Falmouth Bay Short Term Test Site for Marine Energy Converters

Similar documents
The South West Makes Waves In Scotland

SIMON HINDLEY MENG, AMRINA MANAGING DIRECTOR, NAVAL ARCHITECT

Tidal Energy. Transmission & Distribution Network. Wind Energy. Offshore Substation. Onshore Substation. Tidal Stream Energy.

Founding Manifesto Friends of Floating Offshore Wind 18 May 2016

Subsea infrastructure in MRE ICOE November 6, By Don Bryan, BSc, MBA General Manager Pacific Northwest Operations

Emerging Subsea Networks

Development of All Synthetic Fairlead, Mooring line & Anchor System

Western Isles HVDC Link Consultation

Kinsale Area Gas Fields Decommissioning Project Information Leaflet

South Coast Marine Cluster. World Leading Innovation-led Marine & Maritime Cluster

Offshore Drilling Rigs

MAERSK SUPPLY SERVICE. Actively taking part in solving the energy challenges of tomorrow

Moorings & Foundations Richard Yemm

An insights report by the Energy Technologies Institute. Offshore Wind Floating Wind Technology

An insights report by the Energy Technologies Institute. Offshore Wind Floating Wind Technology

Before the EPA Trans-Tasman Resources Ltd Ironsands Extraction Project

Experienced project management Total flexibility of the workforce Modern drydocking facilities

Seagreen Wind Energy Limited C/o SSE Renewables 1 Waterloo Street Glasgow G2 6AY

INTERNATIONAL. June 2017 Volume 13. A Buoyant Future. Reducing Cost and Risk in Floating Offshore Wind

RENEWABLE ENERGY TECHNOLOGY ACCELERATOR (RETA) PROJECT

Discipline. Technology TECHNOLOGY DEVELOPMENT. Technology WITHIN SBM OFFSHORE

ENVIRONMENTAL ASSESSMENT (EA) PROCESS

THE MARINE PARTNER OF CHOICE

Environmental and non-technical impacts of lean principles applied to offshore wind farms

Pelastar TLP Floating Wind Turbine Foundation

ACOUSTIC LIFE CYCLE ASSESSMENT OF OFFSHORE RENEWABLES IMPLICATIONS FROM A WAVE-ENERGY CONVERTER DEPLOYMENT IN FALMOUTH BAY, UK

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Angola Brazil Mooring Egypt Equatorial Guinea Capabilities Malaysia Mexico Norway Singapore United Kingdom United States

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Aedán Smith Head of Planning, RSPB Scotland

tides waves tapping The case for marine energy Lauren Smith Jorge Seaman Siah Hwee Ang

James Fisher and Sons PLC. Marine Energy Supply Chain 14 th September 2017

The offshore wind puzzle getting the pieces right

Marine Renewables Commercialisation Fund: Array Technology Innovation Programme. Angus Vantoch-Wood

Emerging Subsea Networks

ETSU V/06/00187//REP; DTI Pub/URN 01/799 (for Ove Arup reference:

Brae Area Pre Decommissioning MARATHON BRAE. Brae Area Decommissioning Programme. June Revision 1.0

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa

Wind Turbine Decommissioning in the UK Offshore Zone

The first Floating Wind Turbine in France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018

SET-PLAN IMPLEMENTATION

Hayle Harbour. Coastal Community Team Project. Project Report Proposal Letter

EXISTING MARINE RENEWABLE ENERGY ROAD- MAPS

The future of offshore wind in the US

The Application of the Business Model Canvas. Joseph Kelly Eoin Moynihan

Gulfstar One FPS. Nathan Davidson. February 26, 2015

Update on Ireland Marine Renewables Infrastructure Industry Research. Raymond Alcorn

Wind Energy Technology Roadmap

Oil & Gas T T S O I L & G A S.

Driving Cost Reductions in Offshore Wind THE LEANWIND PROJECT FINAL PUBLICATION

Wave Energy Systems Technology Readiness Levels ESBIoe-WAV Rev. 2 Oct 2012

PORT OF POOLE DEVELOPING FOR THE FUTURE

Wave & Tidal Safety & Construction Guidelines

Offshore Wind Floating Turbines

MARITIME SAFETY INFORMATION

Subsea Engineering: Our Action Plan

THE BRIEF FOR THE MAINTENANCE AND/OR INSTALLATION AND/OR PROVISION OF HYDRODYNAMIC EQUIPMENT

Floating Systems. Capability & Experience

OFFSHORE SPECIALIST ENGINEERING SERVICES. ZEE Engineering Consultants

A powerful voice for your business

Design and validation challenges of floating foundations: Nautilus 5MW case. Iñigo Mendikoa Research Engineer

