 3. Set Straight Pipes into Flush end and Drain end properly, and marks lines. 4. 5. 6. dd lubricant onto the Rubber Gaskets of two Straight Pipes and set them into owl.flush Pipe seal Gasket assembly see 3., 3. and 3.3. L L L+6mm L+3mm Mark lines as shows. L is the distance of two marks on Flush Straight Pipe, and L is that of two marks on Drainpipe Straight Pipe. 7. 8. 9. Cut Straight Pipe just as shows. Chamfer and trim the cutting edges on the shortened Straight pipes (as shows). Take out the sponge with silicon oil and smear it on connecting edges of Straight Pipe and ends. 0... d djusting length for olt is d+5mm as shows. First install Drain Straight Pipe into Drain end, and second install Flush Straight Pipe into Hole on owl. Install owl. Station owl properly.
3. 3. 3.3 9.Installation of tank fittings: 3 4 5 The tank fittings have been installed before leaving factory. The above sketches are only for reference. ll data contained is based upon the last product information available at the time of publication. We reserves the right to implement changes of product characteristics, packaging and availability at any time without further notice. TOTO (CHIN) CO., LTD. fter Service Free Tel: 800-80-9787 Mobile telephone:400-80-9787
5. djust horizontally and vertically, and tighten bolt: 3 9 Supply pipe ngle valve Please pre-tighten bolt, and tighten after bracket adjustment. Flexible hose connecting inlet valve Install angle valve, connect it to inlet valve with hose. D E C F Click Click
6.Install Plug: Click 30 80 For the fixing of the long screw, there are two groups of screw holes on the bracket which are of different distance. Please choose the right position according to the size of the toilet bowl. Sketch of installed frame Important remind: When the concealed tank fixed completely, it is important to test leaking with water upon hours before fixing wall. 0~60mm 7.The thickness of fixed wall is 0~60mm (measured from the front of frame to the finished tile surface) 0~60
8.Install toilet bowl.. 3. Set Straight Pipes into Flush end and Drain end properly, and marks lines. 4. 5. 6. dd lubricant onto the Rubber Gaskets of two Straight Pipes and set them into owl.flush Pipe seal Gasket assembly see 3., 3. and 3.3. L L L+6mm L+3mm Mark lines as shows. L is the distance of two marks on Flush Straight Pipe, and L is that of two marks on Drainpipe Straight Pipe. 7. 8. 9. Cut Straight Pipe just as shows. Chamfer and trim the cutting edges on the shortened Straight pipes (as shows). Take out the sponge with silicon oil and smear it on connecting edges of Straight Pipe and ends. 0... d djusting length for olt is d+5mm as shows. First install Drain Straight Pipe into Drain end, and second install Flush Straight Pipe into Hole on owl. Install owl. Station owl properly.
3. 3. 3.3 9.Installation of tank fittings: 3 4 5 The tank fittings have been installed before leaving factory. The above sketches are only for reference. ll data contained is based upon the last product information available at the time of publication. We reserves the right to implement changes of product characteristics, packaging and availability at any time without further notice. TOTO (CHIN) CO., LTD. fter Service Free Tel: 800-80-9787 Mobile telephone:400-80-9787