European Wind Energy Technology Roadmap

MOORING SOLUTIONS IN ASIA PACIFIC A SINGLE, LOCAL SOURCE OF MOORING, POSITIONING AND RIG MOVING SERVICES

MARINE PRIVATE MOORAGE APPLICATION REQUIREMENTS; EXAMPLE PLANS

Neart na Gaoithe Offshore Wind Farm. Project Update 2018

UK offshore wind industry progress to cost reduction

The International Student Offshore Design Competition (ISODC), sponsored by. Society of Mechanical Engineers (ASME), is a perfect opportunity for MIT

NSRI/ORE Subsea Technological Challenges in Offshore Wind

CALM CALM. Our Activities

Table of contents TEMPORARY WORKS DESIGN BV 1

SHORE TO SHIP FREQUENCY

REPLACING FULL MOORING SYSTEM FOR COOEC IN THE SOUTH CHINA SEA

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Richard Rickett, General Manager Engineering and Procurement - March Case Study

Getting to Grips with Offshore Handling and Assembly of Wind, Wave and Tidal Devices

French Corner. January, Thursday 18 th 16:45-18:45. 16:45 - Welcome speech, French Embassy in Norway : Tools for French-Norwegian Cooperation

Offshore Cable Installation. November 2010 John Davies Global Marine Systems Limited

RESEARCH, TESTING AND DEMONSTRATION

WHITE ROSE OILFIELD COMPREHENSIVE STUDY REPORT SUBMITTED BY:

Underwater noise survey during impact piling to construct the Burbo Bank Offshore Wind Farm.

Marine Institute Job Description

Case Study. WAVE HUB An Innovative Renewable Energy Solution

NAVAL ARCHITECTURE, OCEAN AND MARINE ENGINEERING

Summary of Changes and Current Document Status

Marine Risers. Capability & Experience

Offshore Renewable. Energy Conversion platforms Coordination. Action

IHO Presentation Offshore Renewables

RENEWABLE ENERGY SOLUTIONS. oceaneering.com

5.1 Optimal integrated combination of foundation concept and installation method

-PILOT & Industry development -Decommissioning. Audrey Banner Head of Offshore Decommissioning Unit, DECC

transmit foundation loads

Assessing Tidal Energy Resource

Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations. Presented by: James Young, JDR Engineering Director

Dry trees for cost effective solution with the Wellhead Barge: WHB

Research, testing and demonstration.

IMPLEMENTATION OF CABLE HEAD REMOTE SWITCH UNIT TO INCREASE EFFICIENCY AND PRODUCTIVITY OF ONBOARD TESTING IN THE ABSENCE OF LAND INSTALLATIONS

The WindFloat Project. February 2010

Local Contribution to the Aasta Hansteen development

Proposed Marwick Head Wave Farm Request for a Scoping Opinion December 2012

FIELD CASE STUDIES: CATHODIC PROTECTION SYSTEMS

Transcription:

Falmouth Bay Short Term Test Site for Marine Energy Converters A Description of the Proposed Facility submitted in support of FEPA / CPA Consent Applications Falmouth Harbour Commissioners University of Exeter 17 th March 2011

Contents 1. Introduction... 2 2. Background... 2 3. The Test Facility... 3 3.1 Mode of Operation... 3 3.2 Management of Test Deployments... 4 3.3 Test Site Selection... 4 3.4 Test Site Location... 5 4. Device Deployments at the Test Site... 5 4.1 Overview... 5 4.2 MECs and Mooring systems to be Deployed at the Test Site... 6 4.2.1 Bolt 2... 6 4.2.2 Searaser... 7 4.2.3 Other MECs and Mooring Systems Forming the Rochdale Envelope... 7 5. The Natural Environment... 9 5.1 The Seabed Habitat... 9 5.2 Early Consultation with Natural England... 10 5.3 Pollution Control... 10 5.3.1 Noise... 10 1

1. Introduction This document outlines the requirement and specifications for a test site to facilitate the short term testing of Marine Energy Converters (MECs) in Falmouth Bay prior to full operational deployment at a generating site such as Wave Hub. The proposed test site, in Falmouth Bay, is referred to as FabTest within this document. The document is prepared for submission to the Marine Management Organisation (MMO) to accompany an application for FEPA and CPA consent. 2. Background The construction of large-scale marine energy projects such as the 20MW Wave Hub site mark the emergence from the prototype and demonstration stage towards commercial deployment of marine energy converters (MECs). The viability and success of these renewable energy projects is strongly dependent on the reliability of the devices as this determines the amount of generated electricity and the cost for operation and maintenance. Wave Hub is creating the world s largest commercial test site for wave energy technology by providing a grid-connected socket on the seabed off the coast of Cornwall in South West England, to which wave power devices can be connected and their performance evaluated. It is expected that in the near future, groups of marine energy devices will be connected to the Wave Hub at its site 16km off the north coast of Cornwall in 50 m water depth. Whilst the Wave Hub site would provide berthing places at a Technology Readiness Level (TRL) 9 (pre-commercial to commercial), some marine energy devices will require commissioning tests at TRL 7-8 (in water system testing, demonstration and operation). Figure 1 shows the TRL levels 1-9. The viability of commercial marine energy projects will be driven by plant-performance indicators such as reliability, availability and maintainability, as these will heavily influence project cost and revenue. To obtain concise performance and reliability assessments, commissioning tests at TRL level 7-8 in moderate sea conditions will be vital. The determination of performance indicators will lead to economically viable, durable and reliable long term installations. Importantly, the FabTest site will provide the opportunity for device developers to undertake tests at a TRL 7-8 level to confirm structural integrity, response behaviour, mooring/umbilical behaviour and subsea component performance, whilst the installation is subjected to a less 2

energetic sea state than will be encountered at Wave Hub. Further, the short term deployment will be used to develop suitable monitoring systems and deployment procedures. In summary, a commissioning test at the Fabtest site will provide key evidence of capability that will be necessary for deployments at the Wave Hub site. TRL 1-3 Discovery / Concept Definition / Early Stage Development, Design and Engineering Technology Readiness Levels (TRL) TRL 4 Proof of Concept TRL 5-6 System Integration and Laboratory Demonstration TRL 7-8 In Water System Testing, Demonstration, and Operation TRL 9 Pre-Commercial to Commercial Fig 1: Technology Readiness Levels 3. The Test Facility 3.1 Mode of Operation The test site will be located within the Port of Falmouth limits and will be controlled by Falmouth Harbour Commissioners supported by an advisory / management group. Allocation of temporary berthing within the test site area will be for periods of between one day and a maximum of three months. No more than three devices will be deployed at any one time. 3

3.2 Management of Test Deployments The advisory / management group will comprise the following bodies: Falmouth Harbour Commissioners University of Exeter (Peninsula Research Institute for Marine Renewable Energy) The Marine Management Organisation The Wave Hub operating organisation Mojo Maritime Ltd (offshore marine renewable energy consultancy) A & P Falmouth Ltd (dockyard, ship re-fitters, marine engineers, fabricators) Cornwall Marine Network (local marine sector support body) The management group will defer to the independent decisions of Falmouth Harbour Commissioners in all matters relating to their statutory obligations regarding navigational safety, environmental management and operations within the port. The management group will actively administer and control the allocation of test berths within the bounds of the consents held and the port operations mentioned above. Further, the management group will rigorously apply the considerable engineering, marine engineering, hydrodynamics, naval architecture and moorings design expertise held within the group, to validate the readiness and suitability of a device / mooring system for deployment at the site. 3.3 Test Site Selection The test site area has been selected with reference to the following factors: 1. Encompass water depths (LW) between 20 m and 50 m to suit differing MECs. 2. Avoid wrecks and other fish attracting / fish holding bottom features. 3. Be wholly outside and away from the Fal and Helford SAC. 4. Avoid the main fairway into and out of Falmouth Harbour. 5. Avoid the areas frequently used for ship anchorages. 6. Remain wholly within the Falmouth port limits. 7. Be of minimum inconvenience to the local fishing community and other stakeholders. 4

3.4 Test Site Location Figure 2: Chart extract showing the boundaries of the proposed test site. Source: UK Hydrographic Office. The location and the boundaries of the test site are shown in relation to the Port limits and the SAC boundary in Figure 2. 4. Device Deployments at the Test Site 4.1 Overview It is stressed that the MEC devices to be deployed for testing at the Falmouth Bay site will not have a cable connection to shore. Some tests will not include electrical generation at all and in those cases where electrical generation forms part of the test, the electrical energy will be consumed immediately on site via an onboard or adjacent dump load. 5

A Rochdale Envelope approach is employed to describe the range extent of both MEC devices and mooring systems that this consent application includes. Marine Energy Converters will be buoyant or semi buoyant structures attached to the seabed via a mooring system and seabed anchoring. Seabed anchoring will be by means of drag embedment or gravity anchors. Seabed anchors will be deployed for the duration of a single test and retrieved on completion of the test. Mooring piles, rock bolts and suction anchors are not included within this application. Additionally, a device utilising an unguarded open water turbine (with respect to marine mammals) is also excluded from this application. 4.2 MECs and Mooring systems to be Deployed at the Test Site Two particular WEC devices are known to require a test berth during the summer of 2011, these are: Bolt 2 - Developed by Fred Olsen Renewables Ltd Searaser - Developed by Dartmouth Wave Energy Ltd These two devices are described together with their mooring systems below. 4.2.1 Bolt 2 Bolt 2 is a floating annular device of steel hull construction measuring 16 metres in diameter with the open centre of the device measuring approximately 10 metres in diameter. Energy conversion is primarily via heave and surge in relation to a seabed fixing. Each of five independent power take off units (PTOs) mounted on the deck of the hull, is moored to the seabed via a sub surface float. The PTOs convert the heave and surge motions of the hull to rotary motion which is mechanically transmitted to the generator. Auxiliary moorings provide full security to the device in the event of any critical failure within the PTO system. The hull of Bolt 2 will have a draught of approximately 0.3 metre and will have a freeboard of approximately 0.8 metre. A structure will be provided above deck level to accommodate the necessary navigational safety equipment. Seabed anchoring will be achieved by gravity anchors. 6

4.2.2 Searaser Searaser will take the form of a buoy of approximately 5 metres diameter having a deck height of approximately 0.8 metre, a draught of approximately 15 metres and an upper structure accommodating navigational safety equipment. The energy conversion is achieved by reacting the wave lift forces of the surface float against a seabed fixing with a subsurface float element contributing to the stability of the device. Searaser does not itself generate electricity, rather it pumps water ashore or to a floating generating station. In this case (in Falmouth Bay) Searaser will simply pump water from the sea and return it directly to the sea. Searaser is expected to employ a three limbed catenary mooring system with a drag embedment anchor on each of the three limbs. 4.2.3 Other MECs and Mooring Systems Forming the Rochdale Envelope Other marine energy converters that will potentially require short term testing at the Falmouth Bay site will take one of the following physical forms: A substantially buoy shape device e.g. the OPT PB40 and the PB150 WECs (Figure 3). A substantially box shape device e.g. the Oceanlinx WEC device (Figure 4). A substantially tubular shaped device e.g. Pelamis (Figure 5). Figure 3: OPT PB40 WEC Figure 4: Oceanlinx WEC 7

Figure 5: Pelamis Other variants might include non rectangular box type forms e.g. the OWEL Grampus WEC (Figure 6) and floating platform constructions such as the Blue H floating wind platform (Figure 7). The dimensions of the devices will vary but indicative maximum sizes are given as: 30 m diameter for a buoy form 30 m x 30 m (or equivalent area in plan) for a box form 35 m x 35 m (or equivalent area in plan) for a platform 180 m long for a tubular form. Figure 6: OWEL Grampus WEC Figure 7: Blue H floating wind platform 8

Power take off mechanisms will include hydro turbines (guarded for mammals), air turbines, hydraulic systems and mechanically driven linear / rotary generators. As previously stated, seabed anchors will be drag embedment or gravity anchors. Gravity anchors will be of steel, iron or concrete construction. Any loose ballast included within a gravity anchor (e.g. sand gravel etc) will be sealed so that no exchange with seawater is possible. Mooring systems will comprise wire rope, fibre rope, steel chain, sub-surface floats and coupling components (e.g. shackles, swivels etc). It is expected that the maximum number of mooring limbs will be 12 in the case of a box shape device. 5. The Natural Environment 5.1 The Seabed Habitat Figure 8: The seabed habitat Source: Defra, Natural England & JNCC via website http://www.mczmapping.org/# 9

Figure 8 shows the three types of seabed habitat found within the proposed test site, these are: Low energy rock in the area with a depth of less than 20 m. Maerl gravel (dead maerl) in the area 20 m - 30 m deep. Sand in the area 30 m - 50 m deep. 5.2 Early Consultation with Natural England Falmouth Harbour Commissioners have undertaken early stage consultation with Natural England s Truro office. The outcome of this contact was not unfavourable and did not seem to suggest that the site would be deemed inappropriate during any forthcoming consenting process. 5.3 Pollution Control MEC device developers seeking a test berth at the Falmouth Bay site will be required to provide a detailed pollution prevention / control plan in advance of the allocation of a berth. Such a plan will need to demonstrate that the deployment will not breach existing Port regulations concerning pollution and that it will abide by any further constraints detailed in the Fabtest site consents. 5.3.1 Noise Noise pollution by MECs can be considered in four categories, the product of the following: Sound transmitted through the water. Sound transmitted through the air. Sound generated during construction and decommissioning. Sound generated during operation. The two noise components associated with construction / decommissioning are less relevant in the case of Fabtest due to the exclusion of piled / drilled / bolted seabed anchors. The University of Exeter, supported by Falmouth Harbour Commissioners, will work together with each individual MEC device developer to monitor and quantify the sound outputs of the devices deployed for test. 10